SlideShare ist ein Scribd-Unternehmen logo
1 von 63
UAV Stability Augmentation System - USAS ,[object Object],[object Object],[object Object],[object Object],[object Object]
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Mission ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Stretch  Goals ,[object Object],[object Object],[object Object],[object Object]
Overview of Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Overview of Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Overview of Objectives ,[object Object],[object Object],[object Object],[object Object]
Overview of Objectives ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Jake Hanft Development and Assessment of Design Alternatives
Development and Assessment of Design Alternatives ,[object Object],[object Object],[object Object],[object Object],[object Object]
Functional Needs
Test-Bed Aircraft ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Microcontroller ,[object Object],[object Object],[object Object],[object Object]
Microcontroller (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sensor Package Design Parameters ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sensor Package (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Sensor Package (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Simulation Package ,[object Object],[object Object],[object Object],[object Object]
Power ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Design Metric (Microcontrollers)
Design Metric (Test-Bed Aircraft, Sensors and Power Configuration) Independent Adds extra weight but may be necessary 1 Score:  1   Rating:  High Cost:  ?   Rating:  Low Cost:  Free   Rating:  Low Score:  1   Rating:  High 1 Eliminate the need to add another battery back just for the SAS, however, the receiver battery may not carry enough voltage to do this. Tap into Reciever's Power Power Configuration 0 PC board mountable, but difficult configuration compared to PX139 Cost:  $40   Rating:  Low Score:  1  Rating:  Low 1 Good range, 5V operation Omega PX71-0.3GV 0 The extra voltage may require an independent power source Cost:  $85   Rating:  Low Score:  1   Rating:  Low 1 Good range, 8V operation Omega PX138-0.3D5v 1 Has just enough range and has a 5V operating level enabling power through same output as microcontroller Cost:  $85   Rating:  Low Score:  2  Rating:  High 1 Good range, 5V operation Omega PX139-0.3D5V Pressure Transducer 0 Does not have large enough range Cost:  Free   Rating:  Low Score: -1   Rating:  Low -1 ±10 g Dual Axis Accelerometer with Duty Cycle Outputs Analog Devices ADXL210 1 Can be programmable to ±25 g Cost:  Free   Rating:  Low Score:  2   Rating:  High 1 ±50g Dual Axis Accelerometer with Analog Outputs Analog Devices ADXL250 Accelerometer Cost:  $120  Rating:  Low Score:  1  Rating:  Low 1 Would have to take from Futaba package Piezo 1 MEM device with excellent noise handling Cost:  $50   Rating:  Low Score:  2   Rating:  High 1 150 deg/s, can come packaged on an evaluation board Analog Devices ADXL150 2 MEM device with excellent noise handling and larger range Cost:  $50   Rating:  Low Score: 3   Rating:  High 1 300 deg/s, can come packaged on an evalutation board Analog Devices ADXL300 Rate Gyro Low Low 1 Would not have to spend time designing an airplane, however, it would be just as time consuming to redesign a kit. The balsa construction would not be nearly as robust as the custom fiberglass. Kit Low High 3 By building a custom plane, we can custom fit the control package, as well as incorporate a moveable cg apparatus. Also, we will be able to vary the tail length and be able to test the SAS on different configurations easily Custom Test-Bed Aircraft Cost Attributes Scale Specs and Comments Manufacturer/Part Component
Comparison of Design Alternatives Results
Design-To Specifications Tom Bateman HYPER-X USAS
Design-To Specifications ,[object Object],[object Object],[object Object],[object Object]
General Arrangement Cargo Bay 3.75” x 5.5” x 10” R/C Receivers (2) Powerplant Astro 661/APC 15x7 Tailboom Adjustable Length CG Apparatus Inflight Adjustable
Major Aircraft Subsystems Pitch (y) (SAS Control Axis) Roll (x) Yaw (z) Powerplant Electric Motor (.60 size) 30 cell NiCd Main Battery Primary Flight Control System R/C Receiver (Rx) Rx Battery (Shared by SAS) Servos (Rudder, Aileron) Motor Speed Control SAS Electronics and Sensor Package Microcontroller Pitch Rate Gyro Pressure Transducer Linear Accelerometer CG Control System Sail Winch Servo Balance Weight Pitch Control High Speed Digital Servo Elevator
SAS Block Diagram MICROCONTROLLER PITCH  RATE GYRO DATA ACQUISITION PILOT PITCH SIGNAL PILOT + SAS PITCH SIGNAL CG CONTROL  SERVO BALANCE WEIGHT GAIN CONTROL MANUAL CG CONTROL PRESSURE  TRANSDUCER LINEAR ACCELEROMETER PCS FEEDBACK SIGNAL COMMAND OVERRIDE CGS FEEDBACK SIGNAL SAS  BATTERY Rx  BATTERY AUTO CG CONTROL CG CONTROL PCS BYPASS POWER COMMANDS OUTPUTS SENSORS Legend R/C  TRANSMITTER R/C RECEIVER P/C  SERVO ELEVATOR
Electronics Chassis Microcontroller PIC18F458 Rate Gyro Pressure Transducer Accelerometer Chassis QuikFlash Board
Controller Board Schematic PITCH COMMAND PWMD PITCH  RATE CG CONTROL  FEEDBACK DYNAMIC PRESSURE  Z-AXIS ACCELERATION PITCH  COMMAND GAIN CONTROL COMMAND OVERRIDE MICROCONTROLLER V REF A/D A/D 0/1 A/D A/D A/D PWMD PWM PITCH FEEDBACK A/D A/D REG DATA ACQUISITION (EXTERNAL RAM) 0101… VDD 6-9 VDC CG COMMAND PWM CG CONTROL PWMD A/D POWER INTERRUPT DATA SWITCH 0/1 POWER COMMANDS OUTPUTS FEEDBACK SENSORS Legend
Control Process Flow Start (power on) Initialize variables Pitch rate Read sensor inputs Pilot command Gain control Dynamic pressure Read command inputs Command override Z-axis acceleration Read feedback inputs Elevator servo CG Servo Estimate commanded pitch rate Compute PR error Apply control gain Compute elevator deflection Output elevator control signal Pitch command A/D A/D A/D PWM PWM 0/1 A/D A/D PWM Output data acquisition External  Flash RAM   0101… Apply SAS  Authority Limiting Watchdog/ Brownout Timing Loop Command Override ? Bypass pitch control CG control PWM N Y Command CG  to full forward CG command PWM Bypass CG control Data switch 0/1 Data switch 0/1 Primary Control Algorithm
Sensors, Actuators, Electronics
Simulink Model
Simulink Model (Detail)
System Dynamic Response Step Input System Off System On Turbulence System Off System On
Wing Aerodynamic and Structural Model
Wing Aerodynamic and Structural Model
SAS Performance Target
Test-Bed Aircraft Specifications
CG Control System Specifications
Data Acquisition Specifications
Simulation Specifications
Design Issues and Risk Assessment Mike Sheek
Test-Bed Aircraft N/A High -Ensure that an experienced pilot flies  Aircraft -Select an ‘Almost Ready to Fly' model  to use in re-building effort -Ensure that all pre-flight tests and  precautions have been made before flight tests -Require intense last minute build  effort -Inability to verify SAS in RC aircraft Test-bed aircraft mishap prior to SAS tests Off-Ramp: March 19 th If SAS cannot be  integrated by this date  prioritization will move to  developing alternative  testing apparatus Medium -Develop test-bed aircraft in parallel with SAS -Develop back-up testing apparatus to test SAS capabilities -Require unexpected team  resources to overcome complication Unable to integrate the SAS with the  test-bed Aircraft Off-Ramp Risk  Factor Accommodations Impact Specific Risk
Microcontroller N/A High -Select and thoroughly test processor capabilities (w/ components if possible) ASAP -Allocate funds for a back-up microprocessor if need arises -Degrade / disable required performance requirements -Require unexpected team resources to overcome complication -Exceed budget when replacement must be ordered or find required replacement unavailable Discrepancy between expected vs. actual performance N/A High -Schedule critical path -Select processor ASAP -Build expertise on subject by having 3 team members taking Dr. Palo’s Data Acquisition course -Unable to integrate all Components by Project Due Date Software Development Inexperience Off-Ramp Risk Factor Accommodation Impact Specific Risk
Presented by Adam Dean Project Management Plan
Organizational Responsibilities
Project Organization Chart Movable CG Apparatus Design -Mike Sheek- Project Manager (PM) -Adam Dean- Chief Financial Officer (CFO) -Barry Blakeley- Documentation / Web Maintenance -Mike Sheek- -Jake Hanft- Project Test and Evaluation -Barry Blakeley- Flight Control / USAS Integration -Tom Bateman- Control System Software Design -Jake Hanft- Control System Hardware Design -Jake Hanft Test-Bed Aircraft Design - Tom Bateman- Safety Engineer -Tom Bateman-
Work Breakdown Structure 1.0 Program Management 2.0 System Engineering 3.0 Control System 6.0 C.G. Apparatus 4.0 Test-Bed Aircraft 5.0 Data Acquisition 7.0 Pre-Flight Simulate and Verify 1.1 Budget Management (CFO) 1.2 Task Delegation and Organization 1.4 Website and Documentation 1.3 Weekly Time Sheet Collection 1.1 Scheduling 2.1System Integration 2.2 System Specifications 2.3 Design to Specs. Monitoring 3.1 Micro Controller 3.2 Control Theory 3.2 Servos 3.4 Control Software 4.3 Engine Selection 4.2 Structure 4.1Aero Dynamics 3.3 Power System 5.1 Storage Device 3.5 Sensors (Rate Gyros, Accelerometer, etc.) 3.6 Integration 4.7 Tail-Boom Design 4.5 Backbone Design 4.4 Fuselage Design 5.2 Data Source Interfaces 4.6 Landing Gear Design 5.3 Data Uplink 6.3 C.G. Manipulation Effects 6.1 C.G. H/W 6.2 C.G. S/W 6.4 C.G. Apparatus Control Interface 8.0 Test and Verification 8.1 Develop Test Plans 4.8 Fabrication 8.3 Test analysis and Reporting 8.2 C.G. Control System Bench Test 8.3 SAS Hardware Bench test 8.2 Static Wing Loading Test 8.3 Test-Bed Aircraft Flight Test 8.2 C.G. Control System Flight Test 8.3 SAS Hardware Passive Inflight Test 8.2 SAS Active Inflight Test 7.2 Simulation Software 7.1 Simulation Method 7.4 Verification Software 7.3 Verification Method
Test and Evaluation Program CG Control System  Bench Test Due ~ 3/5/04   SAS Hardware  Passive Inflight Test Due ~ 4/2/04 Data Analysis Due ~ 4/29 SAS Hardware  Active Inflight Test Due ~ 4/22/04 CG Control System Flight Test Due ~ 3/29/04 Test-Bed Aircraft Flight Test Due ~ 3/23/04 Static Wing Loading Test Due ~ 10/903 SAS Hardware Bench Test Due ~   3/12/04
Program Schedule
Program Schedule
Estimated Cost Breakdown
Preliminary Drawing Tree
Preliminary Drawing Tree
Preliminary Drawing Tree
Preliminary Drawing Tree
Specialized Facilities and Resources ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Team USAS Questions
Back-Up Charts
System Functional Elements
Program Schedule
Program Schedule
Program Schedule

Weitere ähnliche Inhalte

Was ist angesagt?

Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propellerMun Lai
 
Stress and fatigue analysis of landing gear axle of a trainer aircraft
Stress and fatigue analysis of landing gear axle of a trainer aircraftStress and fatigue analysis of landing gear axle of a trainer aircraft
Stress and fatigue analysis of landing gear axle of a trainer aircrafteSAT Journals
 
Fadec full authority digital engine control-final
Fadec  full authority digital engine control-finalFadec  full authority digital engine control-final
Fadec full authority digital engine control-finalAbhishek Alankar
 
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATION
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATIONPRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATION
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATIONLahiru Dilshan
 
Classical Lamination Theory
Classical Lamination TheoryClassical Lamination Theory
Classical Lamination TheoryNamHuuTran
 
Final fighter aircraft design adp 2
Final fighter aircraft design adp 2Final fighter aircraft design adp 2
Final fighter aircraft design adp 2Dudekula Jamal
 
HAL Aircraft Division Bangalore
HAL Aircraft Division BangaloreHAL Aircraft Division Bangalore
HAL Aircraft Division Bangaloretulasiva
 
Design of fighter aircraft presentation
Design of fighter aircraft presentationDesign of fighter aircraft presentation
Design of fighter aircraft presentationDudekula Jamal
 
Uav presentation
Uav presentationUav presentation
Uav presentationMeshut
 
Drag polar | Flight Mechanics | GATE Aerospace
Drag polar | Flight Mechanics | GATE AerospaceDrag polar | Flight Mechanics | GATE Aerospace
Drag polar | Flight Mechanics | GATE AerospaceAge of Aerospace
 
Aircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAltair
 
Presentation On Fighter Planes
Presentation On Fighter PlanesPresentation On Fighter Planes
Presentation On Fighter PlanesKunal Dhingra
 
Aircraft Performance: Part I
Aircraft Performance: Part IAircraft Performance: Part I
Aircraft Performance: Part IMohammad Tawfik
 
Artificial Feel in aircrafts
Artificial Feel in aircraftsArtificial Feel in aircrafts
Artificial Feel in aircraftsalpha_sherdil
 

Was ist angesagt? (20)

Design Optimization of Drone propeller
Design Optimization of Drone propellerDesign Optimization of Drone propeller
Design Optimization of Drone propeller
 
Stress and fatigue analysis of landing gear axle of a trainer aircraft
Stress and fatigue analysis of landing gear axle of a trainer aircraftStress and fatigue analysis of landing gear axle of a trainer aircraft
Stress and fatigue analysis of landing gear axle of a trainer aircraft
 
Aeroelasticity
Aeroelasticity Aeroelasticity
Aeroelasticity
 
Fadec full authority digital engine control-final
Fadec  full authority digital engine control-finalFadec  full authority digital engine control-final
Fadec full authority digital engine control-final
 
7 air-to-air combat
7 air-to-air combat7 air-to-air combat
7 air-to-air combat
 
Fuselage structures
Fuselage structuresFuselage structures
Fuselage structures
 
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATION
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATIONPRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATION
PRELIMINARY DESIGN APPROACH TO WING BOX LAYOUT AND STRUCTURAL CONFIGURATION
 
Classical Lamination Theory
Classical Lamination TheoryClassical Lamination Theory
Classical Lamination Theory
 
Final fighter aircraft design adp 2
Final fighter aircraft design adp 2Final fighter aircraft design adp 2
Final fighter aircraft design adp 2
 
Wind tunnel
Wind tunnelWind tunnel
Wind tunnel
 
HAL Aircraft Division Bangalore
HAL Aircraft Division BangaloreHAL Aircraft Division Bangalore
HAL Aircraft Division Bangalore
 
Design of fighter aircraft presentation
Design of fighter aircraft presentationDesign of fighter aircraft presentation
Design of fighter aircraft presentation
 
Uav presentation
Uav presentationUav presentation
Uav presentation
 
Drag polar | Flight Mechanics | GATE Aerospace
Drag polar | Flight Mechanics | GATE AerospaceDrag polar | Flight Mechanics | GATE Aerospace
Drag polar | Flight Mechanics | GATE Aerospace
 
Ppt 2 (1)
Ppt 2 (1)Ppt 2 (1)
Ppt 2 (1)
 
Aircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair ProductsAircraft Finite Element Modelling for structure analysis using Altair Products
Aircraft Finite Element Modelling for structure analysis using Altair Products
 
Presentation On Fighter Planes
Presentation On Fighter PlanesPresentation On Fighter Planes
Presentation On Fighter Planes
 
Wind tunnel testing aerospace
Wind tunnel testing aerospaceWind tunnel testing aerospace
Wind tunnel testing aerospace
 
Aircraft Performance: Part I
Aircraft Performance: Part IAircraft Performance: Part I
Aircraft Performance: Part I
 
Artificial Feel in aircrafts
Artificial Feel in aircraftsArtificial Feel in aircrafts
Artificial Feel in aircrafts
 

Andere mochten auch

Aircraft recognition for Air Force Cadets arb 4
Aircraft recognition for Air Force Cadets arb 4Aircraft recognition for Air Force Cadets arb 4
Aircraft recognition for Air Force Cadets arb 4oldcramo2009
 
Quarter model of passive suspension system with simscape
Quarter model of passive suspension system with simscapeQuarter model of passive suspension system with simscape
Quarter model of passive suspension system with simscapeabuamo
 
Lisa mc cann
Lisa mc cannLisa mc cann
Lisa mc cannNASAPMC
 
Students from around the world design, build, and fly an aircraft
Students from around the world design, build, and fly an aircraftStudents from around the world design, build, and fly an aircraft
Students from around the world design, build, and fly an aircraftJean Koster
 
Aviation basic no background
Aviation basic no backgroundAviation basic no background
Aviation basic no backgroundoldcramo2009
 
Aircraft configuration
Aircraft configurationAircraft configuration
Aircraft configurationAmr Emad
 
Modeling and simulation of MEMS
Modeling and simulation of MEMSModeling and simulation of MEMS
Modeling and simulation of MEMSRabie
 
Flight Management System
Flight Management System Flight Management System
Flight Management System Pravin Londhe
 
Avionics Flight managment system
Avionics Flight managment systemAvionics Flight managment system
Avionics Flight managment systemostroumov
 
WBS bus ticketsystem
WBS bus ticketsystemWBS bus ticketsystem
WBS bus ticketsystemIna Ivanova
 
Cronograma, WBS, Diagrama de Red
Cronograma, WBS, Diagrama de RedCronograma, WBS, Diagrama de Red
Cronograma, WBS, Diagrama de RedGUIA PRACTICA PMP
 
5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systemslpapadop
 
Avionics Systems Instruments
Avionics Systems InstrumentsAvionics Systems Instruments
Avionics Systems InstrumentsMichael Bseliss
 
04 software system and application software
04 software   system and application software04 software   system and application software
04 software system and application softwareSowmini Gowda
 
Flight Management System
Flight Management SystemFlight Management System
Flight Management SystemIshwar Bulbule
 
UAV Presentation
UAV PresentationUAV Presentation
UAV PresentationRuyyan
 
Objetivos y metas de la planificación
Objetivos y metas de la planificaciónObjetivos y metas de la planificación
Objetivos y metas de la planificaciónpaty1360
 
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...Jamar Johnson
 

Andere mochten auch (20)

2007 2014 DRONE TECHNOLOGY AND AIR WATER SUPPLY DELIVERY IN RISK SHARING SOCI...
2007 2014 DRONE TECHNOLOGY AND AIR WATER SUPPLY DELIVERY IN RISK SHARING SOCI...2007 2014 DRONE TECHNOLOGY AND AIR WATER SUPPLY DELIVERY IN RISK SHARING SOCI...
2007 2014 DRONE TECHNOLOGY AND AIR WATER SUPPLY DELIVERY IN RISK SHARING SOCI...
 
Aircraft recognition for Air Force Cadets arb 4
Aircraft recognition for Air Force Cadets arb 4Aircraft recognition for Air Force Cadets arb 4
Aircraft recognition for Air Force Cadets arb 4
 
Quarter model of passive suspension system with simscape
Quarter model of passive suspension system with simscapeQuarter model of passive suspension system with simscape
Quarter model of passive suspension system with simscape
 
Lisa mc cann
Lisa mc cannLisa mc cann
Lisa mc cann
 
Students from around the world design, build, and fly an aircraft
Students from around the world design, build, and fly an aircraftStudents from around the world design, build, and fly an aircraft
Students from around the world design, build, and fly an aircraft
 
PM CCAC
PM CCACPM CCAC
PM CCAC
 
Aviation basic no background
Aviation basic no backgroundAviation basic no background
Aviation basic no background
 
Aircraft configuration
Aircraft configurationAircraft configuration
Aircraft configuration
 
Modeling and simulation of MEMS
Modeling and simulation of MEMSModeling and simulation of MEMS
Modeling and simulation of MEMS
 
Flight Management System
Flight Management System Flight Management System
Flight Management System
 
Avionics Flight managment system
Avionics Flight managment systemAvionics Flight managment system
Avionics Flight managment system
 
WBS bus ticketsystem
WBS bus ticketsystemWBS bus ticketsystem
WBS bus ticketsystem
 
Cronograma, WBS, Diagrama de Red
Cronograma, WBS, Diagrama de RedCronograma, WBS, Diagrama de Red
Cronograma, WBS, Diagrama de Red
 
5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems5.15 Typical electronic digital aircraft systems
5.15 Typical electronic digital aircraft systems
 
Avionics Systems Instruments
Avionics Systems InstrumentsAvionics Systems Instruments
Avionics Systems Instruments
 
04 software system and application software
04 software   system and application software04 software   system and application software
04 software system and application software
 
Flight Management System
Flight Management SystemFlight Management System
Flight Management System
 
UAV Presentation
UAV PresentationUAV Presentation
UAV Presentation
 
Objetivos y metas de la planificación
Objetivos y metas de la planificaciónObjetivos y metas de la planificación
Objetivos y metas de la planificación
 
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...Global Operations and Supply Chain Management:  Airbus vs. Boeing Final Assig...
Global Operations and Supply Chain Management: Airbus vs. Boeing Final Assig...
 

Ähnlich wie Uav Stability Augmentation System Usas

Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Sung (Stephen) Kim
 
Semi Autonomous Hand Launched Rotary Wing Unmanned Air Vehicles
Semi Autonomous Hand Launched Rotary Wing Unmanned Air VehiclesSemi Autonomous Hand Launched Rotary Wing Unmanned Air Vehicles
Semi Autonomous Hand Launched Rotary Wing Unmanned Air Vehiclesahmad bassiouny
 
Asiasim2004 final
Asiasim2004 finalAsiasim2004 final
Asiasim2004 finalvrsim
 
Computer modeling-simulation&examples1
Computer modeling-simulation&examples1Computer modeling-simulation&examples1
Computer modeling-simulation&examples1Jian Shen
 
ERAP GSE 2015_e catalogue
ERAP GSE  2015_e catalogueERAP GSE  2015_e catalogue
ERAP GSE 2015_e catalogueSashi B
 
ANSYS SCADE Usage for Unmanned Aircraft Vehicles
ANSYS SCADE Usage for Unmanned Aircraft VehiclesANSYS SCADE Usage for Unmanned Aircraft Vehicles
ANSYS SCADE Usage for Unmanned Aircraft VehiclesAnsys
 
Continuous Performance Testing
Continuous Performance TestingContinuous Performance Testing
Continuous Performance TestingMark Price
 
Electronic System Design Guideline
Electronic System Design GuidelineElectronic System Design Guideline
Electronic System Design GuidelineDavid Trieu
 
Aviation Ground Power Unit - MAK India and USA
Aviation Ground Power Unit - MAK India and USAAviation Ground Power Unit - MAK India and USA
Aviation Ground Power Unit - MAK India and USAangleratrium
 
Srr Payload Team Consept 2
Srr Payload Team Consept 2Srr Payload Team Consept 2
Srr Payload Team Consept 2Seiya Shimizu
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationNercon
 
Improving Dependability of Embedded Software System
Improving Dependability of Embedded Software SystemImproving Dependability of Embedded Software System
Improving Dependability of Embedded Software SystemRAKESH RANA
 
New IGBT Gate Driver Software
New IGBT Gate Driver SoftwareNew IGBT Gate Driver Software
New IGBT Gate Driver SoftwareJuan Munoz
 
01 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa1601 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa16John Todora
 
Bringing Engineering Analysis Codes Into Real-Time Full-Scope Simulators
Bringing Engineering Analysis Codes Into Real-Time Full-Scope SimulatorsBringing Engineering Analysis Codes Into Real-Time Full-Scope Simulators
Bringing Engineering Analysis Codes Into Real-Time Full-Scope SimulatorsGSE Systems, Inc.
 
Introduction to architecture exploration
Introduction to architecture explorationIntroduction to architecture exploration
Introduction to architecture explorationDeepak Shankar
 
Hardware in Loop System Design
Hardware in Loop System DesignHardware in Loop System Design
Hardware in Loop System Designparulo123
 

Ähnlich wie Uav Stability Augmentation System Usas (20)

Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.Flight Readiness Review Presentation for Project A.R.E.S.
Flight Readiness Review Presentation for Project A.R.E.S.
 
Semi Autonomous Hand Launched Rotary Wing Unmanned Air Vehicles
Semi Autonomous Hand Launched Rotary Wing Unmanned Air VehiclesSemi Autonomous Hand Launched Rotary Wing Unmanned Air Vehicles
Semi Autonomous Hand Launched Rotary Wing Unmanned Air Vehicles
 
Asiasim2004 final
Asiasim2004 finalAsiasim2004 final
Asiasim2004 final
 
Square photo update new
Square photo update newSquare photo update new
Square photo update new
 
Computer modeling-simulation&examples1
Computer modeling-simulation&examples1Computer modeling-simulation&examples1
Computer modeling-simulation&examples1
 
ERAP GSE 2015_e catalogue
ERAP GSE  2015_e catalogueERAP GSE  2015_e catalogue
ERAP GSE 2015_e catalogue
 
ANSYS SCADE Usage for Unmanned Aircraft Vehicles
ANSYS SCADE Usage for Unmanned Aircraft VehiclesANSYS SCADE Usage for Unmanned Aircraft Vehicles
ANSYS SCADE Usage for Unmanned Aircraft Vehicles
 
Continuous Performance Testing
Continuous Performance TestingContinuous Performance Testing
Continuous Performance Testing
 
Resume
ResumeResume
Resume
 
Electronic System Design Guideline
Electronic System Design GuidelineElectronic System Design Guideline
Electronic System Design Guideline
 
Aviation Ground Power Unit - MAK India and USA
Aviation Ground Power Unit - MAK India and USAAviation Ground Power Unit - MAK India and USA
Aviation Ground Power Unit - MAK India and USA
 
Srr Payload Team Consept 2
Srr Payload Team Consept 2Srr Payload Team Consept 2
Srr Payload Team Consept 2
 
leaflet_D1000_2021_EN.pdf
leaflet_D1000_2021_EN.pdfleaflet_D1000_2021_EN.pdf
leaflet_D1000_2021_EN.pdf
 
How to Plan for Line Controls and Integration
How to Plan for Line Controls and IntegrationHow to Plan for Line Controls and Integration
How to Plan for Line Controls and Integration
 
Improving Dependability of Embedded Software System
Improving Dependability of Embedded Software SystemImproving Dependability of Embedded Software System
Improving Dependability of Embedded Software System
 
New IGBT Gate Driver Software
New IGBT Gate Driver SoftwareNew IGBT Gate Driver Software
New IGBT Gate Driver Software
 
01 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa1601 introduction to_plc-pac_rev01_fa16
01 introduction to_plc-pac_rev01_fa16
 
Bringing Engineering Analysis Codes Into Real-Time Full-Scope Simulators
Bringing Engineering Analysis Codes Into Real-Time Full-Scope SimulatorsBringing Engineering Analysis Codes Into Real-Time Full-Scope Simulators
Bringing Engineering Analysis Codes Into Real-Time Full-Scope Simulators
 
Introduction to architecture exploration
Introduction to architecture explorationIntroduction to architecture exploration
Introduction to architecture exploration
 
Hardware in Loop System Design
Hardware in Loop System DesignHardware in Loop System Design
Hardware in Loop System Design
 

Mehr von ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Kürzlich hochgeladen

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 

Kürzlich hochgeladen (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 

Uav Stability Augmentation System Usas

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. Jake Hanft Development and Assessment of Design Alternatives
  • 10.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 21. Design Metric (Test-Bed Aircraft, Sensors and Power Configuration) Independent Adds extra weight but may be necessary 1 Score: 1 Rating: High Cost: ? Rating: Low Cost: Free Rating: Low Score: 1 Rating: High 1 Eliminate the need to add another battery back just for the SAS, however, the receiver battery may not carry enough voltage to do this. Tap into Reciever's Power Power Configuration 0 PC board mountable, but difficult configuration compared to PX139 Cost: $40 Rating: Low Score: 1 Rating: Low 1 Good range, 5V operation Omega PX71-0.3GV 0 The extra voltage may require an independent power source Cost: $85 Rating: Low Score: 1 Rating: Low 1 Good range, 8V operation Omega PX138-0.3D5v 1 Has just enough range and has a 5V operating level enabling power through same output as microcontroller Cost: $85 Rating: Low Score: 2 Rating: High 1 Good range, 5V operation Omega PX139-0.3D5V Pressure Transducer 0 Does not have large enough range Cost: Free Rating: Low Score: -1 Rating: Low -1 ±10 g Dual Axis Accelerometer with Duty Cycle Outputs Analog Devices ADXL210 1 Can be programmable to ±25 g Cost: Free Rating: Low Score: 2 Rating: High 1 ±50g Dual Axis Accelerometer with Analog Outputs Analog Devices ADXL250 Accelerometer Cost: $120 Rating: Low Score: 1 Rating: Low 1 Would have to take from Futaba package Piezo 1 MEM device with excellent noise handling Cost: $50 Rating: Low Score: 2 Rating: High 1 150 deg/s, can come packaged on an evaluation board Analog Devices ADXL150 2 MEM device with excellent noise handling and larger range Cost: $50 Rating: Low Score: 3 Rating: High 1 300 deg/s, can come packaged on an evalutation board Analog Devices ADXL300 Rate Gyro Low Low 1 Would not have to spend time designing an airplane, however, it would be just as time consuming to redesign a kit. The balsa construction would not be nearly as robust as the custom fiberglass. Kit Low High 3 By building a custom plane, we can custom fit the control package, as well as incorporate a moveable cg apparatus. Also, we will be able to vary the tail length and be able to test the SAS on different configurations easily Custom Test-Bed Aircraft Cost Attributes Scale Specs and Comments Manufacturer/Part Component
  • 22. Comparison of Design Alternatives Results
  • 23. Design-To Specifications Tom Bateman HYPER-X USAS
  • 24.
  • 25. General Arrangement Cargo Bay 3.75” x 5.5” x 10” R/C Receivers (2) Powerplant Astro 661/APC 15x7 Tailboom Adjustable Length CG Apparatus Inflight Adjustable
  • 26. Major Aircraft Subsystems Pitch (y) (SAS Control Axis) Roll (x) Yaw (z) Powerplant Electric Motor (.60 size) 30 cell NiCd Main Battery Primary Flight Control System R/C Receiver (Rx) Rx Battery (Shared by SAS) Servos (Rudder, Aileron) Motor Speed Control SAS Electronics and Sensor Package Microcontroller Pitch Rate Gyro Pressure Transducer Linear Accelerometer CG Control System Sail Winch Servo Balance Weight Pitch Control High Speed Digital Servo Elevator
  • 27. SAS Block Diagram MICROCONTROLLER PITCH RATE GYRO DATA ACQUISITION PILOT PITCH SIGNAL PILOT + SAS PITCH SIGNAL CG CONTROL SERVO BALANCE WEIGHT GAIN CONTROL MANUAL CG CONTROL PRESSURE TRANSDUCER LINEAR ACCELEROMETER PCS FEEDBACK SIGNAL COMMAND OVERRIDE CGS FEEDBACK SIGNAL SAS BATTERY Rx BATTERY AUTO CG CONTROL CG CONTROL PCS BYPASS POWER COMMANDS OUTPUTS SENSORS Legend R/C TRANSMITTER R/C RECEIVER P/C SERVO ELEVATOR
  • 28. Electronics Chassis Microcontroller PIC18F458 Rate Gyro Pressure Transducer Accelerometer Chassis QuikFlash Board
  • 29. Controller Board Schematic PITCH COMMAND PWMD PITCH RATE CG CONTROL FEEDBACK DYNAMIC PRESSURE Z-AXIS ACCELERATION PITCH COMMAND GAIN CONTROL COMMAND OVERRIDE MICROCONTROLLER V REF A/D A/D 0/1 A/D A/D A/D PWMD PWM PITCH FEEDBACK A/D A/D REG DATA ACQUISITION (EXTERNAL RAM) 0101… VDD 6-9 VDC CG COMMAND PWM CG CONTROL PWMD A/D POWER INTERRUPT DATA SWITCH 0/1 POWER COMMANDS OUTPUTS FEEDBACK SENSORS Legend
  • 30. Control Process Flow Start (power on) Initialize variables Pitch rate Read sensor inputs Pilot command Gain control Dynamic pressure Read command inputs Command override Z-axis acceleration Read feedback inputs Elevator servo CG Servo Estimate commanded pitch rate Compute PR error Apply control gain Compute elevator deflection Output elevator control signal Pitch command A/D A/D A/D PWM PWM 0/1 A/D A/D PWM Output data acquisition External Flash RAM 0101… Apply SAS Authority Limiting Watchdog/ Brownout Timing Loop Command Override ? Bypass pitch control CG control PWM N Y Command CG to full forward CG command PWM Bypass CG control Data switch 0/1 Data switch 0/1 Primary Control Algorithm
  • 34. System Dynamic Response Step Input System Off System On Turbulence System Off System On
  • 35. Wing Aerodynamic and Structural Model
  • 36. Wing Aerodynamic and Structural Model
  • 39. CG Control System Specifications
  • 42. Design Issues and Risk Assessment Mike Sheek
  • 43. Test-Bed Aircraft N/A High -Ensure that an experienced pilot flies Aircraft -Select an ‘Almost Ready to Fly' model to use in re-building effort -Ensure that all pre-flight tests and precautions have been made before flight tests -Require intense last minute build effort -Inability to verify SAS in RC aircraft Test-bed aircraft mishap prior to SAS tests Off-Ramp: March 19 th If SAS cannot be integrated by this date prioritization will move to developing alternative testing apparatus Medium -Develop test-bed aircraft in parallel with SAS -Develop back-up testing apparatus to test SAS capabilities -Require unexpected team resources to overcome complication Unable to integrate the SAS with the test-bed Aircraft Off-Ramp Risk Factor Accommodations Impact Specific Risk
  • 44. Microcontroller N/A High -Select and thoroughly test processor capabilities (w/ components if possible) ASAP -Allocate funds for a back-up microprocessor if need arises -Degrade / disable required performance requirements -Require unexpected team resources to overcome complication -Exceed budget when replacement must be ordered or find required replacement unavailable Discrepancy between expected vs. actual performance N/A High -Schedule critical path -Select processor ASAP -Build expertise on subject by having 3 team members taking Dr. Palo’s Data Acquisition course -Unable to integrate all Components by Project Due Date Software Development Inexperience Off-Ramp Risk Factor Accommodation Impact Specific Risk
  • 45. Presented by Adam Dean Project Management Plan
  • 47. Project Organization Chart Movable CG Apparatus Design -Mike Sheek- Project Manager (PM) -Adam Dean- Chief Financial Officer (CFO) -Barry Blakeley- Documentation / Web Maintenance -Mike Sheek- -Jake Hanft- Project Test and Evaluation -Barry Blakeley- Flight Control / USAS Integration -Tom Bateman- Control System Software Design -Jake Hanft- Control System Hardware Design -Jake Hanft Test-Bed Aircraft Design - Tom Bateman- Safety Engineer -Tom Bateman-
  • 48. Work Breakdown Structure 1.0 Program Management 2.0 System Engineering 3.0 Control System 6.0 C.G. Apparatus 4.0 Test-Bed Aircraft 5.0 Data Acquisition 7.0 Pre-Flight Simulate and Verify 1.1 Budget Management (CFO) 1.2 Task Delegation and Organization 1.4 Website and Documentation 1.3 Weekly Time Sheet Collection 1.1 Scheduling 2.1System Integration 2.2 System Specifications 2.3 Design to Specs. Monitoring 3.1 Micro Controller 3.2 Control Theory 3.2 Servos 3.4 Control Software 4.3 Engine Selection 4.2 Structure 4.1Aero Dynamics 3.3 Power System 5.1 Storage Device 3.5 Sensors (Rate Gyros, Accelerometer, etc.) 3.6 Integration 4.7 Tail-Boom Design 4.5 Backbone Design 4.4 Fuselage Design 5.2 Data Source Interfaces 4.6 Landing Gear Design 5.3 Data Uplink 6.3 C.G. Manipulation Effects 6.1 C.G. H/W 6.2 C.G. S/W 6.4 C.G. Apparatus Control Interface 8.0 Test and Verification 8.1 Develop Test Plans 4.8 Fabrication 8.3 Test analysis and Reporting 8.2 C.G. Control System Bench Test 8.3 SAS Hardware Bench test 8.2 Static Wing Loading Test 8.3 Test-Bed Aircraft Flight Test 8.2 C.G. Control System Flight Test 8.3 SAS Hardware Passive Inflight Test 8.2 SAS Active Inflight Test 7.2 Simulation Software 7.1 Simulation Method 7.4 Verification Software 7.3 Verification Method
  • 49. Test and Evaluation Program CG Control System Bench Test Due ~ 3/5/04 SAS Hardware Passive Inflight Test Due ~ 4/2/04 Data Analysis Due ~ 4/29 SAS Hardware Active Inflight Test Due ~ 4/22/04 CG Control System Flight Test Due ~ 3/29/04 Test-Bed Aircraft Flight Test Due ~ 3/23/04 Static Wing Loading Test Due ~ 10/903 SAS Hardware Bench Test Due ~ 3/12/04
  • 57.