The document shows pictures from various construction projects completed by Yashar Pourang between 2004-2012. They include:
1) The Tenandra Irrigation Scheme in NSW which involved bulk earthworks, compaction testing, and installing concrete pipes and headwalls.
2) Work as a general contractor from 2008-2011 doing earthworks, drainage, concreting, and roads/pavement construction for a large development project.
3) Construction of oil storage tanks and related earthworks for the Persian Gulf Oil Company from 2007-2008.
4) Construction of two residential towers from 2004-2007 for AAC Group including installing piles and forming columns and floors.
17. Tanavob General Contractor (TGC)
Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system,
Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month
21. Tanavob General Contractor (TGC)
Completion of project involves:
Dual layer Asphalt & Spraying (17,000 m³)
Earthworks, excavation and embankment (120,000 m³)
Pavement and Sidewalks ( 4,000 m²)
22. Tanavob General Contractor (TGC)
Roads and Pavement
Satellite pictures of the project (by Google Earth); before commencing the project and 6
month after
23. Tanavob General Contractor (TGC)
Roads and Pavement
Satellite pictures of the project (by Google Earth); 6 month after