SlideShare ist ein Scribd-Unternehmen logo
1 von 6
RECENTLY REALIZED PROJECTS
Delivery of the mechanical equipment produced by Litz Hitech
Corporation from Taiwan to Chelyabinsk via Finland in April-May
2011.



Length: 552 cm

Height: 335 cm

Width: 351 cm




              A POTENTIA AD ACTUM!
RECENTLY REALIZED PROJECTS




Transportation of a batch of building CAT rollers by sea from the United States to the port
of Paldiski (Estonia), and after loading on a railway rolling stock delivery to Central Asia
(Tashkent, Uzbekistan) in March-April 20012



                      A POTENTIA AD ACTUM!
RECENTLY REALIZED PROJECTS




Delivery of 6000 tons of pipe products from TENARIS GLOBAL SERVICES, the largest
supplier of equipment for oil and gas industry, to Russia from the plants located on
different continents: 2100 tons – from Argentina, 900 tons – from Romania, 3,000 tons –
from Italy. Multimodal delivery by different means of transport: sea, rail and trucks, in
December 2011 – January 2012


                    A POTENTIA AD ACTUM!
RECENTLY REALIZED PROJECTS




Multimodal delivery of 63 containers for the Avantex company, leader of the Russian
geotextile materials, representing one single production line.
The cargo was delivered by truck to the sea port of Shanghai, then by sea to the port of
Novorossiysk, then it was transshipped to container trucks and delivered to the Vladimir
region in Central Russia altogether for customs clearance
RECENTLY REALIZED PROJECTS




Multimodal transportation of 5x36-ton hydraulic machines for "Pipeline Systems and
Technologies" from the port of Shanghai to the port of St. Petersburg - Lobnya –
Shchelkovo (Moscow region). The delivery can be considered as complicated due to the
weight of the machine-tool exceeding 36 tons and the height of 2.9 m. The dimensions
and weight of the equipment did not allow moving this equipment in a standard freight
container, in Sept-Oct, 2011

                   A POTENTIA AD ACTUM!
Projects en

Weitere ähnliche Inhalte

Ähnlich wie Projects en

Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)ustluga
 
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013Vadim Shabarov
 
Oversized and project transportations
Oversized and project transportationsOversized and project transportations
Oversized and project transportationsKondrat Haikevich
 
Sky Way - Future Innovative Transport
Sky Way - Future Innovative TransportSky Way - Future Innovative Transport
Sky Way - Future Innovative TransportHappy Tjahyono
 
Sky way presentation 2017
Sky way presentation 2017Sky way presentation 2017
Sky way presentation 2017Oleg Rogovski
 
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLift Events
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Lugaustluga
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”Business Finland
 

Ähnlich wie Projects en (14)

Презентация Инкотек Карго
Презентация Инкотек КаргоПрезентация Инкотек Карго
Презентация Инкотек Карго
 
Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)Automotive logistics russia 2011(ust luga)
Automotive logistics russia 2011(ust luga)
 
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
BalticRail.com regular Koper-Wroclaw train, presentation at TransPoland 2013
 
Train(ing) up
Train(ing) upTrain(ing) up
Train(ing) up
 
Train(ing) up
Train(ing) upTrain(ing) up
Train(ing) up
 
Development of the Russian Seaport Infrastructure
Development of the Russian Seaport InfrastructureDevelopment of the Russian Seaport Infrastructure
Development of the Russian Seaport Infrastructure
 
Klaipedaport Catbig
Klaipedaport CatbigKlaipedaport Catbig
Klaipedaport Catbig
 
Oversized and project transportations
Oversized and project transportationsOversized and project transportations
Oversized and project transportations
 
Sky Way - Future Innovative Transport
Sky Way - Future Innovative TransportSky Way - Future Innovative Transport
Sky Way - Future Innovative Transport
 
Sky way presentation 2017
Sky way presentation 2017Sky way presentation 2017
Sky way presentation 2017
 
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvya...
 
Port Of Ust Luga
Port Of Ust LugaPort Of Ust Luga
Port Of Ust Luga
 
JSC, “Lithuanian railways”
JSC, “Lithuanian railways”JSC, “Lithuanian railways”
JSC, “Lithuanian railways”
 
Sakhalin II OPF Project
Sakhalin II OPF ProjectSakhalin II OPF Project
Sakhalin II OPF Project
 

Projects en

  • 1. RECENTLY REALIZED PROJECTS Delivery of the mechanical equipment produced by Litz Hitech Corporation from Taiwan to Chelyabinsk via Finland in April-May 2011. Length: 552 cm Height: 335 cm Width: 351 cm A POTENTIA AD ACTUM!
  • 2. RECENTLY REALIZED PROJECTS Transportation of a batch of building CAT rollers by sea from the United States to the port of Paldiski (Estonia), and after loading on a railway rolling stock delivery to Central Asia (Tashkent, Uzbekistan) in March-April 20012 A POTENTIA AD ACTUM!
  • 3. RECENTLY REALIZED PROJECTS Delivery of 6000 tons of pipe products from TENARIS GLOBAL SERVICES, the largest supplier of equipment for oil and gas industry, to Russia from the plants located on different continents: 2100 tons – from Argentina, 900 tons – from Romania, 3,000 tons – from Italy. Multimodal delivery by different means of transport: sea, rail and trucks, in December 2011 – January 2012 A POTENTIA AD ACTUM!
  • 4. RECENTLY REALIZED PROJECTS Multimodal delivery of 63 containers for the Avantex company, leader of the Russian geotextile materials, representing one single production line. The cargo was delivered by truck to the sea port of Shanghai, then by sea to the port of Novorossiysk, then it was transshipped to container trucks and delivered to the Vladimir region in Central Russia altogether for customs clearance
  • 5. RECENTLY REALIZED PROJECTS Multimodal transportation of 5x36-ton hydraulic machines for "Pipeline Systems and Technologies" from the port of Shanghai to the port of St. Petersburg - Lobnya – Shchelkovo (Moscow region). The delivery can be considered as complicated due to the weight of the machine-tool exceeding 36 tons and the height of 2.9 m. The dimensions and weight of the equipment did not allow moving this equipment in a standard freight container, in Sept-Oct, 2011 A POTENTIA AD ACTUM!