• MCDR 1988 Rule 3 says :
“mine closure” means steps taken for
reclamation, rehabilitation measures
taken in respect of a mine or part
thereof commencing from
cessation(stopping) of mining or
processing operations in a mine or
part thereof
• The Mine Closure Plan will have two components viz.
I ) Progressive or Concurrent Mine Closure Plan and
II ) Final Mine Closure Plan.
• Progressive Mine Closure Plan includes
various land use activities to be done continuously and
sequentially during the entire period of the mining
operations, whereas
Final Mine Closure activities would start towards the end of
mine life, and may continue even after the reserves are
exhausted and/or mining is discontinued till the mining
area is restored to an acceptable level to create a self
sustained ecosystem.
• MCDR 1988 Rule 3 says :
“progressive mine closure” means a
progressive plan, for the purpose of
providing protective, reclamation
and rehabilitation measures in a mine
or part thereof that has been
prepared in the manner specified in
the standard format and guidelines
issued by Indian Bureau of Mines
Mine closure process
• Shut Down – production stoppage, early
retirement to employees, min labor force is
needed to shut down.
• Decommissioning – equipment, buildings,
disposing waste
• Remediation/reclamation
• Post closure – monitoring, long term care and
maintenance
Reclamation
• Return the land and watercourses to an
acceptable standard of productive use
• Ensuring that any landforms and structures are
stable, and any watercourses are of
acceptable water quality.
• Reclamation typically involves a number of
activities such as removing any hazardous
materials, reshaping the land, restoring topsoil,
and planting native grasses, trees, or ground
cover.
Potential uses of mine sites
following mine closure
• Museums or education centres
• Visitor attractions
• Scientific centres
• Recreational areas
• Gardens or parks
• Fish farms
• Agriculture
Various governing bodies and rules to
monitor Mine Closure Plans
MAJOR MIENRAL CONCESSIONS
• (I) Mines and Mineral (Development and
Regulation) Act, 1957. (MMDR – Act 1957)
• (II) Mineral Concession Rules 1960. (MCR –
1960)
• (III) Mineral Conservation and Development
Rules – 1988 (MCDR – 1988)
Standards according to MCDR 1988
• 23A : Every mine shall have Progressive MCP
and Final MCP.
• 23B :
 Review the progressive mine
closure plan every five years from the date of
its approval
 Approval or refusal of the progressive
mine closure plan should be within ninety days
of the date of its receipt. No response from the
concerned official declares the approval of plan.
• 23C : submit a final mine closure plan for approval
one year prior to the proposed closure of the
mine.
• 23D : The modification of mine closure plan
• 23E : Responsibility of the holder of mining lease
• 23F : Financial assurance
Rs 25000/- per Ha for Category A Mines
Rs 15000/- per Ha for Category B Mines
in any case not < Rs 2 lakh for Cat A &
Rs 1 lakh for Cat B Mines
Format of Progressive MCP of a Mine
• 1.1 Introduction:
the name of the lessee,
the location and extent of lease area,
the type of lease area (forest etc),
the present land use pattern,
the method of mining and
mineral processing operations
1.1: Reasons for closure
• The reasons for closure of mining operations in
relation to exhaustion of mineral, lack of
demand, uneconomic operations, natural
calamity, directives from statutory organization
or court etc. should be specified
1.2 : Statutory Obligations
• The legal obligations, if any, which the
mine owner is bound to comply with
such as special conditions imposed
while execution of lease deed, approval
of mining plan
1.3 : Closure Plan Preparation
2.0 Mine Description
• 2.1 Geology:
• 2.2 Reserves:
• 2.3 Mining Method:
• 2.4 Coal Beneficiation:
3. Closure Plan
• 3.1 Mined-Out Land
• 3.2 Water Quality Management
• 3.3 Air Quality Management
• 3.4 Waste Management
• 3.5 Top Soil Management
• 3.6 Management of Coal Rejects from washery
• 3.7 Infrastructure
• 3.8 Disposal of Mining Machinery
• 3.9 Safety and Security
• 3.10 Economic Repercussions of closure of mine
4. Time Scheduling for
abandonment
5. Abandonment Cost
6. Financial Assurance
7.Responsibility of Mine Owners
8. Provision for Mine Closure
References
• MCDR 1988, MCR 1960
• Ministry of Coal, Guidelines for preparation of MCP
• http://www.miningfacts.org/environment/what-
happens-to-mine-sites-after-a-mine-is-closed/
• Ramco Budawada Limestone Mine of M/s The
Ramco Cements Limited 1st Scheme of Mining
including Mine Closure Planning

Weitere ähnliche Inhalte

Was ist angesagt?

Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
VR M
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
SATYANARAYANA I
 

Was ist angesagt? (20)

Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Blasting Gallery Method
Blasting Gallery MethodBlasting Gallery Method
Blasting Gallery Method
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Roof supports in coal mines
Roof supports in coal minesRoof supports in coal mines
Roof supports in coal mines
 
Mine air sampling
Mine air samplingMine air sampling
Mine air sampling
 
Surface fire in coalfields
Surface fire in coalfieldsSurface fire in coalfields
Surface fire in coalfields
 
Lectures on metal mining
Lectures on metal miningLectures on metal mining
Lectures on metal mining
 
Underground mining method
Underground mining methodUnderground mining method
Underground mining method
 
Surface mining
Surface miningSurface mining
Surface mining
 
Applicability of hydraulic mining
Applicability of hydraulic miningApplicability of hydraulic mining
Applicability of hydraulic mining
 
Highwall mining – a new approach in india
Highwall mining – a new approach in indiaHighwall mining – a new approach in india
Highwall mining – a new approach in india
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 
ore dilution and ore recovery
ore dilution and ore recoveryore dilution and ore recovery
ore dilution and ore recovery
 
Mine planning
Mine planning Mine planning
Mine planning
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Development and depillaring with continuous miner
Development and depillaring with continuous minerDevelopment and depillaring with continuous miner
Development and depillaring with continuous miner
 
Lecture 4: Underground Mining
Lecture 4: Underground MiningLecture 4: Underground Mining
Lecture 4: Underground Mining
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
"STAGES IN THE LIFE OF MINE"
"STAGES IN THE LIFE OF MINE""STAGES IN THE LIFE OF MINE"
"STAGES IN THE LIFE OF MINE"
 

Andere mochten auch

Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Bruce McCarthy
 
Dumping of mining waste (2)
Dumping of mining waste (2)Dumping of mining waste (2)
Dumping of mining waste (2)
Pranjit Sharmah
 
High performance solid-oxide fuel cell-Opening windows to low temperature app...
High performance solid-oxide fuel cell-Opening windows to low temperature app...High performance solid-oxide fuel cell-Opening windows to low temperature app...
High performance solid-oxide fuel cell-Opening windows to low temperature app...
Ye Zhang-Steenwinkel
 
Being and bringing together:a brief introduction to sport for development and...
Being and bringing together:a brief introduction to sport for development and...Being and bringing together:a brief introduction to sport for development and...
Being and bringing together:a brief introduction to sport for development and...
Munas Kalden
 

Andere mochten auch (15)

Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
 
Dumping of mining waste (2)
Dumping of mining waste (2)Dumping of mining waste (2)
Dumping of mining waste (2)
 
Breaking down the best practices for the planning and operation of legacy sit...
Breaking down the best practices for the planning and operation of legacy sit...Breaking down the best practices for the planning and operation of legacy sit...
Breaking down the best practices for the planning and operation of legacy sit...
 
MINING IN INDIA
MINING IN INDIAMINING IN INDIA
MINING IN INDIA
 
Environmental Management System Mining Industry India
Environmental Management System Mining Industry IndiaEnvironmental Management System Mining Industry India
Environmental Management System Mining Industry India
 
mine laws in mineral excavation in india
mine laws in mineral excavation in indiamine laws in mineral excavation in india
mine laws in mineral excavation in india
 
Ec minor mineral b2 mining 2016_dr rlm
Ec minor mineral b2 mining 2016_dr rlmEc minor mineral b2 mining 2016_dr rlm
Ec minor mineral b2 mining 2016_dr rlm
 
Business plan
Business planBusiness plan
Business plan
 
High performance solid-oxide fuel cell-Opening windows to low temperature app...
High performance solid-oxide fuel cell-Opening windows to low temperature app...High performance solid-oxide fuel cell-Opening windows to low temperature app...
High performance solid-oxide fuel cell-Opening windows to low temperature app...
 
Figuras literarias
Figuras literariasFiguras literarias
Figuras literarias
 
Being and bringing together:a brief introduction to sport for development and...
Being and bringing together:a brief introduction to sport for development and...Being and bringing together:a brief introduction to sport for development and...
Being and bringing together:a brief introduction to sport for development and...
 
Risk Course_Slides_Nov 2016 v2
Risk Course_Slides_Nov 2016 v2Risk Course_Slides_Nov 2016 v2
Risk Course_Slides_Nov 2016 v2
 
The role of diet in managing ADHD
The role of diet in managing ADHDThe role of diet in managing ADHD
The role of diet in managing ADHD
 
Acceptable, Achievable, Sustainable? Assessing Closure Goals at Legacy Mine ...
Acceptable, Achievable, Sustainable?  Assessing Closure Goals at Legacy Mine ...Acceptable, Achievable, Sustainable?  Assessing Closure Goals at Legacy Mine ...
Acceptable, Achievable, Sustainable? Assessing Closure Goals at Legacy Mine ...
 
Economic perspective on deep and under cover exploration - Trench et al - Mar...
Economic perspective on deep and under cover exploration - Trench et al - Mar...Economic perspective on deep and under cover exploration - Trench et al - Mar...
Economic perspective on deep and under cover exploration - Trench et al - Mar...
 

Ähnlich wie Standards of Mine Closure Planning

EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
RaghuGhu1
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFU
Stacey O'Sullivan
 

Ähnlich wie Standards of Mine Closure Planning (20)

Riverbed mining - Rajasthan
Riverbed mining - RajasthanRiverbed mining - Rajasthan
Riverbed mining - Rajasthan
 
Extending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine PlanningExtending Open Cast Mine to Underground Mine Planning
Extending Open Cast Mine to Underground Mine Planning
 
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.pptEIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
EIA of Sri Balaji Reservoir, Andhra Pradesh.ppt
 
Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
 
EIA Presentation.pptx
EIA Presentation.pptxEIA Presentation.pptx
EIA Presentation.pptx
 
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
Wind Farm Forum 2015: Ecological Risk Mitigation for the Australian Wind Indu...
 
Seia public consultation dec 2013
Seia public consultation dec 2013Seia public consultation dec 2013
Seia public consultation dec 2013
 
Coal tech-r&d in india
Coal tech-r&d in indiaCoal tech-r&d in india
Coal tech-r&d in india
 
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.7.	MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
7. MINING LEASE, RECLAMATION PLANNING AND SAFETY ZONE MANAGEMENT PLAN.
 
ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014ICFRE RNS reclamation planning_28.11.2014
ICFRE RNS reclamation planning_28.11.2014
 
training and excursion
training and excursiontraining and excursion
training and excursion
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
 
design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2design of common hazardous waste treatment, storage and 2
design of common hazardous waste treatment, storage and 2
 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdf
 
Bky-investor-presentation
Bky-investor-presentationBky-investor-presentation
Bky-investor-presentation
 
radioactive waste
 radioactive waste  radioactive waste
radioactive waste
 
Salient features of Mining Act, Papua New Guineadf
Salient features of Mining Act, Papua New GuineadfSalient features of Mining Act, Papua New Guineadf
Salient features of Mining Act, Papua New Guineadf
 
Rock blasting for mining
Rock blasting  for miningRock blasting  for mining
Rock blasting for mining
 
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
Pendergrass, Gary, GeoEngineers Inc., USEPA Coal Combustion Residuals Rule, I...
 
NATCL Biopile Management Plan Dec 2014 - IFU
NATCL  Biopile Management Plan Dec 2014 - IFUNATCL  Biopile Management Plan Dec 2014 - IFU
NATCL Biopile Management Plan Dec 2014 - IFU
 

Kürzlich hochgeladen

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 

Kürzlich hochgeladen (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Standards of Mine Closure Planning

  • 1. Indian Institute of Technology Banaras Hindu University Varanasi Standards of Mine Closure in Indian Mines Term Paper Guide: Dr. Prof. S. Ratan Dept of Mining Engineering IIT(BHU), Varanasi Uttar Pradesh Submitted by: Abhiram K M.Tech Part I Dept of Mining Engineering IIT(BHU), Varanasi Uttar Pradesh
  • 2. • MCDR 1988 Rule 3 says : “mine closure” means steps taken for reclamation, rehabilitation measures taken in respect of a mine or part thereof commencing from cessation(stopping) of mining or processing operations in a mine or part thereof
  • 3. • The Mine Closure Plan will have two components viz. I ) Progressive or Concurrent Mine Closure Plan and II ) Final Mine Closure Plan. • Progressive Mine Closure Plan includes various land use activities to be done continuously and sequentially during the entire period of the mining operations, whereas Final Mine Closure activities would start towards the end of mine life, and may continue even after the reserves are exhausted and/or mining is discontinued till the mining area is restored to an acceptable level to create a self sustained ecosystem.
  • 4. • MCDR 1988 Rule 3 says : “progressive mine closure” means a progressive plan, for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified in the standard format and guidelines issued by Indian Bureau of Mines
  • 5. Mine closure process • Shut Down – production stoppage, early retirement to employees, min labor force is needed to shut down. • Decommissioning – equipment, buildings, disposing waste • Remediation/reclamation • Post closure – monitoring, long term care and maintenance
  • 6. Reclamation • Return the land and watercourses to an acceptable standard of productive use • Ensuring that any landforms and structures are stable, and any watercourses are of acceptable water quality. • Reclamation typically involves a number of activities such as removing any hazardous materials, reshaping the land, restoring topsoil, and planting native grasses, trees, or ground cover.
  • 7. Potential uses of mine sites following mine closure • Museums or education centres • Visitor attractions • Scientific centres • Recreational areas • Gardens or parks • Fish farms • Agriculture
  • 8. Various governing bodies and rules to monitor Mine Closure Plans MAJOR MIENRAL CONCESSIONS • (I) Mines and Mineral (Development and Regulation) Act, 1957. (MMDR – Act 1957) • (II) Mineral Concession Rules 1960. (MCR – 1960) • (III) Mineral Conservation and Development Rules – 1988 (MCDR – 1988)
  • 9. Standards according to MCDR 1988 • 23A : Every mine shall have Progressive MCP and Final MCP. • 23B :  Review the progressive mine closure plan every five years from the date of its approval  Approval or refusal of the progressive mine closure plan should be within ninety days of the date of its receipt. No response from the concerned official declares the approval of plan.
  • 10. • 23C : submit a final mine closure plan for approval one year prior to the proposed closure of the mine. • 23D : The modification of mine closure plan • 23E : Responsibility of the holder of mining lease • 23F : Financial assurance Rs 25000/- per Ha for Category A Mines Rs 15000/- per Ha for Category B Mines in any case not < Rs 2 lakh for Cat A & Rs 1 lakh for Cat B Mines
  • 11. Format of Progressive MCP of a Mine • 1.1 Introduction: the name of the lessee, the location and extent of lease area, the type of lease area (forest etc), the present land use pattern, the method of mining and mineral processing operations
  • 12. 1.1: Reasons for closure • The reasons for closure of mining operations in relation to exhaustion of mineral, lack of demand, uneconomic operations, natural calamity, directives from statutory organization or court etc. should be specified
  • 13. 1.2 : Statutory Obligations • The legal obligations, if any, which the mine owner is bound to comply with such as special conditions imposed while execution of lease deed, approval of mining plan 1.3 : Closure Plan Preparation
  • 14. 2.0 Mine Description • 2.1 Geology: • 2.2 Reserves: • 2.3 Mining Method: • 2.4 Coal Beneficiation:
  • 15. 3. Closure Plan • 3.1 Mined-Out Land • 3.2 Water Quality Management • 3.3 Air Quality Management • 3.4 Waste Management • 3.5 Top Soil Management • 3.6 Management of Coal Rejects from washery • 3.7 Infrastructure • 3.8 Disposal of Mining Machinery • 3.9 Safety and Security • 3.10 Economic Repercussions of closure of mine
  • 16. 4. Time Scheduling for abandonment 5. Abandonment Cost 6. Financial Assurance 7.Responsibility of Mine Owners 8. Provision for Mine Closure
  • 17. References • MCDR 1988, MCR 1960 • Ministry of Coal, Guidelines for preparation of MCP • http://www.miningfacts.org/environment/what- happens-to-mine-sites-after-a-mine-is-closed/ • Ramco Budawada Limestone Mine of M/s The Ramco Cements Limited 1st Scheme of Mining including Mine Closure Planning