SlideShare ist ein Scribd-Unternehmen logo
1 von 10
Expectation from QMS
By Fazal Wahab
The Project Manager
• QMS is expected to support the following functions of a
project manager:
– QMS should provide facilities whereby a project manager can
consider the vast majority of possible risk, which could affect a
project.
– QMS should specify standards, which will enable staff to report
on their activities in a uniform way.
– QMS should lay down standards and procedures, which ensure
that cost and expenditure records from earlier projects are
kept in a easily accessible form.
The Project Manager
 QMS should provide a way of collecting and analyzing defect
statistics;
 QMS should contain a standard for a project plan which gives
details about the capabilities of the staff who are to carry out
the project task such as system testing.
Programmer/Developer
 QMS should set coding standards
 QMS should provide directions to the developer to store
test data and test outcomes in files.
 QMS should guide the developers and the configuration
managers towards organizing the entire software project
repository
System Designer
 QMS should provide a standard, which describes how the
process architecture and data architecture are to be
written.
 QMS should specify standards, which lead to a system
that should be easily maintainable.
 It should provide standards, which lead to a good
requirements specification.
Analyst
 QMS should provide a standard for the requirements
specification.
 It should provide a number of checklists
 It should provide a description of the process involved
when an analyst liaisons with a customer.
Senior Management
 QMS should provide senior managers with reports of
achievements against targets for each of their projects;
 It should provide direction on the setting up of audit trail
documentation.
 It should provide facilities whereby reports on defects
discovered during development are issued regularly.
Staffing Department
• QMS should provide standards for a project plan where
the skill level of the staff on the project is properly
specified. It helps the HR department to allocate the right
people to the project.
• QMS should provide a standard format for reports as
well as for the resume.
– To produce a written report on the effectiveness of the staff
on the project.
Customer
 QMS provide directives which specify how progress
meeting are to be organized.
 Who should be invited from the developer’s staff?
 When the meeting should be scheduled?
 What physical arrangements, such as the booking of a room
should be made?
 How issues arising from a progress meeting are to be
resolved.
The Testers
 QMS should ensure that procedures and associated
checklists are in place to enable test data and test
outcomes to be stored in a project repository.
 QMS should ensure that procedures exists which help in
arrangement of resources requirement for tests.

Weitere ähnliche Inhalte

Ähnlich wie Expectation from qms lecture 5

Lecture-5-16052022-024149pm.ppt
Lecture-5-16052022-024149pm.pptLecture-5-16052022-024149pm.ppt
Lecture-5-16052022-024149pm.ppt
ShahzaibChang1
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
muneer khan
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
Aew Sanmai
 
Sumana Sundaram - Resumev2.1
Sumana Sundaram - Resumev2.1Sumana Sundaram - Resumev2.1
Sumana Sundaram - Resumev2.1
Sumana Sundaram
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
abdo badr
 

Ähnlich wie Expectation from qms lecture 5 (20)

Lecture-5-16052022-024149pm.ppt
Lecture-5-16052022-024149pm.pptLecture-5-16052022-024149pm.ppt
Lecture-5-16052022-024149pm.ppt
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Project control and process instrumentation
Project control and process instrumentationProject control and process instrumentation
Project control and process instrumentation
 
Summary
SummarySummary
Summary
 
Evaluation and Rating program for Construction Quality and Task Completion
Evaluation and Rating program for Construction Quality and Task CompletionEvaluation and Rating program for Construction Quality and Task Completion
Evaluation and Rating program for Construction Quality and Task Completion
 
MuneerKhanResume v1
MuneerKhanResume v1MuneerKhanResume v1
MuneerKhanResume v1
 
Editable Elements
Editable ElementsEditable Elements
Editable Elements
 
Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018Evm intro. slide deck 13 may 2018
Evm intro. slide deck 13 may 2018
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Sumana Sundaram - Resumev2.1
Sumana Sundaram - Resumev2.1Sumana Sundaram - Resumev2.1
Sumana Sundaram - Resumev2.1
 
Introduction To Software Quality Assurance
Introduction To Software Quality AssuranceIntroduction To Software Quality Assurance
Introduction To Software Quality Assurance
 
Introduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsIntroduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutions
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Sanjeev - cv
Sanjeev - cvSanjeev - cv
Sanjeev - cv
 
Jayaseelan PMO _April 2016
Jayaseelan PMO _April 2016Jayaseelan PMO _April 2016
Jayaseelan PMO _April 2016
 

Mehr von Abdul Basit

Git Developer Cheatsheet
Git Developer CheatsheetGit Developer Cheatsheet
Git Developer Cheatsheet
Abdul Basit
 
Static white box testing lecture 12
Static white box testing lecture 12Static white box testing lecture 12
Static white box testing lecture 12
Abdul Basit
 
Software testing lecture 10
Software testing lecture 10Software testing lecture 10
Software testing lecture 10
Abdul Basit
 
Software testing lecture 9
Software testing lecture 9Software testing lecture 9
Software testing lecture 9
Abdul Basit
 
Software quality assurance lecture 1
Software quality assurance lecture 1Software quality assurance lecture 1
Software quality assurance lecture 1
Abdul Basit
 
Software measurement lecture 7
Software measurement lecture 7Software measurement lecture 7
Software measurement lecture 7
Abdul Basit
 

Mehr von Abdul Basit (20)

Atlassian git cheatsheet
Atlassian git cheatsheetAtlassian git cheatsheet
Atlassian git cheatsheet
 
Github git-cheat-sheet
Github git-cheat-sheetGithub git-cheat-sheet
Github git-cheat-sheet
 
White box testing
White box testingWhite box testing
White box testing
 
Web testing
Web testingWeb testing
Web testing
 
Testing the documentation
Testing the documentationTesting the documentation
Testing the documentation
 
Testing software security
Testing software securityTesting software security
Testing software security
 
Testing fundamentals
Testing fundamentalsTesting fundamentals
Testing fundamentals
 
Test planning
Test planningTest planning
Test planning
 
Test cases planning
Test cases planningTest cases planning
Test cases planning
 
Software Testing
Software TestingSoftware Testing
Software Testing
 
Software Compatibility testing
Software Compatibility testingSoftware Compatibility testing
Software Compatibility testing
 
Black box testing
Black box testingBlack box testing
Black box testing
 
Software Automated testing and tools
Software Automated testing and toolsSoftware Automated testing and tools
Software Automated testing and tools
 
Why test software
Why test softwareWhy test software
Why test software
 
Git Developer Cheatsheet
Git Developer CheatsheetGit Developer Cheatsheet
Git Developer Cheatsheet
 
Static white box testing lecture 12
Static white box testing lecture 12Static white box testing lecture 12
Static white box testing lecture 12
 
Software testing lecture 10
Software testing lecture 10Software testing lecture 10
Software testing lecture 10
 
Software testing lecture 9
Software testing lecture 9Software testing lecture 9
Software testing lecture 9
 
Software quality assurance lecture 1
Software quality assurance lecture 1Software quality assurance lecture 1
Software quality assurance lecture 1
 
Software measurement lecture 7
Software measurement lecture 7Software measurement lecture 7
Software measurement lecture 7
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Kürzlich hochgeladen (20)

How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 

Expectation from qms lecture 5

  • 2. The Project Manager • QMS is expected to support the following functions of a project manager: – QMS should provide facilities whereby a project manager can consider the vast majority of possible risk, which could affect a project. – QMS should specify standards, which will enable staff to report on their activities in a uniform way. – QMS should lay down standards and procedures, which ensure that cost and expenditure records from earlier projects are kept in a easily accessible form.
  • 3. The Project Manager  QMS should provide a way of collecting and analyzing defect statistics;  QMS should contain a standard for a project plan which gives details about the capabilities of the staff who are to carry out the project task such as system testing.
  • 4. Programmer/Developer  QMS should set coding standards  QMS should provide directions to the developer to store test data and test outcomes in files.  QMS should guide the developers and the configuration managers towards organizing the entire software project repository
  • 5. System Designer  QMS should provide a standard, which describes how the process architecture and data architecture are to be written.  QMS should specify standards, which lead to a system that should be easily maintainable.  It should provide standards, which lead to a good requirements specification.
  • 6. Analyst  QMS should provide a standard for the requirements specification.  It should provide a number of checklists  It should provide a description of the process involved when an analyst liaisons with a customer.
  • 7. Senior Management  QMS should provide senior managers with reports of achievements against targets for each of their projects;  It should provide direction on the setting up of audit trail documentation.  It should provide facilities whereby reports on defects discovered during development are issued regularly.
  • 8. Staffing Department • QMS should provide standards for a project plan where the skill level of the staff on the project is properly specified. It helps the HR department to allocate the right people to the project. • QMS should provide a standard format for reports as well as for the resume. – To produce a written report on the effectiveness of the staff on the project.
  • 9. Customer  QMS provide directives which specify how progress meeting are to be organized.  Who should be invited from the developer’s staff?  When the meeting should be scheduled?  What physical arrangements, such as the booking of a room should be made?  How issues arising from a progress meeting are to be resolved.
  • 10. The Testers  QMS should ensure that procedures and associated checklists are in place to enable test data and test outcomes to be stored in a project repository.  QMS should ensure that procedures exists which help in arrangement of resources requirement for tests.