1. Yaqoob Y.AL. Mohammadi
(Qatari national)
Mobile: 55530441
aboukhaled.yaaqoub@gmail.com
Doha, Qatar
----------------------------------------------------------------------------------------------------------------------------------------
Overall 24+ years of experience Waste Heat Recovery Boilers, Maintenance,
Station Superintendent (Plant Manager), Planning & Resource Control Manager.
SUMMARY:
Creative, adaptable Plant Manager with multiple years of broad experience in all aspects
Waste Heat Recovery Boilers, Maintenance & Plant Manager. Specialize in combining
diverse technologies to solve problems and achieve profitable results. Skilled in technical
writing, presentation and training. extremely versatile, team-player, resourceful, flexible,
yet an assertive and decision-making individual. Prepare & Enforce policies, analyze
situations, research and formulate solutions; recruit, plan organize, manage, train, and
evaluate staff. I am a highly motivated, positive, technically competent, creative, and
professional with proven record accomplishments. I am an effective communicator and
a team builder with demonstrated ability to resolve problems.
EDUCATION:
B.Sc Degree in Chemical Engineering, Q.UV. ( spring 1990 )
PROFESSIONAL EXPERIENCE FROM April 2008 till date (Alwaseeta ) QP
company
- Co-ordinate with DID to facilitate the proposed land & master plan for the
allocated area including all facilities & services.
- Participate in official meetings with pressure vessel process agreements.
- Visited DKG. Pressure vessel in hungry to evaluate all requirement including
equipment for pressure vessel project.
- Invited, coordinated with potential J.V. parties to hold meeting with Q.H senior
management.
-visited steel fabricating plant in UAE.
- Participate in all Q.H technical discussion and future plans related to build up an
industrial compound consisting of 25 factories.
2. Pprofessional Eexperience from March 2005 till March 2008
Qatarization Pprogress and Ddevelopment Mmanager T. & D.D.
Job Responsibilities:
- Design specific training programsfor Qataries, implementand follow up of
all Qatari trainees ( Fitters, Technicians, Supervisors and Engineers in house
and overseas. ( uk,usa,Australia & oman ).
Jan. 2002 Company: Qatar Electricity & Water Company
Location : Ras Abu Fontas Power & Water Station
Position : Planning & Resource Control Manager
Job Responsibility: To monitor the following Departments:
1 - Planning & Efficiency Generation.
2 - Planning & Efficiency Desalination.
3 - Material Department.
4 - Man Power Management
MAIN RESPONSIBILITIES:
- To oversee the overall Planning of all QEWC Stations.
- To ensure optimum performance optimization of all
operating plants of QEWC
- To ensure proper utilization of Human Resources,
improve their efficiency & skills.
- To lead the team of Unit Heads, Engineers etc. to
achieve the goals
- To plan for material, manpower, product and customer
needs for all QEWC stations.
3. - To review clients and QEWC representation and
warranties with reference to signed agreements (PWPA,
PPA, WPA, etc.) always ensure that the needs are met.
- To plan all the major outages on long term basis in line with reference to signed
agreements (PWPA, PPA, WPA, etc.) always ensure that the needs are met like
availability etc.
- Maintain proper records and statistics.
- To ensure the integrity of the records.
- To produce QEWC statistical reports.
- To liaise the coordination with customers and
communicate with them.
- To closely monitor the plant performance.
- To ensure that the Standard Procedures are
implemented.
Standardization & coding of materials, provisioning,
calculation of economic ordering quantity for the plant &
equipment spares, general consumables, designing of
procurement flow process, Min-max planning, Call-off order
processing, checking contract document & Budget
preparation.
Jun. 2000 Company: Ministry of Electricity & Water
Location : Ras Abu Aboud Power & Water Station
Position : Station Superintendent ( Plant
Job Responsibility: To monitor the overhaul Operation &
Maintenance of the following equipments:
12 units Gas Turbines (4
Steam Turbines & 8 Gas
Turbines )
2. 4 units. Distillers
3. 5 units . Boilers
4. Balance of the Plant
Assisted team member to raise up yearly budgetto run the power station
smoothly and efficiently.
4. Nov. 1998 Company : Ministry of Electricity & Water
Location: Ras Abu Fontas Power & Water Station
Position: ( Maintenance Superintendent (Manager )
Job Responsibility: To monitor the overhaul Maintenance of the following
equipments:
14 units Gas Turbines
14 units Distillers
12 units WHRB
Boilers
11 units Auxiliary
Boilers
Balance of the Plant
-
Prepared the budget, and planned as per the above requirement.
1995 - 1998 Position: Deputy Maintenance Superintendent.
Job Responsibility : Assisted the maintenance superintendent in all daily,
weekly and monthly , meetings with team member from operation department
in order to run the plant smoothly as per defined policy,
1994 – 1995
Main Project :
Repair & Refurbishment of Distiller # 1 & 2. With 300 meter length and 03
meter heights of Brine Channel at RAF-A with the in-house man & material
resources.
5. jun. 1991 Company: Ministry of Electricity & Water
Location: Ras Abu Fontas Power & Water Station
Position: Desalination Engineer( under training )
Job Responsibility: Ingaged with the sinor site engineer To plan, supervise
and monitor for overhaul maintenance activities of GTs (14 units ) and Distillers
(14 units at the plant.
Nov. 1990 Company: Ministry of Electricity & Water
Nov. 1990 Company: Ministry of Electricity & Water
Location: Ras Abu Fontas Power & Water Station
Position: Assistant Engineer Operation ( Shift duties )
Job Responsibility: To supervise and co-ordinate the operation of
Distillers, Waste Heat Recovery Boilers, Auxiliary Boilers and Balance of Plant
TRAINING/COURSES ATTENDED:
Sl. # Description of Certificate Country Year Duration Field of study
1 Gas Turbine Training Program Qatar 1990-1991 Nov.1990 to 30.01.1991 Gas Turbine
2 Boiler Construction Material Program Qatar 1991 02.06.1991 to 05.06.1991 Boiler
3 Desalination Training Program Qatar 1991 15.06.1991 to 30.09.1991 Desalination
4 Water Technology Dubai 1992 04.01.1992 to 09.01.1992 Water Technology
5 Standardization & specification Committee Qatar 1992 03.02.1992 to 10.02.1992
Material Specificatinos
6. 6 Confederation of British Industries Design & installation U.K. 1992 05.10.1992 to
22.12.1992 Wier Pumps
7 Desalination Maintenance Course (Inst.) Italy 1994 18.11.1994 to 02.12.1994
Desalination Maint.
8 Language Institute Qatar 1994-1995 1994-1995 Language
9 Middle East Consumer Program U.S.A. 1995 26.05.1995 to 06.06.1995 Mechanical
Seals Teachnology
10 Hot Path components Efficiency Holland 1999 20.05.1999 to 30.05.1999 Hot Path
components Efficiency (GT )
11 Gas Turbine Maintenance Program(Major Overhaul) Qatar 2000 01.01.2000 Gas
Turbine Maintenance
12 Material Management Master Class Dubai 2002 03.03.2002 to 08.03.2002
Material Management
13 Finance for the Non-Financial Executives Qatar 2002 01.06.2002 to 05.06.2002
Finance
14 GCC O & M Committee Management Bahrain 2002 24.06.2002 to 26.06.2002 Plant
Operation & Maintenance
15 GCC O & M committee Meeting Kuwait 2002 13.10.2002 to 16.10.2002 Plant
Operation & Maintenance
16 Material Management/ Siemens GT Inner Casing Manufacturing Process Workshop Practical
Measuring Of Parts Netherlands 2003 06.01.2003 to 17.01.2003 Material Management
&
17 O & M Committee Meeting No. 10 of GCC Dubai 2003 25.02.2003 to 27.02.2003
Plant Operation & Maintenance
18 GCC O&M Committee meeting Riyadh 2003 02.06.2003 to 04.06.2003 Plant
Operation & Maintenance
19 8 th Conference of O&M Committee for Elec. & Maint. Sectors of GCC Kuwait 2003
09.09.2003 to 10.09.2003 Conferance / Electrical Maintenance
20 4 th International Human Resources Association Congress (MENA chapter) Dubai 2003
29.09.2003 to 02.10.2003 Human Resources
21 Leading Concepts program Dubai 2003 20.10.2003 to 22.10.2003 Leader Ship
22 Strategic Planning & Goal Setting Dubai 2004 03.07.2004 to 07.07.2004
Planning
23 Proactive Problem solving Dubai 2004 25.12.2004 to 29.12.2004 Problem
Solving
24 Safety Passport For Process Operators Qatar 2005 11-.9.2005 to 15.9.2005 SAFETY
SUBJECT/PLANT
7. 25 Advanced Managrment (MINI MBA) Qatar 2005 27.11.2005 to 1.12.2005
MANAGEMENT COURSE
26 Mastering the Training Cycle (Module 1 & 2) Dubai 2005 17.12.2005 to 28.12.2005
TRAINING EVALUATION
27 The 10-Day MBA Kuala Lumpur 2006 27.11.2006 to 8.12.2006 LEADERSHEP
28 Effective Stress Management Qatar 2007 28.10.2007 to 1.11.2007 PROOBLEM
SOLVING