The document outlines the design and construction phases for redeveloping infrastructure in Al-Beyda city. The design phase includes surveying the existing situation, and developing general designs for systems like foul water, storm water, drinking water and roads. The construction phase involves mobilization, and issuing task orders to define specific construction polygons, like Polygon 8. Details are provided on aspects like camp setup, and typical infrastructure elements to be constructed, such as the separative foul water system and green space amenities.
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
Presentación Libia
1.
2. • 1.- DESIGN PHASE
• EXISTING SITUATION
• GENERAL DESIGN
• CONSTRUCTION DESIGN (Task Orders/
Polygons)
• 2.- CONSTRUCTION PHASE
• Mobilization
• Tasks Orders
3. • EXISTING SITUATION
– Full detailed Map of Al-Beyda
– General study of the visible state of the city
– Special constructions (main reservoirs,
tanks..)
– Geotechnical Investigation
5. GENERAL DESIGN
• 1.- FOUL WATER
• 2.- STORM WATER
• 3.- DRINKING WATER
• 4.- TELECOMUNICATIONS-CIVIL WORKS
• 5.- LOW VOLTAGE + PUBLIC LIGHTING
• 6.- GAS
• 7.- ROADS+SIDEWALKS
6. •Separate system for all the city except basin 8;
•Gravity solution (considering microtunnels);
•Two existing FWTP on South and Northwest
Ch1.1.1
Ch1.1.2
Ch1.1.3
Ch1.2.6
GENERAL DESIGN
FOR FOUL WATER DRAINAGE
APRIL 2010
7. Separate system for all the city except basin 8:
95.5% going to surrounding water lines for natural flow or recharge of groundwater levels
4.5% combined going to storm floating tank through microtunnel (basin 8);
whenever possible with superficial flow in border areas.
Population 2035 ~ 183,500
Maximum flow velocity = 4m/s
GENERAL DESIGN
FOR STORM WATER DRAINAGE
APRIL 2010
40. 1.- Footing/Bike 5.- Fountain 9.- Children games
GREEN AREAS AREAS
2.- Sport zone 6.- Green avenue 10.- Skating area
3.- Pergola 7.- Equipment
4.- Green areas GREEN
8.- Green areas