This presentation is for planning and study purposes only. Proposals and options contained herein are subject to review, approval and any legally
required notice, collective bargaining and consultation obligations.
Improve Identification of
PSM Covered Processes
GBPL: XiaoMing Zeng
Corp. HSE, APAC
2014
Status: Certified
2
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
3
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Project Charter
Element Project Information
0. Project Title Improve Identification of PSM Covered Processes
1. Area of Focus
or Function:
PSM, Corp. HSE;
Scope: Geographically APAC One-HON sites where with ASM supports; Operating modes of existing assets and
acquired assets including JVs where HON has operational control; Business scope includes all SBGs (including TS
for confirmation);
2. Problem
Statement
Some SBG do not recognize PSM covered processes on their facilities, esp. those outside of PMT
manufacturing sites. Thus Process Safety is not managed in a consistent and effective way on those sites
missing the identification. Examples include the Tier 1 PS incident Event ID: 398014 with root causes
identified as not PSM covered process.
3. Benefit to
Customers:
The customers of this project include those SBG leaders, SBG site leaders, Site HSE leaders and the impacted
personnel with PSM covered processes. By using a screening tool to determine the covered processes,
adequate PSM support and resources can be allocated to those covered processes and PSM performance can
be improved. Adequate PSM system if identified for the covered processes will reduce the likelihood and loses
of PS events.
4. Project
Metrics: Metrics: Baseline Goal Entitlement Units
Rate
(Successful Id of PSM applicability)
Not currently
measured
90% Goal %
Coverage
(Screening sites in the region)
Not currently
measured
100% Goal %
5. Business
Impact
Improve PSM performance on non-PMT sites and reduce potential process safety injuries and property loses.
Improve SBUs meeting corporate HSE values. Some Good Industrial Practices from PMT can be shared across all
other SBGs.
6. Team Members
7. Team
Resources
APAC ASMs, Allen Wang (PMT PS), Site HSE leaders, Steven Eason, Toni Wenzel (PMT PS); Kent Hart (M&A);
Tony Aguilera (AERO)
8. Timing: 6 months (after due training, Dec. 24, 2014)
4
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Green Belt Tools
• Tools Utilized
- Six Sigma Project Charter
- Thought Process Map
- SIPOC
- Failure Modes Effects Analysis (FMEA)
- Process Map
- Control Plan
5
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
SIPOC: Process Definition
Apply
Screening
Std/ tool
Collect PSI
Document
screening
result
D M A I C
6
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
SIPOC D M A I C
7
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
SIPOC D M A I C
8
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
SIPOC D M A I C
9
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Thought Process Map D M A I C
10
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Thought Process Map D M A I C
11
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Thought Process Map D M A I C
12
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Next steps…
• Xiaoming presented a 2-hr training to ASMs on
PMTHSE805, how to screen and document the
results by early May.
• ASMs did process screening using PMTHSE805 std,
1~2 processes/site/ASM by June.
• Xiaoming reviewed the screening results from all
ASMs by June.
13
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Measurement System Evaluation
14
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Measurement System Evaluation
15
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Measurement System Evaluation – Phase 1
Site/ASM Accuracy rate (%) Items Y rated N Items N rated Y
SHAero 84.6 Q19, Q20, Q23, Q24 NA
NT 69.2 Q5, Q6 Q9, Q12, Q19, Q20, Q24, Q25
CS 88.5 Q5, Q13, Q23 NA
LY 84.6 Q5, Q13, Q14, Q26 NA
GZ 84.6 Q2 Q15, Q16, Q26
XA 76.9 Q16, Q23 Q5, Q8, Q13, Q24
Average 81.4 Most freq. errors: Q5, Q13, Q23, Q24
16
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
FMEA:
17
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
The Work Process
18
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Improvement – Develop Screening Tool
19
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Measurement System Evaluation - using tool
Measurement System Evaluation
Site/ASM Accuracy rate (%) Items Y rated N Items N rated Y
Tianjin ECC 92.3 Q9 Q8
Xiamen (CH28) 96.2 Q12
Shengzhen 88.5 Q12, Q15, Q9
Maxon (WGQ), ECC 96.2 Q20
Suzhou Aero 92.3 Q2, Q16
Tianjin HPS 100
Zhongshan 100
Average 95.1 Most freq. errors: Q9, Q12
20
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Process Control Plan
Project: PSM Applicability Screening to determine covered processesCore Team: APAC ASMs Date (Orig): 9/9/2014
Key Contact: Xiaoming Zeng, Steven Eason
Date (Rev):
Process ProcessStep
Potential
Failure Mode
Potential
Failure Effects
ProcessSpecification
Measurement
Technique
Sample
Size
Sample
Frequency
Control
Method
Reaction
Plan
PSM Applicability
Screening to determine
covered processes
Using the
screening tool &
having record
reviewed and
archived
unidentified
process safety
risks
Safety incident
Reported
All sites shall comply with
corp. standard
HSEMS805 and its tool
and record sheet
internal audit All One
HON sites
annually and
relevant
process
changes
MOC review,
PSM audit
and SAT
Create
action plan
to address
audit
findings.
21
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
Documentation
• Project Charter:
• Green Belt Tools:
Microsoft Office
Word Document
Microsoft Office
Excel 97-2003 Worksheet
22
Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate templateSteven Bonacorsi
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Anand Subramaniam
 
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian BealeFailure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian BealeAdrian Beale
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationInnovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationGovind Ramu
 
Failure mode and effects analysis
Failure mode and effects analysisFailure mode and effects analysis
Failure mode and effects analysisDeep parmar
 
What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2Jitesh Gaurav
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisECC International
 
FAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSISFAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSISANOOPA NARAYANAN
 
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...Yasser Sami Abdel Dayem Amer
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMDr.Raja R
 

Was ist angesagt? (20)

Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
Design fmea
Design fmeaDesign fmea
Design fmea
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Process F.M.E.A
Process F.M.E.AProcess F.M.E.A
Process F.M.E.A
 
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian BealeFailure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
Failure Mode and Effects Analysis WithAdrian™ FMEA 2013 Adrian Beale
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationInnovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
 
Failure mode and effects analysis
Failure mode and effects analysisFailure mode and effects analysis
Failure mode and effects analysis
 
Failure mode and effect analysis
Failure mode and effect analysisFailure mode and effect analysis
Failure mode and effect analysis
 
PFMEA
PFMEA PFMEA
PFMEA
 
What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
FMEA
FMEAFMEA
FMEA
 
Fmea
FmeaFmea
Fmea
 
Fmea
FmeaFmea
Fmea
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
FAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSISFAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSIS
 
CAPA: A Risk Mitigating Quality System
CAPA: A Risk Mitigating Quality SystemCAPA: A Risk Mitigating Quality System
CAPA: A Risk Mitigating Quality System
 
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
FAILURE MODE AND EFFECT ANALYSIS (FMEA) FOR IMPLEMENTATION OF CLINICAL PRACTI...
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
 

Ähnlich wie PSM Project GB Presentation zxm

How to manage your testing automation project ttm methodology
How to manage your testing automation project   ttm methodologyHow to manage your testing automation project   ttm methodology
How to manage your testing automation project ttm methodologyRam Yonish
 
Six sigma,SIPOC, Fact based decison making
Six sigma,SIPOC, Fact based decison makingSix sigma,SIPOC, Fact based decison making
Six sigma,SIPOC, Fact based decison makingsadia butt
 
UAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateUAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateThinksoft Global
 
expoQA15_Ard Kramer
expoQA15_Ard KramerexpoQA15_Ard Kramer
expoQA15_Ard KramerArd Kramer
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
Project qulaity initiative report
Project qulaity  initiative reportProject qulaity  initiative report
Project qulaity initiative reportAbdullaHaneefa
 
5 project commissioning best practices for you to consider
5 project commissioning best practices for you to consider5 project commissioning best practices for you to consider
5 project commissioning best practices for you to considerOlivia Wilson
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Skillogic Solutions
 
Are my RCM Analysts effective?
Are my RCM Analysts effective?Are my RCM Analysts effective?
Are my RCM Analysts effective?Daryl Mather
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptFailure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptMadan Karki
 
Harpreet Singh-Resume-QA
Harpreet Singh-Resume-QAHarpreet Singh-Resume-QA
Harpreet Singh-Resume-QAHarpreet Singh
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJ. García - Verdugo
 

Ähnlich wie PSM Project GB Presentation zxm (20)

How to manage your testing automation project ttm methodology
How to manage your testing automation project   ttm methodologyHow to manage your testing automation project   ttm methodology
How to manage your testing automation project ttm methodology
 
Six sigma,SIPOC, Fact based decison making
Six sigma,SIPOC, Fact based decison makingSix sigma,SIPOC, Fact based decison making
Six sigma,SIPOC, Fact based decison making
 
UAT for a Major US Banking Conglomerate
UAT for a Major US Banking ConglomerateUAT for a Major US Banking Conglomerate
UAT for a Major US Banking Conglomerate
 
expoQA15_Ard Kramer
expoQA15_Ard KramerexpoQA15_Ard Kramer
expoQA15_Ard Kramer
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
Project qulaity initiative report
Project qulaity  initiative reportProject qulaity  initiative report
Project qulaity initiative report
 
5 project commissioning best practices for you to consider
5 project commissioning best practices for you to consider5 project commissioning best practices for you to consider
5 project commissioning best practices for you to consider
 
PBS Resume
PBS ResumePBS Resume
PBS Resume
 
Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7Six Sigma Green Belt Training Part 7
Six Sigma Green Belt Training Part 7
 
FAQs on Billings and Project Milestones
FAQs on Billings and Project MilestonesFAQs on Billings and Project Milestones
FAQs on Billings and Project Milestones
 
Are my RCM Analysts effective?
Are my RCM Analysts effective?Are my RCM Analysts effective?
Are my RCM Analysts effective?
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
RKMILLER_PI-BA_7-16
RKMILLER_PI-BA_7-16RKMILLER_PI-BA_7-16
RKMILLER_PI-BA_7-16
 
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.pptFailure Modes FMEA-&-Measurement_Systems_Analysis.ppt
Failure Modes FMEA-&-Measurement_Systems_Analysis.ppt
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
 
Harpreet Singh-Resume-QA
Harpreet Singh-Resume-QAHarpreet Singh-Resume-QA
Harpreet Singh-Resume-QA
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control PlanJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Control Plan
 
S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 

PSM Project GB Presentation zxm

  • 1. This presentation is for planning and study purposes only. Proposals and options contained herein are subject to review, approval and any legally required notice, collective bargaining and consultation obligations. Improve Identification of PSM Covered Processes GBPL: XiaoMing Zeng Corp. HSE, APAC 2014 Status: Certified
  • 2. 2 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements.
  • 3. 3 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Project Charter Element Project Information 0. Project Title Improve Identification of PSM Covered Processes 1. Area of Focus or Function: PSM, Corp. HSE; Scope: Geographically APAC One-HON sites where with ASM supports; Operating modes of existing assets and acquired assets including JVs where HON has operational control; Business scope includes all SBGs (including TS for confirmation); 2. Problem Statement Some SBG do not recognize PSM covered processes on their facilities, esp. those outside of PMT manufacturing sites. Thus Process Safety is not managed in a consistent and effective way on those sites missing the identification. Examples include the Tier 1 PS incident Event ID: 398014 with root causes identified as not PSM covered process. 3. Benefit to Customers: The customers of this project include those SBG leaders, SBG site leaders, Site HSE leaders and the impacted personnel with PSM covered processes. By using a screening tool to determine the covered processes, adequate PSM support and resources can be allocated to those covered processes and PSM performance can be improved. Adequate PSM system if identified for the covered processes will reduce the likelihood and loses of PS events. 4. Project Metrics: Metrics: Baseline Goal Entitlement Units Rate (Successful Id of PSM applicability) Not currently measured 90% Goal % Coverage (Screening sites in the region) Not currently measured 100% Goal % 5. Business Impact Improve PSM performance on non-PMT sites and reduce potential process safety injuries and property loses. Improve SBUs meeting corporate HSE values. Some Good Industrial Practices from PMT can be shared across all other SBGs. 6. Team Members 7. Team Resources APAC ASMs, Allen Wang (PMT PS), Site HSE leaders, Steven Eason, Toni Wenzel (PMT PS); Kent Hart (M&A); Tony Aguilera (AERO) 8. Timing: 6 months (after due training, Dec. 24, 2014)
  • 4. 4 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Green Belt Tools • Tools Utilized - Six Sigma Project Charter - Thought Process Map - SIPOC - Failure Modes Effects Analysis (FMEA) - Process Map - Control Plan
  • 5. 5 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. SIPOC: Process Definition Apply Screening Std/ tool Collect PSI Document screening result D M A I C
  • 6. 6 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. SIPOC D M A I C
  • 7. 7 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. SIPOC D M A I C
  • 8. 8 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. SIPOC D M A I C
  • 9. 9 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Thought Process Map D M A I C
  • 10. 10 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Thought Process Map D M A I C
  • 11. 11 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Thought Process Map D M A I C
  • 12. 12 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Next steps… • Xiaoming presented a 2-hr training to ASMs on PMTHSE805, how to screen and document the results by early May. • ASMs did process screening using PMTHSE805 std, 1~2 processes/site/ASM by June. • Xiaoming reviewed the screening results from all ASMs by June.
  • 13. 13 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Measurement System Evaluation
  • 14. 14 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Measurement System Evaluation
  • 15. 15 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Measurement System Evaluation – Phase 1 Site/ASM Accuracy rate (%) Items Y rated N Items N rated Y SHAero 84.6 Q19, Q20, Q23, Q24 NA NT 69.2 Q5, Q6 Q9, Q12, Q19, Q20, Q24, Q25 CS 88.5 Q5, Q13, Q23 NA LY 84.6 Q5, Q13, Q14, Q26 NA GZ 84.6 Q2 Q15, Q16, Q26 XA 76.9 Q16, Q23 Q5, Q8, Q13, Q24 Average 81.4 Most freq. errors: Q5, Q13, Q23, Q24
  • 16. 16 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. FMEA:
  • 17. 17 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. The Work Process
  • 18. 18 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Improvement – Develop Screening Tool
  • 19. 19 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Measurement System Evaluation - using tool Measurement System Evaluation Site/ASM Accuracy rate (%) Items Y rated N Items N rated Y Tianjin ECC 92.3 Q9 Q8 Xiamen (CH28) 96.2 Q12 Shengzhen 88.5 Q12, Q15, Q9 Maxon (WGQ), ECC 96.2 Q20 Suzhou Aero 92.3 Q2, Q16 Tianjin HPS 100 Zhongshan 100 Average 95.1 Most freq. errors: Q9, Q12
  • 20. 20 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Process Control Plan Project: PSM Applicability Screening to determine covered processesCore Team: APAC ASMs Date (Orig): 9/9/2014 Key Contact: Xiaoming Zeng, Steven Eason Date (Rev): Process ProcessStep Potential Failure Mode Potential Failure Effects ProcessSpecification Measurement Technique Sample Size Sample Frequency Control Method Reaction Plan PSM Applicability Screening to determine covered processes Using the screening tool & having record reviewed and archived unidentified process safety risks Safety incident Reported All sites shall comply with corp. standard HSEMS805 and its tool and record sheet internal audit All One HON sites annually and relevant process changes MOC review, PSM audit and SAT Create action plan to address audit findings.
  • 21. 21 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. Documentation • Project Charter: • Green Belt Tools: Microsoft Office Word Document Microsoft Office Excel 97-2003 Worksheet
  • 22. 22 Preliminary – not final – no decision will be taken without satisfaction of any applicable consultation or negotiation requirements. THANK YOU