Proposed Pilot 2 Dryer Door
Glass Sub Assembly
Change
Wesley Roberts - 8/22/2016
Parts Effected by Proposed Chang
• Dryer Glass M00622943 (Light Blue)
• Dryer Seal M0063199 (Purple)
• Current Dryer Metal Ring
M0062288/009 (Red)
• New Dryer Metal Ring M0062288/010
(Blue)
8/22/2016 2
Current Production
• Original assembly required the gasket to go
around the glass then be stretched under the
ring.
• Currently the gap between the metal ring and the
gasket is .12mm.
• Assembly of the gasket to the metal ring takes
~5 minutes and is difficult, requiring an adhesive
to keep the gasket in place.
• The door can be faulty because the adhesive
bulges underneath the gasket. This causes the
gasket to be different heights around the ring.
8/22/2016 3
Proposals for Change
• Increase the inside diameter of the metal
ring by 5.0 mm. The gap between the
metal ring is 5.12 mm
• The gasket can be successfully be
assembled to the door with out an
adhesive.
• Assembly of the gasket to the glass can be
achieved in < 1 minute.
• Two mock up dryer doors are currently
assembled. One is mounted to a Pilot 2
MLT dryer in the validation lab.
8/22/2016 4
Proposals for Change
• Increase the shoulder length of the gasket by
2.5mm
• No mock up has been assembled
• New seals can be ordered and be here in
a weeks time.
• Assembly time should be shortened because
of longer seal.
• Seal may interfere with gap filler on front
panel, causing the door not to close.
• The distance between gap
filler and seal is 2.8mm
8/22/2016 5
Gasket
shoulder
length
2.5mm
longer
Larger Diameter Ring Assembled
Seal Around Glass Seal, Glass and Ring Assembled
8/22/2016 6
Larger Diameter Ring Assembled
8/22/2016 7
Close up of Assembly Full assembly
Next Steps
• Testing
- Open Force, Close Force, and Child Safety
- Open Force and Close Force was tested on one door. Open Force average is 9.76
lbs. Close force average is 10.58 lbs.
- MLT and CLT testing (the effects of wear on the seal)
- DOE testing (see if the gasket has any effects on the heater cycling)
8/22/2016 8
• Cost associated with changes
- Get quotes from Tool makers

Weitere ähnliche Inhalte

Was ist angesagt?

Specimen holder for polishing machines
Specimen  holder for polishing machines Specimen  holder for polishing machines
Specimen holder for polishing machines BETSYDEVASIA
 
Squeeze Forming or Squeeze Casting Process
Squeeze Forming or Squeeze Casting ProcessSqueeze Forming or Squeeze Casting Process
Squeeze Forming or Squeeze Casting Processabhijeet saxena
 
Shell moulding casting technology
Shell moulding   casting technologyShell moulding   casting technology
Shell moulding casting technologyHarsh Joshi
 
CRG - Ceramic Rotary Discharging Valve
CRG - Ceramic Rotary Discharging ValveCRG - Ceramic Rotary Discharging Valve
CRG - Ceramic Rotary Discharging ValveJason Cui
 
Orange_ppt-20160516
Orange_ppt-20160516Orange_ppt-20160516
Orange_ppt-20160516Wang Jordan
 
Shell moulding and investment casting
Shell moulding and investment castingShell moulding and investment casting
Shell moulding and investment castingkhurb
 
Manufactring technology
Manufactring technologyManufactring technology
Manufactring technologysamsul hak
 
Features during casting process of fused cast azs block
Features during casting process of fused cast azs blockFeatures during casting process of fused cast azs block
Features during casting process of fused cast azs blocksunrise refractory
 
Ball mill end cover_ball mill head
Ball mill end cover_ball mill headBall mill end cover_ball mill head
Ball mill end cover_ball mill headIris Han
 
What to do if the mold hardness is not enough -dgmf mold clamps co., ltd
What to do if the mold hardness is not enough -dgmf mold clamps co., ltdWhat to do if the mold hardness is not enough -dgmf mold clamps co., ltd
What to do if the mold hardness is not enough -dgmf mold clamps co., ltdJasmineHL
 

Was ist angesagt? (20)

Specimen holder for polishing machines
Specimen  holder for polishing machines Specimen  holder for polishing machines
Specimen holder for polishing machines
 
Squeeze Forming or Squeeze Casting Process
Squeeze Forming or Squeeze Casting ProcessSqueeze Forming or Squeeze Casting Process
Squeeze Forming or Squeeze Casting Process
 
Shell moulding casting technology
Shell moulding   casting technologyShell moulding   casting technology
Shell moulding casting technology
 
CRG - Ceramic Rotary Discharging Valve
CRG - Ceramic Rotary Discharging ValveCRG - Ceramic Rotary Discharging Valve
CRG - Ceramic Rotary Discharging Valve
 
Orange_ppt-20160516
Orange_ppt-20160516Orange_ppt-20160516
Orange_ppt-20160516
 
Squeeze casting
Squeeze castingSqueeze casting
Squeeze casting
 
C2 casting
C2 castingC2 casting
C2 casting
 
Shell moulding and investment casting
Shell moulding and investment castingShell moulding and investment casting
Shell moulding and investment casting
 
shell moulding
shell mouldingshell moulding
shell moulding
 
Gating system
Gating systemGating system
Gating system
 
Squeeze casting
Squeeze castingSqueeze casting
Squeeze casting
 
Manufactring technology
Manufactring technologyManufactring technology
Manufactring technology
 
Centrifugal casting
Centrifugal    castingCentrifugal    casting
Centrifugal casting
 
Hari ppt
Hari pptHari ppt
Hari ppt
 
Features during casting process of fused cast azs block
Features during casting process of fused cast azs blockFeatures during casting process of fused cast azs block
Features during casting process of fused cast azs block
 
Centrifugal casting 1
Centrifugal casting 1Centrifugal casting 1
Centrifugal casting 1
 
Permenant moulding methods
Permenant moulding methodsPermenant moulding methods
Permenant moulding methods
 
Continuous Casting Steel
Continuous Casting SteelContinuous Casting Steel
Continuous Casting Steel
 
Ball mill end cover_ball mill head
Ball mill end cover_ball mill headBall mill end cover_ball mill head
Ball mill end cover_ball mill head
 
What to do if the mold hardness is not enough -dgmf mold clamps co., ltd
What to do if the mold hardness is not enough -dgmf mold clamps co., ltdWhat to do if the mold hardness is not enough -dgmf mold clamps co., ltd
What to do if the mold hardness is not enough -dgmf mold clamps co., ltd
 

Ähnlich wie Proposed Pilot 2 Dryer Door Glass Sub Assembly

Insulating Glazing Unit Failures - Lessons From an All Glass Tower
Insulating Glazing Unit Failures - Lessons From an All Glass TowerInsulating Glazing Unit Failures - Lessons From an All Glass Tower
Insulating Glazing Unit Failures - Lessons From an All Glass TowerGraham Finch
 
Bonding and debonding in orthodontics
Bonding and debonding in orthodonticsBonding and debonding in orthodontics
Bonding and debonding in orthodonticsDr.Aisha Khoja
 
Epoxy Coating For Steel Rebar
Epoxy Coating For Steel RebarEpoxy Coating For Steel Rebar
Epoxy Coating For Steel RebarMECandPMV
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazingDanishPathan7
 
New developments in construction technology
New developments in construction technologyNew developments in construction technology
New developments in construction technologyGAW Consultants
 
How to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputHow to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputMargaret Harrison
 
Nilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesNilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesraymondmouw
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012Mouli Edla
 
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...IRJET Journal
 
Jeremias prefab modular systems vs traditional exhaust piping
Jeremias prefab modular systems vs traditional exhaust pipingJeremias prefab modular systems vs traditional exhaust piping
Jeremias prefab modular systems vs traditional exhaust pipingRoberto Gutierrez
 
Insulation to seal the air duct
Insulation to seal the air ductInsulation to seal the air duct
Insulation to seal the air ductlee shin
 
Journal Club Presentationn 3 Cement.pptx
Journal Club Presentationn 3 Cement.pptxJournal Club Presentationn 3 Cement.pptx
Journal Club Presentationn 3 Cement.pptxHafizAli86
 
Rotary Sealing for Improved Downhole Equipment Performance
Rotary Sealing for Improved Downhole Equipment PerformanceRotary Sealing for Improved Downhole Equipment Performance
Rotary Sealing for Improved Downhole Equipment PerformanceBSEmarketing
 
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...Design World
 
IRJET- Construction of Hollow Reinforced Concrete Block
IRJET- Construction of Hollow Reinforced Concrete BlockIRJET- Construction of Hollow Reinforced Concrete Block
IRJET- Construction of Hollow Reinforced Concrete BlockIRJET Journal
 
Awwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsAwwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsVaradaraj Ck
 
Bone anchored pendulum appliance. (2)
Bone anchored pendulum appliance. (2)Bone anchored pendulum appliance. (2)
Bone anchored pendulum appliance. (2)Indian dental academy
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10SmarterHomeGuide
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 newTom Ray
 

Ähnlich wie Proposed Pilot 2 Dryer Door Glass Sub Assembly (20)

Insulating Glazing Unit Failures - Lessons From an All Glass Tower
Insulating Glazing Unit Failures - Lessons From an All Glass TowerInsulating Glazing Unit Failures - Lessons From an All Glass Tower
Insulating Glazing Unit Failures - Lessons From an All Glass Tower
 
Bonding and debonding in orthodontics
Bonding and debonding in orthodonticsBonding and debonding in orthodontics
Bonding and debonding in orthodontics
 
Epoxy Coating For Steel Rebar
Epoxy Coating For Steel RebarEpoxy Coating For Steel Rebar
Epoxy Coating For Steel Rebar
 
Stick framing system with glazing
Stick framing system with glazingStick framing system with glazing
Stick framing system with glazing
 
New developments in construction technology
New developments in construction technologyNew developments in construction technology
New developments in construction technology
 
How to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase OutputHow to Improve Steam Turbine Head Rate and Increase Output
How to Improve Steam Turbine Head Rate and Increase Output
 
Nilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valvesNilcra Zirconia ceramic for severe service pumps and valves
Nilcra Zirconia ceramic for severe service pumps and valves
 
Gasket hand book 2012
Gasket hand book 2012Gasket hand book 2012
Gasket hand book 2012
 
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...
IRJET- Experimental Study on Mesh Confined Concrete Subjected to High Tempera...
 
Jeremias prefab modular systems vs traditional exhaust piping
Jeremias prefab modular systems vs traditional exhaust pipingJeremias prefab modular systems vs traditional exhaust piping
Jeremias prefab modular systems vs traditional exhaust piping
 
Insulation to seal the air duct
Insulation to seal the air ductInsulation to seal the air duct
Insulation to seal the air duct
 
Journal Club Presentationn 3 Cement.pptx
Journal Club Presentationn 3 Cement.pptxJournal Club Presentationn 3 Cement.pptx
Journal Club Presentationn 3 Cement.pptx
 
Corium q&amp;a 2020
Corium q&amp;a 2020Corium q&amp;a 2020
Corium q&amp;a 2020
 
Rotary Sealing for Improved Downhole Equipment Performance
Rotary Sealing for Improved Downhole Equipment PerformanceRotary Sealing for Improved Downhole Equipment Performance
Rotary Sealing for Improved Downhole Equipment Performance
 
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...
How to Eliminate Mechanical, Vibrational Loosening, Clampload & Corrosion Fai...
 
IRJET- Construction of Hollow Reinforced Concrete Block
IRJET- Construction of Hollow Reinforced Concrete BlockIRJET- Construction of Hollow Reinforced Concrete Block
IRJET- Construction of Hollow Reinforced Concrete Block
 
Awwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williamsAwwa 102 painting sherwyn williams
Awwa 102 painting sherwyn williams
 
Bone anchored pendulum appliance. (2)
Bone anchored pendulum appliance. (2)Bone anchored pendulum appliance. (2)
Bone anchored pendulum appliance. (2)
 
Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10Der bindley 200 dpi_03-01-10
Der bindley 200 dpi_03-01-10
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 new
 

Proposed Pilot 2 Dryer Door Glass Sub Assembly

  • 1. Proposed Pilot 2 Dryer Door Glass Sub Assembly Change Wesley Roberts - 8/22/2016
  • 2. Parts Effected by Proposed Chang • Dryer Glass M00622943 (Light Blue) • Dryer Seal M0063199 (Purple) • Current Dryer Metal Ring M0062288/009 (Red) • New Dryer Metal Ring M0062288/010 (Blue) 8/22/2016 2
  • 3. Current Production • Original assembly required the gasket to go around the glass then be stretched under the ring. • Currently the gap between the metal ring and the gasket is .12mm. • Assembly of the gasket to the metal ring takes ~5 minutes and is difficult, requiring an adhesive to keep the gasket in place. • The door can be faulty because the adhesive bulges underneath the gasket. This causes the gasket to be different heights around the ring. 8/22/2016 3
  • 4. Proposals for Change • Increase the inside diameter of the metal ring by 5.0 mm. The gap between the metal ring is 5.12 mm • The gasket can be successfully be assembled to the door with out an adhesive. • Assembly of the gasket to the glass can be achieved in < 1 minute. • Two mock up dryer doors are currently assembled. One is mounted to a Pilot 2 MLT dryer in the validation lab. 8/22/2016 4
  • 5. Proposals for Change • Increase the shoulder length of the gasket by 2.5mm • No mock up has been assembled • New seals can be ordered and be here in a weeks time. • Assembly time should be shortened because of longer seal. • Seal may interfere with gap filler on front panel, causing the door not to close. • The distance between gap filler and seal is 2.8mm 8/22/2016 5 Gasket shoulder length 2.5mm longer
  • 6. Larger Diameter Ring Assembled Seal Around Glass Seal, Glass and Ring Assembled 8/22/2016 6
  • 7. Larger Diameter Ring Assembled 8/22/2016 7 Close up of Assembly Full assembly
  • 8. Next Steps • Testing - Open Force, Close Force, and Child Safety - Open Force and Close Force was tested on one door. Open Force average is 9.76 lbs. Close force average is 10.58 lbs. - MLT and CLT testing (the effects of wear on the seal) - DOE testing (see if the gasket has any effects on the heater cycling) 8/22/2016 8 • Cost associated with changes - Get quotes from Tool makers