SCOTIABANK BBQ
Toronto
August 15, 2014
AGNICO EAGLE | SCOTIA BBQ 2014 2
FORWARD LOOKING STATEMENTS
The information in this presentation has been prepared as at August 15, 2014. Certain statements contained in this document constitute “forward-looking
statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under the provisions of
Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned” and similar expressions are
intended to identify forward-looking statements. Such statements include without limitation: statements the Company's forward-looking production guidance,
including estimated ore grades, project timelines, drilling results, metal production, mine estimates horizons, production, total cash costs per ounce, minesite costs
per tonne; all-in sustaining costs and cash flows; the estimated timing and conclusions of technical reports and other studies; the methods by which ore will be
extracted or processed; statements concerning expansion projects, recovery rates, mill throughput, and projected exploration expenditures, including costs and
other estimates upon which such projections are based; estimates of depreciation expense, general and administrative expense and tax rates; the impact of
maintenance shutdowns; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral
production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, total cash costs, minesite costs, all-in
sustaining costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements as to
the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the
timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and
resources, and statements regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine and project sites and
statements and information regarding the sufficiency of the Company’s cash resources and other statements regarding anticipated trends with respect to the
Company's operations, exploration and the funding thereof. Such statements reflect the Company’s views as at the date of this document and are subject to certain
risks, uncertainties and assumptions and undue reliance should not be placed on such statements. Forward-looking statements are necessarily based upon a
number of factors and assumptions that, while considered reasonable by Agnico Eagle as of the date of such statements, are inherently subject to significant
business, economic and competitive uncertainties and contingencies. The material factors and assumptions used in the preparation of the forward looking
statements and information contained herein, which may prove to be incorrect, include, but are not limited to, the assumptions set forth herein and in management's
discussion and analysis (“MD&A”) and the Company's Annual Information Form (“AIF”) for the year ended December 31, 2103 filed with Canadian securities
regulators and that are included in its Annual Report on Form 40-F for the year ended December 31, 2013 (“Form 40-F”) filed with the U.S. Securities and Exchange
Commission (the “SEC”) as well as: that there are no significant disruptions affecting operations; that production, permitting and expansion at each of Agnico Eagle's
properties proceeds on a basis consistent with current expectations and plans; that the relevant metals prices, exchange rates and prices for key mining and
construction supplies will be consistent with Agnico Eagle's expectations; that Agnico Eagle's current estimates of mineral reserves, mineral resources, mineral
grades and metal recovery are accurate; that there are no material delays in the timing for completion of ongoing growth projects; that the Company's current plans
to optimize production are successful; and that there are no material variations in the current tax and regulatory environment. Many factors, known and unknown
could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but
are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates;
uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and
development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the
Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of such risks and other
factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the AIF and
MD&A filed on SEDAR at www.sedar.com and included in the Form 40-F filed on EDGAR at www.sec.gov, as well as the Company’s other filings with the Canadian
securities regulators and the SEC. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information.
For a detailed breakdown of the Company’s reserve and resource position see the AIF or Form 40-F.
AGNICO EAGLE | SCOTIA BBQ 2014 3
NOTES TO INVESTORS
Note Regarding the Use of Non-GAAP Financial Measures
This document discloses certain measures, including ‘‘total cash costs per ounce’’ and ‘‘minesite costs per tonne’’ that are not recognized measures under US
GAAP. This data may not be comparable to data presented by other gold producers. For a reconciliation of these measures to the most directly comparable financial
information presented in the consolidated financial statements prepared in accordance with US GAAP and for an explanation of how management uses these
measures, see “Reconciliation of Non-GAAP Financial Performance Measures” in the Company’s earnings news release dated July 30, 2014 as well as the
Company’s MD&A and Form 40-F. All references herein to total cash costs per ounce are to total cash costs per ounce on a by-product basis, that is, deducting by-
product metal revenue from production costs. For further information on this measure and for information on total cash costs per ounce on a co-product basis, that
is before the effect of by-product metals revenues, please see the Company’s earnings news release dated July 30, 2014. The Company believes that the generally
accepted industry measures that it uses are realistic indicators of operating performance and are useful in allowing year over year comparisons. However, non-US
GAAP measures should be considered together with other data prepared in accordance with US GAAP, and such measures, taken by themselves, are not
necessarily indicative of operating costs or income measures prepared in accordance with US GAAP. This document also contains information as to estimated
future total cash costs per ounce and minesite costs per tonne. The estimates are based upon the total cash costs per ounce and minesite costs per tonne that the
Company expects to incur to mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include
production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore
not practicable to reconcile these forward-looking non-US GAAP financial measures to the most comparable US GAAP measure.
Note Regarding Production Guidance
The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that
are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not
reconcile exactly with the production models used to support these mineral reserves.
AGNICO EAGLE | SCOTIA BBQ 2014 4
AGNICO EAGLE – A PREMIUM GOLD EQUITY
RUNNING A
MANAGEABLE
BUSINESS
Delivering
on
Production
Guidance
45%
Production
Growth
Through
2016*
2014 AISC
expected to
be below
$1000 per
ounce
Highest
Reserve
Grade
Amongst
North
American
Peers
Balance
Sheet
Flexibility
Low Share
Count after
57 Years
32 years
of
Consecutive
Dividend
Payments
Low Political
Risk
Pipeline
Expected to
Drive Future
Production
Growth
Experienced
Management
with Diversified
Technical
Expertise
*Includes Agnico Eagle’s 50% share of production from the Canadian Malartic mine
AGNICO EAGLE | SCOTIA BBQ 2014 5
2014 H1 HIGHLIGHTS
 Gold production of 692K oz
– Total cash costs at $579/oz, better than $678/oz guidance
 Joint acquisition with Yamana Gold of Osisko Mining Corporation completed on June
16, 2014 – studies underway to optimize the Canadian Malartic mine plan
Meadowbank
Kittila
Pinos Altos
La India
LaRonde
Lapa
Goldex NORTHERN
BUSINESS
SOUTHERN
BUSINESS
Canadian Malartic (50%)
 Production guidance increased to 1.35M oz
- 1.37M oz with cash costs forecasted to be
between $650 and $675 per ounce, All-in
sustaining cost are unchanged at $990/oz
 Mid-Year 2014 Exploration Update – IVR
discovery near Meadowbank continues to
expand; new deep intersection at Kittila;
and technical studies progress at Meliadine
and Akasaba West projects
Creston
Mascota
AGNICO EAGLE | SCOTIA BBQ 2014 6
Q2 2014 RESULTS
CONTINUED STRONG OPERATING PERFORMANCE
Q2 2014 YTD 2014
All amounts are in US$
(Unless Otherwise Indicated)
Production
(Gold oz)
Total Cash Cost*
($/oz)
Operating Margin ($000’s) Production (Gold oz)
Total Cash Cost*
($/oz)
Northern Business
LaRonde 48,494 $691 $27,820 107,846 $642
Lapa 18,821 $847 $8,763 42,230 $747
Goldex 23,929 $654 $13,674 43,359 $678
Canadian Malartic (50%) 11,878 $614 $547 11,878 $614
Kittila 31,830 $862 $14,002 70,382 $825
Meadowbank 118,161 $577 $80,644 274,605 $496
253,113 $664 $145,450 550,300 $603
Southern Business
Pinos Altos 43,978 $481 $33,324 89,195 $465
Creston Mascota 11,159 $616 $7,336 21,476 $615
La India 17,809 $457 $12,678 31,509 $446
72,946 $496 $53,338 142,180 $484
Total 326,059 $626 $198,788 692,480 $579
Q2 2014 Total Operating Margin – $198.8 MQ2 2014 Revenue by Metal
Gold
95%
Silver
4%
Base Metals
1%
Meadowbank,
41%
Pinos Altos, 17%LaRonde, 14%
Kittila, 7%
Goldex, 7%
La India, 6%
Lapa, 4%
Creston Mascota,
4%
Canadian
Malartic, 0.3%
*Total cash costs are presented on a by-product basis, that is net of by-product revenue
NORTHERN
BUSINESS
AGNICO EAGLE | SCOTIA BBQ 2014 8
LARONDE
GOOD COST PERFORMANCE CONTINUES
 Production and service hoist drive upgrade completed
 Strong costs per tonne performance driven by reduced
labor and contractor costs and lower material costs
 Production from the deeper mine expected to increase
in H2 2014 as deeper higher grade ore from the level
293 pyramid advances to maturity
 Mined grade forecast to increase towards the average
reserve grade over the next several years
Proven Gold Reserves (million oz)
(6.0 M tonnes @ 3.48 g/t)
0.7
Probable Gold Reserves (million oz)
(18.1 M tonnes @ 5.50 g/t)
3.2
Indicated resource (million oz)
(4.2 M tonnes @ 2.12 g/t)
0.3
Inferred resource (million oz)
(10.5 M tonnes @ 4.61 g/t)
1.6
Estimated LOM (years) 12
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
$80
$90
$100
$110
-
10
20
30
40
50
60
70
Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
AGNICO EAGLE | SCOTIA BBQ 2014 9
MEADOWBANK
RECORD THROUGHPUT AND CONTINUED COST CONTROL DRIVES STRONG PERFORMANCE
 Record daily throughput in Q2 2014 due to continued
optimization of mine plan and improved equipment
availability
 Increase in year-over-year production reflecting higher
grades, increased throughput and better recoveries
 60:40 split of production between H1 and H2
anticipated as the higher grade Goose pit expected to
be mined out by year-end 2014
 Exploration drilling has expanded the scope of the
mineralization at the IVR property – a second phase,
20,000 metres drill program has commenced
Proven Gold Reserves (million oz)
(1.1 M tonnes @ 2.88 g/t)
0.1
Probable Gold Reserves (million oz)
(15.7 M tonnes @ 3.26 g/t)
1.6
Indicated gold resource (million oz)
(7.3 M tonnes @ 3.28 g/t)
0.8
Inferred gold resource (million oz)
(3.3 M tonnes @ 3.96 g/t)
0.4
Estimated LOM (years) 4
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
$70
$76
$82
$88
$94
-
25
50
75
100
125
150
Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
AGNICO EAGLE | SCOTIA BBQ 2014 10
 Agnico Eagle and Yamana each acquired a 50% interest in
Osisko Mining and formed a joint committee to operate the
Canadian Malartic mine on June 16, 2014
 A new NI 43-101 report for Canadian Malartic was released
August 13, 2014 and an update on optimization plans is
expected at the end of Q3 2014
 Partners will also jointly explore the Kirkland Lake Assets,
where one drill is currently active on each of the Upper
Beaver and Canadian Kirkland properties.
 Exploration programs and budgets for the Kirkland Lake
camp are expected to be released later this fall
CANADIAN MALARTIC GP (50% INTEREST)
OPTIMIZATION AND COST SAVING STUDIES UNDERWAY
$540
$560
$580
$600
$620
100
110
120
130
140
150
Q1-14 Q2-14*
Production (koz) Cash Costs
*Includes 11,878 ounces attributable to AEM post the Osisko acquisition
P&P Gold Reserves* (million oz)
(131.6 M tonnes @ 1.06 g/t)
4.5
Measured & Indicated Gold Resources
(Undiluted), Including Reserves* (million oz)
(157.1 M tonnes @ 1.07 g/t)
5.4
Inferred gold resource* (million oz)
(23.2 M tonnes @ 0.77 g/t)
0.6
Estimated LOM (years)
*AEM’s 50% portion as of June 15, 2014
14
See AEM August 13, 2014 press release for detailed breakdown of reserves and resources.
AGNICO EAGLE | SCOTIA BBQ 2014 11
 Mill expansion expected to be completed by the end of
2014 (ahead of original mid-2015 schedule)
 Expansion scope increased from 750 tpd to 1,000 tpd;
mill expected to process over 4,000 tpd and expected
to be completed within original budget of $103 million
 Studies for Rimpi zone and shaft completed – Focus
on developing the Rimpi zone through a ramp system
to provide additional mill feed
 Deep drilling indicates Suuri zone remains open below
1,340m (approximately 240m below the reserve base)
Proven Gold Reserves (million oz)
(1.1 M tonnes @ 4.27 g/t)
0.1
Probable Gold Reserves (million oz)
(30.5 M tonnes @ 4.65 g/t)
4.6
Measured & Indicated gold resource (million oz)
(11.0 M tonnes @ 2.79 g/t)
1.0
Inferred gold resource (million oz)
(7.5 M tonnes @ 4.12 g/t)
1.0
Estimated LOM (years) 21
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
KITTILA
PLANT EXPANSION TO BE COMPLETED AHEAD OF SCHEDULE
€ 60
€ 70
€ 80
€ 90
-
10
20
30
40
50
60
Q4-12 Q1-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
No production in Q2-13 due to scheduled shutdown
AGNICO EAGLE | SCOTIA BBQ 2014 12
 Throughput forecast to increase to 6,000 tpd by year-end
2014
 Q2 2014 minesite costs per tonne were C$33, significantly
lower than 2014 guidance (C$37/t)
 Accelerated development of the exploration ramp into the
D zone (the top of the Deep zone) is underway
 Development progressing on the M2, M5 and E2 satellite
zones and technical studies on development of additional
satellites expected in early 2015
 Akasaba West technical study expected by year end 2014
Probable Gold Reserves (million oz)
(7.5 M tonnes @ 1.52 g/t)
0.4
Measured gold resource (million oz)
(12.4 M tonnes @ 1.86 g/t)
0.7
Indicated gold resource (million oz)
(17.7 M tonnes @ 2.03 g/t)
1.2
Inferred gold resource (million oz)
(26.1 M tonnes @ 1.64 g/t)
1.4
Estimated LOM (years) 4
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
GOLDEX
EXCELLENT COST PERFORMANCE; MILL RAMP UP TO 6,000 TPD AHEAD OF SCHEDULE
$30
$33
$36
15
20
25
Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
AGNICO EAGLE | SCOTIA BBQ 2014 13
 Lower minesite costs in Q2 2014 due to lower labor
costs and continued cost reduction efforts despite
mining at a deeper depth
 Grades are expected to improve in H2 2014 with
mining commissioned in the Zulapa 7 zone
Proven Gold Reserves (million oz)
(1.0 M tonnes @ 5.99 g/t)
0.2
Probable Gold Reserves (million oz)
(0.5 M tonnes @ 5.92 g/t)
0.1
Indicated gold resource (million oz)
(1.6 M tonnes @ 4.28 g/t)
0.2
Inferred gold resource (million oz)
(1.0 M tonnes @ 5.49 g/t)
0.2
Estimated LOM (years) 3
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
LAPA
HIGHER GRADES EXPECTED FROM ZULAPA ZONE 7 IN Q4 2014
$100
$105
$110
$115
$120
-
5
10
15
20
25
30
Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
SOUTHERN
BUSINESS
AGNICO EAGLE | SCOTIA BBQ 2014 15
PINOS ALTOS
STRONG CASH FLOW GENERATION CONTINUES
 Costs in the 2014 period were favorably impacted by
shorter hauls and better drilling and blasting
performance (lower explosives consumption) in the
open pit and lower consumable costs
 The shaft is currently excavated to a depth of 228
metres with concrete lining to a depth of 212 metres
 Cost per tonne variation primarily due to normal
fluctuations in milled vs. heap leach ratio ore mix
Proven Gold Reserves (million oz)
(2.0 M tonnes @ 2.54 g/t)
0.2
Probable Gold Reserves (million oz)
(26.7 M tonnes @ 2.45 g/t)
2.1
Indicated gold resource (million oz)
(13.9 M tonnes @ 1.54 g/t)
0.7
Inferred gold resource (million oz)
(17.7 M tonnes @ 1.28 g/t)
0.7
Estimated LOM (years) 14
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $35
$50
$65
-
10
20
30
40
50
Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
AGNICO EAGLE | SCOTIA BBQ 2014 16
CRESTON MASCOTA
PHASE 3 LEACH PAD NOW COMMISSIONED
 The expanded capacity for the agglomerator and
overland conveyors was installed in May and
commissioned in early June
 Phase 3 leach pad was completed in June and
has been fully commissioned
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $10
$15
$20
5
6
7
8
9
10
11
12
Q2-13 Q3-13 Q4-13 Q1-14 Q2-14
Production (koz) Cost/tonne
No production in Q4-12 and Q1-13 due to temporary suspension of Phase one leach pad
Proven Gold Reserves (million oz)
(0.3 M tonnes @ 0.61 g/t)
0.0
Probable Gold Reserves (million oz)
(6.8 M tonnes @ 1.31 g/t)
0.3
Indicated gold resource (million oz)
(2.4 M tonnes @ 0.66 g/t)
0.05
Inferred gold resource (million oz)
(0.8 M tonnes @ 0.82 g/t)
0.02
Estimated LOM (years) 5
AGNICO EAGLE | SCOTIA BBQ 2014 17
LA INDIA
RAMP-UP CONTINUES; CRUSHING CIRCUIT REFINEMENTS EXPECTED TO
ENHANCE STACKING RATES
 1.1M tonnes of ore stacked on heap leach pad during
Q2 2014 which yielded 17,809 ounces of payable
gold production
 Throughput continues to ramp up - stacking rates
currently averaging approximately 12,500 tpd
 Planned modifications to the crushing and stacking
circuits are expected to be completed during Q3 2014
 La India closed the first “water year” (July 1, 2013 to
June 30, 2014) with approximately 200,000 m3 in
storage
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
Probable Gold Reserves (million oz)
(26.9 M tonnes @ 0.87 g/t)
0.8
Measured gold resource (million oz)
(5.0 M tonnes @ 0.33 g/t)
0.1
Indicated gold resource (million oz)
(51.3 M tonnes @ 0.38 g/t)
0.6
Inferred gold resource (million oz)
(82.1 M tonnes @ 0.36 g/t)
1.0
Estimated LOM (years) 7
EXPLORATION
AGNICO EAGLE | SCOTIA BBQ 2014 19
PROJECT PIPELINE EXPECTED TO PROVIDE FURTHER GROWTH
ExpansionEXPLORATION ADVANCED DEVELOPMENT &
FEASIBILITY
EXPANSIONS
Kittila Plant Expansion
Rimpi DevelopmentHanhimaa
IVR
Goldex Satellites
NORTHERNBUSINESS
Meliadine
Pinos Altos Shaft
Pinos Altos Satellites
Tarachi and La India
SOUTHERNBUSINESS
Kirkland Lake Partnership (50%)
Akasaba West
Bousquet 5 UG
AGNICO EAGLE | SCOTIA BBQ 2014 20
SIGNIFICANT EXPLORATION FOOTPRINT NEAR MEADOWBANK
IVR AND GREYHOUND PROJECTS PROVIDE POTENTIAL EXPLORATION UPSIDE
AGNICO EAGLE | SCOTIA BBQ 2014 21
IVR DISCOVERY NEAR MEADOWBANK CONTINUES TO EXPAND
FOUR MINERALIZED ZONES HAVE BEEN OUTLINED – MINERALIZATION OPEN IN ALL DIRECTIONS
IVR14-044
8.70 g/t Au / 5.8 m
IVR14-031
10.90 g/t Au / 2.9 m
and 26.13 g/t Au / 4.8 m
IVR14-015
10.52 g/t Au / 3.5 m
IVR13-008
6.55 g/t Au / 7.2 m
And 9.77 g/t Au / 3.5 m
IVR13-004
6.20 g/t Au / 5.7 m
And 6.05 g/t Au / 4.1 m
IVR14-037
2.81 g/t Au / 10.8 m
Incl. 5.83 g/t Au / 2.8 m
IVR14-039
3.70 g/t Au / 7.4 m
IVR14-017
1.83 g/t Au / 14.5 m
Incl. 2.72 g/t Au / 4.8 m
IVR14-028
27.62 g/t Au / 3.0 m
AGNICO EAGLE | SCOTIA BBQ 2014 22
IVR GEOPHYSICAL MAP
MULTIPLE EM-MAGNETIC ANOMALIES OUTLINED
7 km of MAG-EM
favourable target
IVR
project
area
AGNICO EAGLE | SCOTIA BBQ 2014 23
 Exploration ramp extended by 301 metres during Q2 2014, now 527 metres long, to a depth of 168
metres below surface
 Surface drilling program completed early August 2014
 130 holes (37,991metres) completed
 Conversion drilling at Wesmeg/Normeg and Tiriganiaq zones and exploration drilling at Pump,
Discovery and Wolf zones
 Significant new discovery in the Pump zone, indicating potential for high-grade resources – including
hole M14-2220 that yielded 19.8 g/t gold over 5.2 metres at 12 metres depth
 Final Environmental Impact Statement (FEIS) delivered in Q2 2014
 Updated technical study on track for late 2014
MELIADINE
2014 DRILLING EXPECTED TO FURTHER EXPAND RESOURCE BASE
Proven Gold Reserves (million oz)
(0.03 M tonnes @ 7.31 g/t)
0.0
Probable Gold Reserves (million oz)
(11.9 M tonnes @ 7.38 g/t)
2.8
Indicated gold resource (million oz)
(19.0 M tonnes @ 5.05 g/t)
3.1
Inferred gold resource (million oz)
(11.7 M tonnes @ 7.20 g/t)
2.7
Estimated LOM (years)
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
AGNICO EAGLE | SCOTIA BBQ 2014 24
MELIADINE DEPOSIT LOCATIONS
38,000 METRES OF INFILL AND CONVERSION DRILLING CARRIED OUT ON MULTIPLE ZONES
AGNICO EAGLE | SCOTIA BBQ 2014 25
MELIADINE - MINERALIZATION EXPANDED AT WESMEG/NORMEG
CONVERSION DRILLING CONFIRMS GRADE AND WIDTH OF NEAR SURFACE DEPOSITS
M14-2226
12.51 g/t Au / 5.3 m
M14-2249
6.16 g/t Au / 3.1 m
and 7.70 g/t Au / 7.0 m
M14-2269
10.07 g/t Au / 5.8 m
AGNICO EAGLE | SCOTIA BBQ 2014 26
DRILLING AT WOLF EXTENDS MINERALIZATION DOWN PLUNGE
RESOURCES EXPECTED TO GROW
M14-2287
6.12 g/t Au / 4.2 m
M14-2292
6.52 g/t Au / 16.6 m
Incl. 8.42 g/t Au / 11.0 m
M14-2268
5.90 g/t Au / 4.0 m
AGNICO EAGLE | SCOTIA BBQ 2014 27
NEW MINERALIZATION DISCOVERED AT PUMP ZONE
GOOD POTENTIAL TO HOIST ADDITIONAL HIGH-GRADE RESOURCES
M14-2220
19.77 g/t Au / 5.2 m
and 8.29 g/t Au / 5.0 m
M14-2229
18.91 g/t Au / 5.4 m
M14-2305
9.50 g/t Au / 3.9 m
M14-2244
11.51 g/t Au / 3.1 m
AGNICO EAGLE | SCOTIA BBQ 2014 28
2014 LARONDE DEEP EXPLORATION PROGRAM
DRILLING FOCUSED ON UPGRADING RESOURCES BELOW 3.1 KM
• A 3,600 metre drill program
will be carried out to develop
new resources at depth
• A 2,500 metre drill program
is planned for the 20 North
Zone - good potential for
conversion of resources to
reserves
AGNICO EAGLE | SCOTIA BBQ 2014 29
RAMP DEVELOPMENT ACCELERATED INTO TOP OF THE D ZONE
DEVELOPMENT OF ADDITIONAL SATELLITES COULD POTENTIALLY EXTEND MINE LIFE
• Development is progressing on the
M2, M5 and E2 satellite zones
• A new surface portal has been
collared and the old ramp is being
refurbished to provide access to the
M3 and M4 zones. The ramp will also
facilitate the movement of equipment
from surface to UG
• Ramp into the top of the D zone has
been accelerated to provide access
for additional exploration drilling
• Development of additional satellite
zones could potentially extend the
mine life, and improve costs given the
mill has capacity for 8,000 tpd
• The Goldex mining approach may
also open up other mining
opportunities in the region.
AGNICO EAGLE | SCOTIA BBQ 2014 30
INFILL DRILLING COMPLETED AT AKASABA WEST
FEASIBILITY STUDY LATER THIS YEAR EXPECTED TO SUPPORT MILLING AT GOLDEX
164-14-009
1.27 g/t Au, 0.63% Cu / 45 m
164-13-001
1.14 g/t Au, 0.56% Cu / 91 m
164-14-022
0.84 g/t Au, 0.48% Cu / 81 m
164-14-017
1.41 g/t Au, 0.59% Cu / 66 m
164-14-014
0.84 g/t Au, 0.50% Cu / 70 m
164-14-019
1.13 g/t Au, 0.66% Cu / 78 m
AGNICO EAGLE | SCOTIA BBQ 2014 31
KIRKLAND LAKE PROJECTS
35M OZ OF HISTORICAL GOLD PRODUCTION IN THE DISTRICT - MAIN TARGETS
UPPER BEAVER & CANADIAN KIRKLAND
230km2 hosting five deposits with disclosed NI 43-101 resources of 2.1 Moz indicated and 1.8 Moz inferred
BIDGOOD (OP)
Ind: 1.5 Mt @ 1.7 g/t Au, 76 k oz
Inf: 0.3 Mt @ 2.0 g/t Au, 21 k oz
AK (UG)
Ind: 1.2 Mt @ 4.5 g/t Au, 164 k oz
Inf: 1.5 Mt @ 4.2 g/t Au, 207 k oz
ANOKI / MCBEAN (UG)
Ind: 1.4 Mt @ 4.7 g/t Au, 217 k oz
Inf: 1.6 Mt @ 4.7 g/t Au, 237 k oz
MACASSA MINE + SMC
P+P: 2.5 Mt @ 17.1 g/t Au, 1.4 M oz
M+I: 3.8 Mt @ 17.0g/t Au, 2.1M oz
Inf: 1.9 Mt @ 18.6g/t Au, 1.1M oz
(UG) Ind: 0.24 Mt @ 4.3 g/t Au, 33 k oz
(UG) Inf: 3.6 Mt @ 4.8 g/t Au, 557 k oz
(OP) Ind: 1.7 Mt @ 1.9 g/t Au, 104 k oz
(OP) Inf: 1.3 Mt @ 1.9 g/t Au, 76 k oz
UPPER BEAVER (UG)
Ind: 6.9 Mt @ 6.6 g/t Au, 1.5 M oz
Inf: 4.6 Mt @ 4.9 g/t Au, 712 k oz
Canadian Kirkland
Upper Beaver
Source: Modified from Osisko reports and Kirkland Lake Gold reports
AGNICO EAGLE | SCOTIA BBQ 2014 32
EVALUATION OF REGIONAL TARGETS CONTINUES AT KITTILA
EXPLORATION ONGOING ON HANHIMAA AND DRILLING HAS RESUMED AT VIITONEN
KAPSA
AGNICO EAGLE | SCOTIA BBQ 2014 33
DEEP DRILLING EXTENDS SUURI ZONE AT DEPTH
MINERALIZATION APPEARS OPEN APPROXIMATELY 240M BELOW CURRENT RESERVES
ROD14-002C
6.81 g/t Au / 6.4 m
Incl. 12.0 g/t Au / 2.2 m
AGNICO EAGLE | SCOTIA BBQ 2014 34
MULATOS DISTRICT EXPECTED TO YIELD FURTHER DISCOVERIES
LARGE LAND POSITION IN A SIGNIFICANT GOLD DISTRICT
Acquisition of surface rights continues in the district
AGNICO EAGLE | SCOTIA BBQ 2014 35
EXPLORING BULK TONNAGE PORPHYRY TARGETS CLOSE TO LA INDIA
ARROYO HONDO TARGET YIELDS ENCOURAGING RESULTS
Both high Sulphidation and Porphyry targets have
been defined to date
Drill highlights include:
AH-13-010 0.33 g/t Au over 111m
AH-14-014 0.27 g/t Au over 347m incl. 0.87 g/t Au over
35.7m
AH-14-025 0.78 g/t Au over 67m
SUMMARY
AGNICO EAGLE | SCOTIA BBQ 2014 37
 Details on the optimization plan for Canadian Malartic are expected to be presented by
the Partnership by the end of Q3 2014
 Anticipated update to 2015 guidance by the end of Q3 2014
 Completion of 1,000 tpd mill expansion at Kittila expected by year end-2014
 Update on Akasaba West project expected in late 2014
 Updated Meliadine technical study expected in late 2014 or early 2015
 Installation of new ore conveyor at LaRonde Deep expected in 2015 – should help
reduce costs and congestion
 Continuing evaluation of satellite deposits at Pinos Altos and Goldex, which could
enhance production and cost profiles
FUTURE CATALYSTS
AGNICO EAGLE | SCOTIA BBQ 2014 38
234,837 218,980
808,974 880,355
$640 $672
$663
2012A 2013A 2014E 2015E** 2016E**
INCREASED 2014 PRODUCTION AND LOWER COST GUIDANCE
STRONG OPERATIONAL PERFORMANCE AND OSISKO ACQUISITION DRIVES 14% INCREASE
FROM ORIGINAL GUIDANCE OF 1.19M OZ
Payable Gold Production Profile
* Mid range of estimated 2014 revised guidance
** Includes 50% of Osisko’s March 2014 LOM production for the Canadian Malarctic mine
1,043,811
1,099,335
1,360,000*
1,546,000 1,590,000
Northern Business (oz) Southern Business (oz) Annual Production Cash Cost
AGNICO EAGLE | SCOTIA BBQ 2014 39
0%
500%
1000%
1500%
2000%
2500%
04/01/1999 21/05/2001 13/10/2003 02/03/2006 21/07/2008 06/12/2010 26/04/2013
Source: Bloomberg
AEM US Equity XAU IndexGold Spot
AEM US Equity
CAGR
15.25%
Gold Spot
CAGR
10.19%
XAU Index
CAGR
2.82%
INDEXED SHARE PERFORMANCE SINCE 1999
AGNICO EQUITY POISED FOR OUTPERFORMANCE
APPENDIX
AGNICO EAGLE | SCOTIA BBQ 2014 41
GOLD AND SILVER RESERVES AND RESOURCES
DECEMBER 31, 2013
Gold Silver
Tonnes
(000’s)
Gold
(g/t)
Gold
(ounces) (000’s)
Tonnes
(000’s)
Silver
(g/t)
Silver
(ounces) (000’s)
Proven & Probable
Reserves
Northern Business 93,618 4.60 13,841 24,127 19.59 15,192
Southern Business 55,800 1.69 3,024 28,703 64.32 59,354
Total 149,418 3.51 16,865 52,830 43.89 74,546
Measured & Indicated
Resources
Northern Business 86,869 2.96 8,276 4,242 32.53 4,436
Southern Business 70,171 0.61 1,378 13,935 33.63 15,066
Total 157,040 1.91 9,654 18,177 33.37 19,502
Inferred Resources
Northern Business 69,674 3.77 8,434 10,536 14.72 4,986
Southern Business 99,795 0.53 1,686 17,707 26.28 14,962
Total 169,470 1.86 10,121 28,243 21.97 19,948
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
AGNICO EAGLE | SCOTIA BBQ 2014 42
COPPER, ZINC AND LEAD RESERVES AND RESOURCES
DECEMBER 31, 2013
Copper Zinc Lead
Tonnes
(000’s)
Copper
(%)
Copper
(tonnes)
Tonnes
(000’s)
Zinc
(%)
Zinc
(tonnes)
Tonnes
(000’s)
Lead
(%)
Lead
(tonnes)
Proven & Probable
Reserves
Northern Business 24,127 0.25 59,519 24,127 0.67 161,108 24,127 0.04 9,964
Southern Business
Total 24,127 0.25 59,519 24,127 0.67 161,108 24,127 0.04 9,964
Measured & Indicated
Resources
Northern Business 4,242 0.16 6,981 4,242 1.61 68,127 4,242 0.16 6,793
Southern Business
Total 4,242 0.16 6,981 4,242 1.61 68,127 4,242 0.16 6,793
Inferred Resources
Northern Business 10,536 0.27 28,118 10,536 0.55 58,463 10,536 0.05 5,176
Southern Business
Total 10,536 0.27 28,118 10,536 0.55 58,463 10,536 0.05 5,176
See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
AGNICO EAGLE | SCOTIA BBQ 2014 43
NOTES TO INVESTORS REGARDING THE USE OF RESOURCES
Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources
This document uses the terms “measured resources” and “indicated resources”. Investors are advised that while those terms are recognized and required by Canadian regulations, the
SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.
Cautionary Note to Investors Concerning Estimates of Inferred Resources
This document also uses the term “inferred resources”. Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it.
“Inferred resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of
an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-
feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
Scientific and Technical Data
Cautionary Note To U.S. Investors - The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically
and legally extract or produce. Agnico Eagle Mines Limited reports mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and
reporting of resources and reserves in accordance with the Canadian securities regulatory authorities' (the "CSA") National Instrument 43-101 Standards of Disclosure for Mineral
Projects ("NI 43-101"). These standards are similar to those used by the SEC’s Industry Guide No. 7, as interpreted by Staff at the SEC ("Guide 7"). However, the definitions in NI 43-
101 differ in certain respects from those under Guide 7. Accordingly, mineral reserve information contained herein may not be comparable to similar information disclosed by U.S.
companies. Under the requirements of the SEC, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be
economically and legally produced or extracted at the time the reserve determination is made. A "final" or "bankable" feasibility study is required to meet the requirements to designate
reserves under Industry Guide 7. Agnico Eagle uses certain terms in this news release, such as "measured", "indicated", and "inferred", and "resources" that the SEC guidelines
strictly prohibit U.S. registered companies from including in their filings with the SEC.
In prior periods, reserves for all properties were typically estimated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC guidelines.
These guidelines require the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC has interpreted to mean historic
three-year average prices. Given the current lower commodity price environment, Agnico Eagle has decided to use price assumptions that are below the three-year averages. The
assumptions used for the mineral reserves estimates at all mines and advanced projects as of December 31, 2013, reported by the Company on February 12, 2014, are $1,200 per
ounce gold, $18.00 per ounce silver, $0.82 per pound zinc, $3.00 per pound copper, $0.91 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.03, 1.32 and
12.75, respectively.
NI 43-101 requires mining companies to disclose reserves and resources using the subcategories of "proven" reserves, "probable" reserves, "measured" resources, "indicated"
resources and "inferred" resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
AGNICO EAGLE | SCOTIA BBQ 2014 44
NOTES TO INVESTORS REGARDING THE USE OF RESOURCES
A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when
the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of modifying factors. Such studies demonstrate
that, at the time of reporting, extraction could reasonably be justified.
Modifying factors are considerations used to convert mineral resources to mineral reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure,
economic, marketing, legal, environmental, social and governmental factors.
A proven mineral reserve is the economically mineable part of a measured mineral resource. A proven mineral reserve implies a high degree of confidence in the modifying factors. A
probable mineral reserve is the economically mineable part of an indicated and, in some circumstances, a measured mineral resource. The confidence in the modifying factors applying
to a probable mineral reserve is lower than that applying to a proven mineral reserve.
A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable
prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or
interpreted from specific geological evidence and knowledge, including sampling.
A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with confidence
sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from
detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. An indicated mineral
resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the
application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately
detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An inferred mineral resource
is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to
imply but not verify geological and grade or quality continuity.
Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.
A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of
applicable modifying factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that
extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to
proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study.
The effective date for all of the Company's mineral resource and reserve estimates in this news release is December 31, 2013. Additional information about each of the mineral projects
that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports referred to above, which may be found at www.sedar.com.
Other important operating information can be found in the Company's AIF and Form 40-F.
The scientific and technical information contained herein has been approved by Daniel Doucet, Corporate Director, Reserve Development, and/or Alain Blackburn, Senior Vice-
President, Exploration. Both Mr. Doucet and Mr. Blackburn are designated P.Eng. with the Ordre ingenieurs du Québec and qualified persons as defined by NI 43-101.
Trading Symbol:
AEM on TSX & NYSE
Investor Relations:
416-947-1212
info@agnicoeagle.com
agnicoeagle.com

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Corporate Update - November 2014
Corporate Update - November 2014Corporate Update - November 2014
Corporate Update - November 2014
 
Macquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New YorkMacquarie 2015 Global Metals, Mining % Materials Conference, New York
Macquarie 2015 Global Metals, Mining % Materials Conference, New York
 
BAML 21st Annual Canada Mining Conference
BAML 21st Annual Canada Mining ConferenceBAML 21st Annual Canada Mining Conference
BAML 21st Annual Canada Mining Conference
 
Jefferies 11th Annual Industrials Conference
Jefferies 11th Annual Industrials ConferenceJefferies 11th Annual Industrials Conference
Jefferies 11th Annual Industrials Conference
 
Corporate Update - December 2014
Corporate Update - December 2014Corporate Update - December 2014
Corporate Update - December 2014
 
Corporate Update - January 2015
Corporate Update - January 2015Corporate Update - January 2015
Corporate Update - January 2015
 
Q1-2016 Results
Q1-2016 ResultsQ1-2016 Results
Q1-2016 Results
 
Scotiabank BBQ
Scotiabank BBQScotiabank BBQ
Scotiabank BBQ
 
Q2-2015 Results
Q2-2015 ResultsQ2-2015 Results
Q2-2015 Results
 
Q1-2015 Results
Q1-2015 ResultsQ1-2015 Results
Q1-2015 Results
 
El Barqueno Site Tour
El Barqueno Site TourEl Barqueno Site Tour
El Barqueno Site Tour
 
BAML Global Metals, Mining & Steel Conference 2015
BAML Global Metals, Mining & Steel Conference 2015BAML Global Metals, Mining & Steel Conference 2015
BAML Global Metals, Mining & Steel Conference 2015
 
Raymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conferenceRaymond james-39th-annual-institutional-investors-conference
Raymond james-39th-annual-institutional-investors-conference
 
Q3-2014 Results
Q3-2014 ResultsQ3-2014 Results
Q3-2014 Results
 
Amaruq Tour
Amaruq TourAmaruq Tour
Amaruq Tour
 
Annual and Special Meeting
Annual and Special MeetingAnnual and Special Meeting
Annual and Special Meeting
 
Acquisition Of Cayden Resources
Acquisition Of Cayden ResourcesAcquisition Of Cayden Resources
Acquisition Of Cayden Resources
 
Raymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors ConferenceRaymond James 38th Annual Institutional Investors Conference
Raymond James 38th Annual Institutional Investors Conference
 
2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version2017 td-mining-conference-january-17-2018-booklet-version
2017 td-mining-conference-january-17-2018-booklet-version
 
Q2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings PresentationQ2 2018 AEM Earnings Presentation
Q2 2018 AEM Earnings Presentation
 

Andere mochten auch (12)

2010 10-27 q3-resultspresentation_final
2010 10-27 q3-resultspresentation_final2010 10-27 q3-resultspresentation_final
2010 10-27 q3-resultspresentation_final
 
La India Investor Tour
La India Investor TourLa India Investor Tour
La India Investor Tour
 
Agnico Eagle Q4 2013 Results Presentation
Agnico Eagle Q4 2013 Results PresentationAgnico Eagle Q4 2013 Results Presentation
Agnico Eagle Q4 2013 Results Presentation
 
2010 02 25 Aem Presentation
2010 02 25 Aem Presentation2010 02 25 Aem Presentation
2010 02 25 Aem Presentation
 
AEM Q1 2013 results
AEM Q1 2013 resultsAEM Q1 2013 results
AEM Q1 2013 results
 
Denver Gold Forum
Denver Gold ForumDenver Gold Forum
Denver Gold Forum
 
Aem march presentation_updated28march2011
Aem march presentation_updated28march2011Aem march presentation_updated28march2011
Aem march presentation_updated28march2011
 
Corporate update John Tumazos Very Independent Research March 31, 2014
Corporate update    John Tumazos Very Independent Research March 31, 2014Corporate update    John Tumazos Very Independent Research March 31, 2014
Corporate update John Tumazos Very Independent Research March 31, 2014
 
AEM April 2012 Corporate Update
AEM April 2012 Corporate UpdateAEM April 2012 Corporate Update
AEM April 2012 Corporate Update
 
Agnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 ResultsAgnico-Eagle Mines Limited Q4 2009 Results
Agnico-Eagle Mines Limited Q4 2009 Results
 
The Nunavut Experience Mining and Exploring North of 60
The Nunavut Experience Mining and Exploring North of 60The Nunavut Experience Mining and Exploring North of 60
The Nunavut Experience Mining and Exploring North of 60
 
Corporate Update - August 2016
Corporate Update - August 2016Corporate Update - August 2016
Corporate Update - August 2016
 

Ähnlich wie Scotiabank BBQ - august 14 2014 (12)

Q4-2015 Results
Q4-2015 ResultsQ4-2015 Results
Q4-2015 Results
 
Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016Scotia BBQ - August 18 2016
Scotia BBQ - August 18 2016
 
Q4-2016 Results
Q4-2016 ResultsQ4-2016 Results
Q4-2016 Results
 
Q3-2015 Results
Q3-2015 ResultsQ3-2015 Results
Q3-2015 Results
 
Corporate Update - September 2016
Corporate Update - September 2016Corporate Update - September 2016
Corporate Update - September 2016
 
BMO Global Metals and Mining Conference
BMO Global Metals and Mining ConferenceBMO Global Metals and Mining Conference
BMO Global Metals and Mining Conference
 
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel ConferenceBank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
Bank of America Merrill Lynch 2016 Global Metals, Mining & Steel Conference
 
Q2-2016 Results
Q2-2016 ResultsQ2-2016 Results
Q2-2016 Results
 
Raymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference OrlandoRaymond James Institutional Investors Conference Orlando
Raymond James Institutional Investors Conference Orlando
 
BMO Global Metal & Mining Conference
BMO Global Metal & Mining ConferenceBMO Global Metal & Mining Conference
BMO Global Metal & Mining Conference
 
BMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining ConferenceBMO Capital Markets 26th Global Metals & Mining Conference
BMO Capital Markets 26th Global Metals & Mining Conference
 
Q3-2016 Results
Q3-2016 ResultsQ3-2016 Results
Q3-2016 Results
 

Mehr von Agnico Eagle Mines (8)

Supplemental Information - May 2021
Supplemental Information - May 2021Supplemental Information - May 2021
Supplemental Information - May 2021
 
2017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 20172017 Scotiabank Mining Conference December 5 2017
2017 Scotiabank Mining Conference December 5 2017
 
Q3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentationQ3 2017-aem-earnings-presentation
Q3 2017-aem-earnings-presentation
 
Q2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentationQ2 2017-aem-earnings-presentation
Q2 2017-aem-earnings-presentation
 
Corporate Update - November 2016
Corporate Update - November 2016Corporate Update - November 2016
Corporate Update - November 2016
 
Kittila Site Visit
Kittila Site VisitKittila Site Visit
Kittila Site Visit
 
Barsele Gold Project
Barsele Gold ProjectBarsele Gold Project
Barsele Gold Project
 
European Gold Forum 2016
European Gold Forum 2016European Gold Forum 2016
European Gold Forum 2016
 

Kürzlich hochgeladen

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 

Kürzlich hochgeladen (20)

Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 

Scotiabank BBQ - august 14 2014

  • 2. AGNICO EAGLE | SCOTIA BBQ 2014 2 FORWARD LOOKING STATEMENTS The information in this presentation has been prepared as at August 15, 2014. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned” and similar expressions are intended to identify forward-looking statements. Such statements include without limitation: statements the Company's forward-looking production guidance, including estimated ore grades, project timelines, drilling results, metal production, mine estimates horizons, production, total cash costs per ounce, minesite costs per tonne; all-in sustaining costs and cash flows; the estimated timing and conclusions of technical reports and other studies; the methods by which ore will be extracted or processed; statements concerning expansion projects, recovery rates, mill throughput, and projected exploration expenditures, including costs and other estimates upon which such projections are based; estimates of depreciation expense, general and administrative expense and tax rates; the impact of maintenance shutdowns; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future internal rates of return, mining costs, total cash costs, minesite costs, all-in sustaining costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements regarding anticipated future exploration; the anticipated timing of events with respect to the Company’s mine and project sites and statements and information regarding the sufficiency of the Company’s cash resources and other statements regarding anticipated trends with respect to the Company's operations, exploration and the funding thereof. Such statements reflect the Company’s views as at the date of this document and are subject to certain risks, uncertainties and assumptions and undue reliance should not be placed on such statements. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by Agnico Eagle as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The material factors and assumptions used in the preparation of the forward looking statements and information contained herein, which may prove to be incorrect, include, but are not limited to, the assumptions set forth herein and in management's discussion and analysis (“MD&A”) and the Company's Annual Information Form (“AIF”) for the year ended December 31, 2103 filed with Canadian securities regulators and that are included in its Annual Report on Form 40-F for the year ended December 31, 2013 (“Form 40-F”) filed with the U.S. Securities and Exchange Commission (the “SEC”) as well as: that there are no significant disruptions affecting operations; that production, permitting and expansion at each of Agnico Eagle's properties proceeds on a basis consistent with current expectations and plans; that the relevant metals prices, exchange rates and prices for key mining and construction supplies will be consistent with Agnico Eagle's expectations; that Agnico Eagle's current estimates of mineral reserves, mineral resources, mineral grades and metal recovery are accurate; that there are no material delays in the timing for completion of ongoing growth projects; that the Company's current plans to optimize production are successful; and that there are no material variations in the current tax and regulatory environment. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company’s stock price; and risks associated with the Company’s byproduct metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the AIF and MD&A filed on SEDAR at www.sedar.com and included in the Form 40-F filed on EDGAR at www.sec.gov, as well as the Company’s other filings with the Canadian securities regulators and the SEC. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. For a detailed breakdown of the Company’s reserve and resource position see the AIF or Form 40-F.
  • 3. AGNICO EAGLE | SCOTIA BBQ 2014 3 NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This document discloses certain measures, including ‘‘total cash costs per ounce’’ and ‘‘minesite costs per tonne’’ that are not recognized measures under US GAAP. This data may not be comparable to data presented by other gold producers. For a reconciliation of these measures to the most directly comparable financial information presented in the consolidated financial statements prepared in accordance with US GAAP and for an explanation of how management uses these measures, see “Reconciliation of Non-GAAP Financial Performance Measures” in the Company’s earnings news release dated July 30, 2014 as well as the Company’s MD&A and Form 40-F. All references herein to total cash costs per ounce are to total cash costs per ounce on a by-product basis, that is, deducting by- product metal revenue from production costs. For further information on this measure and for information on total cash costs per ounce on a co-product basis, that is before the effect of by-product metals revenues, please see the Company’s earnings news release dated July 30, 2014. The Company believes that the generally accepted industry measures that it uses are realistic indicators of operating performance and are useful in allowing year over year comparisons. However, non-US GAAP measures should be considered together with other data prepared in accordance with US GAAP, and such measures, taken by themselves, are not necessarily indicative of operating costs or income measures prepared in accordance with US GAAP. This document also contains information as to estimated future total cash costs per ounce and minesite costs per tonne. The estimates are based upon the total cash costs per ounce and minesite costs per tonne that the Company expects to incur to mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking non-US GAAP financial measures to the most comparable US GAAP measure. Note Regarding Production Guidance The gold production guidance is based on the Company’s mineral reserves but includes contingencies and assumes metal prices and foreign exchange rates that are different from those used in the reserve estimates. These factors and others mean that the gold production guidance presented in this disclosure does not reconcile exactly with the production models used to support these mineral reserves.
  • 4. AGNICO EAGLE | SCOTIA BBQ 2014 4 AGNICO EAGLE – A PREMIUM GOLD EQUITY RUNNING A MANAGEABLE BUSINESS Delivering on Production Guidance 45% Production Growth Through 2016* 2014 AISC expected to be below $1000 per ounce Highest Reserve Grade Amongst North American Peers Balance Sheet Flexibility Low Share Count after 57 Years 32 years of Consecutive Dividend Payments Low Political Risk Pipeline Expected to Drive Future Production Growth Experienced Management with Diversified Technical Expertise *Includes Agnico Eagle’s 50% share of production from the Canadian Malartic mine
  • 5. AGNICO EAGLE | SCOTIA BBQ 2014 5 2014 H1 HIGHLIGHTS  Gold production of 692K oz – Total cash costs at $579/oz, better than $678/oz guidance  Joint acquisition with Yamana Gold of Osisko Mining Corporation completed on June 16, 2014 – studies underway to optimize the Canadian Malartic mine plan Meadowbank Kittila Pinos Altos La India LaRonde Lapa Goldex NORTHERN BUSINESS SOUTHERN BUSINESS Canadian Malartic (50%)  Production guidance increased to 1.35M oz - 1.37M oz with cash costs forecasted to be between $650 and $675 per ounce, All-in sustaining cost are unchanged at $990/oz  Mid-Year 2014 Exploration Update – IVR discovery near Meadowbank continues to expand; new deep intersection at Kittila; and technical studies progress at Meliadine and Akasaba West projects Creston Mascota
  • 6. AGNICO EAGLE | SCOTIA BBQ 2014 6 Q2 2014 RESULTS CONTINUED STRONG OPERATING PERFORMANCE Q2 2014 YTD 2014 All amounts are in US$ (Unless Otherwise Indicated) Production (Gold oz) Total Cash Cost* ($/oz) Operating Margin ($000’s) Production (Gold oz) Total Cash Cost* ($/oz) Northern Business LaRonde 48,494 $691 $27,820 107,846 $642 Lapa 18,821 $847 $8,763 42,230 $747 Goldex 23,929 $654 $13,674 43,359 $678 Canadian Malartic (50%) 11,878 $614 $547 11,878 $614 Kittila 31,830 $862 $14,002 70,382 $825 Meadowbank 118,161 $577 $80,644 274,605 $496 253,113 $664 $145,450 550,300 $603 Southern Business Pinos Altos 43,978 $481 $33,324 89,195 $465 Creston Mascota 11,159 $616 $7,336 21,476 $615 La India 17,809 $457 $12,678 31,509 $446 72,946 $496 $53,338 142,180 $484 Total 326,059 $626 $198,788 692,480 $579 Q2 2014 Total Operating Margin – $198.8 MQ2 2014 Revenue by Metal Gold 95% Silver 4% Base Metals 1% Meadowbank, 41% Pinos Altos, 17%LaRonde, 14% Kittila, 7% Goldex, 7% La India, 6% Lapa, 4% Creston Mascota, 4% Canadian Malartic, 0.3% *Total cash costs are presented on a by-product basis, that is net of by-product revenue
  • 8. AGNICO EAGLE | SCOTIA BBQ 2014 8 LARONDE GOOD COST PERFORMANCE CONTINUES  Production and service hoist drive upgrade completed  Strong costs per tonne performance driven by reduced labor and contractor costs and lower material costs  Production from the deeper mine expected to increase in H2 2014 as deeper higher grade ore from the level 293 pyramid advances to maturity  Mined grade forecast to increase towards the average reserve grade over the next several years Proven Gold Reserves (million oz) (6.0 M tonnes @ 3.48 g/t) 0.7 Probable Gold Reserves (million oz) (18.1 M tonnes @ 5.50 g/t) 3.2 Indicated resource (million oz) (4.2 M tonnes @ 2.12 g/t) 0.3 Inferred resource (million oz) (10.5 M tonnes @ 4.61 g/t) 1.6 Estimated LOM (years) 12 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $80 $90 $100 $110 - 10 20 30 40 50 60 70 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne
  • 9. AGNICO EAGLE | SCOTIA BBQ 2014 9 MEADOWBANK RECORD THROUGHPUT AND CONTINUED COST CONTROL DRIVES STRONG PERFORMANCE  Record daily throughput in Q2 2014 due to continued optimization of mine plan and improved equipment availability  Increase in year-over-year production reflecting higher grades, increased throughput and better recoveries  60:40 split of production between H1 and H2 anticipated as the higher grade Goose pit expected to be mined out by year-end 2014  Exploration drilling has expanded the scope of the mineralization at the IVR property – a second phase, 20,000 metres drill program has commenced Proven Gold Reserves (million oz) (1.1 M tonnes @ 2.88 g/t) 0.1 Probable Gold Reserves (million oz) (15.7 M tonnes @ 3.26 g/t) 1.6 Indicated gold resource (million oz) (7.3 M tonnes @ 3.28 g/t) 0.8 Inferred gold resource (million oz) (3.3 M tonnes @ 3.96 g/t) 0.4 Estimated LOM (years) 4 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $70 $76 $82 $88 $94 - 25 50 75 100 125 150 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne
  • 10. AGNICO EAGLE | SCOTIA BBQ 2014 10  Agnico Eagle and Yamana each acquired a 50% interest in Osisko Mining and formed a joint committee to operate the Canadian Malartic mine on June 16, 2014  A new NI 43-101 report for Canadian Malartic was released August 13, 2014 and an update on optimization plans is expected at the end of Q3 2014  Partners will also jointly explore the Kirkland Lake Assets, where one drill is currently active on each of the Upper Beaver and Canadian Kirkland properties.  Exploration programs and budgets for the Kirkland Lake camp are expected to be released later this fall CANADIAN MALARTIC GP (50% INTEREST) OPTIMIZATION AND COST SAVING STUDIES UNDERWAY $540 $560 $580 $600 $620 100 110 120 130 140 150 Q1-14 Q2-14* Production (koz) Cash Costs *Includes 11,878 ounces attributable to AEM post the Osisko acquisition P&P Gold Reserves* (million oz) (131.6 M tonnes @ 1.06 g/t) 4.5 Measured & Indicated Gold Resources (Undiluted), Including Reserves* (million oz) (157.1 M tonnes @ 1.07 g/t) 5.4 Inferred gold resource* (million oz) (23.2 M tonnes @ 0.77 g/t) 0.6 Estimated LOM (years) *AEM’s 50% portion as of June 15, 2014 14 See AEM August 13, 2014 press release for detailed breakdown of reserves and resources.
  • 11. AGNICO EAGLE | SCOTIA BBQ 2014 11  Mill expansion expected to be completed by the end of 2014 (ahead of original mid-2015 schedule)  Expansion scope increased from 750 tpd to 1,000 tpd; mill expected to process over 4,000 tpd and expected to be completed within original budget of $103 million  Studies for Rimpi zone and shaft completed – Focus on developing the Rimpi zone through a ramp system to provide additional mill feed  Deep drilling indicates Suuri zone remains open below 1,340m (approximately 240m below the reserve base) Proven Gold Reserves (million oz) (1.1 M tonnes @ 4.27 g/t) 0.1 Probable Gold Reserves (million oz) (30.5 M tonnes @ 4.65 g/t) 4.6 Measured & Indicated gold resource (million oz) (11.0 M tonnes @ 2.79 g/t) 1.0 Inferred gold resource (million oz) (7.5 M tonnes @ 4.12 g/t) 1.0 Estimated LOM (years) 21 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. KITTILA PLANT EXPANSION TO BE COMPLETED AHEAD OF SCHEDULE € 60 € 70 € 80 € 90 - 10 20 30 40 50 60 Q4-12 Q1-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne No production in Q2-13 due to scheduled shutdown
  • 12. AGNICO EAGLE | SCOTIA BBQ 2014 12  Throughput forecast to increase to 6,000 tpd by year-end 2014  Q2 2014 minesite costs per tonne were C$33, significantly lower than 2014 guidance (C$37/t)  Accelerated development of the exploration ramp into the D zone (the top of the Deep zone) is underway  Development progressing on the M2, M5 and E2 satellite zones and technical studies on development of additional satellites expected in early 2015  Akasaba West technical study expected by year end 2014 Probable Gold Reserves (million oz) (7.5 M tonnes @ 1.52 g/t) 0.4 Measured gold resource (million oz) (12.4 M tonnes @ 1.86 g/t) 0.7 Indicated gold resource (million oz) (17.7 M tonnes @ 2.03 g/t) 1.2 Inferred gold resource (million oz) (26.1 M tonnes @ 1.64 g/t) 1.4 Estimated LOM (years) 4 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. GOLDEX EXCELLENT COST PERFORMANCE; MILL RAMP UP TO 6,000 TPD AHEAD OF SCHEDULE $30 $33 $36 15 20 25 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne
  • 13. AGNICO EAGLE | SCOTIA BBQ 2014 13  Lower minesite costs in Q2 2014 due to lower labor costs and continued cost reduction efforts despite mining at a deeper depth  Grades are expected to improve in H2 2014 with mining commissioned in the Zulapa 7 zone Proven Gold Reserves (million oz) (1.0 M tonnes @ 5.99 g/t) 0.2 Probable Gold Reserves (million oz) (0.5 M tonnes @ 5.92 g/t) 0.1 Indicated gold resource (million oz) (1.6 M tonnes @ 4.28 g/t) 0.2 Inferred gold resource (million oz) (1.0 M tonnes @ 5.49 g/t) 0.2 Estimated LOM (years) 3 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. LAPA HIGHER GRADES EXPECTED FROM ZULAPA ZONE 7 IN Q4 2014 $100 $105 $110 $115 $120 - 5 10 15 20 25 30 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne
  • 15. AGNICO EAGLE | SCOTIA BBQ 2014 15 PINOS ALTOS STRONG CASH FLOW GENERATION CONTINUES  Costs in the 2014 period were favorably impacted by shorter hauls and better drilling and blasting performance (lower explosives consumption) in the open pit and lower consumable costs  The shaft is currently excavated to a depth of 228 metres with concrete lining to a depth of 212 metres  Cost per tonne variation primarily due to normal fluctuations in milled vs. heap leach ratio ore mix Proven Gold Reserves (million oz) (2.0 M tonnes @ 2.54 g/t) 0.2 Probable Gold Reserves (million oz) (26.7 M tonnes @ 2.45 g/t) 2.1 Indicated gold resource (million oz) (13.9 M tonnes @ 1.54 g/t) 0.7 Inferred gold resource (million oz) (17.7 M tonnes @ 1.28 g/t) 0.7 Estimated LOM (years) 14 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $35 $50 $65 - 10 20 30 40 50 Q1-13 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne
  • 16. AGNICO EAGLE | SCOTIA BBQ 2014 16 CRESTON MASCOTA PHASE 3 LEACH PAD NOW COMMISSIONED  The expanded capacity for the agglomerator and overland conveyors was installed in May and commissioned in early June  Phase 3 leach pad was completed in June and has been fully commissioned See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. $10 $15 $20 5 6 7 8 9 10 11 12 Q2-13 Q3-13 Q4-13 Q1-14 Q2-14 Production (koz) Cost/tonne No production in Q4-12 and Q1-13 due to temporary suspension of Phase one leach pad Proven Gold Reserves (million oz) (0.3 M tonnes @ 0.61 g/t) 0.0 Probable Gold Reserves (million oz) (6.8 M tonnes @ 1.31 g/t) 0.3 Indicated gold resource (million oz) (2.4 M tonnes @ 0.66 g/t) 0.05 Inferred gold resource (million oz) (0.8 M tonnes @ 0.82 g/t) 0.02 Estimated LOM (years) 5
  • 17. AGNICO EAGLE | SCOTIA BBQ 2014 17 LA INDIA RAMP-UP CONTINUES; CRUSHING CIRCUIT REFINEMENTS EXPECTED TO ENHANCE STACKING RATES  1.1M tonnes of ore stacked on heap leach pad during Q2 2014 which yielded 17,809 ounces of payable gold production  Throughput continues to ramp up - stacking rates currently averaging approximately 12,500 tpd  Planned modifications to the crushing and stacking circuits are expected to be completed during Q3 2014  La India closed the first “water year” (July 1, 2013 to June 30, 2014) with approximately 200,000 m3 in storage See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. Probable Gold Reserves (million oz) (26.9 M tonnes @ 0.87 g/t) 0.8 Measured gold resource (million oz) (5.0 M tonnes @ 0.33 g/t) 0.1 Indicated gold resource (million oz) (51.3 M tonnes @ 0.38 g/t) 0.6 Inferred gold resource (million oz) (82.1 M tonnes @ 0.36 g/t) 1.0 Estimated LOM (years) 7
  • 19. AGNICO EAGLE | SCOTIA BBQ 2014 19 PROJECT PIPELINE EXPECTED TO PROVIDE FURTHER GROWTH ExpansionEXPLORATION ADVANCED DEVELOPMENT & FEASIBILITY EXPANSIONS Kittila Plant Expansion Rimpi DevelopmentHanhimaa IVR Goldex Satellites NORTHERNBUSINESS Meliadine Pinos Altos Shaft Pinos Altos Satellites Tarachi and La India SOUTHERNBUSINESS Kirkland Lake Partnership (50%) Akasaba West Bousquet 5 UG
  • 20. AGNICO EAGLE | SCOTIA BBQ 2014 20 SIGNIFICANT EXPLORATION FOOTPRINT NEAR MEADOWBANK IVR AND GREYHOUND PROJECTS PROVIDE POTENTIAL EXPLORATION UPSIDE
  • 21. AGNICO EAGLE | SCOTIA BBQ 2014 21 IVR DISCOVERY NEAR MEADOWBANK CONTINUES TO EXPAND FOUR MINERALIZED ZONES HAVE BEEN OUTLINED – MINERALIZATION OPEN IN ALL DIRECTIONS IVR14-044 8.70 g/t Au / 5.8 m IVR14-031 10.90 g/t Au / 2.9 m and 26.13 g/t Au / 4.8 m IVR14-015 10.52 g/t Au / 3.5 m IVR13-008 6.55 g/t Au / 7.2 m And 9.77 g/t Au / 3.5 m IVR13-004 6.20 g/t Au / 5.7 m And 6.05 g/t Au / 4.1 m IVR14-037 2.81 g/t Au / 10.8 m Incl. 5.83 g/t Au / 2.8 m IVR14-039 3.70 g/t Au / 7.4 m IVR14-017 1.83 g/t Au / 14.5 m Incl. 2.72 g/t Au / 4.8 m IVR14-028 27.62 g/t Au / 3.0 m
  • 22. AGNICO EAGLE | SCOTIA BBQ 2014 22 IVR GEOPHYSICAL MAP MULTIPLE EM-MAGNETIC ANOMALIES OUTLINED 7 km of MAG-EM favourable target IVR project area
  • 23. AGNICO EAGLE | SCOTIA BBQ 2014 23  Exploration ramp extended by 301 metres during Q2 2014, now 527 metres long, to a depth of 168 metres below surface  Surface drilling program completed early August 2014  130 holes (37,991metres) completed  Conversion drilling at Wesmeg/Normeg and Tiriganiaq zones and exploration drilling at Pump, Discovery and Wolf zones  Significant new discovery in the Pump zone, indicating potential for high-grade resources – including hole M14-2220 that yielded 19.8 g/t gold over 5.2 metres at 12 metres depth  Final Environmental Impact Statement (FEIS) delivered in Q2 2014  Updated technical study on track for late 2014 MELIADINE 2014 DRILLING EXPECTED TO FURTHER EXPAND RESOURCE BASE Proven Gold Reserves (million oz) (0.03 M tonnes @ 7.31 g/t) 0.0 Probable Gold Reserves (million oz) (11.9 M tonnes @ 7.38 g/t) 2.8 Indicated gold resource (million oz) (19.0 M tonnes @ 5.05 g/t) 3.1 Inferred gold resource (million oz) (11.7 M tonnes @ 7.20 g/t) 2.7 Estimated LOM (years) See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources.
  • 24. AGNICO EAGLE | SCOTIA BBQ 2014 24 MELIADINE DEPOSIT LOCATIONS 38,000 METRES OF INFILL AND CONVERSION DRILLING CARRIED OUT ON MULTIPLE ZONES
  • 25. AGNICO EAGLE | SCOTIA BBQ 2014 25 MELIADINE - MINERALIZATION EXPANDED AT WESMEG/NORMEG CONVERSION DRILLING CONFIRMS GRADE AND WIDTH OF NEAR SURFACE DEPOSITS M14-2226 12.51 g/t Au / 5.3 m M14-2249 6.16 g/t Au / 3.1 m and 7.70 g/t Au / 7.0 m M14-2269 10.07 g/t Au / 5.8 m
  • 26. AGNICO EAGLE | SCOTIA BBQ 2014 26 DRILLING AT WOLF EXTENDS MINERALIZATION DOWN PLUNGE RESOURCES EXPECTED TO GROW M14-2287 6.12 g/t Au / 4.2 m M14-2292 6.52 g/t Au / 16.6 m Incl. 8.42 g/t Au / 11.0 m M14-2268 5.90 g/t Au / 4.0 m
  • 27. AGNICO EAGLE | SCOTIA BBQ 2014 27 NEW MINERALIZATION DISCOVERED AT PUMP ZONE GOOD POTENTIAL TO HOIST ADDITIONAL HIGH-GRADE RESOURCES M14-2220 19.77 g/t Au / 5.2 m and 8.29 g/t Au / 5.0 m M14-2229 18.91 g/t Au / 5.4 m M14-2305 9.50 g/t Au / 3.9 m M14-2244 11.51 g/t Au / 3.1 m
  • 28. AGNICO EAGLE | SCOTIA BBQ 2014 28 2014 LARONDE DEEP EXPLORATION PROGRAM DRILLING FOCUSED ON UPGRADING RESOURCES BELOW 3.1 KM • A 3,600 metre drill program will be carried out to develop new resources at depth • A 2,500 metre drill program is planned for the 20 North Zone - good potential for conversion of resources to reserves
  • 29. AGNICO EAGLE | SCOTIA BBQ 2014 29 RAMP DEVELOPMENT ACCELERATED INTO TOP OF THE D ZONE DEVELOPMENT OF ADDITIONAL SATELLITES COULD POTENTIALLY EXTEND MINE LIFE • Development is progressing on the M2, M5 and E2 satellite zones • A new surface portal has been collared and the old ramp is being refurbished to provide access to the M3 and M4 zones. The ramp will also facilitate the movement of equipment from surface to UG • Ramp into the top of the D zone has been accelerated to provide access for additional exploration drilling • Development of additional satellite zones could potentially extend the mine life, and improve costs given the mill has capacity for 8,000 tpd • The Goldex mining approach may also open up other mining opportunities in the region.
  • 30. AGNICO EAGLE | SCOTIA BBQ 2014 30 INFILL DRILLING COMPLETED AT AKASABA WEST FEASIBILITY STUDY LATER THIS YEAR EXPECTED TO SUPPORT MILLING AT GOLDEX 164-14-009 1.27 g/t Au, 0.63% Cu / 45 m 164-13-001 1.14 g/t Au, 0.56% Cu / 91 m 164-14-022 0.84 g/t Au, 0.48% Cu / 81 m 164-14-017 1.41 g/t Au, 0.59% Cu / 66 m 164-14-014 0.84 g/t Au, 0.50% Cu / 70 m 164-14-019 1.13 g/t Au, 0.66% Cu / 78 m
  • 31. AGNICO EAGLE | SCOTIA BBQ 2014 31 KIRKLAND LAKE PROJECTS 35M OZ OF HISTORICAL GOLD PRODUCTION IN THE DISTRICT - MAIN TARGETS UPPER BEAVER & CANADIAN KIRKLAND 230km2 hosting five deposits with disclosed NI 43-101 resources of 2.1 Moz indicated and 1.8 Moz inferred BIDGOOD (OP) Ind: 1.5 Mt @ 1.7 g/t Au, 76 k oz Inf: 0.3 Mt @ 2.0 g/t Au, 21 k oz AK (UG) Ind: 1.2 Mt @ 4.5 g/t Au, 164 k oz Inf: 1.5 Mt @ 4.2 g/t Au, 207 k oz ANOKI / MCBEAN (UG) Ind: 1.4 Mt @ 4.7 g/t Au, 217 k oz Inf: 1.6 Mt @ 4.7 g/t Au, 237 k oz MACASSA MINE + SMC P+P: 2.5 Mt @ 17.1 g/t Au, 1.4 M oz M+I: 3.8 Mt @ 17.0g/t Au, 2.1M oz Inf: 1.9 Mt @ 18.6g/t Au, 1.1M oz (UG) Ind: 0.24 Mt @ 4.3 g/t Au, 33 k oz (UG) Inf: 3.6 Mt @ 4.8 g/t Au, 557 k oz (OP) Ind: 1.7 Mt @ 1.9 g/t Au, 104 k oz (OP) Inf: 1.3 Mt @ 1.9 g/t Au, 76 k oz UPPER BEAVER (UG) Ind: 6.9 Mt @ 6.6 g/t Au, 1.5 M oz Inf: 4.6 Mt @ 4.9 g/t Au, 712 k oz Canadian Kirkland Upper Beaver Source: Modified from Osisko reports and Kirkland Lake Gold reports
  • 32. AGNICO EAGLE | SCOTIA BBQ 2014 32 EVALUATION OF REGIONAL TARGETS CONTINUES AT KITTILA EXPLORATION ONGOING ON HANHIMAA AND DRILLING HAS RESUMED AT VIITONEN KAPSA
  • 33. AGNICO EAGLE | SCOTIA BBQ 2014 33 DEEP DRILLING EXTENDS SUURI ZONE AT DEPTH MINERALIZATION APPEARS OPEN APPROXIMATELY 240M BELOW CURRENT RESERVES ROD14-002C 6.81 g/t Au / 6.4 m Incl. 12.0 g/t Au / 2.2 m
  • 34. AGNICO EAGLE | SCOTIA BBQ 2014 34 MULATOS DISTRICT EXPECTED TO YIELD FURTHER DISCOVERIES LARGE LAND POSITION IN A SIGNIFICANT GOLD DISTRICT Acquisition of surface rights continues in the district
  • 35. AGNICO EAGLE | SCOTIA BBQ 2014 35 EXPLORING BULK TONNAGE PORPHYRY TARGETS CLOSE TO LA INDIA ARROYO HONDO TARGET YIELDS ENCOURAGING RESULTS Both high Sulphidation and Porphyry targets have been defined to date Drill highlights include: AH-13-010 0.33 g/t Au over 111m AH-14-014 0.27 g/t Au over 347m incl. 0.87 g/t Au over 35.7m AH-14-025 0.78 g/t Au over 67m
  • 37. AGNICO EAGLE | SCOTIA BBQ 2014 37  Details on the optimization plan for Canadian Malartic are expected to be presented by the Partnership by the end of Q3 2014  Anticipated update to 2015 guidance by the end of Q3 2014  Completion of 1,000 tpd mill expansion at Kittila expected by year end-2014  Update on Akasaba West project expected in late 2014  Updated Meliadine technical study expected in late 2014 or early 2015  Installation of new ore conveyor at LaRonde Deep expected in 2015 – should help reduce costs and congestion  Continuing evaluation of satellite deposits at Pinos Altos and Goldex, which could enhance production and cost profiles FUTURE CATALYSTS
  • 38. AGNICO EAGLE | SCOTIA BBQ 2014 38 234,837 218,980 808,974 880,355 $640 $672 $663 2012A 2013A 2014E 2015E** 2016E** INCREASED 2014 PRODUCTION AND LOWER COST GUIDANCE STRONG OPERATIONAL PERFORMANCE AND OSISKO ACQUISITION DRIVES 14% INCREASE FROM ORIGINAL GUIDANCE OF 1.19M OZ Payable Gold Production Profile * Mid range of estimated 2014 revised guidance ** Includes 50% of Osisko’s March 2014 LOM production for the Canadian Malarctic mine 1,043,811 1,099,335 1,360,000* 1,546,000 1,590,000 Northern Business (oz) Southern Business (oz) Annual Production Cash Cost
  • 39. AGNICO EAGLE | SCOTIA BBQ 2014 39 0% 500% 1000% 1500% 2000% 2500% 04/01/1999 21/05/2001 13/10/2003 02/03/2006 21/07/2008 06/12/2010 26/04/2013 Source: Bloomberg AEM US Equity XAU IndexGold Spot AEM US Equity CAGR 15.25% Gold Spot CAGR 10.19% XAU Index CAGR 2.82% INDEXED SHARE PERFORMANCE SINCE 1999 AGNICO EQUITY POISED FOR OUTPERFORMANCE
  • 41. AGNICO EAGLE | SCOTIA BBQ 2014 41 GOLD AND SILVER RESERVES AND RESOURCES DECEMBER 31, 2013 Gold Silver Tonnes (000’s) Gold (g/t) Gold (ounces) (000’s) Tonnes (000’s) Silver (g/t) Silver (ounces) (000’s) Proven & Probable Reserves Northern Business 93,618 4.60 13,841 24,127 19.59 15,192 Southern Business 55,800 1.69 3,024 28,703 64.32 59,354 Total 149,418 3.51 16,865 52,830 43.89 74,546 Measured & Indicated Resources Northern Business 86,869 2.96 8,276 4,242 32.53 4,436 Southern Business 70,171 0.61 1,378 13,935 33.63 15,066 Total 157,040 1.91 9,654 18,177 33.37 19,502 Inferred Resources Northern Business 69,674 3.77 8,434 10,536 14.72 4,986 Southern Business 99,795 0.53 1,686 17,707 26.28 14,962 Total 169,470 1.86 10,121 28,243 21.97 19,948 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
  • 42. AGNICO EAGLE | SCOTIA BBQ 2014 42 COPPER, ZINC AND LEAD RESERVES AND RESOURCES DECEMBER 31, 2013 Copper Zinc Lead Tonnes (000’s) Copper (%) Copper (tonnes) Tonnes (000’s) Zinc (%) Zinc (tonnes) Tonnes (000’s) Lead (%) Lead (tonnes) Proven & Probable Reserves Northern Business 24,127 0.25 59,519 24,127 0.67 161,108 24,127 0.04 9,964 Southern Business Total 24,127 0.25 59,519 24,127 0.67 161,108 24,127 0.04 9,964 Measured & Indicated Resources Northern Business 4,242 0.16 6,981 4,242 1.61 68,127 4,242 0.16 6,793 Southern Business Total 4,242 0.16 6,981 4,242 1.61 68,127 4,242 0.16 6,793 Inferred Resources Northern Business 10,536 0.27 28,118 10,536 0.55 58,463 10,536 0.05 5,176 Southern Business Total 10,536 0.27 28,118 10,536 0.55 58,463 10,536 0.05 5,176 See AEM Feb 12, 2014 press release for detailed breakdown of reserves and resources. Reserves are not a subset of resources.
  • 43. AGNICO EAGLE | SCOTIA BBQ 2014 43 NOTES TO INVESTORS REGARDING THE USE OF RESOURCES Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This document uses the terms “measured resources” and “indicated resources”. Investors are advised that while those terms are recognized and required by Canadian regulations, the SEC does not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves. Cautionary Note to Investors Concerning Estimates of Inferred Resources This document also uses the term “inferred resources”. Investors are advised that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. “Inferred resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre- feasibility studies, except in rare cases. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. Scientific and Technical Data Cautionary Note To U.S. Investors - The SEC permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. Agnico Eagle Mines Limited reports mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation, classification and reporting of resources and reserves in accordance with the Canadian securities regulatory authorities' (the "CSA") National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"). These standards are similar to those used by the SEC’s Industry Guide No. 7, as interpreted by Staff at the SEC ("Guide 7"). However, the definitions in NI 43- 101 differ in certain respects from those under Guide 7. Accordingly, mineral reserve information contained herein may not be comparable to similar information disclosed by U.S. companies. Under the requirements of the SEC, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. A "final" or "bankable" feasibility study is required to meet the requirements to designate reserves under Industry Guide 7. Agnico Eagle uses certain terms in this news release, such as "measured", "indicated", and "inferred", and "resources" that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. In prior periods, reserves for all properties were typically estimated using historic three-year average metals prices and foreign exchange rates in accordance with the SEC guidelines. These guidelines require the use of prices that reflect current economic conditions at the time of reserve determination, which the Staff of the SEC has interpreted to mean historic three-year average prices. Given the current lower commodity price environment, Agnico Eagle has decided to use price assumptions that are below the three-year averages. The assumptions used for the mineral reserves estimates at all mines and advanced projects as of December 31, 2013, reported by the Company on February 12, 2014, are $1,200 per ounce gold, $18.00 per ounce silver, $0.82 per pound zinc, $3.00 per pound copper, $0.91 per pound lead and C$/US$, US$/Euro and MXP/US$ exchange rates of 1.03, 1.32 and 12.75, respectively. NI 43-101 requires mining companies to disclose reserves and resources using the subcategories of "proven" reserves, "probable" reserves, "measured" resources, "indicated" resources and "inferred" resources. Mineral resources that are not mineral reserves do not have demonstrated economic viability.
  • 44. AGNICO EAGLE | SCOTIA BBQ 2014 44 NOTES TO INVESTORS REGARDING THE USE OF RESOURCES A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at pre-feasibility or feasibility level as appropriate that include application of modifying factors. Such studies demonstrate that, at the time of reporting, extraction could reasonably be justified. Modifying factors are considerations used to convert mineral resources to mineral reserves. These include, but are not restricted to, mining, processing, metallurgical, infrastructure, economic, marketing, legal, environmental, social and governmental factors. A proven mineral reserve is the economically mineable part of a measured mineral resource. A proven mineral reserve implies a high degree of confidence in the modifying factors. A probable mineral reserve is the economically mineable part of an indicated and, in some circumstances, a measured mineral resource. The confidence in the modifying factors applying to a probable mineral reserve is lower than that applying to a proven mineral reserve. A mineral resource is a concentration or occurrence of solid material of economic interest in or on the Earth's crust in such form, grade or quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade or quality, continuity and other geological characteristics of a mineral resource are known, estimated or interpreted from specific geological evidence and knowledge, including sampling. A measured mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with confidence sufficient to allow the application of modifying factors to support detailed mine planning and final evaluation of the economic viability of the deposit. Geological evidence is derived from detailed and reliable exploration, sampling and testing and is sufficient to confirm geological and grade or quality continuity between points of observation. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are estimated with sufficient confidence to allow the application of modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Geological evidence is derived from adequately detailed and reliable exploration, sampling and testing and is sufficient to assume geological and grade or quality continuity between points of observation. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. Geological evidence is sufficient to imply but not verify geological and grade or quality continuity. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that includes appropriately detailed assessments of applicable modifying factors together with any other relevant operational factors and detailed financial analysis that are necessary to demonstrate, at the time of reporting, that extraction is reasonably justified (economically mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-Feasibility Study. The effective date for all of the Company's mineral resource and reserve estimates in this news release is December 31, 2013. Additional information about each of the mineral projects that is required by NI 43-101, sections 3.2 and 3.3 and paragraphs 3.4 (a), (c) and (d) can be found in the Technical Reports referred to above, which may be found at www.sedar.com. Other important operating information can be found in the Company's AIF and Form 40-F. The scientific and technical information contained herein has been approved by Daniel Doucet, Corporate Director, Reserve Development, and/or Alain Blackburn, Senior Vice- President, Exploration. Both Mr. Doucet and Mr. Blackburn are designated P.Eng. with the Ordre ingenieurs du Québec and qualified persons as defined by NI 43-101.
  • 45. Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-947-1212 info@agnicoeagle.com agnicoeagle.com