SlideShare ist ein Scribd-Unternehmen logo
1 von 39
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1
Project management
Transport Eng. AB Hamza
Afghanistan Railway Authority,
MPW
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 2
Objectives
To explain the main tasks undertaken by project
managers
To introduce software project management and to
describe its distinctive characteristics
To discuss project planning and the planning process
To show how graphical schedule representations are
used by project management
To discuss the notion of risks and the risk
management process
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 3
Topics covered
Management activities
Project planning
Project scheduling
Risk management
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 4
Concerned with activities involved in ensuring
that software is delivered on time and on
schedule and in accordance with the
requirements of the organisations developing
and procuring the software.
Project management is needed because
software development is always subject to
budget and schedule constraints that are set
by the organisation developing the software.
Software project management
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 5
The product is intangible.
The product is uniquely flexible.
Software engineering is not recognized as an
engineering discipline with the sane status as
mechanical, electrical engineering, etc.
The software development process is not
standardised.
Many software projects are 'one-off' projects.
Software management distinctions
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 6
Proposal writing.
Project planning and scheduling.
Project costing.
Project monitoring and reviews.
Personnel selection and evaluation.
Report writing and presentations.
Management activities
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 7
These activities are not peculiar to software
management.
Many techniques of engineering project
management are equally applicable to
software project management.
Technically complex engineering systems tend
to suffer from the same problems as software
systems.
Management commonalities
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 8
Project staffing
May not be possible to appoint the ideal people to
work on a project
• Project budget may not allow for the use of highly-paid
staff;
• Staff with the appropriate experience may not be
available;
• An organisation may wish to develop employee skills
on a software project.
Managers have to work within these constraints
especially when there are shortages of trained staff.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 9
Project planning
Probably the most time-consuming project
management activity.
Continuous activity from initial concept through
to system delivery. Plans must be regularly
revised as new information becomes available.
Various different types of plan may be
developed to support the main software
project plan that is concerned with schedule
and budget.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 10
Types of project plan
Plan Description
Quality plan Describes the quality procedures and standards that will be
used in a project.
Validation plan Describes the approach, resources and schedule used for
system validation.
Configuration
management plan
Describes the configuration management procedures and
structures to be used.
Maintenance plan Predicts the maintenance requirements of the system,
maintenance costs and effort required.
Staff development
plan.
Describes how the skills and experience of the project team
members will be developed.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 11
Project planning process
Establish the project constraints
Make initial assessments of the project parameters
Define project milestones and deliverables
while project has not been completed or cancelled loop
Draw up project schedule
Initiate activities according to schedule
Wait ( for a while )
Review project progress
Revise estimates of project parameters
Update the project schedule
Re-negotiate project constraints and deliverables
if ( problems arise ) then Initiate technical review and possible revision
end if
end loop
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 12
The project plan
The project plan sets out:
• The resources available to the project;
• The work breakdown;
• A schedule for the work.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 13
Project plan structure
Introduction.
Project organisation.
Risk analysis.
Hardware and software resource
requirements.
Work breakdown.
Project schedule.
Monitoring and reporting mechanisms.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 14
Activity organization
Activities in a project should be organised to
produce tangible outputs for management to
judge progress.
Milestones are the end-point of a process
activity.
Deliverables are project results delivered to
customers.
The waterfall process allows for the
straightforward definition of progress
milestones.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 15
Milestones in the RE process
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 16
Project scheduling
Split project into tasks and estimate time and
resources required to complete each task.
Organize tasks concurrently to make optimal
use of workforce.
Minimize task dependencies to avoid delays
caused by one task waiting for another to
complete.
Dependent on project managers intuition and
experience.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 17
The project scheduling process
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 18
Scheduling problems
Estimating the difficulty of problems and hence
the cost of developing a solution is hard.
Productivity is not proportional to the number
of people working on a task.
Adding people to a late project makes it later
because of communication overheads.
The unexpected always happens. Always
allow contingency in planning.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 19
Bar charts and activity networks
Graphical notations used to illustrate the
project schedule.
Show project breakdown into tasks. Tasks
should not be too small. They should take
about a week or two.
Activity charts show task dependencies and
the the critical path.
Bar charts show schedule against calendar
time.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 20
Task durations and dependencies
Activity Duration (days) Dependencies
T1 8
T2 15
T3 15 T1 (M1)
T4 10
T5 10 T2, T4 (M2)
T6 5 T1, T2 (M3)
T7 20 T1 (M1)
T8 25 T4 (M5)
T9 15 T3, T6 (M4)
T10 15 T5, T7 (M7)
T11 7 T9 (M6)
T12 10 T11 (M8)
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 21
Activity network
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 22
Activity timeline
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 23
Staff allocation
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 24
Risk management
Risk management is concerned with
identifying risks and drawing up plans to
minimise their effect on a project.
A risk is a probability that some adverse
circumstance will occur
• Project risks affect schedule or resources;
• Product risks affect the quality or performance of
the software being developed;
• Business risks affect the organisation developing
or procuring the software.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 25
Software risks
Risk Affects Description
Staff turnover Project Experienced staff will leave the project before it is finished.
Management change Project There will be a change of organisational management with
different priorities.
Hardware unavailability Project Hardware that is essential for the project will not be
delivered on schedule.
Requirements change Project and
product
There will be a larger number of changes to the
requirements than anticipated.
Specification delays Project and
product
Specifications of essential interfaces are not available on
schedule
Size underestimate Project and
product
The size of the system has been underestimated.
CASE tool under-
performance
Product CASE tools which support the project do not perform as
anticipated
Technology change Business The underlying technology on which the system is built is
superseded by new technology.
Product competition Business A competitive product is marketed before the system is
completed.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 26
The risk management process
Risk identification
• Identify project, product and business risks;
Risk analysis
• Assess the likelihood and consequences of these
risks;
Risk planning
• Draw up plans to avoid or minimise the effects of
the risk;
Risk monitoring
• Monitor the risks throughout the project;
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 27
The risk management process
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 28
Risk identification
Technology risks.
People risks.
Organisational risks.
Requirements risks.
Estimation risks.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 29
Risks and risk types
Risk type Possible risks
Technology The database used in the system cannot process as many transactions per second
as expected.
Software components that should be reused contain defects that limit their
functionality.
People It is impossible to recruit staff with the skills required.
Key staff are ill and unavailable at critical times.
Required training for staff is not available.
Organisational The organisation is restructured so that different management are responsible for
the project.
Organisational financial problems force reductions in the project budget.
Tools The code generated by CASE tools is i nefficient.
CASE tools cannot be integrated.
Requirements Changes to requirements that require major design rework are proposed.
Customers fail to understand the impact o f requirements changes.
Estimation The time required to develop the software is underestimated.
The rate of defect repair is underestimated.
The size of the software is underestimated.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 30
Risk analysis
Assess probability and seriousness of each
risk.
Probability may be very low, low, moderate,
high or very high.
Risk effects might be catastrophic, serious,
tolerable or insignificant.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 31
Risk analysis (i)
Risk Probability Effects
Organisational financial problems force reductions in
the project budget.
Low Catastrophic
It is impossible to recruit staff with the skills required
for the project.
High Catastrophic
Key staff are ill at critical times in the project. Moderate Serious
Software components that should be reused contain
defects which limit their functionality.
Moderate Serious
Changes to requirements that require major design
rework are proposed.
Moderate Serious
The organisation is restructured so that different
management are responsible for the project.
High Serious
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 32
Risk analysis (ii)
Risk Probability Effects
The database used in the system cannot process as
many transactions per second as expec ted.
Moderate Serious
The time required to develop the software is
underestimated.
High Serious
CASE tools cannot be integrated. High Tolerable
Customers fail to understand the impact o f
requirements changes.
Moderate Tolerable
Required training for staff is not available. Moderate Tolerable
The rate of defect repair is underestimated. Moderate Tolerable
The size of the software is underestimated. High Tolerable
The code generated by CASE tools is i nefficient. Moderate Insignificant
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 33
Risk planning
Consider each risk and develop a strategy to
manage that risk.
Avoidance strategies
• The probability that the risk will arise is reduced;
Minimisation strategies
• The impact of the risk on the project or product will
be reduced;
Contingency plans
• If the risk arises, contingency plans are plans to
deal with that risk;
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 34
Risk management strategies (i)
Risk Strategy
Organisational
financial problems
Prepare a briefing document for senior management
showing how the project is making a very important
contribution to the goals of the business.
Recruitment
problems
Alert customer of potential difficulties and the
possibility of delays, investigate buying-in
components.
Staff illness Reorganise team so that there is more overlap of work
and people therefore understand each other’s jobs.
Defective
components
Replace potentially defective components with bought-
in components of known reliability.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 35
Risk management strategies (ii)
Risk Strategy
Requirements
changes
Derive traceability information to assess requ irements
change impact, maximise information hiding in the
design.
Organisational
restructuring
Prepare a briefing document for senior management
showing how the project is making a very important
contribution to the goals of the business.
Database
performance
Investigate the possibility of buying a higher-
performance database.
Underestimated
development time
Investigate buying in components, investigate use of a
program generator
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 36
Risk monitoring
Assess each identified risks regularly to decide
whether or not it is becoming less or more
probable.
Also assess whether the effects of the risk
have changed.
Each key risk should be discussed at
management progress meetings.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 37
Risk indicators
Risk type Potential indicators
Technology Late delivery of hardware or support software, many reported
technology problems
People Poor staff morale, poor relationships amongst team member,
job availability
Organisational Organisational gossip, lack of action by senior management
Tools Reluctance by team members to use tools, complaints about
CASE tools, demands for higher-powered workstations
Requirements Many requirements change requests, customer complaints
Estimation Failure to meet agreed schedule, failure to clear r eported
defects
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 38
Key points
Good project management is essential for project
success.
The intangible nature of software causes problems for
management.
Managers have diverse roles but their most significant
activities are planning, estimating and scheduling.
Planning and estimating are iterative processes
which continue throughout the course of a
project.
©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 39
A project milestone is a predictable state
where a formal report of progress is presented
to management.
Project scheduling involves preparing various
graphical representations showing project
activities, their durations and staffing.
Risk management is concerned with
identifying risks which may affect the project
and planning to ensure that these risks do not
develop into major threats.
Key points

Weitere ähnliche Inhalte

Was ist angesagt?

Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and trackingyenohhoney
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleGlen Alleman
 
Lecture6
Lecture6Lecture6
Lecture6soloeng
 
Software Project Managment
Software Project ManagmentSoftware Project Managment
Software Project ManagmentSaqib Naveed
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for AgileGlen Alleman
 
Spm ksp
Spm kspSpm ksp
Spm kspktosri
 
Six ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAMSix ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAMGlen Alleman
 
Building a Credible Performance Measurement Baseling
Building a Credible Performance Measurement BaselingBuilding a Credible Performance Measurement Baseling
Building a Credible Performance Measurement BaselingGlen Alleman
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling DiagramsSaqib Raza
 
Build an integrated master plan and integrated master
Build an integrated master plan and integrated masterBuild an integrated master plan and integrated master
Build an integrated master plan and integrated masterGlen Alleman
 
Integrated Program Performance Management
Integrated Program Performance ManagementIntegrated Program Performance Management
Integrated Program Performance ManagementGlen Alleman
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringGlen Alleman
 
A credible pmb is the window to program
A credible pmb is the window to programA credible pmb is the window to program
A credible pmb is the window to programGlen Alleman
 
Calculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsCalculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsGlen Alleman
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan DevelopmentGlen Alleman
 

Was ist angesagt? (20)

Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and tracking
 
Software Project Management
Software Project ManagementSoftware Project Management
Software Project Management
 
Primavera p6 advanced project planning
Primavera p6 advanced project planningPrimavera p6 advanced project planning
Primavera p6 advanced project planning
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master schedule
 
Lecture6
Lecture6Lecture6
Lecture6
 
Software Project Managment
Software Project ManagmentSoftware Project Managment
Software Project Managment
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Process Flow and Narrative for Agile
Process Flow and Narrative for AgileProcess Flow and Narrative for Agile
Process Flow and Narrative for Agile
 
Spm ksp
Spm kspSpm ksp
Spm ksp
 
Six ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAMSix ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAM
 
Building a Credible Performance Measurement Baseling
Building a Credible Performance Measurement BaselingBuilding a Credible Performance Measurement Baseling
Building a Credible Performance Measurement Baseling
 
Software Project Scheduling Diagrams
Software Project Scheduling DiagramsSoftware Project Scheduling Diagrams
Software Project Scheduling Diagrams
 
Build an integrated master plan and integrated master
Build an integrated master plan and integrated masterBuild an integrated master plan and integrated master
Build an integrated master plan and integrated master
 
Dashboard reporting
Dashboard reporting Dashboard reporting
Dashboard reporting
 
Integrated Program Performance Management
Integrated Program Performance ManagementIntegrated Program Performance Management
Integrated Program Performance Management
 
From Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems EngineeringFrom Principles to Strategies for Systems Engineering
From Principles to Strategies for Systems Engineering
 
A credible pmb is the window to program
A credible pmb is the window to programA credible pmb is the window to program
A credible pmb is the window to program
 
Calculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile ProjectsCalculating Physical Percent Complete on Agile Projects
Calculating Physical Percent Complete on Agile Projects
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 

Andere mochten auch

11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3Ahmad Basim Hamza
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4Ahmad Basim Hamza
 
10 lecture project scheduling 2
10 lecture project scheduling 210 lecture project scheduling 2
10 lecture project scheduling 2Ahmad Basim Hamza
 
Pagrindines unix komandos
Pagrindines unix komandosPagrindines unix komandos
Pagrindines unix komandosDonatas Bukelis
 
25 08-2014-odf-report-case-of-nadezhda-savchenko-ua
25 08-2014-odf-report-case-of-nadezhda-savchenko-ua25 08-2014-odf-report-case-of-nadezhda-savchenko-ua
25 08-2014-odf-report-case-of-nadezhda-savchenko-uaodfoundation
 
Yd2605142 odf prelim_report_elections_2014_ua
Yd2605142 odf prelim_report_elections_2014_uaYd2605142 odf prelim_report_elections_2014_ua
Yd2605142 odf prelim_report_elections_2014_uaodfoundation
 
Yd1105167 sprawozdanie merytoryczne 2014 eng-fin
Yd1105167 sprawozdanie merytoryczne 2014 eng-finYd1105167 sprawozdanie merytoryczne 2014 eng-fin
Yd1105167 sprawozdanie merytoryczne 2014 eng-finodfoundation
 
Tinklo technine iranga_konspektas
Tinklo technine iranga_konspektasTinklo technine iranga_konspektas
Tinklo technine iranga_konspektasDonatas Bukelis
 
Data-Driven Marketing Roadshow DataSift - March 27, 2014
Data-Driven Marketing Roadshow DataSift - March 27, 2014Data-Driven Marketing Roadshow DataSift - March 27, 2014
Data-Driven Marketing Roadshow DataSift - March 27, 2014DDM Alliance
 
Paskaita nr1 savokos_topologija
Paskaita nr1 savokos_topologijaPaskaita nr1 savokos_topologija
Paskaita nr1 savokos_topologijaDonatas Bukelis
 
Catalogo de ventas
Catalogo de ventasCatalogo de ventas
Catalogo de ventas7480462
 
Presentationwingsnetwork
PresentationwingsnetworkPresentationwingsnetwork
PresentationwingsnetworkDavide Galli
 
Free bsd praktiniu_darbu_uzduotys
Free bsd praktiniu_darbu_uzduotysFree bsd praktiniu_darbu_uzduotys
Free bsd praktiniu_darbu_uzduotysDonatas Bukelis
 
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-engodfoundation
 
Paskaita nr7 didieji_tinklai
Paskaita nr7 didieji_tinklaiPaskaita nr7 didieji_tinklai
Paskaita nr7 didieji_tinklaiDonatas Bukelis
 

Andere mochten auch (20)

11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4
 
10 lecture project scheduling 2
10 lecture project scheduling 210 lecture project scheduling 2
10 lecture project scheduling 2
 
Final project
Final projectFinal project
Final project
 
Pagrindines unix komandos
Pagrindines unix komandosPagrindines unix komandos
Pagrindines unix komandos
 
25 08-2014-odf-report-case-of-nadezhda-savchenko-ua
25 08-2014-odf-report-case-of-nadezhda-savchenko-ua25 08-2014-odf-report-case-of-nadezhda-savchenko-ua
25 08-2014-odf-report-case-of-nadezhda-savchenko-ua
 
Yd2605142 odf prelim_report_elections_2014_ua
Yd2605142 odf prelim_report_elections_2014_uaYd2605142 odf prelim_report_elections_2014_ua
Yd2605142 odf prelim_report_elections_2014_ua
 
Yd1105167 sprawozdanie merytoryczne 2014 eng-fin
Yd1105167 sprawozdanie merytoryczne 2014 eng-finYd1105167 sprawozdanie merytoryczne 2014 eng-fin
Yd1105167 sprawozdanie merytoryczne 2014 eng-fin
 
Tinklo technine iranga_konspektas
Tinklo technine iranga_konspektasTinklo technine iranga_konspektas
Tinklo technine iranga_konspektas
 
Data-Driven Marketing Roadshow DataSift - March 27, 2014
Data-Driven Marketing Roadshow DataSift - March 27, 2014Data-Driven Marketing Roadshow DataSift - March 27, 2014
Data-Driven Marketing Roadshow DataSift - March 27, 2014
 
Paskaita nr7 windows_os
Paskaita nr7 windows_osPaskaita nr7 windows_os
Paskaita nr7 windows_os
 
Paskaita nr1 savokos_topologija
Paskaita nr1 savokos_topologijaPaskaita nr1 savokos_topologija
Paskaita nr1 savokos_topologija
 
Burabod
BurabodBurabod
Burabod
 
Usb atmintuko kodavimas
Usb atmintuko kodavimasUsb atmintuko kodavimas
Usb atmintuko kodavimas
 
Catalogo de ventas
Catalogo de ventasCatalogo de ventas
Catalogo de ventas
 
Presentationwingsnetwork
PresentationwingsnetworkPresentationwingsnetwork
Presentationwingsnetwork
 
Top画面でできる事
Top画面でできる事Top画面でできる事
Top画面でできる事
 
Free bsd praktiniu_darbu_uzduotys
Free bsd praktiniu_darbu_uzduotysFree bsd praktiniu_darbu_uzduotys
Free bsd praktiniu_darbu_uzduotys
 
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
25 04-2014-odf-45-days-of-russian-occupation-of-crimea-eng
 
Paskaita nr7 didieji_tinklai
Paskaita nr7 didieji_tinklaiPaskaita nr7 didieji_tinklai
Paskaita nr7 didieji_tinklai
 

Ähnlich wie Project Management (Soft)

Ähnlich wie Project Management (Soft) (20)

Unit-3-Risk-mgmt.ppt
Unit-3-Risk-mgmt.pptUnit-3-Risk-mgmt.ppt
Unit-3-Risk-mgmt.ppt
 
project managnement.ppt
project managnement.pptproject managnement.ppt
project managnement.ppt
 
Project Management.pdf
Project Management.pdfProject Management.pdf
Project Management.pdf
 
ch5.pdf
ch5.pdfch5.pdf
ch5.pdf
 
Software Engineering - Ch5
Software Engineering - Ch5Software Engineering - Ch5
Software Engineering - Ch5
 
Project Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk ManagementProject Scheduling, Planning and Risk Management
Project Scheduling, Planning and Risk Management
 
Project-management.ppt
Project-management.pptProject-management.ppt
Project-management.ppt
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
 
8.project management chapter 8
8.project management chapter 88.project management chapter 8
8.project management chapter 8
 
sftware cst est
sftware cst estsftware cst est
sftware cst est
 
CostEstimation-1.ppt
CostEstimation-1.pptCostEstimation-1.ppt
CostEstimation-1.ppt
 
0273710133 pp01v2
0273710133 pp01v20273710133 pp01v2
0273710133 pp01v2
 
Se-Lecture-6.ppt
Se-Lecture-6.pptSe-Lecture-6.ppt
Se-Lecture-6.ppt
 
PROJECT MANAGEMENT
PROJECT MANAGEMENTPROJECT MANAGEMENT
PROJECT MANAGEMENT
 
Introduction to Software Enigneering
Introduction to Software Enigneering Introduction to Software Enigneering
Introduction to Software Enigneering
 
Software Engineering - Ch4
Software Engineering - Ch4Software Engineering - Ch4
Software Engineering - Ch4
 
Lec01 inroduction to software cost estimation ver1.ppt
Lec01 inroduction to software cost estimation ver1.pptLec01 inroduction to software cost estimation ver1.ppt
Lec01 inroduction to software cost estimation ver1.ppt
 
Project management
Project managementProject management
Project management
 
Ch26
Ch26Ch26
Ch26
 
Software Engineering - Ch17
Software Engineering - Ch17Software Engineering - Ch17
Software Engineering - Ch17
 

Kürzlich hochgeladen

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 

Kürzlich hochgeladen (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 

Project Management (Soft)

  • 1. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 1 Project management Transport Eng. AB Hamza Afghanistan Railway Authority, MPW
  • 2. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 2 Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process To show how graphical schedule representations are used by project management To discuss the notion of risks and the risk management process
  • 3. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 3 Topics covered Management activities Project planning Project scheduling Risk management
  • 4. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 4 Concerned with activities involved in ensuring that software is delivered on time and on schedule and in accordance with the requirements of the organisations developing and procuring the software. Project management is needed because software development is always subject to budget and schedule constraints that are set by the organisation developing the software. Software project management
  • 5. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 5 The product is intangible. The product is uniquely flexible. Software engineering is not recognized as an engineering discipline with the sane status as mechanical, electrical engineering, etc. The software development process is not standardised. Many software projects are 'one-off' projects. Software management distinctions
  • 6. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 6 Proposal writing. Project planning and scheduling. Project costing. Project monitoring and reviews. Personnel selection and evaluation. Report writing and presentations. Management activities
  • 7. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 7 These activities are not peculiar to software management. Many techniques of engineering project management are equally applicable to software project management. Technically complex engineering systems tend to suffer from the same problems as software systems. Management commonalities
  • 8. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 8 Project staffing May not be possible to appoint the ideal people to work on a project • Project budget may not allow for the use of highly-paid staff; • Staff with the appropriate experience may not be available; • An organisation may wish to develop employee skills on a software project. Managers have to work within these constraints especially when there are shortages of trained staff.
  • 9. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 9 Project planning Probably the most time-consuming project management activity. Continuous activity from initial concept through to system delivery. Plans must be regularly revised as new information becomes available. Various different types of plan may be developed to support the main software project plan that is concerned with schedule and budget.
  • 10. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 10 Types of project plan Plan Description Quality plan Describes the quality procedures and standards that will be used in a project. Validation plan Describes the approach, resources and schedule used for system validation. Configuration management plan Describes the configuration management procedures and structures to be used. Maintenance plan Predicts the maintenance requirements of the system, maintenance costs and effort required. Staff development plan. Describes how the skills and experience of the project team members will be developed.
  • 11. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 11 Project planning process Establish the project constraints Make initial assessments of the project parameters Define project milestones and deliverables while project has not been completed or cancelled loop Draw up project schedule Initiate activities according to schedule Wait ( for a while ) Review project progress Revise estimates of project parameters Update the project schedule Re-negotiate project constraints and deliverables if ( problems arise ) then Initiate technical review and possible revision end if end loop
  • 12. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 12 The project plan The project plan sets out: • The resources available to the project; • The work breakdown; • A schedule for the work.
  • 13. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 13 Project plan structure Introduction. Project organisation. Risk analysis. Hardware and software resource requirements. Work breakdown. Project schedule. Monitoring and reporting mechanisms.
  • 14. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 14 Activity organization Activities in a project should be organised to produce tangible outputs for management to judge progress. Milestones are the end-point of a process activity. Deliverables are project results delivered to customers. The waterfall process allows for the straightforward definition of progress milestones.
  • 15. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 15 Milestones in the RE process
  • 16. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 16 Project scheduling Split project into tasks and estimate time and resources required to complete each task. Organize tasks concurrently to make optimal use of workforce. Minimize task dependencies to avoid delays caused by one task waiting for another to complete. Dependent on project managers intuition and experience.
  • 17. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 17 The project scheduling process
  • 18. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 18 Scheduling problems Estimating the difficulty of problems and hence the cost of developing a solution is hard. Productivity is not proportional to the number of people working on a task. Adding people to a late project makes it later because of communication overheads. The unexpected always happens. Always allow contingency in planning.
  • 19. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 19 Bar charts and activity networks Graphical notations used to illustrate the project schedule. Show project breakdown into tasks. Tasks should not be too small. They should take about a week or two. Activity charts show task dependencies and the the critical path. Bar charts show schedule against calendar time.
  • 20. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 20 Task durations and dependencies Activity Duration (days) Dependencies T1 8 T2 15 T3 15 T1 (M1) T4 10 T5 10 T2, T4 (M2) T6 5 T1, T2 (M3) T7 20 T1 (M1) T8 25 T4 (M5) T9 15 T3, T6 (M4) T10 15 T5, T7 (M7) T11 7 T9 (M6) T12 10 T11 (M8)
  • 21. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 21 Activity network
  • 22. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 22 Activity timeline
  • 23. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 23 Staff allocation
  • 24. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 24 Risk management Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project. A risk is a probability that some adverse circumstance will occur • Project risks affect schedule or resources; • Product risks affect the quality or performance of the software being developed; • Business risks affect the organisation developing or procuring the software.
  • 25. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 25 Software risks Risk Affects Description Staff turnover Project Experienced staff will leave the project before it is finished. Management change Project There will be a change of organisational management with different priorities. Hardware unavailability Project Hardware that is essential for the project will not be delivered on schedule. Requirements change Project and product There will be a larger number of changes to the requirements than anticipated. Specification delays Project and product Specifications of essential interfaces are not available on schedule Size underestimate Project and product The size of the system has been underestimated. CASE tool under- performance Product CASE tools which support the project do not perform as anticipated Technology change Business The underlying technology on which the system is built is superseded by new technology. Product competition Business A competitive product is marketed before the system is completed.
  • 26. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 26 The risk management process Risk identification • Identify project, product and business risks; Risk analysis • Assess the likelihood and consequences of these risks; Risk planning • Draw up plans to avoid or minimise the effects of the risk; Risk monitoring • Monitor the risks throughout the project;
  • 27. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 27 The risk management process
  • 28. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 28 Risk identification Technology risks. People risks. Organisational risks. Requirements risks. Estimation risks.
  • 29. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 29 Risks and risk types Risk type Possible risks Technology The database used in the system cannot process as many transactions per second as expected. Software components that should be reused contain defects that limit their functionality. People It is impossible to recruit staff with the skills required. Key staff are ill and unavailable at critical times. Required training for staff is not available. Organisational The organisation is restructured so that different management are responsible for the project. Organisational financial problems force reductions in the project budget. Tools The code generated by CASE tools is i nefficient. CASE tools cannot be integrated. Requirements Changes to requirements that require major design rework are proposed. Customers fail to understand the impact o f requirements changes. Estimation The time required to develop the software is underestimated. The rate of defect repair is underestimated. The size of the software is underestimated.
  • 30. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 30 Risk analysis Assess probability and seriousness of each risk. Probability may be very low, low, moderate, high or very high. Risk effects might be catastrophic, serious, tolerable or insignificant.
  • 31. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 31 Risk analysis (i) Risk Probability Effects Organisational financial problems force reductions in the project budget. Low Catastrophic It is impossible to recruit staff with the skills required for the project. High Catastrophic Key staff are ill at critical times in the project. Moderate Serious Software components that should be reused contain defects which limit their functionality. Moderate Serious Changes to requirements that require major design rework are proposed. Moderate Serious The organisation is restructured so that different management are responsible for the project. High Serious
  • 32. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 32 Risk analysis (ii) Risk Probability Effects The database used in the system cannot process as many transactions per second as expec ted. Moderate Serious The time required to develop the software is underestimated. High Serious CASE tools cannot be integrated. High Tolerable Customers fail to understand the impact o f requirements changes. Moderate Tolerable Required training for staff is not available. Moderate Tolerable The rate of defect repair is underestimated. Moderate Tolerable The size of the software is underestimated. High Tolerable The code generated by CASE tools is i nefficient. Moderate Insignificant
  • 33. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 33 Risk planning Consider each risk and develop a strategy to manage that risk. Avoidance strategies • The probability that the risk will arise is reduced; Minimisation strategies • The impact of the risk on the project or product will be reduced; Contingency plans • If the risk arises, contingency plans are plans to deal with that risk;
  • 34. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 34 Risk management strategies (i) Risk Strategy Organisational financial problems Prepare a briefing document for senior management showing how the project is making a very important contribution to the goals of the business. Recruitment problems Alert customer of potential difficulties and the possibility of delays, investigate buying-in components. Staff illness Reorganise team so that there is more overlap of work and people therefore understand each other’s jobs. Defective components Replace potentially defective components with bought- in components of known reliability.
  • 35. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 35 Risk management strategies (ii) Risk Strategy Requirements changes Derive traceability information to assess requ irements change impact, maximise information hiding in the design. Organisational restructuring Prepare a briefing document for senior management showing how the project is making a very important contribution to the goals of the business. Database performance Investigate the possibility of buying a higher- performance database. Underestimated development time Investigate buying in components, investigate use of a program generator
  • 36. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 36 Risk monitoring Assess each identified risks regularly to decide whether or not it is becoming less or more probable. Also assess whether the effects of the risk have changed. Each key risk should be discussed at management progress meetings.
  • 37. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 37 Risk indicators Risk type Potential indicators Technology Late delivery of hardware or support software, many reported technology problems People Poor staff morale, poor relationships amongst team member, job availability Organisational Organisational gossip, lack of action by senior management Tools Reluctance by team members to use tools, complaints about CASE tools, demands for higher-powered workstations Requirements Many requirements change requests, customer complaints Estimation Failure to meet agreed schedule, failure to clear r eported defects
  • 38. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 38 Key points Good project management is essential for project success. The intangible nature of software causes problems for management. Managers have diverse roles but their most significant activities are planning, estimating and scheduling. Planning and estimating are iterative processes which continue throughout the course of a project.
  • 39. ©Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 5 Slide 39 A project milestone is a predictable state where a formal report of progress is presented to management. Project scheduling involves preparing various graphical representations showing project activities, their durations and staffing. Risk management is concerned with identifying risks which may affect the project and planning to ensure that these risks do not develop into major threats. Key points