FEATUREFEATURE Putrajaya Core Island Plant 4:
Malaysia’s first remotely charged chilled-water
storage system
Arul Hisham Abdul Rahim, Principal, AHAR Consultants; and
Rosli Mohamed, Partner, AHAR Consultants
S
ince 1999, Malaysia has had
a new federal administrative
center: Putrajaya, a 5,000-acre
planned city that is one of
Southeast Asia’s largest construction
projects. Still in development some
15 miles south of Kuala Lumpur, it
was established as part of the Malay-
sian government’s plan to move its
agencies and ministries out of “KL”
to alleviate traffic congestion and
preserve that city’s status as a major
commercial and financial hub.
	 Putrajaya is gearing up to one day
accommodate a resident population
of 350,000; it currently has around
72,000 inhabitants. The federal, com-
mercial and residential buildings
rising up across the city stand amid
lush green parks, botanical gardens,
wetlands and a 1,600-acre manmade
lake – forming a landscape that
planners have called an “intelligent
garden city.” Putrajaya is divided
into 20 “precincts,” with a concentra-
tion of employment and commercial
development in the four precincts on
Putrajaya Core Island.
	 Gas District Cooling (Putrajaya)
Sdn Bhd (GDCP) supplies the chilled
water to air condition approximately
13 million sq ft of space in Putrajaya.
The company is a subsidiary of Malay-
sia’s largest district cooling provider,
Gas District Cooling (M) Sdn Bhd (part
of the PETRONAS group of compa-
nies), which currently owns, manages
and operates six cogeneration/district
cooling plants in Putrajaya.
	 GDCP’s newest district cooling
facility in the city, Plant 4, was com-
pleted in early 2013 on Putrajaya Core
Island. It was built in anticipation of
new office buildings in the island’s
Precincts 3 and 4. GDCP sought the
optimal solution to accommodate the
corresponding expected increase in
cooling demand – and the result was
a chilled-water storage system that is
the first of its kind in Malaysia.
PLANNING FOR THE FUTURE
	 Putrajaya was conceived to be
an integrated development that
would take into consideration all
the administrative and technology
needs of its residents and tenants.
The infrastructure services – elec-
trical, domestic water, telecom-
munications and chilled water – for
buildings in Precincts 2, 3 and 4 on
Putrajaya Core Island are connected
through the Putrajaya Combined
Utility Tunnel along the island’s
main boulevard.
The Seri Gemilang Bridge, a Putrajaya landmark, serves as the main entrance to the Core Island from the south.
Courtesy © CEphoto, Uwe Aranas/CC-BY-SA-3.0.
GDCP’s Plant 4, commissioned in March 2013,
includes a 100,000-ton-hr thermal energy
storage system that utilizes chilled water
produced during off-peak periods at Plant 2.
Courtesy AHAR Consultants.
8	 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED.
	 In most commercial and govern-
ment offices in Malaysia, air condi-
tioning accounts for more than
60 percent of total building energy
use. Prior to the completion of Plant
4, the island’s Precinct 2, 3 and 4
building air-conditioning needs were
served solely by GDCP Plant 2, located
at Precinct 2. Built in 1998, Plant 2 is
a cogeneration facility utilizing natu-
ral gas to provide energy for steam
absorption chillers, direct-fired chill-
ers and electricity generation for its
own use. The plant is also connected
to the grid of Tenaga Nasional Berhad
(TNB), Malaysia’s national electric
utility, for access to standby and top-
up (peaking) power when needed.
	 In 2009, the city’s master develop-
er Putrajaya Holdings Sdn Bhd under-
took a strategic planning study of the
future chilled-water supply needed to
meet the cooling needs of Core Island
buildings. At the time, the cooling
demand from Precinct 3 and 4 build-
ings was anticipated to exceed the
generating capacity of Plant 2 by 2013.
As the city’s buildings are mainly
offices, 95 percent of the cooling load
occurs during the day. Due to this,
Plant 2 equipment had to be turned
on and off daily depending on the load
demand. This imposed operational
stresses on the equipment, especially
the gas turbines, shortening their life
expectancy. In addition, the Plant 2
site was already fully developed and
could not be expanded further.
	
THE COOLING DEMAND FROM
PRECINCT 3 AND 4 BUILDINGS
WAS ANTICIPATED TO EXCEED
THE GENERATING CAPACITY OF
PLANT 2 BY 2013.
	
	 Installing a new chiller plant
could address the need for additional
new cooling load demand. However,
the energy cost would also increase
correspondingly: With the price of
gas, electricity and water expected to
rise in the future, the generating cost
for chilled-water supply would also
go up. Another option studied was
reducing peak cooling load demand
by load shedding through the use of
chilled-water thermal energy storage.
It is very well-documented world-
wide that the installation and use of
chilled-water storage is an effective
way to meet cooling load and at the
same time lower energy cost (and
often also decrease capital cost).
	 The maximum sendout capac-
ity from the existing GDCP Plant 2
and two potential locations for a new
plant (plots 4U1 and 4U2) were evalu-
ated. Figure 1 shows the existing and
potential future distribution piping
and plants as studied in 2009. It was
decided that construction of a new
plant at plot 4U1 (Plant 5) was not
feasible because of the high capital
cost, which would have included the
installation of new plant equipment
and a new chilled-water pipe loop.
	 Plant 2, designed to primarily
serve Precinct 2, had been extended
to provide cooling energy to Precinct
3 and Precinct 4 between 2007 and
Figure 1. GDCP Existing and Potential Future Plant Locations and Piping on Putrajaya
Core Island, 2009.
Source: Gas District Cooling (Putrajaya) Sdn Bhd.
ST10
ST9
ST8
ST7
ST20
BRIDGE6
BRIDGE4
BRIDGE9
BRIDGE8
PUTRABRIDGE
PRECINCT 4
PRECINCT 3
PRECINCT 2
DATARAN
DATARAN
WAWASAN
DATARAN
PUTRAJAYA
RAKYAT
KHAZANAH
DATARAN
PROMENADE
18U2
18V2
18P9
4GDE
4C8
18P10
3V1
3P1
3M2
3C2
3M1
3G2
3G3
3C11
3C7
3M6
3M5
3M4
3M3
3C3
3C1
3G1
3C4
3C6
2C3
2G1
2C1
2G2
2C4
2C5
2M10
2M5
2M62C7
2C6
2M12P4
2M3
2M4
2M9
2C12
2C10
2C8
2M8
2U1
2C9
2C15
2M11
2C2
2M7
2C14
2G6
2G3
2G4
2C11
2R1
2G5
2C13
2P2
2P3
3C9
3C10
3C12
4M9
4C27
4C22
4C21
4C20
4P6
4C19
4C18
4C174C16
4C15
4G11
4G10
4G9
4G8
4C24
4C25
4P5
4C26
4G7
4C28
4C144C13
4P7
4U1
4R34R44R5
4PP1
4R9
4R84R7
4R6
4P4
4M6
4M7
4M5
4M4
4M8
4R1
4R2
4C9
4M3
4P3
4M2
4M1
4C4
4P2
4C12
4G5
4U2
4G3
4G4
4C11
4C6
4C5
4G24G1
4C24C1
2P1
4C3
4C7
3C5
4M10
18V3
18P8
2U5
2U6
2U8
4T2
4T4B
4T3
4T4A
CUTP2C
CUTP2A
CUTP2B
DN
DN
DN
DN
DN
DNDN
ND
DN
DN
DN
DN
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MM
M
M
M
M
M
MM
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
MSLSHMSLSHMSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSHMSLSHMSLSHSMSLHMSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHSMLSHSMLSH
SMLSH
SMLSH
SMLSH
SMLSH
SMLSH
SMLSH
SMLSHSMLSHSMLSHSMLSHSMLSH
SMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSH
TRANS
LOCAL
CEMENT RENDER
PAVER
DOTTED LINE TO SHOW WALL
CEMENT RENDER
CEMENT RENDERCAPACITOR CEMENT RENDER
CEMENT RENDER
CAPACITOR
( 50 TONNE )TRANSFORMER
2
N.E.R
PPU
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSH
MSLSH
MSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
MSSLH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSHMSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSH
MSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSHMSLSH
MSLSH
MSLSH
MSLSHMSLSH
MSLSHMSLSHMSLSHMSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSH
MSLSHMSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSSLH
MSSLH
MSSLH
MSSLHMS
SLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSSLH
MSLSHMSLSHMSLSH
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
GASMALAYSIA
DISTRICTMETERING
GDCCONSUMER
GASMETERINGSTATION
MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH
MSLSHMSLSHMSLSH
SMLSH
SMLSH
SMLSH
SMLSH
SMLSH
SMLSH
MSLSH
CEMENT RENDER( 50 TONNE )TRANSFORMER
2
CEMENT RENDER( 50 TONNE )TRANSFORMER
2
STATION
PLOT 2U1
PLANT 2
PLOT 4U2
PLANT 4
PLOT 4U1
PLANT 5
N
S
EW
Existing Chilled-Water Piping
Potential Future Chilled-Water Piping
District Energy / Fourth Quarter 2015	 9© 2015 International District Energy Association. ALL RIGHTS RESERVED.
2009, in order to cater to the new
development at the middle and
southern end of Core Island. Plant 2
chilled-water production consisted
(and still consists) of a series of steam
absorption chillers, direct-fired chill-
ers and electric centrifugal chillers.
It also produced (and continues to
produce) around 9 MW electricity for
its ancillary equipment and approxi-
mately 24,000 tons of maximum cool-
ing capacity after taking into consid-
eration equipment degradation and
standby capacity.
	 In light of the remote locations of
some prospective development plots,
particularly those located at the Core
Island’s southernmost tip, the site for
Plant 4 was chosen because of its
·· close proximity to existing cooling
load demand and near-term
customers;
·· reasonable proximity to existing
Plant 2, which would make remote
thermal energy storage tank
charging from Plant 2 a possibility;
and
·· availability of existing utilities
infrastructure (electricity, water,
chilled-water pipes and gas).
	 With a charging capacity at Plant
2 of 20,000 tons operating for 10 hours
a day, it was theoretically possible to
produce up to 200,000 ton-hr for stor-
age. Chilled-water generation by Plant
2 with thermal energy storage at Plant
4 was determined to be able to serve
all existing and under-construction
loads during daytime peak periods.
TYPICAL LOAD PROFILE
	 In a typical day in 2009, the
peak load at Plant 2 (fig. 2) occurred
between 6 a.m. and 9 a.m. when the
plant experienced pulldown load from
the buildings. From 10 a.m. on, the
load profile was relatively constant
until 5 p.m. when the offices were
closed. Based on the foregoing, the
following conclusions were derived:
1.	 Plant peak load was approximately
25 percent of the average plant
sendout load.
2.	 The coincident building peak loads
of 20,000 tons occurred during this
same 6-9 a.m. period due to the
similarity of building type (i.e., pri-
marily office buildings).
3.	 Demand-side management such as
precooling of the buildings during
nighttime was not practiced by the
buildings’ operators to reduce this
peaking pulldown load demand.
4.	 The buildings’ load profile of around
16,000 tons was generally quite con-
stant from 10 a.m. until 5 p.m.
5.	 There was hardly any night load.
6.	 In addition to the anticipated
higher cooling load demand in the
future, higher peaking load occur-
ring early in the morning also
necessitated that more chillers be
run to meet the cooling load.
PLANT 4 DESIGN GOALS
	 The capacity and options study
was completed at the end of 2009.
Subsequently, the design team, led
by AHAR Consultants together with
the architect, cost surveyor, civil and
structural engineers, proceeded with
the design and construction of Plant
4. The design goals for Plant 4 were to
·· accommodate the increase in new
customers’ chilled-water demand;
·· optimize asset utilization of Plant 2;
·· increase Plant 2 in-house electricity
generation efficiency and reduce
electricity import from TNB;
·· reduce frequent start-stop opera-
tion of gas turbines at Plant 2,
improving their life span;
·· mitigate the peaking load while
using the existing chillers at Plant 2;
and
·· provide better control of chilled-
water supply temperature.
	 Plant 4 was designed as a hybrid
plant consisting of chilled-water stor-
age and electric-driven chillers. The
construction of the whole plant was
phased as follows:
·· Phase 1 – one thermal energy storage
tank of nominal rated capacity of
100,000 ton-hr charged from Plant 2
with associated thermal energy stor-
age and secondary booster pumps
·· Phase 2 – a second thermal energy
storage tank of nominal rated
capacity of 100,000 ton-hr charged
from Plant 2 with associated thermal
energy storage and secondary
booster pumps
·· Phase 3 – electric-driven centrifugal
chillers with 12,000-ton installed
capacity and associated condenser
water pumps, chiller pumps and
associated secondary booster pumps
	 Bids for the engineering, procure-
ment, construction and commission-
ing for Phase 1 were called in the
second quarter of 2010, with work
completed in early 2013. Construction
of Phases 2 and 3 is expected to com-
mence in 2017 and 2020, respectively,
depending on the actual load growth
of the Core Island.
	 At full buildout this three-phase
design will allow for charging the
thermal energy storage tanks with
the 6.1 C (43 F) supply water from
Plant 2, with the ability to peak this
water down to 3.9 C (39 F) using the
Plant 4 chillers while maintaining the
ability to produce chilled water from
Figure 2. Screenshot of Typical Load Profile, GDCP Plant 2, 2009.
Source: Gas District Cooling (Putrajaya) Sdn Bhd.
Buildings Start
Operation
High Peaking Load
Low Night Load
10	 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED.
a highly efficient series-counterflow
configuration. This will allow for
significantly larger production stor-
age capacity to be achieved from the
same-sized tanks.
	 These objectives will be achieved
with a relatively simple piping and
valving configuration and with no
more pumps than would be required
for a traditional primary-secondary
pumping arrangement.
	
CHALLENGES OF REMOTELY
CHARGING
	 The design team had to consider
numerous challenges involved in
remotely charging the two chilled-
water storage tanks. From the
hydraulic point of view, the top water
level of each of these atmospheric
tanks had to be at the highest point
of the entire system. Plant 2, which
at 39.2 m (128.6 ft) above sea level is
higher than the 33.6 m (110 ft) above
sea level where the Plant 4 tanks
will be, requires a minimum return
pressure of 3 bar (43.5 psi). Given the
tanks’ height of 32 m (105 ft), the
resultant system’s pressure is more
than adequate to provide sufficient
return pressure to Plant 2.
	 Another issue of concern was the
system pressure generated during dis-
charge. The combined tank static head
and Plant 4 pump discharge pressure
had to be lower than the existing sys-
tem’s design pressure rating of 16 bar
(232 psi). Numerous simulations using
hydraulic software were conducted
to determine the maximum Plant 4
pump discharge pressure to ensure
that the designed pressure rating was
not exceeded.
	 The ability of existing pumps at
Plant 2 to move a huge amount of
chilled water through the existing 900-
mm (35.4-inch) pipe during charging
was also evaluated. This was a major
concern especially in Phase 2 when the
two tanks will require charging, as the
most likely path of the chilled water
would be the short distance between
Plant 2 and Plant 4 (see fig. 1). It was
determined that the Plant 2 pump
head was adequate to move charging
and discharging chilled-water flow up
to a certain stage. However, if the load
growth of Precinct 3 and 4 concentrates
mainly at the south end of the Core
Island, Plant 2 pumps will have to be
upgraded depending on the plant send-
out ratio between Plant 2 and Plant 4.
TANK SPECIFICATIONS
	 The performance specifications
for each of the two chilled-water
storage tank and diffuser systems to
be installed at Plant 4 are shown in
table 1.
	 Based on the capacity, the speci-
fied tank dimensions were 45 m
(147.6 ft) diameter and 32 m (105.0 ft)
high, with a 700-mm- (27.6-inch-) thick
concrete wall. It is believed that, with
its particular capacity and dimen-
sions, the first of these tanks, com-
pleted in 2013, is the largest water-
retaining structure in Malaysia.
	 Prestressed concrete was used to
reduce the tank wall thickness. Con-
crete was chosen because it offered
better cost benefit to the owner com-
pared to steel. As Malaysia is not a
steel producer, the cost to import steel
plates would have made this size of
tank uneconomical. A concrete tank
of this size also posed concerns to the
local authorities about its potential for
sabotage as well as leakage. Although
Malaysia is a relatively terrorism-free
country, the authorities insisted that
a risk impact analysis be conducted.
The study concluded that the con-
crete tank is less likely a terrorist
target than the ministry buildings in
Putrajaya. To mitigate any possibility
of leakage, the design team decided to
use two layers of 2-mm (0.078-inch)
and 3-mm (0.118-inch) spray poly-
urea waterproofing membrane, with
50 mm (1.97 inches) of polyurethane
thermal insulation sandwiched in
between. Rigorous inspections and
quality control checks were conducted
during construction to ensure water-
tightness requirements were met.
	 The storage tank has an internal
stratification diffuser inlet and outlet
header design arranged to distribute
the flow for proper efficient opera-
tion during charging and discharging
modes. The diffuser header design
utilizes a directed flow-splitting
approach to evenly distribute the
water to the nozzles. The nozzles are
distributed radially around the area
centroid of the tank, and the directed
flow-dividing elements of the system
assure that each nozzle is fed with
the same volume of water. The flow
velocity is gradually reduced in the
header system from 1.5 m/s (4.9 ft/s)
55,399 cu m (14.6 million gal)
100,000 ton-hr @ 6.5 C (11.7 F) delta T
4,610 cmh (20,300 gpm)
More than 90% including thermocline,
freeboard and diffuser volume
13.3 C (56 F)
6.1 C (43 F)
6.1 C (43 F)
Maximum 2,000
Less than 2
3.05 m (10 ft) water gauge
2% of rated thermal energy storage
capacity at 3.9 C (39 F)
Spray polyurethane
Spray polyurea
Water Volume
Rated Cooling Storage Capacity
Rated Tank Discharge Flow Rate Capacity Per Hour
Usable Discharge Capacity
Design Inlet Temperature During Discharging Cycle
Design Outlet Temperature During Discharging Cycle
Design Inlet Temperature During Charging Cycle
Reynolds Number
Froude Number
Maximum Pressure Loss Between Inlet and Outlet Flange
Maximum Heat Gain Over 24 Hours
Tank Insulation Material
Tank Waterproof Material
Source: AHAR Consultants.
Table 1. Performance Specifications for GDCP Plant 4 Chilled-Water Storage Tank and
Diffuser System.
District Energy / Fourth Quarter 2015	 11© 2015 International District Energy Association. ALL RIGHTS RESERVED.
in the feeder pipe to 0.1 m/s (0.33 ft/s)
at the nozzle exit. The large circular
nozzles expel the water parallel to
the water surface or tank base, induc-
ing secondary water movement only
in a parallel layer. Warm water is
withdrawn from the top of the tank,
cooled and reinserted at the bottom
of the tank during the charging cycle.
Cold water is withdrawn from the
bottom of the tank and dispatched to
the buildings, where it is warmed and
returned to the top of the tank during
the discharging cycle.
PHASE 1 PERFORMANCE
	 After construction of Plant 4
(Phase 1) was completed in early
2013, it was successfully commis-
sioned in March 2013. A typical five-
day charging and discharging cycle in
February 2013 is shown in figure 3.
	 Figure 3 shows that the load
profile increased to 25,000 tons peak
load early in the morning and aver-
aged around 22,000 ton-hr. (Figure 3
also reflects current load and sendout
capacity.) With the new configura-
tion, this peak load is taken up by
the chilled-water storage discharge
instead of additional chillers run at
Plant 2. Fewer chillers are required
to satisfy daily load, thus enhancing
system availability. There is also a
reduction of 4 MW of electrical power
imported from the electricity compa-
ny. This has significantly reduced the
electrical maximum demand charge
incurred during peak periods, cor-
respondingly lowering the unit util-
ity cost of chilled-water production.
Plant 2 electricity generation effi-
ciency has also improved by having
constant loading of the turbine gen-
erators day and night. The generators
are able to be fully loaded and oper-
ate at optimum efficiency with cooler
nighttime ambient temperatures.
	 Thermal energy storage tank dis-
charge capacity averaging between
88,000 and 92,000 ton-hr is obtained
daily, with a maximum instantaneous
discharge capacity of 13,000 tons.
With the steam chillers maintaining
a constant output of 14,500 tons day
and night, the gas turbines are able to
be operated 24 hours per day, result-
ing in better utilization and avoidance
of start-stop operations.
	 The performance of the diffuser
system was also analyzed during the
commissioning period from January
to March 2013. Most of the significant
performance parameters exceeded
the design criteria, as shown in table
2. Most significant is the thermocline
thickness averaging 0.8 m (2.62 ft).
This thin thermocline thickness indi-
cates that the diffusers were working
properly, with the cold and warm
water bodies being properly stratified
in the tank.
	 A screenshot of thermocline
thickness is shown in figure 4. The
x-axis refers to time, while the y-axis
is the temperature. Various colored
lines represent individual tempera-
ture sensors installed at 0.5-m (1.64-
ft) intervals vertically inside the tank.
By calculating the water volume
and the time spread at each pair of
sensors, the thermocline averages
0.87 m (2.85 ft) thick. In comparison,
thermocline thicknesses of 1-2 m
(3.28-6.56 ft) are not uncommon in
other chilled-water tank installations
worldwide.1
	 The significance of a thin ther-
mocline is that it yields better storage
efficiency. The diffuser design using
three double-ring octagonal pipes with
drilled 8-mm (0.31-inch) nozzles spray-
Figure 3. Putrajaya Core Island Plants 2 and 4 Load Profile and Sendouts, February 2013.
Source: Gas District Cooling (Putrajaya) Sdn Bhd.
109,012 ton-hr @ 6.5 C (11.7 F) delta T
78,433 ton-hr @ 4.32 C (39.8 F) delta T
72,585 ton-hr @ 4.32 C (39.8 F) delta T
0.6-1.0 m (1.97-3.28 ft)
1,991
0.09
92.54%
2.25 m (7.38 ft) water gauge
0.57% of rated thermal energy storage capacity
Rated Storage Capacity
Charging Storage Capacity
Discharge Storage Capacity
Thermocline Thickness
Reynolds Number
Froude Number
Usable Tank Volume
Maximum Pressure Loss
Maximum Heat Gain Over 24 Hours
Source: AHAR Consultants.
Table 2. Tested Performance of GDCP Plant 4 Chilled-Water Storage Tank and Diffuser
System (Jan. 17, 2013).
1
Bahnfleth, William P., and Amy Musser, “Thermal Performance of a Full-Scale Stratified Chilled-Water Thermal
Storage Tank,” ASHRAE Conference proceeding, Toronto 1998.
Average Plant 2 Sendout Capacity – 14,500 Tons
Chiller Discharge Charging —— Plant Sendout
12	 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED.
ing at a 120-degree angle in the vertical
plane proved that the actual perfor-
mance exceeded specifications. A total
of 91,500 nozzles ensure that the water
is evenly distributed and diffused.
	 At this juncture, the objective for
better chilled-water supply tempera-
ture control has not yet been accom-
plished, as Plant 4 is still dependent
on Plant 2 for its chilled water. It is
envisaged that when the electric
chillers are installed at Plant 4 in the
ultimate phase – where the chillers
can be operated either in parallel or
in series-counterflow configurations
with the storage tank – this design
intent can also be achieved.
MEETING EXPECTATIONS
	 Plant 4 has been in operation to
supply chilled water to Precincts 3
and 4 in Putrajaya Core Island since
January 2013. Initial results have
shown that the operation of this
chilled-water storage system has met
the expectations of the client and
design team. Currently, Plants 2 and
4 are operating in tandem during the
daytime to supply chilled water.
	 The installation of chilled-water
storage in a district cooling system is
an excellent tool in demand-side
management. This technology
enables a plant owner to reduce
energy cost by decreasing electric-
ity maximum demand during peak
periods. Thermal energy storage also
increases the load supply capability
during the high peak period and
enhances district cooling system reli-
ability and availability.
	 By incorporating thermal energy
storage, GDCP has improved system
redundancy, as fewer chillers are
required during the peak period. The
company is also better able to utilize
the assets at Plant 2 by running the
gas turbines 24/7. Daily start-stop
operation of the gas turbines has
been avoided, improving equipment
life expectancy. Furthermore, the use
of chilled-water storage has reduced
net capital expenses by 40 percent
compared to installation of an equiv-
alent capacity of conventional chiller
plant equipment. The chilled-water
production unit cost remains similar
to the pre-Plant 4 period, despite the
operation of both plants.
	 In addition to these operational
and financial advantages, GDCP is also
seeing reduced greenhouse gas emis-
sions. The use of thermal energy stor-
age at Plant 4 with chilled-water gener-
ation from Plant 2 offers a significantly
decreased carbon footprint – lower by
445 metric tons of carbon dioxide per
week, or 20.7 percent – compared to
that of a grid-connected conventional
chiller Plant 4 and the existing Plant 2.
	 While providing these numerous
benefits, GDCP Plant 4 has also, sig-
nificantly, made history as the first
remotely charged satellite chilled-
water storage system in Malaysia and
has the biggest reinforced concrete
chilled-water tank in the country, as
well as in Asia.
Authors’ Note: We acknowledge the
assistance provided to AHAR Consul-
tants during the evaluation, design and
implementation of the Plant 4 thermal
energy storage project, in particular by our
engineering team members Mark Spurr
and Bryan Kleist of FVB Energy Inc., Min-
neapolis, Minn., and John S. Andrepont of
The Cool Solutions Co., Lisle, Ill. We also
thank John Andrepont (with whom one of
the authors collaborated on the first large
chilled-water thermal energy storage proj-
ect in Malaysia in the mid-1990s) for his
contributions to the content and writing of
this article.
Arul Hisham Abdul
Rahim, principal with
AHAR Consultants, has a
wide range of experience in
thermal storage and district
cooling with more than 20
years of practice. A regis-
tered engineer with the Board of Engineers
Malaysia, he is a member of ASHRAE and
a fellow with the Institution of Engineers
Malaysia. He holds a degree in mechanical
engineering from The University of Texas
at El Paso. Hisham can be contacted at
arulhisham@aharconsultants.com.
Rosli Mohamed, partner
with AHAR Consultants,
graduated from the
University of North
Carolina at Charlotte in
mechanical engineering.
Prior to joining the firm, he
worked in various capacities with Tenaga
Nasional Berhad, Malaysia’s national elec-
tricity company. He is a fellow with the
Institution of Engineers Malaysia and a
registered engineer with the Board of
Engineers Malaysia. He can be reached at
roslimohamed@aharconsultants.com.
Figure 4. Screenshot of GDCP Plant 4 Thermal Energy Storage Tank Temperature Sensor
Readings.
Source: AHAR Consultants.

Weitere ähnliche Inhalte

Was ist angesagt?

passive heating system with trombe wall
passive heating system with trombe wall passive heating system with trombe wall
passive heating system with trombe wall GrkemDiken
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling Systempnnazz
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System SilkThreadJewellery
 
thermal comfort climatology architecture
thermal comfort climatology architecturethermal comfort climatology architecture
thermal comfort climatology architecturemanoj chauhan
 
Chilled beam
Chilled beamChilled beam
Chilled beamAshif AR
 
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...Juma Yousef J. Saleh جمعة يوسف جمعة صالح
 
Air conditioning (malay)
Air conditioning (malay)Air conditioning (malay)
Air conditioning (malay)Mohamad Haniff
 
Electronic cooling
Electronic coolingElectronic cooling
Electronic coolingabuamo
 
Pengenalan kepada Chiller (small package unit)
Pengenalan kepada Chiller (small package unit)Pengenalan kepada Chiller (small package unit)
Pengenalan kepada Chiller (small package unit)apizero
 
Chilled water systems
Chilled water systemsChilled water systems
Chilled water systemsJason Abston
 
Zeor energy buliding
Zeor energy bulidingZeor energy buliding
Zeor energy bulidingVrati Sharma
 

Was ist angesagt? (20)

Sistem Chiller
Sistem ChillerSistem Chiller
Sistem Chiller
 
passive heating system with trombe wall
passive heating system with trombe wall passive heating system with trombe wall
passive heating system with trombe wall
 
Tesla solar roof
Tesla solar roofTesla solar roof
Tesla solar roof
 
Topic 3 District Cooling System
Topic 3 District Cooling SystemTopic 3 District Cooling System
Topic 3 District Cooling System
 
Cept case study
Cept case studyCept case study
Cept case study
 
Ventilation Systems
Ventilation SystemsVentilation Systems
Ventilation Systems
 
Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System Architecture - Centralized Air Conditioning System
Architecture - Centralized Air Conditioning System
 
Air condition system
Air condition systemAir condition system
Air condition system
 
thermal comfort climatology architecture
thermal comfort climatology architecturethermal comfort climatology architecture
thermal comfort climatology architecture
 
CASE STUDY.pdf
CASE STUDY.pdfCASE STUDY.pdf
CASE STUDY.pdf
 
Dry & Wet Riser Systems
Dry & Wet Riser SystemsDry & Wet Riser Systems
Dry & Wet Riser Systems
 
Chilled beam
Chilled beamChilled beam
Chilled beam
 
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...
Module (s 203) fundamentals of cooling tower أساسيات ومبدأ عمل أبراج التبريد-...
 
Air conditioning (malay)
Air conditioning (malay)Air conditioning (malay)
Air conditioning (malay)
 
Surat Residency Green Building Concept PPT
 Surat Residency Green Building Concept PPT Surat Residency Green Building Concept PPT
Surat Residency Green Building Concept PPT
 
Electronic cooling
Electronic coolingElectronic cooling
Electronic cooling
 
Pengenalan kepada Chiller (small package unit)
Pengenalan kepada Chiller (small package unit)Pengenalan kepada Chiller (small package unit)
Pengenalan kepada Chiller (small package unit)
 
Chapter4.pdf
Chapter4.pdfChapter4.pdf
Chapter4.pdf
 
Chilled water systems
Chilled water systemsChilled water systems
Chilled water systems
 
Zeor energy buliding
Zeor energy bulidingZeor energy buliding
Zeor energy buliding
 

Ähnlich wie Putrajaya Core Island Plant 4: Malaysia's first remotely charged chilled water storage system

Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgeNate Sandvig
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuDato Mat Isa
 
Dc summit jeddah 2010 george berbari presentation
Dc summit jeddah 2010   george berbari presentationDc summit jeddah 2010   george berbari presentation
Dc summit jeddah 2010 george berbari presentationOliviaModisakeng
 
IJSRED-V2I2P6
IJSRED-V2I2P6IJSRED-V2I2P6
IJSRED-V2I2P6IJSRED
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at CheeyapparaIRJET Journal
 
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...IJAEMSJORNAL
 
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...Yury Lyapichev
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbourneJohn Rimac
 
Water Treatment
Water TreatmentWater Treatment
Water TreatmentSite Web
 
fujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorialfujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorialDaniel ANG
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
The future of hydro power in kenya
The future of hydro power in kenyaThe future of hydro power in kenya
The future of hydro power in kenyaSammy Jamar
 
Construction Regulatory Issues for Large Scale Solar (PWC 2016)
Construction Regulatory Issues for Large Scale Solar (PWC 2016)Construction Regulatory Issues for Large Scale Solar (PWC 2016)
Construction Regulatory Issues for Large Scale Solar (PWC 2016)Turlough Guerin GAICD FGIA
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerPeter Cockcroft
 

Ähnlich wie Putrajaya Core Island Plant 4: Malaysia's first remotely charged chilled water storage system (20)

Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for Terengganu
 
Dc summit jeddah 2010 george berbari presentation
Dc summit jeddah 2010   george berbari presentationDc summit jeddah 2010   george berbari presentation
Dc summit jeddah 2010 george berbari presentation
 
MEI Solar
MEI Solar MEI Solar
MEI Solar
 
IJSRED-V2I2P6
IJSRED-V2I2P6IJSRED-V2I2P6
IJSRED-V2I2P6
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET-  	  Design of Small Hydro Electric Power Plant at CheeyapparaIRJET-  	  Design of Small Hydro Electric Power Plant at Cheeyappara
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
 
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
Cost benefit Analysis Between Solar-Powered and Diesel Fuel-Fed Pumps of the ...
 
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...
Lyapichev. Hydropower of Tadjikistan is extremely sensitive to climate change...
 
Power+Generation+Project+-+Melbourne
Power+Generation+Project+-+MelbournePower+Generation+Project+-+Melbourne
Power+Generation+Project+-+Melbourne
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2
 
fujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorialfujairah-2-uae-ka26-cogeneration-advertorial
fujairah-2-uae-ka26-cogeneration-advertorial
 
Thermal power
Thermal powerThermal power
Thermal power
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
The future of hydro power in kenya
The future of hydro power in kenyaThe future of hydro power in kenya
The future of hydro power in kenya
 
Construction Regulatory Issues for Large Scale Solar (PWC 2016)
Construction Regulatory Issues for Large Scale Solar (PWC 2016)Construction Regulatory Issues for Large Scale Solar (PWC 2016)
Construction Regulatory Issues for Large Scale Solar (PWC 2016)
 
OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2
 
Ipp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fullerIpp process in indonesia 1995 by cockcroft and fuller
Ipp process in indonesia 1995 by cockcroft and fuller
 

Kürzlich hochgeladen

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Putrajaya Core Island Plant 4: Malaysia's first remotely charged chilled water storage system

  • 1. District Energy / Fourth Quarter 2015 7© 2015 International District Energy Association. ALL RIGHTS RESERVED. FEATUREFEATURE Putrajaya Core Island Plant 4: Malaysia’s first remotely charged chilled-water storage system Arul Hisham Abdul Rahim, Principal, AHAR Consultants; and Rosli Mohamed, Partner, AHAR Consultants S ince 1999, Malaysia has had a new federal administrative center: Putrajaya, a 5,000-acre planned city that is one of Southeast Asia’s largest construction projects. Still in development some 15 miles south of Kuala Lumpur, it was established as part of the Malay- sian government’s plan to move its agencies and ministries out of “KL” to alleviate traffic congestion and preserve that city’s status as a major commercial and financial hub. Putrajaya is gearing up to one day accommodate a resident population of 350,000; it currently has around 72,000 inhabitants. The federal, com- mercial and residential buildings rising up across the city stand amid lush green parks, botanical gardens, wetlands and a 1,600-acre manmade lake – forming a landscape that planners have called an “intelligent garden city.” Putrajaya is divided into 20 “precincts,” with a concentra- tion of employment and commercial development in the four precincts on Putrajaya Core Island. Gas District Cooling (Putrajaya) Sdn Bhd (GDCP) supplies the chilled water to air condition approximately 13 million sq ft of space in Putrajaya. The company is a subsidiary of Malay- sia’s largest district cooling provider, Gas District Cooling (M) Sdn Bhd (part of the PETRONAS group of compa- nies), which currently owns, manages and operates six cogeneration/district cooling plants in Putrajaya. GDCP’s newest district cooling facility in the city, Plant 4, was com- pleted in early 2013 on Putrajaya Core Island. It was built in anticipation of new office buildings in the island’s Precincts 3 and 4. GDCP sought the optimal solution to accommodate the corresponding expected increase in cooling demand – and the result was a chilled-water storage system that is the first of its kind in Malaysia. PLANNING FOR THE FUTURE Putrajaya was conceived to be an integrated development that would take into consideration all the administrative and technology needs of its residents and tenants. The infrastructure services – elec- trical, domestic water, telecom- munications and chilled water – for buildings in Precincts 2, 3 and 4 on Putrajaya Core Island are connected through the Putrajaya Combined Utility Tunnel along the island’s main boulevard. The Seri Gemilang Bridge, a Putrajaya landmark, serves as the main entrance to the Core Island from the south. Courtesy © CEphoto, Uwe Aranas/CC-BY-SA-3.0. GDCP’s Plant 4, commissioned in March 2013, includes a 100,000-ton-hr thermal energy storage system that utilizes chilled water produced during off-peak periods at Plant 2. Courtesy AHAR Consultants.
  • 2. 8 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED. In most commercial and govern- ment offices in Malaysia, air condi- tioning accounts for more than 60 percent of total building energy use. Prior to the completion of Plant 4, the island’s Precinct 2, 3 and 4 building air-conditioning needs were served solely by GDCP Plant 2, located at Precinct 2. Built in 1998, Plant 2 is a cogeneration facility utilizing natu- ral gas to provide energy for steam absorption chillers, direct-fired chill- ers and electricity generation for its own use. The plant is also connected to the grid of Tenaga Nasional Berhad (TNB), Malaysia’s national electric utility, for access to standby and top- up (peaking) power when needed. In 2009, the city’s master develop- er Putrajaya Holdings Sdn Bhd under- took a strategic planning study of the future chilled-water supply needed to meet the cooling needs of Core Island buildings. At the time, the cooling demand from Precinct 3 and 4 build- ings was anticipated to exceed the generating capacity of Plant 2 by 2013. As the city’s buildings are mainly offices, 95 percent of the cooling load occurs during the day. Due to this, Plant 2 equipment had to be turned on and off daily depending on the load demand. This imposed operational stresses on the equipment, especially the gas turbines, shortening their life expectancy. In addition, the Plant 2 site was already fully developed and could not be expanded further. THE COOLING DEMAND FROM PRECINCT 3 AND 4 BUILDINGS WAS ANTICIPATED TO EXCEED THE GENERATING CAPACITY OF PLANT 2 BY 2013. Installing a new chiller plant could address the need for additional new cooling load demand. However, the energy cost would also increase correspondingly: With the price of gas, electricity and water expected to rise in the future, the generating cost for chilled-water supply would also go up. Another option studied was reducing peak cooling load demand by load shedding through the use of chilled-water thermal energy storage. It is very well-documented world- wide that the installation and use of chilled-water storage is an effective way to meet cooling load and at the same time lower energy cost (and often also decrease capital cost). The maximum sendout capac- ity from the existing GDCP Plant 2 and two potential locations for a new plant (plots 4U1 and 4U2) were evalu- ated. Figure 1 shows the existing and potential future distribution piping and plants as studied in 2009. It was decided that construction of a new plant at plot 4U1 (Plant 5) was not feasible because of the high capital cost, which would have included the installation of new plant equipment and a new chilled-water pipe loop. Plant 2, designed to primarily serve Precinct 2, had been extended to provide cooling energy to Precinct 3 and Precinct 4 between 2007 and Figure 1. GDCP Existing and Potential Future Plant Locations and Piping on Putrajaya Core Island, 2009. Source: Gas District Cooling (Putrajaya) Sdn Bhd. ST10 ST9 ST8 ST7 ST20 BRIDGE6 BRIDGE4 BRIDGE9 BRIDGE8 PUTRABRIDGE PRECINCT 4 PRECINCT 3 PRECINCT 2 DATARAN DATARAN WAWASAN DATARAN PUTRAJAYA RAKYAT KHAZANAH DATARAN PROMENADE 18U2 18V2 18P9 4GDE 4C8 18P10 3V1 3P1 3M2 3C2 3M1 3G2 3G3 3C11 3C7 3M6 3M5 3M4 3M3 3C3 3C1 3G1 3C4 3C6 2C3 2G1 2C1 2G2 2C4 2C5 2M10 2M5 2M62C7 2C6 2M12P4 2M3 2M4 2M9 2C12 2C10 2C8 2M8 2U1 2C9 2C15 2M11 2C2 2M7 2C14 2G6 2G3 2G4 2C11 2R1 2G5 2C13 2P2 2P3 3C9 3C10 3C12 4M9 4C27 4C22 4C21 4C20 4P6 4C19 4C18 4C174C16 4C15 4G11 4G10 4G9 4G8 4C24 4C25 4P5 4C26 4G7 4C28 4C144C13 4P7 4U1 4R34R44R5 4PP1 4R9 4R84R7 4R6 4P4 4M6 4M7 4M5 4M4 4M8 4R1 4R2 4C9 4M3 4P3 4M2 4M1 4C4 4P2 4C12 4G5 4U2 4G3 4G4 4C11 4C6 4C5 4G24G1 4C24C1 2P1 4C3 4C7 3C5 4M10 18V3 18P8 2U5 2U6 2U8 4T2 4T4B 4T3 4T4A CUTP2C CUTP2A CUTP2B DN DN DN DN DN DNDN ND DN DN DN DN M M M M M M M M M M M M M M M M M M M M M M M M M M M M M MM M M M M M MM M M MM M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M MM M M M M M M M M M M M M M M M M M M M M M M M M M M M MM M M M M M M M M M M M M M M M M M M M M M M M M M M MSLSHMSLSHMSLSH MSLSHMSLSH MSLSH MSLSH MSLSHMSLSHMSLSHMSLSH MSLSH MSLSHMSLSHMSLSHSMSLHMSLSH MSLSH MSLSH MSLSHMSLSHMSLSH MSLSHMSLSHMSLSH MSLSHMSLSH MSLSH MSLSH MSLSHMSLSH MSLSH MSLSH MSLSHMSLSHMSLSHMSLSHMSLSHSMLSHSMLSH SMLSH SMLSH SMLSH SMLSH SMLSH SMLSH SMLSHSMLSHSMLSHSMLSHSMLSH SMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSHSMLSH TRANS LOCAL CEMENT RENDER PAVER DOTTED LINE TO SHOW WALL CEMENT RENDER CEMENT RENDERCAPACITOR CEMENT RENDER CEMENT RENDER CAPACITOR ( 50 TONNE )TRANSFORMER 2 N.E.R PPU MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSH MSLSH MSLSH MSLSHMSLSHMSLSH MSLSHMSLSHMSLSH MSLSHMSLSH MSLSH MSLSHMSLSH MSLSHMSLSHMSLSH MSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSH MSLSH MSLSH MSLSHMSLSH MSLSHMSLSHMSLSH MSLSHMSLSHMSLSH MSSLH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSH MSLSHMSLSH MSLSH MSLSHMSLSHMSLSHMSLSH MSLSHMSLSH MSLSHMSLSH MSLSH MSLSH MSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSH MSLSH MSLSH MSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSH MSLSHMSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSHMSLSH MSLSH MSLSH MSLSHMSLSH MSLSHMSLSHMSLSHMSLSH MSLSH MSLSH MSLSH MSLSH MSLSH MSLSHMSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSSLH MSSLH MSSLH MSSLHMS SLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSSLH MSLSHMSLSHMSLSH MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH GASMALAYSIA DISTRICTMETERING GDCCONSUMER GASMETERINGSTATION MSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSHMSLSH MSLSHMSLSHMSLSH SMLSH SMLSH SMLSH SMLSH SMLSH SMLSH MSLSH CEMENT RENDER( 50 TONNE )TRANSFORMER 2 CEMENT RENDER( 50 TONNE )TRANSFORMER 2 STATION PLOT 2U1 PLANT 2 PLOT 4U2 PLANT 4 PLOT 4U1 PLANT 5 N S EW Existing Chilled-Water Piping Potential Future Chilled-Water Piping
  • 3. District Energy / Fourth Quarter 2015 9© 2015 International District Energy Association. ALL RIGHTS RESERVED. 2009, in order to cater to the new development at the middle and southern end of Core Island. Plant 2 chilled-water production consisted (and still consists) of a series of steam absorption chillers, direct-fired chill- ers and electric centrifugal chillers. It also produced (and continues to produce) around 9 MW electricity for its ancillary equipment and approxi- mately 24,000 tons of maximum cool- ing capacity after taking into consid- eration equipment degradation and standby capacity. In light of the remote locations of some prospective development plots, particularly those located at the Core Island’s southernmost tip, the site for Plant 4 was chosen because of its ·· close proximity to existing cooling load demand and near-term customers; ·· reasonable proximity to existing Plant 2, which would make remote thermal energy storage tank charging from Plant 2 a possibility; and ·· availability of existing utilities infrastructure (electricity, water, chilled-water pipes and gas). With a charging capacity at Plant 2 of 20,000 tons operating for 10 hours a day, it was theoretically possible to produce up to 200,000 ton-hr for stor- age. Chilled-water generation by Plant 2 with thermal energy storage at Plant 4 was determined to be able to serve all existing and under-construction loads during daytime peak periods. TYPICAL LOAD PROFILE In a typical day in 2009, the peak load at Plant 2 (fig. 2) occurred between 6 a.m. and 9 a.m. when the plant experienced pulldown load from the buildings. From 10 a.m. on, the load profile was relatively constant until 5 p.m. when the offices were closed. Based on the foregoing, the following conclusions were derived: 1. Plant peak load was approximately 25 percent of the average plant sendout load. 2. The coincident building peak loads of 20,000 tons occurred during this same 6-9 a.m. period due to the similarity of building type (i.e., pri- marily office buildings). 3. Demand-side management such as precooling of the buildings during nighttime was not practiced by the buildings’ operators to reduce this peaking pulldown load demand. 4. The buildings’ load profile of around 16,000 tons was generally quite con- stant from 10 a.m. until 5 p.m. 5. There was hardly any night load. 6. In addition to the anticipated higher cooling load demand in the future, higher peaking load occur- ring early in the morning also necessitated that more chillers be run to meet the cooling load. PLANT 4 DESIGN GOALS The capacity and options study was completed at the end of 2009. Subsequently, the design team, led by AHAR Consultants together with the architect, cost surveyor, civil and structural engineers, proceeded with the design and construction of Plant 4. The design goals for Plant 4 were to ·· accommodate the increase in new customers’ chilled-water demand; ·· optimize asset utilization of Plant 2; ·· increase Plant 2 in-house electricity generation efficiency and reduce electricity import from TNB; ·· reduce frequent start-stop opera- tion of gas turbines at Plant 2, improving their life span; ·· mitigate the peaking load while using the existing chillers at Plant 2; and ·· provide better control of chilled- water supply temperature. Plant 4 was designed as a hybrid plant consisting of chilled-water stor- age and electric-driven chillers. The construction of the whole plant was phased as follows: ·· Phase 1 – one thermal energy storage tank of nominal rated capacity of 100,000 ton-hr charged from Plant 2 with associated thermal energy stor- age and secondary booster pumps ·· Phase 2 – a second thermal energy storage tank of nominal rated capacity of 100,000 ton-hr charged from Plant 2 with associated thermal energy storage and secondary booster pumps ·· Phase 3 – electric-driven centrifugal chillers with 12,000-ton installed capacity and associated condenser water pumps, chiller pumps and associated secondary booster pumps Bids for the engineering, procure- ment, construction and commission- ing for Phase 1 were called in the second quarter of 2010, with work completed in early 2013. Construction of Phases 2 and 3 is expected to com- mence in 2017 and 2020, respectively, depending on the actual load growth of the Core Island. At full buildout this three-phase design will allow for charging the thermal energy storage tanks with the 6.1 C (43 F) supply water from Plant 2, with the ability to peak this water down to 3.9 C (39 F) using the Plant 4 chillers while maintaining the ability to produce chilled water from Figure 2. Screenshot of Typical Load Profile, GDCP Plant 2, 2009. Source: Gas District Cooling (Putrajaya) Sdn Bhd. Buildings Start Operation High Peaking Load Low Night Load
  • 4. 10 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED. a highly efficient series-counterflow configuration. This will allow for significantly larger production stor- age capacity to be achieved from the same-sized tanks. These objectives will be achieved with a relatively simple piping and valving configuration and with no more pumps than would be required for a traditional primary-secondary pumping arrangement. CHALLENGES OF REMOTELY CHARGING The design team had to consider numerous challenges involved in remotely charging the two chilled- water storage tanks. From the hydraulic point of view, the top water level of each of these atmospheric tanks had to be at the highest point of the entire system. Plant 2, which at 39.2 m (128.6 ft) above sea level is higher than the 33.6 m (110 ft) above sea level where the Plant 4 tanks will be, requires a minimum return pressure of 3 bar (43.5 psi). Given the tanks’ height of 32 m (105 ft), the resultant system’s pressure is more than adequate to provide sufficient return pressure to Plant 2. Another issue of concern was the system pressure generated during dis- charge. The combined tank static head and Plant 4 pump discharge pressure had to be lower than the existing sys- tem’s design pressure rating of 16 bar (232 psi). Numerous simulations using hydraulic software were conducted to determine the maximum Plant 4 pump discharge pressure to ensure that the designed pressure rating was not exceeded. The ability of existing pumps at Plant 2 to move a huge amount of chilled water through the existing 900- mm (35.4-inch) pipe during charging was also evaluated. This was a major concern especially in Phase 2 when the two tanks will require charging, as the most likely path of the chilled water would be the short distance between Plant 2 and Plant 4 (see fig. 1). It was determined that the Plant 2 pump head was adequate to move charging and discharging chilled-water flow up to a certain stage. However, if the load growth of Precinct 3 and 4 concentrates mainly at the south end of the Core Island, Plant 2 pumps will have to be upgraded depending on the plant send- out ratio between Plant 2 and Plant 4. TANK SPECIFICATIONS The performance specifications for each of the two chilled-water storage tank and diffuser systems to be installed at Plant 4 are shown in table 1. Based on the capacity, the speci- fied tank dimensions were 45 m (147.6 ft) diameter and 32 m (105.0 ft) high, with a 700-mm- (27.6-inch-) thick concrete wall. It is believed that, with its particular capacity and dimen- sions, the first of these tanks, com- pleted in 2013, is the largest water- retaining structure in Malaysia. Prestressed concrete was used to reduce the tank wall thickness. Con- crete was chosen because it offered better cost benefit to the owner com- pared to steel. As Malaysia is not a steel producer, the cost to import steel plates would have made this size of tank uneconomical. A concrete tank of this size also posed concerns to the local authorities about its potential for sabotage as well as leakage. Although Malaysia is a relatively terrorism-free country, the authorities insisted that a risk impact analysis be conducted. The study concluded that the con- crete tank is less likely a terrorist target than the ministry buildings in Putrajaya. To mitigate any possibility of leakage, the design team decided to use two layers of 2-mm (0.078-inch) and 3-mm (0.118-inch) spray poly- urea waterproofing membrane, with 50 mm (1.97 inches) of polyurethane thermal insulation sandwiched in between. Rigorous inspections and quality control checks were conducted during construction to ensure water- tightness requirements were met. The storage tank has an internal stratification diffuser inlet and outlet header design arranged to distribute the flow for proper efficient opera- tion during charging and discharging modes. The diffuser header design utilizes a directed flow-splitting approach to evenly distribute the water to the nozzles. The nozzles are distributed radially around the area centroid of the tank, and the directed flow-dividing elements of the system assure that each nozzle is fed with the same volume of water. The flow velocity is gradually reduced in the header system from 1.5 m/s (4.9 ft/s) 55,399 cu m (14.6 million gal) 100,000 ton-hr @ 6.5 C (11.7 F) delta T 4,610 cmh (20,300 gpm) More than 90% including thermocline, freeboard and diffuser volume 13.3 C (56 F) 6.1 C (43 F) 6.1 C (43 F) Maximum 2,000 Less than 2 3.05 m (10 ft) water gauge 2% of rated thermal energy storage capacity at 3.9 C (39 F) Spray polyurethane Spray polyurea Water Volume Rated Cooling Storage Capacity Rated Tank Discharge Flow Rate Capacity Per Hour Usable Discharge Capacity Design Inlet Temperature During Discharging Cycle Design Outlet Temperature During Discharging Cycle Design Inlet Temperature During Charging Cycle Reynolds Number Froude Number Maximum Pressure Loss Between Inlet and Outlet Flange Maximum Heat Gain Over 24 Hours Tank Insulation Material Tank Waterproof Material Source: AHAR Consultants. Table 1. Performance Specifications for GDCP Plant 4 Chilled-Water Storage Tank and Diffuser System.
  • 5. District Energy / Fourth Quarter 2015 11© 2015 International District Energy Association. ALL RIGHTS RESERVED. in the feeder pipe to 0.1 m/s (0.33 ft/s) at the nozzle exit. The large circular nozzles expel the water parallel to the water surface or tank base, induc- ing secondary water movement only in a parallel layer. Warm water is withdrawn from the top of the tank, cooled and reinserted at the bottom of the tank during the charging cycle. Cold water is withdrawn from the bottom of the tank and dispatched to the buildings, where it is warmed and returned to the top of the tank during the discharging cycle. PHASE 1 PERFORMANCE After construction of Plant 4 (Phase 1) was completed in early 2013, it was successfully commis- sioned in March 2013. A typical five- day charging and discharging cycle in February 2013 is shown in figure 3. Figure 3 shows that the load profile increased to 25,000 tons peak load early in the morning and aver- aged around 22,000 ton-hr. (Figure 3 also reflects current load and sendout capacity.) With the new configura- tion, this peak load is taken up by the chilled-water storage discharge instead of additional chillers run at Plant 2. Fewer chillers are required to satisfy daily load, thus enhancing system availability. There is also a reduction of 4 MW of electrical power imported from the electricity compa- ny. This has significantly reduced the electrical maximum demand charge incurred during peak periods, cor- respondingly lowering the unit util- ity cost of chilled-water production. Plant 2 electricity generation effi- ciency has also improved by having constant loading of the turbine gen- erators day and night. The generators are able to be fully loaded and oper- ate at optimum efficiency with cooler nighttime ambient temperatures. Thermal energy storage tank dis- charge capacity averaging between 88,000 and 92,000 ton-hr is obtained daily, with a maximum instantaneous discharge capacity of 13,000 tons. With the steam chillers maintaining a constant output of 14,500 tons day and night, the gas turbines are able to be operated 24 hours per day, result- ing in better utilization and avoidance of start-stop operations. The performance of the diffuser system was also analyzed during the commissioning period from January to March 2013. Most of the significant performance parameters exceeded the design criteria, as shown in table 2. Most significant is the thermocline thickness averaging 0.8 m (2.62 ft). This thin thermocline thickness indi- cates that the diffusers were working properly, with the cold and warm water bodies being properly stratified in the tank. A screenshot of thermocline thickness is shown in figure 4. The x-axis refers to time, while the y-axis is the temperature. Various colored lines represent individual tempera- ture sensors installed at 0.5-m (1.64- ft) intervals vertically inside the tank. By calculating the water volume and the time spread at each pair of sensors, the thermocline averages 0.87 m (2.85 ft) thick. In comparison, thermocline thicknesses of 1-2 m (3.28-6.56 ft) are not uncommon in other chilled-water tank installations worldwide.1 The significance of a thin ther- mocline is that it yields better storage efficiency. The diffuser design using three double-ring octagonal pipes with drilled 8-mm (0.31-inch) nozzles spray- Figure 3. Putrajaya Core Island Plants 2 and 4 Load Profile and Sendouts, February 2013. Source: Gas District Cooling (Putrajaya) Sdn Bhd. 109,012 ton-hr @ 6.5 C (11.7 F) delta T 78,433 ton-hr @ 4.32 C (39.8 F) delta T 72,585 ton-hr @ 4.32 C (39.8 F) delta T 0.6-1.0 m (1.97-3.28 ft) 1,991 0.09 92.54% 2.25 m (7.38 ft) water gauge 0.57% of rated thermal energy storage capacity Rated Storage Capacity Charging Storage Capacity Discharge Storage Capacity Thermocline Thickness Reynolds Number Froude Number Usable Tank Volume Maximum Pressure Loss Maximum Heat Gain Over 24 Hours Source: AHAR Consultants. Table 2. Tested Performance of GDCP Plant 4 Chilled-Water Storage Tank and Diffuser System (Jan. 17, 2013). 1 Bahnfleth, William P., and Amy Musser, “Thermal Performance of a Full-Scale Stratified Chilled-Water Thermal Storage Tank,” ASHRAE Conference proceeding, Toronto 1998. Average Plant 2 Sendout Capacity – 14,500 Tons Chiller Discharge Charging —— Plant Sendout
  • 6. 12 District Energy / Fourth Quarter 2015 © 2015 International District Energy Association. ALL RIGHTS RESERVED. ing at a 120-degree angle in the vertical plane proved that the actual perfor- mance exceeded specifications. A total of 91,500 nozzles ensure that the water is evenly distributed and diffused. At this juncture, the objective for better chilled-water supply tempera- ture control has not yet been accom- plished, as Plant 4 is still dependent on Plant 2 for its chilled water. It is envisaged that when the electric chillers are installed at Plant 4 in the ultimate phase – where the chillers can be operated either in parallel or in series-counterflow configurations with the storage tank – this design intent can also be achieved. MEETING EXPECTATIONS Plant 4 has been in operation to supply chilled water to Precincts 3 and 4 in Putrajaya Core Island since January 2013. Initial results have shown that the operation of this chilled-water storage system has met the expectations of the client and design team. Currently, Plants 2 and 4 are operating in tandem during the daytime to supply chilled water. The installation of chilled-water storage in a district cooling system is an excellent tool in demand-side management. This technology enables a plant owner to reduce energy cost by decreasing electric- ity maximum demand during peak periods. Thermal energy storage also increases the load supply capability during the high peak period and enhances district cooling system reli- ability and availability. By incorporating thermal energy storage, GDCP has improved system redundancy, as fewer chillers are required during the peak period. The company is also better able to utilize the assets at Plant 2 by running the gas turbines 24/7. Daily start-stop operation of the gas turbines has been avoided, improving equipment life expectancy. Furthermore, the use of chilled-water storage has reduced net capital expenses by 40 percent compared to installation of an equiv- alent capacity of conventional chiller plant equipment. The chilled-water production unit cost remains similar to the pre-Plant 4 period, despite the operation of both plants. In addition to these operational and financial advantages, GDCP is also seeing reduced greenhouse gas emis- sions. The use of thermal energy stor- age at Plant 4 with chilled-water gener- ation from Plant 2 offers a significantly decreased carbon footprint – lower by 445 metric tons of carbon dioxide per week, or 20.7 percent – compared to that of a grid-connected conventional chiller Plant 4 and the existing Plant 2. While providing these numerous benefits, GDCP Plant 4 has also, sig- nificantly, made history as the first remotely charged satellite chilled- water storage system in Malaysia and has the biggest reinforced concrete chilled-water tank in the country, as well as in Asia. Authors’ Note: We acknowledge the assistance provided to AHAR Consul- tants during the evaluation, design and implementation of the Plant 4 thermal energy storage project, in particular by our engineering team members Mark Spurr and Bryan Kleist of FVB Energy Inc., Min- neapolis, Minn., and John S. Andrepont of The Cool Solutions Co., Lisle, Ill. We also thank John Andrepont (with whom one of the authors collaborated on the first large chilled-water thermal energy storage proj- ect in Malaysia in the mid-1990s) for his contributions to the content and writing of this article. Arul Hisham Abdul Rahim, principal with AHAR Consultants, has a wide range of experience in thermal storage and district cooling with more than 20 years of practice. A regis- tered engineer with the Board of Engineers Malaysia, he is a member of ASHRAE and a fellow with the Institution of Engineers Malaysia. He holds a degree in mechanical engineering from The University of Texas at El Paso. Hisham can be contacted at arulhisham@aharconsultants.com. Rosli Mohamed, partner with AHAR Consultants, graduated from the University of North Carolina at Charlotte in mechanical engineering. Prior to joining the firm, he worked in various capacities with Tenaga Nasional Berhad, Malaysia’s national elec- tricity company. He is a fellow with the Institution of Engineers Malaysia and a registered engineer with the Board of Engineers Malaysia. He can be reached at roslimohamed@aharconsultants.com. Figure 4. Screenshot of GDCP Plant 4 Thermal Energy Storage Tank Temperature Sensor Readings. Source: AHAR Consultants.