Exploring for Copper and Gold in
Yukon, BC and Nevada
TSX-V:ATC
Forward-Looking Statements
2
FORWARD-LOOKING STATEMENTS
This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the
estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future
operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit.
These statements are based on information currently available to ATAC Resources Ltd. (“ATAC”) and ATAC provides no assurance that actual results will meet management’s
expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or
"would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral
resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and
sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger
Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental
assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these
assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be
materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the
exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining
operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development
activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks
related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks
inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that
might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization
and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms,
or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward-
looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not
undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws.
TECHNICAL DISCLOSURE
It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the
economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of
the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the
Tiger Deposit PEA is summarized in ATAC’s February 27, 2020 technical report titled “Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold
Project, Yukon, Canada”, which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com. Additional information about the
Osiris Resource Estimate is summarized in ATAC’s July 28, 2022 news release titled “ATAC Announces Updated Resource Estimate for the Osiris Deposit, Yukon”. A technical
report for the updated Osiris Resource Estimate will be filed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com within 45 days.
Historical information for East Goldfield and the Val Target rely on disclosure from previous operators and have not been independently verified.
QUALIFIED PERSON
Adam Coulter, M.Sc., P.Geo., ATAC’s Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101. All technical information contained in this
presentation has been approved by Adam Coulter.
TRUE WIDTHS
True widths for diamond drill holes are estimated to be 30% - 100% of intersected widths. RAB drill hole intersections are drilled thicknesses and true widths are unknown.
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
Corporate Overview
3
Share Structure*
Shares Outstanding 209,813,641
Fully Diluted 247,127,778
Options ($0.17 - $0.55) 11,675,000
Warrants ($0.23 - $0.28) 25,639,137
Working Capital C$7.5M
52-Week Range 0.09 – 0.20
200-Day Moving Average 0.13
* Share Structure as at April 7, 2022
Recent Financings
Shares Issued* Proceeds
April 2022 25,000,000 @ $0.16/share (FT) ~$4.0M
June 2021
14,400,000 @ $0.175/share (non-FT)
2,400,000 @ $0.21/share (FT)
~$2.5M
~$0.5M
April 2021 4,800,000 @ $0.21/share (FT) ~$1.0 M
Significant Holders
Barrick Gold Corporation 13.3%*
Konwave Gold Equity Fund 2.7%**
Strategic Metals Ltd. 2.1%**
LF Ruffer Gold Fund 1.0%***
* As at April 7, 2022 ** As at September 30, 2021 **** As at December 31, 2021
Exploring for Copper and Gold in Yukon, BC and Nevada
Experienced Management
Graham Downs, President & CEO – Over 25 years in the junior mining sector
Ian Talbot, COO – Geologist & lawyer, formerly internal counsel with BHP Billiton World Exploration
Jasmine Lau, CPA, CFO – Charted Professional Accountant with extensive resource sector experience
Rob Carne, P.Geo, Executive Chairman of Technical Committee – Former President of ATAC
Ed Cope, Technical Advisor – Formerly VP Exploration, North America for Barrick Gold Corporation
Adam Coulter, P.Geo., VP Exploration – 10 years of exploration experience
Andrew Carne, P.Eng., VP Corporate & Project Development – 10 years of exploration experience
* FT = Flow-Through Shares
TSX-V:ATC
100%-owned High-Grade Resources in Yukon:
Osiris: 732,000 oz. Au at 4.12 g/t (Indicated)*
1,044,000 oz. Au at 3.47 g/t (Inferred)*
Tiger: 464,000 oz. Au at 3.19 g/t (M&I)*
PIL Property in BC hosts multiple untested Cu-Au-
Mo porphyry and epithermal Au-Ag targets.
Located in the heart of the Toodoggone, one of
BC’s hottest exploration districts.
2021 work at the road-accessible Connaught
Property identified significant Cu-MoÂąAu porphyry
potential over a 13 km trend
100%-owned, 185-km long, district-scale Rackla
Gold Property in Yukon with no underlying royalties
4
Strategic Assets in Top Tier Jurisdictions
*Please see appendix for 43-101 compliant mineral resources.
Exploring for Copper and Gold in Yukon, BC and Nevada
2022 exploration plans provide multiple paths to
value creation. Multi-commodity exploration
pipeline includes work from grassroots to
discovery to resource expansion drilling.
TSX-V:ATC
2022 Exploration Plans
5
Yukon Exploration
BC Exploration
Catch Property
• Systematic evaluation of gold-copper targets
PIL Property
• Evaluate undrilled 1,300 x 750 m Copper Ridge anomaly
• Phase 1: 20 km IP survey
• Phase 2: Maiden diamond drill program
• Property wide prospecting, mapping and soil sampling
6,500 m of Drilling in 2022
Exploring for Copper and Gold in Yukon, BC and Nevada
Connaught Property
• 5,000 m maiden RC drill program on porphyry targets
• Trench 3 additional Cu-Mo ± Au porphyry targets
Rackla Gold Property
• Resume work at Osiris Deposit, Nadaleen Project
• 1,500 m resource expansion diamond drill program
• Step out on OS-18-273: 26.70 m of 12.95 g/t Au
TSX-V:ATC
ESG
6
Exploring for Gold in Yukon and Nevada
TSX-V:ATC
The Rau Project hosts the advanced-stage Tiger
Gold Deposit with a PEA pre-tax NPV(5%) of
$118.2 M and IRR of 54.5%
Rackla Gold Property
7
The Nadaleen Project hosts Canada’s first Carlin-
type gold discoveries with an indicated resource of
732,000 ounces at 4.12 g/t Au and inferred resource of
1,044,000 ounces at 3.47 g/t Au at the Osiris Deposit
The Rackla Gold Property is ~1,700 km² and is
comprised of two separate projects: Nadaleen and
Rau.
Exploring for Copper and Gold in Yukon, BC and Nevada
Both projects have significant exploration potential,
with numerous targets open to expansion and others
not yet drill tested
Yukon
TSX-V:ATC
Nadaleen Trend Location
8
Exploring for Copper and Gold in Yukon, BC and Nevada
Nadaleen Project
Access & Infrastructure
• Potential for shared road
infrastructure with other projects
• Access route from Canol Road
currently being studied
TSX-V:ATC
Nadaleen Trend Arsenic-in-Soil
9
Exploring for Copper and Gold in Yukon, BC and Nevada
Yukon
2022 Exploration
• 1,500m of expansion diamond drilling
completed at the Osiris Deposit
TSX-V:ATC
Osiris Deposit – Carlin-Style Gold Resources
10
Total Indicated Resources: 732,000 ounces gold at an average grade of 4.12 g/t (5.5Mt)
Total Inferred Resources: 1,044,000 ounces gold at an average grade of 3.47 g/t (9.4Mt)
Includes the Conrad, Sunrise, Osiris, and Ibis Zones
Pit-Constrained Indicated Resources: 604,000 ounces gold at an average grade of 4.03 g/t (4.7Mt)
Pit-Constrained Inferred Resources: 530,000 ounces gold at an average grade of 3.07 g/t (5.4Mt)
Nadaleen Project
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
Osiris Deposit Cross-Section
11
Exploring for Copper and Gold in Yukon, BC and Nevada
Nadaleen Project
Exploration Potential
• All zones remain open in multiple
directions, with 1,200 m of vertical extent
TSX-V:ATC
Osiris Deposit – 2022 Drilling Area
12
Exploring for Copper and Gold in Yukon, BC and Nevada
Nadaleen Project
2022 Exploration
• Step-out and expansion drilling at
Conrad, Sunrise and Osiris
TSX-V:ATC
Connaught Property Overview
13
Exploring for Copper and Gold in Yukon, BC and Nevada
137 km2 road-accessible property,
65 km west of Dawson City, in the
headwaters of the Sixtymile placer
gold (>560,000 oz Au)
No historic exploration for porphyry
potential
2021 trenching returned broad areas
of highly elevated copper and
molybdenum in Target Area A with
extensive phyllic alteration
Surface copper grades are expected
to be depleted due to leaching, and
are in line with Casino Deposit
leached cap grades
5,000 m maiden RC drill program
in 2022 to evaluate porphyry
potential in Target Areas A and C
Regional trenching and
prospecting to evaluate Target
Areas B and D
Yukon
Outcrop in 2021 Trench: 1.38% Cu
TSX-V:ATC
Connaught Project – Copper in Soil
14
Exploring for Copper and Gold in Yukon, BC and Nevada
Yukon
2022 Exploration
• 5,000m RC drill program will evaluate
Target Areas A and C
TSX-V:ATC
Connaught Project – 2021 Trenching
15
Exploring for Copper and Gold in Yukon, BC and Nevada
Yukon
Note this is an unglaciated environment,
where copper grades are depleted due
to surface leaching.
TSX-V:ATC
PIL Property Overview
16
Exploring for Copper and Gold in Yukon, BC and Nevada
BC
Large, underexplored land package with
numerous highly prospective copper-gold
porphyry and epithermal gold-silver targets
Located in a prolific and highly active part
of BC’s Golden Horseshoe, amongst
multiple past producing mines and advanced
exploration projects
Recently identified Copper Ridge Zone hosts
a 1300 x 750 m copper-gold-molybdenum
soil anomaly which has not been drill
tested
Composite talus sampling in 2015 at the
Copper Cliff discovery returned 25 m of
1.04% copper and has not been evaluated
by drilling
Atlas East grab sampling returned 489.71 g/t
gold with 6,514 g/t silver from a brecciated
bedrock source and 72.47 g/t gold with
2,187 g/t silver from quartz vein float
material
TSX-V:ATC
PIL Property – Copper
17
Exploring for Copper and Gold in Yukon, BC and Nevada
BC
2022 Exploration – Phase 1
• IP Survey at Copper Ridge
• Property-wide prospecting
and mapping
2022 Exploration – Phase 2
• Diamond Drilling at Copper
Ridge
TSX-V:ATC
Catch Property Overview
18
• New gold-copper discovery in underexplored
extension of the Quesnel and Stikine terrane
• 800 x 400 m of >400 ppm copper and >100
ppb gold in soil
• Weighted average of all 2021 hand trenches:
0.34 g/t gold and 0.22% copper
• Rock samples have peak values of 52.4 g/t
gold, 1.60% copper, 228 ppm molybdenum
and 41.7 g/t silver
Exploring for Copper and Gold in Yukon, BC and Nevada
Sample 3853101: 1.57% copper and 7.45 g/t gold
Yukon
TSX-V:ATC
Catch Property – Copper
19
Exploring for Copper and Gold in Yukon, BC and Nevada
Yukon
2022 Exploration
• Systematic property-wide exploration
• Follow up on 2021 trench discoveries
TSX-V:ATC
Catch Property – Copper
20
Exploring for Copper and Gold in Yukon, BC and Nevada
Yukon
TSX-V:ATC
2022 – A Transformational Year for ATAC
21
Exploring for Copper and Gold in Yukon, BC and Nevada
Well positioned to embark on a transformational year and build
momentum for the company
Strong exploration plan, with property pipeline from grassroots
through resource delineation
Re-rate opportunity with significant value gap between assets
and current market capitalization
Project Pipeline
Grassroots Discovery Resource Definition Economics
Connaught, YK
Catch, YK
Rosy, YK PIL, BC
Rau Project, YK
(NPV @ $1,550/oz = $161.4M)
Nadaleen Project, YK
(732,000 oz Indicated @ 4.12 g/t Au,
1,044,000 oz Inferred @ 3.47 g/t Au)
TSX-V:ATC
Why Invest in ATAC?
22
Robust pipeline with projects from grassroots to economic-stage
in multiple jurisdictions, with 7,000 m drilling in 2022
Economic Tiger Deposit
Updated Tiger Deposit PEA demonstrates a pre-tax NPV(5%) of
$118.2M with an IRR of 54.5% at US$1,400/oz gold
Compelling road-accessible copper-molybdenumÂągold
porphyry potential in Yukon along a 13 km trend
100% ownership of two high-grade open-pit gold deposits in
Yukon, both open for expansion
Experienced team with a track of discovery and rapid
advancement
Exploring for Copper and Gold in Yukon, BC and Nevada
Well-financed, with over $7.5M in treasury
Thank you
TSX-V:ATC
Tiger Resource and PEA Gold Price Sensitivity
2020 Tiger Resource & PEA
APPENDIX
22
25
26
27
28 Tiger Capital and Operating Costs
Management & Directors
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
Management & Directors
25
Graham Downs, President & CEO
23 years of Yukon mineral exploration experience
Director of Trifecta Gold
Adam Coulter, VP Exploration
Professional Geologist, working in mineral exploration and
development since 2012
Andrew Carne, VP Corporate & Project Development
Professional Engineer, working in mineral exploration and
development since 2012
Vice President of the Yukon Chamber of Mines
Ian Talbot, Chief Operating Officer
Formerly internal counsel with BHP Billiton World Exploration
Jasmine Lau, Chief Financial Officer
Chartered Professional Accountant with extensive resource
sector experience
Ed Cope, Technical Advisor
21 years with Barrick Gold Corporation; retired
as VP Exploration for North America in 2016
Bill Wengzynowski, Geological Consultant
30+ years of Yukon-focused exploration experience
Two-time recipient of Yukon Prospector of the Year award
Douglas Goss, Chairman & Director
Queen Elizabeth II Golden and Diamond Jubilee Medals
Alberta Order of Excellence
General Counsel & Corporate Secretary to Premium Brands since
1999
Rob Carne, Executive Chairman, Technical Committee & Director
Former President of ATAC and part of the Rackla Gold Project
discovery team
Bruce Youngman, Director
President and COO of Canplats Resources; acquired by Goldcorp
Former VP and director of Northern Dynasty Minerals
Don Poirier, Director
Former VP Corporate Development for Hecla Mining
Glenn Yeadon, Secretary & Director
34 years as a partner or associate of Tupper, Jonsson & Yeadon
James Gray, Director
Managing partner of De Visser Gray LLP with extensive experience
in accounting and auditing for junior resource companies
Maureen Upton, Director
20 years of experience in ESG strategy and implementation with
multinational natural resource corporations and financial institutions
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
2020 Updated Tiger Resource & PEA
26
Parameter Value
Gold Price (US$/oz) $1400
Exchange Rate (US$:CA$) 0.77
Pre-tax NPV(5%) (millions) $118.2
Pre-tax IRR 54.5%
Post-tax NPV(5%) (millions) $85.4
Post-tax IRR 42.6%
Recovered Gold 267,090 oz
Average Gold Grade 3.82 g/t
Average Oxide Recovery 90.5%
Average Sulphide Recovery 61.1%
Pre-production Capital (millions) $110.1
Sustaining Capital (millions) $9.3
Payback (pre-tax) 1.24 years
Payback (post-tax) 1.40 years
Pre-production Period 1 year
Mine life 6 years
Process Carbon-in-Pulp Leach
Production Rate 1,500 tpd
Operational Period Year-round (365 days)
Strip Ratio 5.3:1
Access Method Tote Road: ~$11 million
*See page 2 for 43-101 Technical Report disclosure
• Measured and Indicated Resources of
464,000 ounces of gold at 3.19 g/t
• Pre-Tax NPV of $118.2 M with an IRR of
54.5% and a 1.24 year payback period
• PEA envisions a small, high-grade,
conventional open pit operation
• At US$1,550/oz gold price the NPV
increases to $161.4 M with an IRR of
69.2%
• The deposit remains open for expansion
along strike and at depth
Rau Project
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
Tiger Resources and PEA Gold Price Sensitivity
27
Type Constraint Classification
Au Cut-off
(g/t)
Tonnes
> Cut-off
Grade
> Cut-off
Contained
Metal
Au (g/t) Au (oz)
Oxide Open Pit Indicated 0.75 1,980,000 3.74 238,000
Underground Indicated 1.5 165,000 3.09 16,000
Sulphide Open Pit Measured 0.75 799,000 2.92 75,000
Open Pit Indicated 0.75 847,000 2.68 73,000
Underground Measured 1.5 29,000 2.06 2,000
Underground Indicated 1.5 706,000 2.64 60,000
Total M+I Variable 4,526,000 3.19 464,000
Oxide Open Pit Inferred 0.75 20,000 1.54 1,000
Underground Inferred 1.5 41,000 2.62 3,000
Sulphide Open Pit Inferred 0.75 7,000 2.41 500
Underground Inferred 1.5 97,000 2.26 7,000
Total Inferred Variable 165,000 2.17 11,500
Gold Price $US/oz (0.77 $US/CA$) $1,250 $1,300 $1,350 $1,400 $1,450 $1,500 $1,550
Pre-Tax NPV (5% discount rate) $M $74.9 $89.4 $103.8 $118.2 $132.6 $147.0 $161.4
Pre-Tax IRR 38.7% 44.1% 49.4% 54.5% 59.4% 64.3% 69.2%
The Mineral Resource estimate used in the updated PEA was completed by Steven Ristorcelli, C.P.G. (Mine Development Associates). The
effective date of this Mineral Resource estimate is January 3, 2020. Three dimensional polygonal models were constructed to constrain oxide and
sulphide mineralization, as well as model rock types and grade corridors. See page 2 for Technical Report disclosure.
Rau Project
Exploring for Copper and Gold in Yukon, BC and Nevada
TSX-V:ATC
Tiger Capital and Operating Costs
28
* Totals may not add exactly due to rounding
** Includes capitalized pre-production mining costs.
Major mining equipment is leased
*** Contingencies were factored on an area-by-area basic depending on
the detail level of each estimate
Capital Costs
Pre Production
(Millions)*
Sustaining
Capital
LOM
Site Infrastructure $8.4 - $8.4
Tote Road $11.6 - $11.6
Open Pit Mining** $10.4 - $10.4
Materials Crushing
and Handling
$2.0 - $2.0
Process Plant $30.4 - $30.4
Tailings and Water
Management
$8.0 $9.3 $17.3
Project Indirects $20.8 - $20.8
Owner’s Cost $1.3 - $1.3
Contingencies*** $17.2 - $17.2
TOTAL $110.1 $9.3 $119.4
Operating Costs
LOM
Avg.
Mining Costs
($/t mined)*
$4.28
Processing
($/t processed)
$29.88
G & A
($/t processed)
$15.33
Surface Services
($/t processed)
$4.68
Camp & Genset Leasing
($/t processed)
$0.64
Equipment Leasing
($/t processed)
$1.68
* Not including capitalized pre-production mining
costs
*See page 2 for 43-101 Technical Report disclosure
Rau Project
Exploring for Copper and Gold in Yukon, BC and Nevada

Weitere ähnliche Inhalte

Ähnlich wie ATAC Resources Ltd. Corporate Presentation July 2022

ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation November 2021
ATAC Resources Ltd. Corporate Presentation November 2021ATAC Resources Ltd. Corporate Presentation November 2021
ATAC Resources Ltd. Corporate Presentation November 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation March 2020
ATAC Resources Ltd. Corporate Presentation March 2020ATAC Resources Ltd. Corporate Presentation March 2020
ATAC Resources Ltd. Corporate Presentation March 2020ATAC Resources Ltd
 
Atac corporate ppt_july_2021
Atac corporate ppt_july_2021Atac corporate ppt_july_2021
Atac corporate ppt_july_2021Adnet Communications
 
ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021Adnet Communications
 
ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation January 2021
ATAC Resources Ltd. Corporate Presentation January 2021ATAC Resources Ltd. Corporate Presentation January 2021
ATAC Resources Ltd. Corporate Presentation January 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation December 2019
ATAC Resources Ltd. Corporate Presentation December 2019ATAC Resources Ltd. Corporate Presentation December 2019
ATAC Resources Ltd. Corporate Presentation December 2019ATAC Resources
 
ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd
 
ATAC Resources Ltd. Corporate Presentation September 2019
ATAC Resources Ltd. Corporate Presentation September 2019ATAC Resources Ltd. Corporate Presentation September 2019
ATAC Resources Ltd. Corporate Presentation September 2019ATAC Resources
 
ATAC Resources Ltd. Corporate Presentation November 2019
ATAC Resources Ltd. Corporate Presentation November 2019ATAC Resources Ltd. Corporate Presentation November 2019
ATAC Resources Ltd. Corporate Presentation November 2019ATAC Resources
 
ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources
 
ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources
 
ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020Adnet Communications
 
ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd
 
ATAC Corporate Presentation October 2020
ATAC Corporate Presentation October 2020ATAC Corporate Presentation October 2020
ATAC Corporate Presentation October 2020Adnet Communications
 
ATAC Resources Ltd. Corporate Presentation September 2020
ATAC Resources Ltd. Corporate Presentation September 2020ATAC Resources Ltd. Corporate Presentation September 2020
ATAC Resources Ltd. Corporate Presentation September 2020ATAC Resources Ltd
 

Ähnlich wie ATAC Resources Ltd. Corporate Presentation July 2022 (20)

ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021ATAC Resources Ltd. Corporate Presentation August 2021
ATAC Resources Ltd. Corporate Presentation August 2021
 
ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021ATAC Resources Ltd. Corporate Presentation December 2021
ATAC Resources Ltd. Corporate Presentation December 2021
 
ATAC Resources Ltd. Corporate Presentation November 2021
ATAC Resources Ltd. Corporate Presentation November 2021ATAC Resources Ltd. Corporate Presentation November 2021
ATAC Resources Ltd. Corporate Presentation November 2021
 
ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021ATAC Resources Ltd. Corporate Presentation April 2021
ATAC Resources Ltd. Corporate Presentation April 2021
 
ATAC Resources Ltd. Corporate Presentation March 2020
ATAC Resources Ltd. Corporate Presentation March 2020ATAC Resources Ltd. Corporate Presentation March 2020
ATAC Resources Ltd. Corporate Presentation March 2020
 
Atac corporate ppt_july_2021
Atac corporate ppt_july_2021Atac corporate ppt_july_2021
Atac corporate ppt_july_2021
 
ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021ATAC Resources Corporate Presentation June 2021
ATAC Resources Corporate Presentation June 2021
 
ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021ATAC Resources Ltd. Corporate Presentation May 2021
ATAC Resources Ltd. Corporate Presentation May 2021
 
ATAC Resources Ltd. Corporate Presentation January 2021
ATAC Resources Ltd. Corporate Presentation January 2021ATAC Resources Ltd. Corporate Presentation January 2021
ATAC Resources Ltd. Corporate Presentation January 2021
 
ATAC Resources Ltd. Corporate Presentation December 2019
ATAC Resources Ltd. Corporate Presentation December 2019ATAC Resources Ltd. Corporate Presentation December 2019
ATAC Resources Ltd. Corporate Presentation December 2019
 
ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021ATAC Resources Ltd. Corporate Presentation February 2021
ATAC Resources Ltd. Corporate Presentation February 2021
 
ATAC Resources Ltd. Corporate Presentation September 2019
ATAC Resources Ltd. Corporate Presentation September 2019ATAC Resources Ltd. Corporate Presentation September 2019
ATAC Resources Ltd. Corporate Presentation September 2019
 
ATAC Resources Ltd. Corporate Presentation November 2019
ATAC Resources Ltd. Corporate Presentation November 2019ATAC Resources Ltd. Corporate Presentation November 2019
ATAC Resources Ltd. Corporate Presentation November 2019
 
Atac Corporate January 2020
Atac Corporate January 2020Atac Corporate January 2020
Atac Corporate January 2020
 
ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019
 
ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019ATAC Resources Ltd. Corporate Presentation May 2019
ATAC Resources Ltd. Corporate Presentation May 2019
 
ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020ATAC Resources Corporate Presentation November 2020
ATAC Resources Corporate Presentation November 2020
 
ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020ATAC Resources Ltd. Corporate Presentation December 2020
ATAC Resources Ltd. Corporate Presentation December 2020
 
ATAC Corporate Presentation October 2020
ATAC Corporate Presentation October 2020ATAC Corporate Presentation October 2020
ATAC Corporate Presentation October 2020
 
ATAC Resources Ltd. Corporate Presentation September 2020
ATAC Resources Ltd. Corporate Presentation September 2020ATAC Resources Ltd. Corporate Presentation September 2020
ATAC Resources Ltd. Corporate Presentation September 2020
 

KĂźrzlich hochgeladen

如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...First NO1 World Amil baba in Faisalabad
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 

KĂźrzlich hochgeladen (20)

young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...No 1 AMil Baba In Islamabad  No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
No 1 AMil Baba In Islamabad No 1 Amil Baba In Lahore No 1 Amil Baba In Faisl...
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 

ATAC Resources Ltd. Corporate Presentation July 2022

  • 1. TSX-V: ATC OTCQB: ATADF July 2022 Exploring for Copper and Gold in Yukon, BC and Nevada
  • 2. TSX-V:ATC Forward-Looking Statements 2 FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of inferred and indicated mineral resources; (ii) the success of exploration activities; (iii) the results of the PEA including statements about future production, future operating and capital costs, the projected IRR, NPV, payback period, and production timelines for the Tiger Deposit. These statements are based on information currently available to ATAC Resources Ltd. (“ATAC”) and ATAC provides no assurance that actual results will meet management’s expectations. In certain cases, forward-looking information may be identified by such terms as "anticipates", "believes", "could", "estimates", "expects", "may", "shall", "will", or "would". Forward-looking information contained in this presentation is based on certain factors and assumptions regarding, among other things, the estimation of mineral resources, the realization of resource estimate, gold metal prices, the timing and amount of future exploration and development expenditures, the estimation of initial and sustaining capital requirements, the estimation of labour and operating costs, the availability of necessary financing and materials to continue to explore and develop the Tiger Deposit in the short and long-term, the progress of exploration and development activities, the receipt of necessary regulatory approvals, the completion of the environmental assessment process, and assumptions with respect to currency fluctuations, environmental risks, title disputes or claims, and other similar matters. While ATAC considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ATAC to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration and development of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined including the possibility that mining operations may not commence at the Tiger Deposit, risks relating to variations in mineral resources, grade or recovery rates resulting from current exploration and development activities, risks relating to changes in gold prices and the worldwide demand for and supply of gold, risks related to increased competition in the mining industry generally, risks related to current global financial conditions, uncertainties inherent in the estimation of mineral resources, access and supply risks, reliance on key personnel, operational risks inherent in the conduct of mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the risk of delays or increased costs that might be encountered during the development process, regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, including the risk that the financing necessary to fund the exploration and development activities at the Tiger Deposit may not be available on satisfactory terms, or at all, risks related to disputes concerning property titles and interest, and environmental risks. This list is not exhaustive of the factors that may affect any of ATAC's forward- looking information. These and other factors should be considered carefully and readers should not place undue reliance on ATAC's forward-looking information. ATAC does not undertake to update any forward-looking information that may be made from time to time by ATAC or on its behalf, except in accordance with applicable securities laws. TECHNICAL DISCLOSURE It should be noted that the Tiger Deposit PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the PEA forecast will be realized or that any of the resources will ever be upgraded to reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Additional information about the Tiger Deposit PEA is summarized in ATAC’s February 27, 2020 technical report titled “Technical Report and Preliminary Economic Assessment for the Tiger Deposit, Rackla Gold Project, Yukon, Canada”, which can be viewed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com. Additional information about the Osiris Resource Estimate is summarized in ATAC’s July 28, 2022 news release titled “ATAC Announces Updated Resource Estimate for the Osiris Deposit, Yukon”. A technical report for the updated Osiris Resource Estimate will be filed at www.sedar.com under the ATAC profile or on the ATAC website at www.atacresources.com within 45 days. Historical information for East Goldfield and the Val Target rely on disclosure from previous operators and have not been independently verified. QUALIFIED PERSON Adam Coulter, M.Sc., P.Geo., ATAC’s Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101. All technical information contained in this presentation has been approved by Adam Coulter. TRUE WIDTHS True widths for diamond drill holes are estimated to be 30% - 100% of intersected widths. RAB drill hole intersections are drilled thicknesses and true widths are unknown. Exploring for Copper and Gold in Yukon, BC and Nevada
  • 3. TSX-V:ATC Corporate Overview 3 Share Structure* Shares Outstanding 209,813,641 Fully Diluted 247,127,778 Options ($0.17 - $0.55) 11,675,000 Warrants ($0.23 - $0.28) 25,639,137 Working Capital C$7.5M 52-Week Range 0.09 – 0.20 200-Day Moving Average 0.13 * Share Structure as at April 7, 2022 Recent Financings Shares Issued* Proceeds April 2022 25,000,000 @ $0.16/share (FT) ~$4.0M June 2021 14,400,000 @ $0.175/share (non-FT) 2,400,000 @ $0.21/share (FT) ~$2.5M ~$0.5M April 2021 4,800,000 @ $0.21/share (FT) ~$1.0 M Significant Holders Barrick Gold Corporation 13.3%* Konwave Gold Equity Fund 2.7%** Strategic Metals Ltd. 2.1%** LF Ruffer Gold Fund 1.0%*** * As at April 7, 2022 ** As at September 30, 2021 **** As at December 31, 2021 Exploring for Copper and Gold in Yukon, BC and Nevada Experienced Management Graham Downs, President & CEO – Over 25 years in the junior mining sector Ian Talbot, COO – Geologist & lawyer, formerly internal counsel with BHP Billiton World Exploration Jasmine Lau, CPA, CFO – Charted Professional Accountant with extensive resource sector experience Rob Carne, P.Geo, Executive Chairman of Technical Committee – Former President of ATAC Ed Cope, Technical Advisor – Formerly VP Exploration, North America for Barrick Gold Corporation Adam Coulter, P.Geo., VP Exploration – 10 years of exploration experience Andrew Carne, P.Eng., VP Corporate & Project Development – 10 years of exploration experience * FT = Flow-Through Shares
  • 4. TSX-V:ATC 100%-owned High-Grade Resources in Yukon: Osiris: 732,000 oz. Au at 4.12 g/t (Indicated)* 1,044,000 oz. Au at 3.47 g/t (Inferred)* Tiger: 464,000 oz. Au at 3.19 g/t (M&I)* PIL Property in BC hosts multiple untested Cu-Au- Mo porphyry and epithermal Au-Ag targets. Located in the heart of the Toodoggone, one of BC’s hottest exploration districts. 2021 work at the road-accessible Connaught Property identified significant Cu-MoÂąAu porphyry potential over a 13 km trend 100%-owned, 185-km long, district-scale Rackla Gold Property in Yukon with no underlying royalties 4 Strategic Assets in Top Tier Jurisdictions *Please see appendix for 43-101 compliant mineral resources. Exploring for Copper and Gold in Yukon, BC and Nevada 2022 exploration plans provide multiple paths to value creation. Multi-commodity exploration pipeline includes work from grassroots to discovery to resource expansion drilling.
  • 5. TSX-V:ATC 2022 Exploration Plans 5 Yukon Exploration BC Exploration Catch Property • Systematic evaluation of gold-copper targets PIL Property • Evaluate undrilled 1,300 x 750 m Copper Ridge anomaly • Phase 1: 20 km IP survey • Phase 2: Maiden diamond drill program • Property wide prospecting, mapping and soil sampling 6,500 m of Drilling in 2022 Exploring for Copper and Gold in Yukon, BC and Nevada Connaught Property • 5,000 m maiden RC drill program on porphyry targets • Trench 3 additional Cu-Mo Âą Au porphyry targets Rackla Gold Property • Resume work at Osiris Deposit, Nadaleen Project • 1,500 m resource expansion diamond drill program • Step out on OS-18-273: 26.70 m of 12.95 g/t Au
  • 7. TSX-V:ATC The Rau Project hosts the advanced-stage Tiger Gold Deposit with a PEA pre-tax NPV(5%) of $118.2 M and IRR of 54.5% Rackla Gold Property 7 The Nadaleen Project hosts Canada’s first Carlin- type gold discoveries with an indicated resource of 732,000 ounces at 4.12 g/t Au and inferred resource of 1,044,000 ounces at 3.47 g/t Au at the Osiris Deposit The Rackla Gold Property is ~1,700 km² and is comprised of two separate projects: Nadaleen and Rau. Exploring for Copper and Gold in Yukon, BC and Nevada Both projects have significant exploration potential, with numerous targets open to expansion and others not yet drill tested Yukon
  • 8. TSX-V:ATC Nadaleen Trend Location 8 Exploring for Copper and Gold in Yukon, BC and Nevada Nadaleen Project Access & Infrastructure • Potential for shared road infrastructure with other projects • Access route from Canol Road currently being studied
  • 9. TSX-V:ATC Nadaleen Trend Arsenic-in-Soil 9 Exploring for Copper and Gold in Yukon, BC and Nevada Yukon 2022 Exploration • 1,500m of expansion diamond drilling completed at the Osiris Deposit
  • 10. TSX-V:ATC Osiris Deposit – Carlin-Style Gold Resources 10 Total Indicated Resources: 732,000 ounces gold at an average grade of 4.12 g/t (5.5Mt) Total Inferred Resources: 1,044,000 ounces gold at an average grade of 3.47 g/t (9.4Mt) Includes the Conrad, Sunrise, Osiris, and Ibis Zones Pit-Constrained Indicated Resources: 604,000 ounces gold at an average grade of 4.03 g/t (4.7Mt) Pit-Constrained Inferred Resources: 530,000 ounces gold at an average grade of 3.07 g/t (5.4Mt) Nadaleen Project Exploring for Copper and Gold in Yukon, BC and Nevada
  • 11. TSX-V:ATC Osiris Deposit Cross-Section 11 Exploring for Copper and Gold in Yukon, BC and Nevada Nadaleen Project Exploration Potential • All zones remain open in multiple directions, with 1,200 m of vertical extent
  • 12. TSX-V:ATC Osiris Deposit – 2022 Drilling Area 12 Exploring for Copper and Gold in Yukon, BC and Nevada Nadaleen Project 2022 Exploration • Step-out and expansion drilling at Conrad, Sunrise and Osiris
  • 13. TSX-V:ATC Connaught Property Overview 13 Exploring for Copper and Gold in Yukon, BC and Nevada 137 km2 road-accessible property, 65 km west of Dawson City, in the headwaters of the Sixtymile placer gold (>560,000 oz Au) No historic exploration for porphyry potential 2021 trenching returned broad areas of highly elevated copper and molybdenum in Target Area A with extensive phyllic alteration Surface copper grades are expected to be depleted due to leaching, and are in line with Casino Deposit leached cap grades 5,000 m maiden RC drill program in 2022 to evaluate porphyry potential in Target Areas A and C Regional trenching and prospecting to evaluate Target Areas B and D Yukon Outcrop in 2021 Trench: 1.38% Cu
  • 14. TSX-V:ATC Connaught Project – Copper in Soil 14 Exploring for Copper and Gold in Yukon, BC and Nevada Yukon 2022 Exploration • 5,000m RC drill program will evaluate Target Areas A and C
  • 15. TSX-V:ATC Connaught Project – 2021 Trenching 15 Exploring for Copper and Gold in Yukon, BC and Nevada Yukon Note this is an unglaciated environment, where copper grades are depleted due to surface leaching.
  • 16. TSX-V:ATC PIL Property Overview 16 Exploring for Copper and Gold in Yukon, BC and Nevada BC Large, underexplored land package with numerous highly prospective copper-gold porphyry and epithermal gold-silver targets Located in a prolific and highly active part of BC’s Golden Horseshoe, amongst multiple past producing mines and advanced exploration projects Recently identified Copper Ridge Zone hosts a 1300 x 750 m copper-gold-molybdenum soil anomaly which has not been drill tested Composite talus sampling in 2015 at the Copper Cliff discovery returned 25 m of 1.04% copper and has not been evaluated by drilling Atlas East grab sampling returned 489.71 g/t gold with 6,514 g/t silver from a brecciated bedrock source and 72.47 g/t gold with 2,187 g/t silver from quartz vein float material
  • 17. TSX-V:ATC PIL Property – Copper 17 Exploring for Copper and Gold in Yukon, BC and Nevada BC 2022 Exploration – Phase 1 • IP Survey at Copper Ridge • Property-wide prospecting and mapping 2022 Exploration – Phase 2 • Diamond Drilling at Copper Ridge
  • 18. TSX-V:ATC Catch Property Overview 18 • New gold-copper discovery in underexplored extension of the Quesnel and Stikine terrane • 800 x 400 m of >400 ppm copper and >100 ppb gold in soil • Weighted average of all 2021 hand trenches: 0.34 g/t gold and 0.22% copper • Rock samples have peak values of 52.4 g/t gold, 1.60% copper, 228 ppm molybdenum and 41.7 g/t silver Exploring for Copper and Gold in Yukon, BC and Nevada Sample 3853101: 1.57% copper and 7.45 g/t gold Yukon
  • 19. TSX-V:ATC Catch Property – Copper 19 Exploring for Copper and Gold in Yukon, BC and Nevada Yukon 2022 Exploration • Systematic property-wide exploration • Follow up on 2021 trench discoveries
  • 20. TSX-V:ATC Catch Property – Copper 20 Exploring for Copper and Gold in Yukon, BC and Nevada Yukon
  • 21. TSX-V:ATC 2022 – A Transformational Year for ATAC 21 Exploring for Copper and Gold in Yukon, BC and Nevada Well positioned to embark on a transformational year and build momentum for the company Strong exploration plan, with property pipeline from grassroots through resource delineation Re-rate opportunity with significant value gap between assets and current market capitalization Project Pipeline Grassroots Discovery Resource Definition Economics Connaught, YK Catch, YK Rosy, YK PIL, BC Rau Project, YK (NPV @ $1,550/oz = $161.4M) Nadaleen Project, YK (732,000 oz Indicated @ 4.12 g/t Au, 1,044,000 oz Inferred @ 3.47 g/t Au)
  • 22. TSX-V:ATC Why Invest in ATAC? 22 Robust pipeline with projects from grassroots to economic-stage in multiple jurisdictions, with 7,000 m drilling in 2022 Economic Tiger Deposit Updated Tiger Deposit PEA demonstrates a pre-tax NPV(5%) of $118.2M with an IRR of 54.5% at US$1,400/oz gold Compelling road-accessible copper-molybdenumÂągold porphyry potential in Yukon along a 13 km trend 100% ownership of two high-grade open-pit gold deposits in Yukon, both open for expansion Experienced team with a track of discovery and rapid advancement Exploring for Copper and Gold in Yukon, BC and Nevada Well-financed, with over $7.5M in treasury
  • 24. TSX-V:ATC Tiger Resource and PEA Gold Price Sensitivity 2020 Tiger Resource & PEA APPENDIX 22 25 26 27 28 Tiger Capital and Operating Costs Management & Directors Exploring for Copper and Gold in Yukon, BC and Nevada
  • 25. TSX-V:ATC Management & Directors 25 Graham Downs, President & CEO 23 years of Yukon mineral exploration experience Director of Trifecta Gold Adam Coulter, VP Exploration Professional Geologist, working in mineral exploration and development since 2012 Andrew Carne, VP Corporate & Project Development Professional Engineer, working in mineral exploration and development since 2012 Vice President of the Yukon Chamber of Mines Ian Talbot, Chief Operating Officer Formerly internal counsel with BHP Billiton World Exploration Jasmine Lau, Chief Financial Officer Chartered Professional Accountant with extensive resource sector experience Ed Cope, Technical Advisor 21 years with Barrick Gold Corporation; retired as VP Exploration for North America in 2016 Bill Wengzynowski, Geological Consultant 30+ years of Yukon-focused exploration experience Two-time recipient of Yukon Prospector of the Year award Douglas Goss, Chairman & Director Queen Elizabeth II Golden and Diamond Jubilee Medals Alberta Order of Excellence General Counsel & Corporate Secretary to Premium Brands since 1999 Rob Carne, Executive Chairman, Technical Committee & Director Former President of ATAC and part of the Rackla Gold Project discovery team Bruce Youngman, Director President and COO of Canplats Resources; acquired by Goldcorp Former VP and director of Northern Dynasty Minerals Don Poirier, Director Former VP Corporate Development for Hecla Mining Glenn Yeadon, Secretary & Director 34 years as a partner or associate of Tupper, Jonsson & Yeadon James Gray, Director Managing partner of De Visser Gray LLP with extensive experience in accounting and auditing for junior resource companies Maureen Upton, Director 20 years of experience in ESG strategy and implementation with multinational natural resource corporations and financial institutions Exploring for Copper and Gold in Yukon, BC and Nevada
  • 26. TSX-V:ATC 2020 Updated Tiger Resource & PEA 26 Parameter Value Gold Price (US$/oz) $1400 Exchange Rate (US$:CA$) 0.77 Pre-tax NPV(5%) (millions) $118.2 Pre-tax IRR 54.5% Post-tax NPV(5%) (millions) $85.4 Post-tax IRR 42.6% Recovered Gold 267,090 oz Average Gold Grade 3.82 g/t Average Oxide Recovery 90.5% Average Sulphide Recovery 61.1% Pre-production Capital (millions) $110.1 Sustaining Capital (millions) $9.3 Payback (pre-tax) 1.24 years Payback (post-tax) 1.40 years Pre-production Period 1 year Mine life 6 years Process Carbon-in-Pulp Leach Production Rate 1,500 tpd Operational Period Year-round (365 days) Strip Ratio 5.3:1 Access Method Tote Road: ~$11 million *See page 2 for 43-101 Technical Report disclosure • Measured and Indicated Resources of 464,000 ounces of gold at 3.19 g/t • Pre-Tax NPV of $118.2 M with an IRR of 54.5% and a 1.24 year payback period • PEA envisions a small, high-grade, conventional open pit operation • At US$1,550/oz gold price the NPV increases to $161.4 M with an IRR of 69.2% • The deposit remains open for expansion along strike and at depth Rau Project Exploring for Copper and Gold in Yukon, BC and Nevada
  • 27. TSX-V:ATC Tiger Resources and PEA Gold Price Sensitivity 27 Type Constraint Classification Au Cut-off (g/t) Tonnes > Cut-off Grade > Cut-off Contained Metal Au (g/t) Au (oz) Oxide Open Pit Indicated 0.75 1,980,000 3.74 238,000 Underground Indicated 1.5 165,000 3.09 16,000 Sulphide Open Pit Measured 0.75 799,000 2.92 75,000 Open Pit Indicated 0.75 847,000 2.68 73,000 Underground Measured 1.5 29,000 2.06 2,000 Underground Indicated 1.5 706,000 2.64 60,000 Total M+I Variable 4,526,000 3.19 464,000 Oxide Open Pit Inferred 0.75 20,000 1.54 1,000 Underground Inferred 1.5 41,000 2.62 3,000 Sulphide Open Pit Inferred 0.75 7,000 2.41 500 Underground Inferred 1.5 97,000 2.26 7,000 Total Inferred Variable 165,000 2.17 11,500 Gold Price $US/oz (0.77 $US/CA$) $1,250 $1,300 $1,350 $1,400 $1,450 $1,500 $1,550 Pre-Tax NPV (5% discount rate) $M $74.9 $89.4 $103.8 $118.2 $132.6 $147.0 $161.4 Pre-Tax IRR 38.7% 44.1% 49.4% 54.5% 59.4% 64.3% 69.2% The Mineral Resource estimate used in the updated PEA was completed by Steven Ristorcelli, C.P.G. (Mine Development Associates). The effective date of this Mineral Resource estimate is January 3, 2020. Three dimensional polygonal models were constructed to constrain oxide and sulphide mineralization, as well as model rock types and grade corridors. See page 2 for Technical Report disclosure. Rau Project Exploring for Copper and Gold in Yukon, BC and Nevada
  • 28. TSX-V:ATC Tiger Capital and Operating Costs 28 * Totals may not add exactly due to rounding ** Includes capitalized pre-production mining costs. Major mining equipment is leased *** Contingencies were factored on an area-by-area basic depending on the detail level of each estimate Capital Costs Pre Production (Millions)* Sustaining Capital LOM Site Infrastructure $8.4 - $8.4 Tote Road $11.6 - $11.6 Open Pit Mining** $10.4 - $10.4 Materials Crushing and Handling $2.0 - $2.0 Process Plant $30.4 - $30.4 Tailings and Water Management $8.0 $9.3 $17.3 Project Indirects $20.8 - $20.8 Owner’s Cost $1.3 - $1.3 Contingencies*** $17.2 - $17.2 TOTAL $110.1 $9.3 $119.4 Operating Costs LOM Avg. Mining Costs ($/t mined)* $4.28 Processing ($/t processed) $29.88 G & A ($/t processed) $15.33 Surface Services ($/t processed) $4.68 Camp & Genset Leasing ($/t processed) $0.64 Equipment Leasing ($/t processed) $1.68 * Not including capitalized pre-production mining costs *See page 2 for 43-101 Technical Report disclosure Rau Project Exploring for Copper and Gold in Yukon, BC and Nevada