           ACCMAN   INSTITUTE OF MANAGEMENT   (GREATER NOIDA)          PROJECT            ON                 CAPACITY PLANNINGSUBMITTED BY:-MOHD.ARISHSUBMITTED TO:-PROF.SUBIR GUHA<br />,[object Object]
Capacity planning is the process of determining the production capacity needed by an organization to meet changing demand for its products.
Capacity is the rate of productive capability of a facility. Capacity is usually expressed as volume of output per time period. It is the process of determining the necessary to meet the production objectives. The objectives of capacity planning are:
To identify and solve capacity problem in a timely manner to meet consumer needs.
 To maintain a balance between required capacity and available capacity.
The goal of capacity planning is to minimize this discrepancy.
Capacity is calculated: (number of machines or workers) × (number of shifts) × (utilization) × (efficiency).
THE NEED FOR CAPACITY PLANNING:Capacity planning is the first step when an organization decided to produce more or a new product. Once capacity is evaluated and a need for a new expanded facility is determined, facility location and process technology activities occur. Too much capacity would require exploring ways to reduce capacity, such as temporarily closing, selling, or consolidating facilities. Consolidation might involve relocation, a combining of technologies, or a rearrangement of equipment and processes.<br />,[object Object]
It helps an organization to identify and plan the actions necessary to meet customer’s present and future demand.
HOW IS CAPACITY MEASURED?For some organization capacity is simple to measure. General Motors Corporation can use “numbers of automobiles per year.”  But what about organization whose product lines are more diverse? For these firms, it is hard to find a common unit of output.<br />    As a substitute, capacity can be expressed in terms of input. A legal office may express capacity in terms of the number of attorneys employed per year. A custom job shop or an auto repair shop may express capacity in terms of available labour hours and/or machine hours per week, month, or year.<br />,[object Object],Organization                                                 Measure                                              OutputAutomobile manufacturer                             Numbers of autosSteel producer                                               Tones of steelPower company                                             Megawatts of electricity                                               InputAirline                                                            Numbers of seatHospital                                                         Number of bedsTax office                                                       Number of accountants<br />,[object Object]
Capacity planning normally involves the following activities:

Weitere ähnliche Inhalte

Was ist angesagt?

Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
Atif Ghayas
 
Operations Management Presentation
Operations Management PresentationOperations Management Presentation
Operations Management Presentation
Patrick Rubix
 

Was ist angesagt? (20)

Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Operations Management : Line Balancing
Operations Management : Line BalancingOperations Management : Line Balancing
Operations Management : Line Balancing
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
(CAPACITY PLANNIG)
(CAPACITY PLANNIG)(CAPACITY PLANNIG)
(CAPACITY PLANNIG)
 
Production and Operation Management
Production and Operation ManagementProduction and Operation Management
Production and Operation Management
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Productivity and operation management
Productivity and operation managementProductivity and operation management
Productivity and operation management
 
Operations Management Presentation
Operations Management PresentationOperations Management Presentation
Operations Management Presentation
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 
capacity planning om
capacity planning omcapacity planning om
capacity planning om
 
Operation Process
Operation ProcessOperation Process
Operation Process
 
Production Planning
Production PlanningProduction Planning
Production Planning
 
Demand forecasting ppt
Demand forecasting pptDemand forecasting ppt
Demand forecasting ppt
 

Andere mochten auch

Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
Jaisa Gapuz
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
gerlyn bonus
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
senthil.G
 

Andere mochten auch (20)

Process Strategies and Capacity Planning
Process Strategies and Capacity PlanningProcess Strategies and Capacity Planning
Process Strategies and Capacity Planning
 
Strategic capacity planning for products and services
Strategic capacity planning for products and servicesStrategic capacity planning for products and services
Strategic capacity planning for products and services
 
Material requirement planning (mrp1)
Material requirement planning (mrp1)Material requirement planning (mrp1)
Material requirement planning (mrp1)
 
MRP1 vs MRP2
MRP1 vs MRP2MRP1 vs MRP2
MRP1 vs MRP2
 
MES - Manufacturing Execution System Explained
MES - Manufacturing Execution System ExplainedMES - Manufacturing Execution System Explained
MES - Manufacturing Execution System Explained
 
Manufacturing Execution Systems
Manufacturing Execution SystemsManufacturing Execution Systems
Manufacturing Execution Systems
 
Manufacturing Execution System
Manufacturing Execution SystemManufacturing Execution System
Manufacturing Execution System
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Capacity Requirement Planning
Capacity Requirement PlanningCapacity Requirement Planning
Capacity Requirement Planning
 
Learning Curves in Production Management
Learning Curves in Production ManagementLearning Curves in Production Management
Learning Curves in Production Management
 
Product design and development ch2
Product design and development ch2Product design and development ch2
Product design and development ch2
 
Product design and development ch3
Product design and development ch3Product design and development ch3
Product design and development ch3
 
Learning curve
Learning curveLearning curve
Learning curve
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
Product designing strategy
Product designing strategyProduct designing strategy
Product designing strategy
 
Product design
Product designProduct design
Product design
 
Aggregate planning and mps om
Aggregate planning and mps omAggregate planning and mps om
Aggregate planning and mps om
 
Learn curve
Learn curveLearn curve
Learn curve
 
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORTMARUTI SUZUKI PRODUCT ANALYSIS REPORT
MARUTI SUZUKI PRODUCT ANALYSIS REPORT
 
TIME STUDY
TIME STUDYTIME STUDY
TIME STUDY
 

Ähnlich wie Capacity Planning

Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
dutconsult
 
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptxFacility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
MeetLalcheta
 

Ähnlich wie Capacity Planning (20)

CHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptxCHAPTER 3 System and design Capacity.pptx
CHAPTER 3 System and design Capacity.pptx
 
Capacity resource planning and production scheduling
Capacity resource planning and production schedulingCapacity resource planning and production scheduling
Capacity resource planning and production scheduling
 
CAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNINGCAPACITY PLANNING AND ‎FACILITIES PLANNING
CAPACITY PLANNING AND ‎FACILITIES PLANNING
 
4. Capacity Planning.docx
4. Capacity Planning.docx4. Capacity Planning.docx
4. Capacity Planning.docx
 
Capacity management
Capacity managementCapacity management
Capacity management
 
Capacity planning chapter 8
Capacity planning chapter 8Capacity planning chapter 8
Capacity planning chapter 8
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptxGroup 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
 
Reading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdfReading 3 Strategic Capacity Management.pdf
Reading 3 Strategic Capacity Management.pdf
 
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptxFacility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
Facility_Capacity_Planning_&_its_Measurement_Final[1] - Copy.pptx
 
CAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNINGCAPACITY & AGGREGATE PLANNING
CAPACITY & AGGREGATE PLANNING
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Chapter 06
Chapter 06Chapter 06
Chapter 06
 
Capacity Managment
Capacity ManagmentCapacity Managment
Capacity Managment
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Capacity Planning and Control
Capacity Planning and ControlCapacity Planning and Control
Capacity Planning and Control
 
Facility Laout
Facility LaoutFacility Laout
Facility Laout
 
Process of Operation management
Process of Operation management Process of Operation management
Process of Operation management
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 
Chapter 05 Slides.pptx
Chapter 05                                      Slides.pptxChapter 05                                      Slides.pptx
Chapter 05 Slides.pptx
 

Mehr von MOHD ARISH

Centralized monitoring station for it computing and network infrastructure1
Centralized monitoring station for it computing and network infrastructure1Centralized monitoring station for it computing and network infrastructure1
Centralized monitoring station for it computing and network infrastructure1
MOHD ARISH
 
Centralized monitoring station for it computing and network infrastructure
Centralized monitoring station for it computing and network infrastructureCentralized monitoring station for it computing and network infrastructure
Centralized monitoring station for it computing and network infrastructure
MOHD ARISH
 
Customers complaint pretaing to baroda connect & atm cum debit card
Customers complaint pretaing to baroda connect & atm  cum debit cardCustomers complaint pretaing to baroda connect & atm  cum debit card
Customers complaint pretaing to baroda connect & atm cum debit card
MOHD ARISH
 
Kaizen theory
Kaizen theory Kaizen theory
Kaizen theory
MOHD ARISH
 
Toyata production system
Toyata production systemToyata production system
Toyata production system
MOHD ARISH
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
MOHD ARISH
 
HIndustan Unilever Project(Final)
HIndustan Unilever Project(Final)HIndustan Unilever Project(Final)
HIndustan Unilever Project(Final)
MOHD ARISH
 
Automated Process
Automated ProcessAutomated Process
Automated Process
MOHD ARISH
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
MOHD ARISH
 
Project On Operation Management
Project On Operation ManagementProject On Operation Management
Project On Operation Management
MOHD ARISH
 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
MOHD ARISH
 
Inventory management
Inventory managementInventory management
Inventory management
MOHD ARISH
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
MOHD ARISH
 

Mehr von MOHD ARISH (20)

Centralized monitoring station for it computing and network infrastructure1
Centralized monitoring station for it computing and network infrastructure1Centralized monitoring station for it computing and network infrastructure1
Centralized monitoring station for it computing and network infrastructure1
 
Centralized monitoring station for it computing and network infrastructure
Centralized monitoring station for it computing and network infrastructureCentralized monitoring station for it computing and network infrastructure
Centralized monitoring station for it computing and network infrastructure
 
Businese research project on mobile shops
Businese research project on mobile shopsBusinese research project on mobile shops
Businese research project on mobile shops
 
Customers complaint pretaing to baroda connect & atm cum debit card
Customers complaint pretaing to baroda connect & atm  cum debit cardCustomers complaint pretaing to baroda connect & atm  cum debit card
Customers complaint pretaing to baroda connect & atm cum debit card
 
bank of baroda
bank of barodabank of baroda
bank of baroda
 
Six sigma
Six sigmaSix sigma
Six sigma
 
PPT on DELL
PPT on DELLPPT on DELL
PPT on DELL
 
Kaizen theory
Kaizen theory Kaizen theory
Kaizen theory
 
Toyota
ToyotaToyota
Toyota
 
Toyata production system
Toyata production systemToyata production system
Toyata production system
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Supply chain
Supply chainSupply chain
Supply chain
 
HIndustan Unilever Project(Final)
HIndustan Unilever Project(Final)HIndustan Unilever Project(Final)
HIndustan Unilever Project(Final)
 
Automated Process
Automated ProcessAutomated Process
Automated Process
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Project On Operation Management
Project On Operation ManagementProject On Operation Management
Project On Operation Management
 
Dell
DellDell
Dell
 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
 
Inventory management
Inventory managementInventory management
Inventory management
 
Inventory Management
Inventory ManagementInventory Management
Inventory Management
 

Capacity Planning

  • 1.
  • 2. Capacity planning is the process of determining the production capacity needed by an organization to meet changing demand for its products.
  • 3. Capacity is the rate of productive capability of a facility. Capacity is usually expressed as volume of output per time period. It is the process of determining the necessary to meet the production objectives. The objectives of capacity planning are:
  • 4. To identify and solve capacity problem in a timely manner to meet consumer needs.
  • 5.  To maintain a balance between required capacity and available capacity.
  • 6. The goal of capacity planning is to minimize this discrepancy.
  • 7. Capacity is calculated: (number of machines or workers) × (number of shifts) × (utilization) × (efficiency).
  • 8.
  • 9. It helps an organization to identify and plan the actions necessary to meet customer’s present and future demand.
  • 10.
  • 11. Capacity planning normally involves the following activities:
  • 14. Identifying alternative ways to modify capacity.
  • 15. Evaluating financial, economical, and technological capacity alternatives.
  • 16. Selecting a capacity alternative most suited to achieving strategic mission.
  • 17. THREE STEPS OF CAPACITY PLANNING:
  • 18. Determine Service Level Requirements:
  • 19. The first step on the capacity planning process is to categorize the work done by systems and to quantify users’ expectation for how the work gets down.
  • 22. Identify service levels for each workload
  • 23. Analyze current capacity:
  • 24. Next, the current capacity of the system must be analyzed to determine how it is meeting the needs of the users.
  • 25. Measure service levels and compare to objectives
  • 28. Identify components of response time
  • 30. Finally, using forecasts of future business activity, future system requirements are determined. Implementing the required changes in system configuring will ensure that sufficient capacity will be available to maintain service level, even as circumstanced change in the future.
  • 32. Plan future system configuration
  • 34. Capacity requirements can be evaluated from two extreme perspectives- short term and long term.
  • 36. Managers often use forecast of product demand to estimate the short-term work load the facility must handle. By looking ahead up to 12 months, managers anticipate output requirements for different products or services. Then they compare requirements with existing capacity and detect when capacity adjustments are needed.
  • 38. Long term capacity requirements are more difficult to determine because future demand and technologies are uncertain. Forecasting five or ten years into the future is a risky and difficult task. What products or services will the firm are producing then? Today’s product may not even exist in the future. Obviously, long-term capacity requirement are dependent on marketing plans, product development, and the life cycles of the products.
  • 39. Changing in process technology must also be anticipated. Even if producers remain unchanged, the methods for generating them may change dramatically. Capacity planning must involve forecasts of technology as well as product.
  • 41. After existing and future capacity requirements are assessed, alternative ways of modifying capacity must be identified.
  • 43. For short-term periods of up to one year, fundamental capacity id fixed. Major facilities are seldom opened or closed on a regular monthly or yearly basis. Many short-term adjustments for increasing or decreasing capacity are possible, however. Which adjustment to make depended on whether the conversion process is primarily labour-or capital-intensive and whether the product is one that can be stored in inventory.
  • 45. Expansion from World War II through the 1960s, the U.S. economy was one of abundance and growth. Since the 1970s the United States has encountered problems of scarce resources and a more competitive economy. Organization today cannot be locked into thinking only about expanding the resource base; they must also consider optimal approaches to contracting it.
  • 46. Example:- A warehousing operation foresees the need for an additional 100,000 square feet of space by the end of the next five year. One option is to add an additional 50,000 square feet now and another 50,000 square feet two year from now. Another option is to add the entire 100,000 square feet now.
  • 47. Estimated costs for building the entire addition now are $50/square foot. If expanded incrementally, the initial 50,000 square feet will cost $60/square foot.
  • 48. The 50,000 square feet to be added later are estimated at $80/square foot. Which alternative is better? At a minimum, the lower construction costs plus excess capacity costs of total construction now must be compared with higher costs of deferred construction. The operation manager must consider the costs, benefits, and risks of each option.
  • 49. WHAT IS DONE IF THERE IN AN INBALANCED BETWEEN DEMAND AND CAPACITY:
  • 50. If there is an imbalance in the demand and the capacity in the short term then it can be tackled by temporary measures /adjustments such as increasing/ decreasing the labour force or creating and carrying inventory in the lean period to be used up in the peak-demand period.
  • 51. If there is an imbalance in the long term demand and the capacity then an organization can respond by changing /modifying the capacity.
  • 52. If capacity is short then it can create new facility or expand existing facility
  • 53. If there is excess capacity then it can temporarily close/ sell/ consolidate facilities. Consolidation can be done by relocation (combining technologies) rearrangement of equipment.
  • 54. WHAT ARE THE MODELS AND TECHNIQUES THAT ARE USEFUL FOR CAPACITY PLANNING?
  • 55. Present value analysis: It is used to evaluate the time of capital investment and fund flows.
  • 56. Aggregate planning models: it is useful for examining the way of using the examining the way of using the existing capacity in the short terms.
  • 57. Break even analysis: to determine the minimum break even volumes of production.
  • 58. Linear programming: this is helpful in determining the optimum product mix for maximizing contribution, considering the capacity constraints.
  • 59. Computers simulation: it is helpful to determine the effects of various scheduling policies.
  • 60. Decision tree analysis: this can be applied for long term capacity problems.
  • 61. WHAT ARE ECONOMIES OF SCALE?
  • 62. It is well known principle of economics. It indicates the relationship between cost and capacity in an operating system.
  • 63. When output increases in an operating system, the system is likely to experience cost advantages on account several factors. Due the following reasons the average unit cost begins to fall with the rise in output level :
  • 64. Spreading the fixed costs of capacity over a larger output
  • 65. Improved utilization of several resources in the system
  • 66. Cost benefit in procurement on account of increased volume.
  • 67. Efficient use of supervisory and management staff.
  • 68. The economies of scale cease to occur beyond a level of production or output. This is called ‘Diseconomies of scale’. There can be several reasons for this:
  • 69. Inefficient management due to largeness of operation and resultant lack of coordination.
  • 70. Overuse of machineries and break down of material handling equipments
  • 71. Over hiring of employees, or excessive overtime.
  • 72. Service slowdowns due to increasing complexities
  • 73. Increase in quality problems because of mismanagement and lack of focus.
  • 74.