What is Plaster?
Plaster is a building material used for coating walls and
ceilings. Sand-cement plaster is used extensively in building
work as a decorative or protective coating for concrete and
masonry walls .
Plaster is one of the oldest building materials, the most
primitive form was mud plaster, used to hold together
structures made of branches or wood for example. Today
internal plastering is used more as a way of smoothing out
surfaces and preparing them for decoration, it also adds
strength to the wall or ceiling and helps seal together building
materials.
Materials Required
 Cement
 Sand
 Water
 Masonry Trowel
 Smoothening Trowel
 Metal Float
 Measuring Tape
 Plumb Bob
 Mud Pan
 Chicken Mesh
 Hairs
 Recron Fibre6/9/2014
Know your Materials!
6/9/2014
Cement Sand Recron Fibre
Final Mortar mix (made from
mixing Cement,sand,water and
recron fibre) present in a Mudpan
Procedure
1. After the masonry wall made of bricks or aerated blocks is ready, it is
first cleaned properly before starting the plastering wall using brushes
and trowels.
6/9/2014
Brick wall Aerated Block wall
2. The scaffold is prepared for provide the labour a platform to stand and
materials required for plastering are transported at the site of plastering.
3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For
ex-In our case the ratio specified is 1:4.So we use
1 unit volume of cement for 4 unit volume of
sand. The normal cement bag is 50 kg in mass
0.035 m3. So we prepare a container of volume
0.035 m3 and pour 4 containers of cement.
6/9/2014
Scaffolding
Container
for
measuring
sand
4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125
gm fibre for 1 bag of cement.
5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of
cement, but at site it is subjected to the workability requirements.
Note: The mortar mix should be used within it’s initial setting time = 45 min
6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at
the joint in future.
6/9/2014
Chicken Mesh Labour putting Chicken Mesh
7. Making of Level Pads : Level pads are used for maintaining the thickness of
plaster coat required.They act as a reference for checking thickness of plaster.
- First we lay a reference line using rope and nails
- We check the distance of wall from this reference line and note it(say D1)
- Now we put the mortar of wall and smoothen it. We now calculate the
distance between the reference line and level pad’s surface(say D2)
D1-D2= Thickness of coat required
- If the thickness doesn’t matches then adjust the thickness of level pad
- Now make one level pad above the first level pad and check if it’s in line
with the help of plumb bob.It might happen the wall is not exactly vertical
either inwards or outwards which can be checked with help of plumb bob
hence thickness of level pad can be adjusted accordingly.
6/9/2014
6/9/2014
Labourers checking the distance of wall from reference
line
Making of level pad
6/9/2014
Level Pad
Labourers checking distance of level pad from reference
line
6/9/2014
Plumb Bob
No gap between wall and plumb
bob, signifying that wall is straight
Gap between wall and plumb
bob indicating that wall is
“Inwards”
- After checking for vertical alignment of level pads, check for horizontal
alignment with the help of a rope( pin a rope parallel to the first level pad
also vertical with adjacent wall).Adjust the level pads in thickness if the wall
is tilted sideways.
6/9/2014
Checking for vertical alignment of pads
Horizontally laid level pads
8. After making the level pads, wet the wall with help of diluted cement water slurry
to provide better adhesion with mortar.
9. The mason then applies the mortar on the walls
with the help of trowel.
6/9/2014
Masonry Trowel
10. With the help of metal float the mason creates a smooth reference plain of
required thickness by pressing the float against two vertical level pads.The
additional mortar is scrapped of with the help of float.
6/9/2014Metal Float
Reference Plain
11. The finishing of the plaster is done with the help of finishing trowel.
6/9/2014
Removing excess material with
float
Finishing Trowel
12. After smoothening, the plaster is roughened up for providing better adhesion in
case of a second coat. A hair is used for it or sometimes labour also uses chicken
mesh only.
6/9/2014
Hair used for roughening
surface
Rough Plaster coat
Challenges in Manual Plastering
1. A proper hierarchical system is not present on site. Ideally the engineer should
teach the supervisor as in what he requires and the supervisor should convey it to
the labour.But due to lack of number and agility of supervisors the engineer has
to do that part.
2. Due to above point, the engineer is not able to perform his main task efficiently
which is Quality Checks .Two examples in this regard are:-
(a) Amount of water is not as per as standards and the labour puts water
according to his will. This in turn degrades the quality of the mix.
(b) Checking of the thickness and alignment of level pads is not proper which
leads to lack of uniformity of plaster. Plumb checking is not also proper.
3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes
used beyond 4 hours. This again degrades the quality.
4. The floor is not cleaned properly before starting plaster and sacks are not always
laid down to collect the fallen mortar. So the mortar gets mixed with the mud and
is then used again which has serious implications on the quality.
6/9/2014
5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of
loosing labour the supervisor also doesn’t say much to them as his performance is
judged by the way he handles the labourers.This leads to slow pace of work.
6/9/2014
Fallen Mortar getting mixed
with mud

Weitere ähnliche Inhalte

Was ist angesagt?

Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
Zairul Zaiky
 
properties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricksproperties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricks
Zeeshan Afzal
 
Brick walling an introduction
Brick walling an introductionBrick walling an introduction
Brick walling an introduction
doogstone
 

Was ist angesagt? (20)

Bricks
BricksBricks
Bricks
 
Concrete block
Concrete blockConcrete block
Concrete block
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
Finishing work,Construction workshop.
Finishing work,Construction workshop.Finishing work,Construction workshop.
Finishing work,Construction workshop.
 
Plastering
PlasteringPlastering
Plastering
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Production of concrete
Production of concreteProduction of concrete
Production of concrete
 
Water proofing in buildings
Water proofing in buildingsWater proofing in buildings
Water proofing in buildings
 
Defects in plastering
Defects in plasteringDefects in plastering
Defects in plastering
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Concrete
ConcreteConcrete
Concrete
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Waterproofing
WaterproofingWaterproofing
Waterproofing
 
Blockwork
BlockworkBlockwork
Blockwork
 
properties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricksproperties,Manufacturing, types and features of bricks
properties,Manufacturing, types and features of bricks
 
Brick walling an introduction
Brick walling an introductionBrick walling an introduction
Brick walling an introduction
 
PRESENTATION ON CONCRETE
PRESENTATION ON CONCRETEPRESENTATION ON CONCRETE
PRESENTATION ON CONCRETE
 
Timber - A Construction Material
Timber - A Construction MaterialTimber - A Construction Material
Timber - A Construction Material
 

Ähnlich wie Manual plastering

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
Chan Yifung
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
Rohan chansoriya
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
Sheng Zhe
 

Ähnlich wie Manual plastering (20)

Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
 
abcreport
abcreportabcreport
abcreport
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Construction basic SIP
Construction basic SIPConstruction basic SIP
Construction basic SIP
 
project on multistoried infrastructure
project on multistoried infrastructureproject on multistoried infrastructure
project on multistoried infrastructure
 
cereamic
cereamiccereamic
cereamic
 
educational program cob, lime and straw
educational program cob, lime and straweducational program cob, lime and straw
educational program cob, lime and straw
 
Brickwork and plastering
Brickwork and plasteringBrickwork and plastering
Brickwork and plastering
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdf
 
paving_.pdf
paving_.pdfpaving_.pdf
paving_.pdf
 
Ct & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall reportCt & bm & mea assignment brickwall report
Ct & bm & mea assignment brickwall report
 
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay BricksComparative Study on Fly Ash Bricks and Conventional Clay Bricks
Comparative Study on Fly Ash Bricks and Conventional Clay Bricks
 
Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012Buildingmaterialslabmanuallab01 161125043012
Buildingmaterialslabmanuallab01 161125043012
 
Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)Buildingmaterialslabmanuallab01 161125043012 (1)
Buildingmaterialslabmanuallab01 161125043012 (1)
 
Building materials lab_manual lab 01
Building materials lab_manual  lab 01Building materials lab_manual  lab 01
Building materials lab_manual lab 01
 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
 
house construction
house constructionhouse construction
house construction
 
HALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptxHALF BRICK PARTITION WALL.pptx
HALF BRICK PARTITION WALL.pptx
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 

Kürzlich hochgeladen

Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
Kamal Acharya
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 

Kürzlich hochgeladen (20)

ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptxROAD CONSTRUCTION PRESENTATION.PPTX.pptx
ROAD CONSTRUCTION PRESENTATION.PPTX.pptx
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptx
 
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdfBURGER ORDERING SYSYTEM PROJECT REPORT..pdf
BURGER ORDERING SYSYTEM PROJECT REPORT..pdf
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
ChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdfChatGPT Prompt Engineering for project managers.pdf
ChatGPT Prompt Engineering for project managers.pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 

Manual plastering

  • 2. What is Plaster? Plaster is a building material used for coating walls and ceilings. Sand-cement plaster is used extensively in building work as a decorative or protective coating for concrete and masonry walls . Plaster is one of the oldest building materials, the most primitive form was mud plaster, used to hold together structures made of branches or wood for example. Today internal plastering is used more as a way of smoothing out surfaces and preparing them for decoration, it also adds strength to the wall or ceiling and helps seal together building materials.
  • 3. Materials Required  Cement  Sand  Water  Masonry Trowel  Smoothening Trowel  Metal Float  Measuring Tape  Plumb Bob  Mud Pan  Chicken Mesh  Hairs  Recron Fibre6/9/2014
  • 4. Know your Materials! 6/9/2014 Cement Sand Recron Fibre Final Mortar mix (made from mixing Cement,sand,water and recron fibre) present in a Mudpan
  • 5. Procedure 1. After the masonry wall made of bricks or aerated blocks is ready, it is first cleaned properly before starting the plastering wall using brushes and trowels. 6/9/2014 Brick wall Aerated Block wall
  • 6. 2. The scaffold is prepared for provide the labour a platform to stand and materials required for plastering are transported at the site of plastering. 3. Cement Mortar is prepared by mixing cement and sand in ratio specified. For ex-In our case the ratio specified is 1:4.So we use 1 unit volume of cement for 4 unit volume of sand. The normal cement bag is 50 kg in mass 0.035 m3. So we prepare a container of volume 0.035 m3 and pour 4 containers of cement. 6/9/2014 Scaffolding Container for measuring sand
  • 7. 4. Recron fibre is added to it as it helps in avoiding cracks in plaster. We use 125 gm fibre for 1 bag of cement. 5. Water is added .As per as IS standards 0.025 m3 of water is added to 1 bag of cement, but at site it is subjected to the workability requirements. Note: The mortar mix should be used within it’s initial setting time = 45 min 6. Chicken mesh is used at the joint of Lintel and masonry wall to avoid cracks at the joint in future. 6/9/2014 Chicken Mesh Labour putting Chicken Mesh
  • 8. 7. Making of Level Pads : Level pads are used for maintaining the thickness of plaster coat required.They act as a reference for checking thickness of plaster. - First we lay a reference line using rope and nails - We check the distance of wall from this reference line and note it(say D1) - Now we put the mortar of wall and smoothen it. We now calculate the distance between the reference line and level pad’s surface(say D2) D1-D2= Thickness of coat required - If the thickness doesn’t matches then adjust the thickness of level pad - Now make one level pad above the first level pad and check if it’s in line with the help of plumb bob.It might happen the wall is not exactly vertical either inwards or outwards which can be checked with help of plumb bob hence thickness of level pad can be adjusted accordingly. 6/9/2014
  • 9. 6/9/2014 Labourers checking the distance of wall from reference line Making of level pad
  • 10. 6/9/2014 Level Pad Labourers checking distance of level pad from reference line
  • 11. 6/9/2014 Plumb Bob No gap between wall and plumb bob, signifying that wall is straight Gap between wall and plumb bob indicating that wall is “Inwards”
  • 12. - After checking for vertical alignment of level pads, check for horizontal alignment with the help of a rope( pin a rope parallel to the first level pad also vertical with adjacent wall).Adjust the level pads in thickness if the wall is tilted sideways. 6/9/2014 Checking for vertical alignment of pads Horizontally laid level pads
  • 13. 8. After making the level pads, wet the wall with help of diluted cement water slurry to provide better adhesion with mortar. 9. The mason then applies the mortar on the walls with the help of trowel. 6/9/2014 Masonry Trowel
  • 14. 10. With the help of metal float the mason creates a smooth reference plain of required thickness by pressing the float against two vertical level pads.The additional mortar is scrapped of with the help of float. 6/9/2014Metal Float Reference Plain
  • 15. 11. The finishing of the plaster is done with the help of finishing trowel. 6/9/2014 Removing excess material with float Finishing Trowel
  • 16. 12. After smoothening, the plaster is roughened up for providing better adhesion in case of a second coat. A hair is used for it or sometimes labour also uses chicken mesh only. 6/9/2014 Hair used for roughening surface Rough Plaster coat
  • 17. Challenges in Manual Plastering 1. A proper hierarchical system is not present on site. Ideally the engineer should teach the supervisor as in what he requires and the supervisor should convey it to the labour.But due to lack of number and agility of supervisors the engineer has to do that part. 2. Due to above point, the engineer is not able to perform his main task efficiently which is Quality Checks .Two examples in this regard are:- (a) Amount of water is not as per as standards and the labour puts water according to his will. This in turn degrades the quality of the mix. (b) Checking of the thickness and alignment of level pads is not proper which leads to lack of uniformity of plaster. Plumb checking is not also proper. 3. The mortar is not used within it’s initial setting time of 45 Minutes and sometimes used beyond 4 hours. This again degrades the quality. 4. The floor is not cleaned properly before starting plaster and sacks are not always laid down to collect the fallen mortar. So the mortar gets mixed with the mud and is then used again which has serious implications on the quality. 6/9/2014
  • 18. 5. Due to lack of supervision the labour is idle for a lot of time.Also due to the fear of loosing labour the supervisor also doesn’t say much to them as his performance is judged by the way he handles the labourers.This leads to slow pace of work. 6/9/2014 Fallen Mortar getting mixed with mud