Project Scheduling 2
Prepared by Sebghatullah Karimi
(Junior Lecturer of Kabul Polytechnic University)
1392
Kardan University
Civil Engineering Faculty
Explain how the work environment, the
construction contract, and the project scope
influence the scheduling process.
Explain the three types of project activities used
in scheduling.
Define milestone.
Describe the characteristics of a network diagram.
2
Work breakdown structure – The organization of the
project into specific parts that can be coordinated and
controlled.
Activity – A well-defined, measurable part of the
overall project. An activity must be suitable for
assignment to a particular project team member, and
it consumes both time and resources.
Trade – A construction specialty, such as plumber,
carpenter, welder.
Submittal – A sample of an item to be procured for a
project by a supplier or subcontractor. A submittal
must be approved by the owner or designer prior to
procurement.
3
• A network schedule is graphical drawing of a logical sequence of
events to complete a project. A network-based schedule is a
powerful tool for the planning, development, and construction of
sophisticated projects.
• The development of a network-based schedule follows a logical
process that should involve most of the key project team members.
Every network schedule must begin with a complete understanding
of the project objective, as defined by the owner. The project
participants then take this objective and break it down into tasks
that provide the level of detail necessary to organize, manage, and
control the project. Once these tasks are defined, the project team
establishes the order in which the tasks are to be performed, such
that the project will be completed in an efficient manner.
• To create the network, team members decide which activities must
precede, succeed, or run concurrently with other activities. The end
result of this process is a logic diagram that accurately depicts the
order that the work will follow.
4
The preparation of a network schedule requires a careful analysis of
three factors:
The work environment. The work environment includes such
consideration as the weather, site conditions, availability of building
materials, access for deliveries, availability of power, and the
amount of construction currently occurring in the region.
The contract. A construction contract will typically include the
project completion date, milestones, incentive clauses (which
provide bonuses for early completion), liquidated damages clauses
(which provide penalties for late completion), work rules governing
safety and hiring requirements, and identification of materials and
work that will be provided by the owner. All of these considerations
will affect project organization and scheduling.
The project scope. The scope of the project, as described in the
drawings and specifications, is a major consideration in scheduling.
Drawings and specifications are the source of all the materials and
quantities used in the project and may also describe required
construction methods.
5
1. The first step in the networking process is to define
the work breakdown structure for the project.
2. From the work breakdown structure, the team
defines the specific activities that will make up the
network diagram. An activity must be suitable for
assignment to a particular project team member,
and it should consume both time and resources.
6
Construction activities can generally be characterized as one of three
types:
Production activities are the activities that define the actual
physical construction of the project. Examples include Erect
Concrete Wall. A well-developed schedule allows the project team
to separate all activities of each trade in such a way that each
contractor has a clearly defined scope of work without overlap or
omission.
Procurement activities involve the purchase of materials,
equipment, and services for the project. Most procurement
activities follow a logical sequence, beginning with the preparation
of a submittal, the approval of the submittal by the owner or
designer, the ordering and fabrication of the item, and then the
delivery of the item to the job site..
Administrative activities include required inspections by local
officials or regulatory agencies, as well as permitting. Identifying
these activities requires the involvement of all project team
members, since normally no one person knows all the
administrative requirements for a complex project. 7
A key event in a project schedule can be identified by the use of a
milestone. Examples of milestones include the planned shutdown
of electricity or water supply in order to make connections to
existing utilities, the delivery of a certain phase of a project to the
owner, or a city agreement that a road be opened by a specific
date. Unlike an activity, a milestone cannot be assigned to a
company or person and does not consume time or resources. A
milestone is used simply to signify an important point in the life of
a project.
8
A network diagram is a pictorial representation of all
activities that make up a project and the order in
which these activities must occur to complete the
project in an efficient manner. In order to
develop the network diagram, the scheduler must
answer the following questions for each activity:
9
What activities must occur before this activity
can be done?
What activities must follow this activity?
What activities can be accomplished at the
same time that this activity is occurring?
10
A typical example of a network diagram is shown at the top of
Figure 9.4 in the Gould textbook. As you can see:
The diagram is read from left to right.
Activities are identified by rectangles (nodes) and connected
by arrows.
Each rectangle indicates a single activity.
The network is continuous. Each activity, except the first and
last, has both preceding and succeeding activities.
Activities without predecessors are assumed to begin at the
start of the project.
Activities without successors are assumed to be complete
when the project finishes.
No activity can start until all preceding activities have been
completed.
11
12
13

Weitere ähnliche Inhalte

Was ist angesagt?

Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
guestc8140fe
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
B Sai Prasad
 

Was ist angesagt? (19)

Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
Spm ap-network model-
Spm ap-network model-Spm ap-network model-
Spm ap-network model-
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Economics of project evaluation cpm module2
Economics of project evaluation cpm module2Economics of project evaluation cpm module2
Economics of project evaluation cpm module2
 
rules of formulating network planning model .
rules of formulating network planning model .rules of formulating network planning model .
rules of formulating network planning model .
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9
 
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project M...
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Ch09
Ch09Ch09
Ch09
 
Construction project scheduling and quality control
Construction project scheduling and quality controlConstruction project scheduling and quality control
Construction project scheduling and quality control
 
MS Project Terminology -Top 20 terms everyone must know
MS Project Terminology -Top 20 terms everyone must knowMS Project Terminology -Top 20 terms everyone must know
MS Project Terminology -Top 20 terms everyone must know
 
ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
 
Project management-planning and scheduling
Project management-planning and schedulingProject management-planning and scheduling
Project management-planning and scheduling
 
Steps in project control process
Steps in project control processSteps in project control process
Steps in project control process
 
Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010Seven Basic Steps to Build Realistic Schedule in Project 2010
Seven Basic Steps to Build Realistic Schedule in Project 2010
 
Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a project
 
06 project time management
06  project time management06  project time management
06 project time management
 
Project time management
Project time managementProject time management
Project time management
 

Andere mochten auch

11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3
Ahmad Basim Hamza
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4
Ahmad Basim Hamza
 
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
odfoundation
 
Odf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-plOdf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-pl
odfoundation
 
Sprawozdanie merytoryczne 2014
Sprawozdanie merytoryczne 2014Sprawozdanie merytoryczne 2014
Sprawozdanie merytoryczne 2014
odfoundation
 

Andere mochten auch (20)

11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4
 
Project Management (Soft)
Project Management (Soft)Project Management (Soft)
Project Management (Soft)
 
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
Yd1305161 sprawozdanie finansowe_2010_z_us-eng done.
 
Pagrindines unix komandos
Pagrindines unix komandosPagrindines unix komandos
Pagrindines unix komandos
 
Paskaita nr3 funkcijos
Paskaita nr3 funkcijosPaskaita nr3 funkcijos
Paskaita nr3 funkcijos
 
TechTalk#2: Принципы управления временем
TechTalk#2: Принципы управления временемTechTalk#2: Принципы управления временем
TechTalk#2: Принципы управления временем
 
Odf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-plOdf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-pl
 
SmartSuite Webinar: Turning Data into Actionable Information
SmartSuite Webinar: Turning Data into Actionable InformationSmartSuite Webinar: Turning Data into Actionable Information
SmartSuite Webinar: Turning Data into Actionable Information
 
Top 10 tips for growing your social media following
Top 10 tips for growing your social media followingTop 10 tips for growing your social media following
Top 10 tips for growing your social media following
 
03.07.2014 odf oleg_sentsov_case_ua
03.07.2014 odf oleg_sentsov_case_ua03.07.2014 odf oleg_sentsov_case_ua
03.07.2014 odf oleg_sentsov_case_ua
 
Paskaita nr5 modeliai
Paskaita nr5 modeliaiPaskaita nr5 modeliai
Paskaita nr5 modeliai
 
Sprawozdanie merytoryczne 2014
Sprawozdanie merytoryczne 2014Sprawozdanie merytoryczne 2014
Sprawozdanie merytoryczne 2014
 
Группа компаний "Скобеев и Партнеры"
Группа компаний "Скобеев и Партнеры"Группа компаний "Скобеев и Партнеры"
Группа компаний "Скобеев и Партнеры"
 
Elektroninio pasto klientu_konfiguravimas
Elektroninio pasto klientu_konfiguravimasElektroninio pasto klientu_konfiguravimas
Elektroninio pasto klientu_konfiguravimas
 
Log book.ashx
Log book.ashxLog book.ashx
Log book.ashx
 
Burabod
BurabodBurabod
Burabod
 
25 08-2014-odf-report-case-of-nadezhda-savchenko-ru 1
25 08-2014-odf-report-case-of-nadezhda-savchenko-ru 125 08-2014-odf-report-case-of-nadezhda-savchenko-ru 1
25 08-2014-odf-report-case-of-nadezhda-savchenko-ru 1
 
Ubuntu failu share_unix_net_komandos
Ubuntu failu share_unix_net_komandosUbuntu failu share_unix_net_komandos
Ubuntu failu share_unix_net_komandos
 
Paskaita nr9 eksplotavimas_tti
Paskaita nr9 eksplotavimas_ttiPaskaita nr9 eksplotavimas_tti
Paskaita nr9 eksplotavimas_tti
 

Ähnlich wie 10 lecture project scheduling 2

MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docxMBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
alfredacavx97
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
AMIT PAYAL
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 

Ähnlich wie 10 lecture project scheduling 2 (20)

09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docxMBA 6941, Managing Project Teams 1 Course Learning Outco.docx
MBA 6941, Managing Project Teams 1 Course Learning Outco.docx
 
Pm chapter 5...
Pm chapter 5...Pm chapter 5...
Pm chapter 5...
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
Chapter 5-Project Management.pptx
Chapter 5-Project Management.pptxChapter 5-Project Management.pptx
Chapter 5-Project Management.pptx
 
Projectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit PayalProjectmanagement anupama-Amit Payal
Projectmanagement anupama-Amit Payal
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Pm chapter 5
Pm chapter 5Pm chapter 5
Pm chapter 5
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Project time management
Project time managementProject time management
Project time management
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 
Time Management within IT Project Management
Time Management within IT Project ManagementTime Management within IT Project Management
Time Management within IT Project Management
 
Chapter 4.pptx
Chapter 4.pptxChapter 4.pptx
Chapter 4.pptx
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 

Kürzlich hochgeladen

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Kürzlich hochgeladen (20)

Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

10 lecture project scheduling 2

  • 1. Project Scheduling 2 Prepared by Sebghatullah Karimi (Junior Lecturer of Kabul Polytechnic University) 1392 Kardan University Civil Engineering Faculty
  • 2. Explain how the work environment, the construction contract, and the project scope influence the scheduling process. Explain the three types of project activities used in scheduling. Define milestone. Describe the characteristics of a network diagram. 2
  • 3. Work breakdown structure – The organization of the project into specific parts that can be coordinated and controlled. Activity – A well-defined, measurable part of the overall project. An activity must be suitable for assignment to a particular project team member, and it consumes both time and resources. Trade – A construction specialty, such as plumber, carpenter, welder. Submittal – A sample of an item to be procured for a project by a supplier or subcontractor. A submittal must be approved by the owner or designer prior to procurement. 3
  • 4. • A network schedule is graphical drawing of a logical sequence of events to complete a project. A network-based schedule is a powerful tool for the planning, development, and construction of sophisticated projects. • The development of a network-based schedule follows a logical process that should involve most of the key project team members. Every network schedule must begin with a complete understanding of the project objective, as defined by the owner. The project participants then take this objective and break it down into tasks that provide the level of detail necessary to organize, manage, and control the project. Once these tasks are defined, the project team establishes the order in which the tasks are to be performed, such that the project will be completed in an efficient manner. • To create the network, team members decide which activities must precede, succeed, or run concurrently with other activities. The end result of this process is a logic diagram that accurately depicts the order that the work will follow. 4
  • 5. The preparation of a network schedule requires a careful analysis of three factors: The work environment. The work environment includes such consideration as the weather, site conditions, availability of building materials, access for deliveries, availability of power, and the amount of construction currently occurring in the region. The contract. A construction contract will typically include the project completion date, milestones, incentive clauses (which provide bonuses for early completion), liquidated damages clauses (which provide penalties for late completion), work rules governing safety and hiring requirements, and identification of materials and work that will be provided by the owner. All of these considerations will affect project organization and scheduling. The project scope. The scope of the project, as described in the drawings and specifications, is a major consideration in scheduling. Drawings and specifications are the source of all the materials and quantities used in the project and may also describe required construction methods. 5
  • 6. 1. The first step in the networking process is to define the work breakdown structure for the project. 2. From the work breakdown structure, the team defines the specific activities that will make up the network diagram. An activity must be suitable for assignment to a particular project team member, and it should consume both time and resources. 6
  • 7. Construction activities can generally be characterized as one of three types: Production activities are the activities that define the actual physical construction of the project. Examples include Erect Concrete Wall. A well-developed schedule allows the project team to separate all activities of each trade in such a way that each contractor has a clearly defined scope of work without overlap or omission. Procurement activities involve the purchase of materials, equipment, and services for the project. Most procurement activities follow a logical sequence, beginning with the preparation of a submittal, the approval of the submittal by the owner or designer, the ordering and fabrication of the item, and then the delivery of the item to the job site.. Administrative activities include required inspections by local officials or regulatory agencies, as well as permitting. Identifying these activities requires the involvement of all project team members, since normally no one person knows all the administrative requirements for a complex project. 7
  • 8. A key event in a project schedule can be identified by the use of a milestone. Examples of milestones include the planned shutdown of electricity or water supply in order to make connections to existing utilities, the delivery of a certain phase of a project to the owner, or a city agreement that a road be opened by a specific date. Unlike an activity, a milestone cannot be assigned to a company or person and does not consume time or resources. A milestone is used simply to signify an important point in the life of a project. 8
  • 9. A network diagram is a pictorial representation of all activities that make up a project and the order in which these activities must occur to complete the project in an efficient manner. In order to develop the network diagram, the scheduler must answer the following questions for each activity: 9
  • 10. What activities must occur before this activity can be done? What activities must follow this activity? What activities can be accomplished at the same time that this activity is occurring? 10
  • 11. A typical example of a network diagram is shown at the top of Figure 9.4 in the Gould textbook. As you can see: The diagram is read from left to right. Activities are identified by rectangles (nodes) and connected by arrows. Each rectangle indicates a single activity. The network is continuous. Each activity, except the first and last, has both preceding and succeeding activities. Activities without predecessors are assumed to begin at the start of the project. Activities without successors are assumed to be complete when the project finishes. No activity can start until all preceding activities have been completed. 11
  • 12. 12
  • 13. 13