SlideShare ist ein Scribd-Unternehmen logo
1 von 21
MISSISSIPPI DOT
I-55 SPLIT DIAMOND INTERCHANGE
 SMART WORK ZONE SYSTEM AND
     PERFORMANCE MEASURES
Smart Work Zone Systems (SWZS), utilize
 computers, communication systems and other
 ITS field devices to inform motorists, reduce
 congestion, clear accidents, reduce secondary
 accidents and make work zones safer for the
 highway workers and the motorists.
               www.MDOTTraffic.com
             www.fhwa.dot.gov/workzones



Introduction
MDOT Goals for SWZS
 1. Safety
    a. Alert Drivers to slow or stopped traffic
    b. Clear accidents more quickly
 2. Reduce Congestion
    a. Monitor travel times
    b. Alert drivers of delays
    c. Provide information before decision points
 3. Evaluate for the Future


Goals
Vicinity Map
33,000

                        47,000


              71,000


                       20,000




                                 Annual Average Daily Traffic




Project Map
Project Background
 1. Funding Mechanism
 2. MDOT SWZS Philosophy
 3. Design Procedure
 4. Bidding Process




Project Design
I55 Split-Diamond Interchange Project
 Minimum Requirements
 1. 10 Portable Message Boards
 2. 20 Side-Fired Radar Devices
 3. Typical Sign Messages Provided
   Normal: “Road Work Ahead, Reduced Speed Ahead”
   35mph> “Congestion Ahead, Expect Delays”
   5mph > “Slow Traffic Ahead, Expect Long Delays”
   Stopped: “Stopped Traffic Ahead, Prepare To Stop”




Specifications
Smart Work Zone System Delivered
 1. Contractor Designed
 2. 13 miles vs 5 miles req’d
 3. 10 Signs Deployed vs 8 req’d
 4. No Devices in the
      Work Zone
 5. Website and Field
      Monitoring



System Delivered
ASTI Web Features
SWZS Performance Measures

        1. Mobility

        2. Safety

        3. Traveler Information

        4. System Performance




Goals
SWZS Performance Measures

      1. Mobility



      Rate of Diversion      Travel Times
      Delay                  Reduced Demand
      Speeds                 Incidents in the WZ
      Work Zone Throughput   Maximum Queue Lengths




PM Mobility
SWZS Performance Measures

      2. Safety


      Number of Crashes
      Crash Rate
      Crash Severity
      Citations
      Reduction in aggressive maneuvers
         (forced merges)




PM Safety
SWZS Performance Measures

      3. Traveler Information


      Web – Email Alerts
      Smart phone apps
      511
      Message Boards
      Highway Advisory Radio
      Survey Questions




PM Traveler Information
SWZS Performance Measures

      4. System Performance



      Error logs
      Missing data
      Down time
      Web site features
      Benefits – Users perspective




PM System Performance
Speed, Volume, Occupancy Report




Sample Report
Speed Data
Volume Data
Occupancy Data
January 2013 Speed Chart - SB 1st
                                      Lane


                                                            28-Jan
            7:00                                            21-Jan
                                                            14-Jan
                                                            7-Jan


                   56        58      60       62      64




PM Report
Future Performance Measures
 1. Spot Speed Studies
 2. Project Diary
 3. Crash Report Analysis
 4. Continue to develop PM Reports
 5. Integrate info 511
 6. Survey Questionaires




ITS Installations
QUESTIONS ?
   ACEY ROBERTS P.E.
      ITS Engineer
aroberts@mdot.state.ms.us

Weitere ähnliche Inhalte

Ähnlich wie Mississippi DOT Smart Work Zone Systems Performance Measures

Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitModified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitIRJET Journal
 
Savvius_Introduction to workshop
Savvius_Introduction to workshopSavvius_Introduction to workshop
Savvius_Introduction to workshopSTelligence Company
 
Inaku Patrick Jones Cv
Inaku Patrick Jones CvInaku Patrick Jones Cv
Inaku Patrick Jones CvPatrickinaku
 
G03403041052
G03403041052G03403041052
G03403041052theijes
 
Artificial Intelligent System to detect Pit holes using HSV in Open CV
Artificial Intelligent System to detect Pit holes using HSV in Open CVArtificial Intelligent System to detect Pit holes using HSV in Open CV
Artificial Intelligent System to detect Pit holes using HSV in Open CVIRJET Journal
 
Machine Learning Based Traffic Volume Count Prediction
Machine Learning Based Traffic Volume Count PredictionMachine Learning Based Traffic Volume Count Prediction
Machine Learning Based Traffic Volume Count PredictionIRJET Journal
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay Sharma
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay Sharma
 
Smart Traffic Managment System Approaches.pptx
Smart Traffic Managment System Approaches.pptxSmart Traffic Managment System Approaches.pptx
Smart Traffic Managment System Approaches.pptxReetBezboruah
 
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...IRC
 
IRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET Journal
 
IRJET - Driver Monitoring System
IRJET - Driver Monitoring SystemIRJET - Driver Monitoring System
IRJET - Driver Monitoring SystemIRJET Journal
 
Minesoft Company Overview
Minesoft Company OverviewMinesoft Company Overview
Minesoft Company OverviewMinesoft
 
IRJET- Image Processing based Intelligent Traffic Control and Monitoring ...
IRJET-  	  Image Processing based Intelligent Traffic Control and Monitoring ...IRJET-  	  Image Processing based Intelligent Traffic Control and Monitoring ...
IRJET- Image Processing based Intelligent Traffic Control and Monitoring ...IRJET Journal
 
Bml 303 past papers pack
Bml 303 past papers packBml 303 past papers pack
Bml 303 past papers packSan King
 
ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1Agenor Technology Ltd
 
Webinar on Functional Safety Analysis using Model-based System Analysis
Webinar on Functional Safety Analysis using Model-based System AnalysisWebinar on Functional Safety Analysis using Model-based System Analysis
Webinar on Functional Safety Analysis using Model-based System AnalysisDeepak Shankar
 

Ähnlich wie Mississippi DOT Smart Work Zone Systems Performance Measures (20)

Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side UnitModified Congestion Re-Routing Scheme using Centralized Road Side Unit
Modified Congestion Re-Routing Scheme using Centralized Road Side Unit
 
Savvius_Introduction to workshop
Savvius_Introduction to workshopSavvius_Introduction to workshop
Savvius_Introduction to workshop
 
Automated Traffic Signal Performance Measures
Automated Traffic Signal Performance MeasuresAutomated Traffic Signal Performance Measures
Automated Traffic Signal Performance Measures
 
Inaku Patrick Jones Cv
Inaku Patrick Jones CvInaku Patrick Jones Cv
Inaku Patrick Jones Cv
 
G03403041052
G03403041052G03403041052
G03403041052
 
Artificial Intelligent System to detect Pit holes using HSV in Open CV
Artificial Intelligent System to detect Pit holes using HSV in Open CVArtificial Intelligent System to detect Pit holes using HSV in Open CV
Artificial Intelligent System to detect Pit holes using HSV in Open CV
 
Machine Learning Based Traffic Volume Count Prediction
Machine Learning Based Traffic Volume Count PredictionMachine Learning Based Traffic Volume Count Prediction
Machine Learning Based Traffic Volume Count Prediction
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Sanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTESanjay_Sharma _resume_Telecom IMS LTE
Sanjay_Sharma _resume_Telecom IMS LTE
 
Smart Traffic Managment System Approaches.pptx
Smart Traffic Managment System Approaches.pptxSmart Traffic Managment System Approaches.pptx
Smart Traffic Managment System Approaches.pptx
 
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...
Monitoring and sustaining services: Lessons learned from WaterAid's post-impl...
 
IRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road BlockIRJET - Traffic Signal Automation using Spike Road Block
IRJET - Traffic Signal Automation using Spike Road Block
 
SWIMing in a Standards Soup
SWIMing in a Standards SoupSWIMing in a Standards Soup
SWIMing in a Standards Soup
 
Mis ppt level 2 revised
Mis ppt level 2 revisedMis ppt level 2 revised
Mis ppt level 2 revised
 
IRJET - Driver Monitoring System
IRJET - Driver Monitoring SystemIRJET - Driver Monitoring System
IRJET - Driver Monitoring System
 
Minesoft Company Overview
Minesoft Company OverviewMinesoft Company Overview
Minesoft Company Overview
 
IRJET- Image Processing based Intelligent Traffic Control and Monitoring ...
IRJET-  	  Image Processing based Intelligent Traffic Control and Monitoring ...IRJET-  	  Image Processing based Intelligent Traffic Control and Monitoring ...
IRJET- Image Processing based Intelligent Traffic Control and Monitoring ...
 
Bml 303 past papers pack
Bml 303 past papers packBml 303 past papers pack
Bml 303 past papers pack
 
ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1ICEflo Implementation Management Solution V1d1
ICEflo Implementation Management Solution V1d1
 
Webinar on Functional Safety Analysis using Model-based System Analysis
Webinar on Functional Safety Analysis using Model-based System AnalysisWebinar on Functional Safety Analysis using Model-based System Analysis
Webinar on Functional Safety Analysis using Model-based System Analysis
 

Mehr von Acey Roberts

CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work ZonesAcey Roberts
 
Wireless Communication in ITS
Wireless Communication in ITSWireless Communication in ITS
Wireless Communication in ITSAcey Roberts
 
MS RIVER BRIDGE SECURITY ITS PROJECT
MS RIVER BRIDGE SECURITY ITS PROJECTMS RIVER BRIDGE SECURITY ITS PROJECT
MS RIVER BRIDGE SECURITY ITS PROJECTAcey Roberts
 
2012 ASCE Mississippi Report Card
2012 ASCE Mississippi Report Card2012 ASCE Mississippi Report Card
2012 ASCE Mississippi Report CardAcey Roberts
 
MDOT ITS Design Manual
MDOT ITS Design ManualMDOT ITS Design Manual
MDOT ITS Design ManualAcey Roberts
 
Highway 90 Reconstruction (MS)
Highway 90 Reconstruction (MS)Highway 90 Reconstruction (MS)
Highway 90 Reconstruction (MS)Acey Roberts
 
MDOT's Response to Hurricane Gustav
MDOT's Response to Hurricane GustavMDOT's Response to Hurricane Gustav
MDOT's Response to Hurricane GustavAcey Roberts
 

Mehr von Acey Roberts (7)

CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work Zones
 
Wireless Communication in ITS
Wireless Communication in ITSWireless Communication in ITS
Wireless Communication in ITS
 
MS RIVER BRIDGE SECURITY ITS PROJECT
MS RIVER BRIDGE SECURITY ITS PROJECTMS RIVER BRIDGE SECURITY ITS PROJECT
MS RIVER BRIDGE SECURITY ITS PROJECT
 
2012 ASCE Mississippi Report Card
2012 ASCE Mississippi Report Card2012 ASCE Mississippi Report Card
2012 ASCE Mississippi Report Card
 
MDOT ITS Design Manual
MDOT ITS Design ManualMDOT ITS Design Manual
MDOT ITS Design Manual
 
Highway 90 Reconstruction (MS)
Highway 90 Reconstruction (MS)Highway 90 Reconstruction (MS)
Highway 90 Reconstruction (MS)
 
MDOT's Response to Hurricane Gustav
MDOT's Response to Hurricane GustavMDOT's Response to Hurricane Gustav
MDOT's Response to Hurricane Gustav
 

Kürzlich hochgeladen

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 

Kürzlich hochgeladen (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 

Mississippi DOT Smart Work Zone Systems Performance Measures

  • 1. MISSISSIPPI DOT I-55 SPLIT DIAMOND INTERCHANGE SMART WORK ZONE SYSTEM AND PERFORMANCE MEASURES
  • 2. Smart Work Zone Systems (SWZS), utilize computers, communication systems and other ITS field devices to inform motorists, reduce congestion, clear accidents, reduce secondary accidents and make work zones safer for the highway workers and the motorists. www.MDOTTraffic.com www.fhwa.dot.gov/workzones Introduction
  • 3. MDOT Goals for SWZS 1. Safety a. Alert Drivers to slow or stopped traffic b. Clear accidents more quickly 2. Reduce Congestion a. Monitor travel times b. Alert drivers of delays c. Provide information before decision points 3. Evaluate for the Future Goals
  • 5. 33,000 47,000 71,000 20,000 Annual Average Daily Traffic Project Map
  • 6. Project Background 1. Funding Mechanism 2. MDOT SWZS Philosophy 3. Design Procedure 4. Bidding Process Project Design
  • 7. I55 Split-Diamond Interchange Project Minimum Requirements 1. 10 Portable Message Boards 2. 20 Side-Fired Radar Devices 3. Typical Sign Messages Provided Normal: “Road Work Ahead, Reduced Speed Ahead” 35mph> “Congestion Ahead, Expect Delays” 5mph > “Slow Traffic Ahead, Expect Long Delays” Stopped: “Stopped Traffic Ahead, Prepare To Stop” Specifications
  • 8. Smart Work Zone System Delivered 1. Contractor Designed 2. 13 miles vs 5 miles req’d 3. 10 Signs Deployed vs 8 req’d 4. No Devices in the Work Zone 5. Website and Field Monitoring System Delivered
  • 10. SWZS Performance Measures 1. Mobility 2. Safety 3. Traveler Information 4. System Performance Goals
  • 11. SWZS Performance Measures 1. Mobility Rate of Diversion Travel Times Delay Reduced Demand Speeds Incidents in the WZ Work Zone Throughput Maximum Queue Lengths PM Mobility
  • 12. SWZS Performance Measures 2. Safety Number of Crashes Crash Rate Crash Severity Citations Reduction in aggressive maneuvers (forced merges) PM Safety
  • 13. SWZS Performance Measures 3. Traveler Information Web – Email Alerts Smart phone apps 511 Message Boards Highway Advisory Radio Survey Questions PM Traveler Information
  • 14. SWZS Performance Measures 4. System Performance Error logs Missing data Down time Web site features Benefits – Users perspective PM System Performance
  • 15. Speed, Volume, Occupancy Report Sample Report
  • 19. January 2013 Speed Chart - SB 1st Lane 28-Jan 7:00 21-Jan 14-Jan 7-Jan 56 58 60 62 64 PM Report
  • 20. Future Performance Measures 1. Spot Speed Studies 2. Project Diary 3. Crash Report Analysis 4. Continue to develop PM Reports 5. Integrate info 511 6. Survey Questionaires ITS Installations
  • 21. QUESTIONS ? ACEY ROBERTS P.E. ITS Engineer aroberts@mdot.state.ms.us

Hinweis der Redaktion

  1. MDOT uses Smart Work Zone Systems to accomplish its missison statement of making the Highways safer for users.Improve safety, by reducing accidents. Alert drivers to slowing or stopped traffic, and clear accidents more quickly.Reduce congestion by monitoring travel times, alert drivers to delays before decision points so alternate routes are available.Evaluate for the future: demo products, gather and study traffic flow against base line traffic, virtual modeling future projects with previous SWZS traffic data, benefit cost analysis by assiging costs to delay safety vehicle operating costs, ect.
  2. Fast tracked funding – interstate widening, split diamond interchange, head to head traffic flowContractor designed vsmdot designed (like a traffic control plan)Minimum details for this project due to fast tracked funding, mainly detailed in specifications and notice to bidders for a contractor designed systemBidding involved a lump sum bid item for the “SWZ system” that provides full payment for the SWZS. A per each pay item for additional field devices was included should the project engineer request them during construction. System monitoring is a lump sum bid item pay for on a daily basis for resetting devices, web services and ongoing maintenance
  3. By addendum we were able to sneak a SWZS specification into the plans and a cooresponding notice to bidders for TMC modifications that sets up an RSS feed to the statewide MDOT TMC in Jackson.These are all portable trailer mounted, cell phone comm, solar powered devices. All data recorded will be provided in polling increments to the State Agency. A minimum of 10 PCMS boards were requested with 8 in the field, 2 for backup/spares. A minimum of 20 radar units were requested.Typical sign messages were given based on speed threasholds.
  4. The contractor, Mississippi Based Hill Brothers Const. used ASTI as a sub contractor. The system they proposed to MDOT essentially spread the devices out farther both North and South of the work zone from around a 5 mile footprint discussed in the bid documents to a 13 miles footprint. They used 10 signs (5 north and 5 south) in the field as opposed to the 8 recommended and also used 20 data collectors. They did not place any devices within the 2 mile temporary head to head traffic arrangement.
  5. ASTI Website developed Real-Time traffic countsDatabase for Speed, Volume OccupancyDatabase of PCMS MessagesASTI maintains the website icons and updates all information
  6. Establishing and monitoring performance is a way of determining the usefulness of a system to the agency, to the contractor, and to the public travelling through the work zone. It is important for agencies to track performance measures in order to justify the additional cost to the project of utilizing ITS technologies as weighed against the benefits the system provides. Care should betaken to conduct any analysis in such a way that the affects can be attributed to the application being studied and not to any other measures. The specific measures tracked should be aligned with the goals of the particular application(s) used, but typically, metrics of a work zone ITS application can be categorized as follows:MobilitySafetyTraveler informationSystem performance
  7. Although mobility is one of the key benefits of using smart work zones, it is often the mostdifficult benefit to quantify. The primary metrics used to evaluate work zone ITS deploymentsin t4rms of how well they improve mobility include:Rate of diversion (traffic volumes on mainline and alternate routes)DelaySpeedsWork zone throughputTravel timeReduced demandUser surveysIncidents within the work zone and at the approachesMaximum queue lengthsExtensive coverage of detector and surveillance equipment to collect data is not always availablein a work zone. Before and after studies can be used to determine the affects if the system isdeployed some time after the work activity has already commenced. Many agencies use thechange in traffic volumes on alternate routes as a proxy to measure how effective work zoneATIS is in changing driver behavior. It appears that the most widely used method of measuringthe effectiveness of work zones equipped with ITS in improving mobility is through driversurveys.
  8. Deploying agencies are sometimes reluctant to quantify specific crash reduction goals in workzones, and the data is not always available in a comprehensive and timely enough manner foranalysis. It is also often difficult to determine whether or not a particular crash was caused bythe work zone, or if the contributing factors would have led to the crash without it. The obviousdifficulty of quantifying how many crashes were avoided is evident. The metrics which can beused to evaluate safety include:Number of crashesCrash rateCrash severityCitationsReduction in observed aggressive maneuvers and forced mergesMany agencies have begun using the reduction of aggressive behavior as a safety metric. Thiscan be a rather subjective measure, but can be estimated by simulation modeling, or quantifiedby personal observation or review of recorded video data from before and after deployment ofthe system.
  9. The effectiveness of information dissemination from a smart work zone is an important measure and one that correlates closely with the degree of customer satisfaction achieved from the system. How many drivers are getting the information, how useful it is to them, and how much impact their use of the information has on the safety and mobility of the work zone can often be measured by customer surveys. Survey questions can be asked of motorists on-site at locations near the work zone, such as nearby rest areas or truck stops, by telephone, mail or e-mail. Surveys can be targeted at specific groups, such as private citizens or commercial vehicleoperators. Useful information can also be gathered from observation, and from law enforcement, contractor, and construction management interviews.Example questions, such as the following from the I-30 Little Rock to Benton Construction Zone Survey, can be used to assess the effectiveness of information dissemination:17 Have you ever read the electronic message signs?Rate your level of agreement/disagreement with the following statements about the electronicmessage signs:  The messages are EASY to understand. The messages are ACCURATE. The messages are DETAILED enough to help me make decisions about my route The signs are located in the right places to help me make decisions about my route. Because of the info on the signs, I am better prepared to react to slow or stopped traffic. I feel safer traveling through this construction zone because of the information on the signs. Just having the information makes me feel less bothered by the delays in the constructionzone.Have you ever tuned into the highway advisory radio? The radio broadcast quality is too poor to hear properly. The messages are USEFUL. The messages are ACCURATE. The messages are updated frequently enough. The messages are DETAILED enough to help me make decisions about my route.Visits to project websites can be counted to track the number of unique visitors, the number ofreturn visitors, the types of information they are accessing, and the days and times they areusing the website. An on-line survey can also be included on the project website. Thesemethods can all be used to determine what information is deemed the most useful by the public.
  10. System performance is a measure of how well the system operates during its deployment. If thesystem is not working properly, its effectiveness in improving safety and mobility through thework zone is compromised. Ease of installation and maintenance, and the lack of unplannedoutages can be measure by:Error logsMissing dataDown timeProductivityWorkers’ exposure to hazardsConstruction efficiencyUser perspectives on system performance, functionality, and benefits to motorists.
  11. Sample report data: This table lists speed data in the southbound direction at data collector #9 just south of Hwy 463 on I55. A report was ran Monday morning from 6am to 8am