Project: PV Carpark Jeddah, Saudi Arabia
“The largest transparent PV-Carpark in the world”
Power output approx. 3.432 MW
Partially transparent Almaden
Poly Module P60-260 Wp
Preliminary draft and cost calculation
Almaden Europe GmbH
Hanauerstr. 1 - 80992 Munich, Germany
Phone. +49 (89) 2196 3215 – info@almaden-europe.com
Carports System Jeddah 9/2/15 2
Contents
............................................................................................................................................................................... 3
1. The Project “Solar Carport”................................................................................................................................ 4
1.1 Future Industry ............................................................................................................................................. 4
1.2 Location........................................................................................................................................................ 4
2. Concept of construction ..................................................................................................................................... 5
2.1 Steel supporting structure ............................................................................................................................ 5
2.2 PV Roof Construction.................................................................................................................................... 6
2.3 PV – Modules................................................................................................................................................ 7
2.4 Made in Dubai: The first world Modules ...................................................................................................... 8
2.5 Specification of the modules ...................................................................................................................... 10
2.6 Inverters ..................................................................................................................................................... 11
3. Carpark system Jeddah..................................................................................................................................... 12
3.1 Arrangement on existing parking area....................................................................................................... 12
3.2 Schematic representation of PV carport system Jeddah ............................................................................ 12
................................................................................................................................................................................. 12
3.3 Cost and yield Calculation of the PV carport system Jeddah...................................................................... 13
4. PV Sol calculation of the PV Carport system..................................................................................................... 15
Carports System Jeddah 9/2/15 3
0
20
40
60
80
100
120
140
160
180
200
220
240
kWh/mÂČ
Feb Apr Jun Aug Oct Dec
Time Period 1. 1. - 31.12.
Irradiation onto Tilted Surface 2.258 kWh/mÂČ
At a glance:
Location: The solar carpark is located in the King Abdulaziz University “KAU” campus in Jeddah
– Saudi Arabia. This is a large parking area for about 880 cars.
Field: The plan is to build and operate photovoltaic systems in form of solar carports with a total
size of 125 x 208 m. The total power output is about 3.432 MWp.
Production and Consumption: According to the professional photovoltaic analysis software PV
SOL 6.0, the annual yield of the PV system is about 5.491 MWh.
The purpose of this project is the production of electricity which is used:
 To power part of the air conditioners of the university
 to power 480 pieces of 15W LED lamps to illuminate the parking areas
 to power as many as possible 120W LED street lights on 8m poles
Runtime/ Warranty: At the selection of the components and the suppliers, we assumed a
runtime of at least 30 years. Shorter standard warranty periods may be extended with a
surcharge.
Radiation: The average annual sum of global radiation in Jeddah is about 2258 kWh / mÂČ / p.a.
The actual radiation on the south and north to 5° inclined surface was determined with the
professional planning program PV Sol 6.0, which takes shading in consideration; and the actual
radiation is also based on the calculation of annual yield.
Seasonal radiation value: In comparison to a south-south orientation, the chosen north-south
orientation allows a larger consistency during different seasons of a year.
Picture 1: Simulation of the radiation value in Jeddah (in kWh per month)
Carports System Jeddah 9/2/15 4
1. The Project “Solar Carport”
1.1 Future Industry
Photovoltaic is a proven technology for decades, the systems are largely maintenance-free and
extremely reliable. Photovoltaic is a key technology of the 21st century.
1.2 Location
The solar park will be built on a large parking area with 125 x 208 m in the King Abdulaziz
University “KAU” campus of Jeddah. As it can be seen in the following picture, the complete
area is totally free of shading:
Picture 2: Location of the parking area in Jeddah
Carports System Jeddah 9/2/15 5
2. Concept of construction
2.1 Steel supporting structure
Acording to the size of this parking area as well as the special requirement, we suggest our
proven steel supporting structure which could cover the whole parking area. Each park space is
about 5.5 meter deep, 3 meter high, and about 6 meter long , the passage way is about 7 meter
width. Between each field there is 1 meter empty space for modules cleaining. The support
profiles are assembeld in the back side in order to facilitate the entering and exiting of the
vehicles.
Picture 3: Steel supporting structure
Carports System Jeddah 9/2/15 6
2.2 PV Roof Construction
Our individual construction can be assembled to almost size. For this project we use a PV roof
segment as the following view from above, each segement has 60 pieces of mouldes, 15.6 KWp
power output. For the total area we need 220 segments, the whole power out put is 3.432
MWp.
Picture 4: PV roof constructions
Carports System Jeddah 9/2/15 7
2.3 PV – Modules
Especially for the hot climate in Jeddah we choose Almaden Desert modules P60-260Wp with
the following outstanding features:
 Desert modules work at temperatures up to 125°C where other panels fail
 Produce more power at hot temperatures
 30 year limited power output warranty
 Lightweight, 12kg mÂČ
 Extreme durability through Hi-Tec hardening processes
 Highest wind load> 2400 Pa
Hot and humid climate:
Is a special threat to modules. A chemical reaction with most foils like EVA takes place and as a
result citric acid builds up. Consequently, the temperature rises and the acid boils, which
destroys the modules over months and years. Almaden established a unique technique in order
to oppose these threats and protect the cells.
Desert climate:
Desert areas include very high temperatures of up to 85°C in the inside of the module.
Temperatures change in fast cycles. In many cases the material doesn‘t withstand these
changes over its lifespan of 30 – 50 years. As a result, Almaden modules loose very little power
compared to other cells.
Picture 6: Highlights of the glass - glass modules
Carports System Jeddah 9/2/15 8
2.4 Made in Dubai: The first world Modules
Why are Almaden Modules more suitable than standard Modules?
Standard Modules are not suitable for desert climate
Standard PV modules are made for regions with a moderate climate. They usually are made of
one sheet of glass at the front side and a plastic sheet on the rear side.
All tests e.g. from TUV are based on Standard Test Conditions (STC) which were developed in
Germany more than 30 years ago and were therefore based on moderate weather conditions
such as those found in Germany. Although the module temperature is above 25° C in most
countries around the world, the tests are still based on this low temperature. Other test
procedures include hail and snow loads, weather conditions which are rarely found in most
countries. The resistance to sandstorms, very high temperatures and other weather conditions
found in desert areas are not tested at all.
Special Almaden Solar Glass for Desert Modules
Almaden – a world market leader of Premium Solar Glass - has been working on special
technologies for glass suitable for very rough climates with high temperatures for more than 10
years. This Premium glass is used for both sides of the Almaden desert modules. These
ALMADEN DESERT MODULESÂź are produced in Silicon OasisÂź in Dubai and also tested in the
new DEWA (Dubai Electricity and Water Authority) test facility.
Here in the desert people know best how to produce this superior quality which will be also
tested in the region.
Almaden Desert Modules: Better performance & no failure in damp-heat tests
A damp heat test is part of simulating how panels age. This damp-heat test increases the
temperature to 85°C in combination with humidity of 85%. This process simulates 20 years’ time
when the test is performed over 4,000 hours. As seen in the graph standard modules with
plastic back sheet start to fail after 1,000 hours (simulating a period of only 16 years). Almaden
panels can easily survive 4,000 hours in a damp heat test without any problems. This means
that even in desert regions we can guarantee lifetimes of more than 30 years thus creating a
huge financial advantage of more than 30 % (after considering the slightly higher costs).
Carports System Jeddah 9/2/15 9
Not only are the power benefit and the longer lifetime major advantages of the Desert
technology, but also the fact that these panels can be used in regions where other panels simply
will not work. Almaden Desert ModulesŸ work at temperatures up to 125°C where other
panels fail.
More power when it’s hot
The hotter the cell the less power comes from the panel. Because we know that every watt
counts, we have developed a module and cell that will generate more wattage at the same
nominal power. Normal PV panels have a temperature coefficient of about -0.5%/°C. Our
specially optimized cells improve this coefficient by approx. 15 %, which leads to improved
power generation. The result is shown in the graph below: A power benefit results which will
increase with each degree of heat.
Picture 8: Almaden Desert Modules produce more power when itÂŽs hot
Almaden Desert ModuleÂź
Picture 7: Damp-Heat comparison test (85°C/85% humidity)
Carports System Jeddah 9/2/15 10
2.5 Specification of the modules
The module consists of 60 polycrystalline solar cells. These provide the following data:
The module has the following certifications:
Picture 4: Certifications of the module
Picture 9: P 60 Module
Carports System Jeddah 9/2/15 11
2.6 Inverters
In order to feed the generated direct current (DC) by the solar modules into the grid of the local
utility company or to use them in the won electricity network, the DC must be converted by an
inverter into grid-compliant alternating current (AC). Choosing a system specifically designed for
large-scale systems is critical to the performance of a plant under different light conditions as
well as their availability. Regarding the transformation of the electricity current from DC to AC.
For the total power of the project, we suggest to use 2 stations, one on each side of the carpark.
This reduces the length of the cables and the less of the power. Below we present you one
station of a central inverter system:
Bonfiglioli’s RPS Station “ICON 20 3 ND” provides a new powerful turnkey solution for
complete management of a photovoltaic field up to 1.7 kVA. The station is designed for an easy
transportation and a quick installation. Thanks to a cabin temperature control system and
innovative dust filters, the station is suitable for use in extreme environmental conditions all
around the world. To meet a large PV power plant’s demanded capacity; several RPS stations
ICON 20 3ND can be combined. The RPS Station ICON 20 3 ND is suited to integrate up to four
Bonfiglioli Endurance inverter systems (RPS ND) into 20 ft. high-cube (HQ) container based on
ISO construction standard. The RPS Station ICON 20 3 ND is suited to integrate up to three
Bonfiglioli Endurance inverter systems (RPS ND) into 20 ft. high-cube (HQ) container based on
ISO construction standard. The RPS ND are centralized inverters and working by two systems in
Master-Slave configuration. Besides the inverters the stations are equipped with DC cabinets
including the fuse protected of connection of PV array, an UPS and an auxiliary transformer. All
the devices are anchored and placed in order to guarantee the maximum stability and
accessibility of the structure. The RPS station “ICON 20 3ND” requires a medium voltage
transformer (two windings on the secondary) and MV switchgear to be installed outside the
station.
The benefits at a glance:
 Plug & Play solution up to 1.72 MVA
 professional and flexible Customer
 High system efficiency
 Modular and serviceable system
 Powerful and compact wall mounted boilers
 Forced air ventilation system with pre-filtering, thus reduced maintenance
 Global services and support during the whole life-cycle.
Remark: The inverters included in this calculation are intended for reference only. Depending on
the client’s requirements, the inverters can be replaced accordingly.
Carports System Jeddah 9/2/15 12
3. Carpark system Jeddah
3.1 Arrangement on existing parking area
Picture 5: Arrangement on existing parking area, Jeddah
3.2 Schematic representation of PV carport system Jeddah
Schematic presentation of our PV carpark:
2
2-Directions Passage w ay (1) (Width: 7 meters, 3.5 meters in Each Direction)
1
MAIN ROAD : ENTRANCE TO THE PARKING LOT
5
2-Directions Passage w ay (4)
4
2-Directions Passage w ay (3)
3
2-Directions Passage w ay (2)
8
2-Directions Passage w ay (7)
7
2-Directions Passage w ay (6)
6
2-Directions Passage w ay (5)
MAIN ROAD : ENTRANCE TO THE PARKING LOT
Rowsfrom1-to-12
12
2-Directions Passage w ay (11)
11
2-Directions Passage w ay (10)
10
2-Directions Passage w ay (9)
9
2-Directions Passage w ay (8)
Segments Parkingplace Length Width Area
Summe 220 880 125m 208m 26,000m
2
Picture 6: Schematic representation of the parking area, Jeddah for 880 parking spaces and 26,000 mÂČ
1
2
1
1
1
0
9
8
7
6
5
4
3
Rowsfrom1-to-12
2-Directions Passage w ay (11)
2-Directions Passage w ay (10)
2-Directions Passage w ay (9)
2-Directions Passage w ay (8)
2-Directions Passage w ay (7)
2-Directions Passage w ay (6)
2-Directions Passage w ay (5)
9 10 11 12
2-Directions Passage w ay (4)
2-Directions Passage w ay (3)
2-Directions Passage w ay (2)
1 2 3 4
2-Directions Passage w ay (1) (Width: 7 meters, 3.5 meters in Each Direction)
10 11 12 13 14
3 4 5
1 2 3 4 5 6 7 8 209 15 16 17 18 19
19 20
1 2 3 4 5 6 7 8
13 14 15 16 17 187 8 9 10 11 121 2
15 16 17
6
18 19 209 10 11 12 13 14
19 20
1 2 3 4 5 6
11 12 13 14 15 165 6 7 8 9 10
19 2014 15
1 2 3 4 5 6 7 8
13
10 11
16 17 187 8 9 10 11 12
17 18
1 2 3 4 5 6 7 8
137 8 9 10 11 121 2 3 4 5 6
9
209 10 11 12 13 14
19 2014 15 16 17 18
15 16 17 18 19 2012 13 14
20
15 16 17 18 19
1914 15 16 17 18137 8 9 10 11 121 2 3 4 5 6
19 20
1 2 3 4 5 6 7 8
13 14 15 16 17 18
15 16 17 18 19 209 10 14
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
11 12 13
7 8 9 10 11 121 2 3 4 5 6
209 10 11 12 13 14
19 2014 15 16 17 1813
15 16 17 18 19
19
16 17 18 19
10 11 121 2
15
3 4 5 6
11 12 13 14 15 16
20
1 2 3 4 5 6 7 8
13 14 15 16 17 187 8 9
1 2 3 4 5 6
209 10 11 12 13 14
1 2 3 4 5 6 7 8 209 10
19 2014 15 16 17 18
3 4 5 6 12
137 8 9 10 11 12
17 18 19
19 20
1 2 3 4 5 6 7 8
13 14 15 16 17 187 8 9 10 111 2
15 16 17 18 19 209 10 11 12 13 14
1 2 3 4 5 6 7 8
137 8 9 10 11 121 2 3 4 5 6
209 10 11 12 13 14
19 2014 15 16 17 18
15 16 17 18 19
16 17 18 1915 209 10 11 12 13 141 2 3 4 5 6 7 8
Carports System Jeddah 9/2/15 13
3.3 Cost and yield Calculation of the PV carport system Jeddah
The table below shows a calculation of the carpark structure as well as the modules and the
inverter system for the PV plant in Jeddah. Please note: This is a budget calculation only. The
final price will be adjusted according to the results of a detailed technical plan.
Type Unit price USD Discount
Price with discount
USD
Quantity Sum USD
Steel supporting structure 5909.7 20% 4727.76 220 1,040,107.20
Roof construction 5750 20% 4600 220 1,012,000.00
Sum I 2,052,107.20
Type Unit price USD Discount
Price with discount
USD
Quantity Sum USD
Desert Modules P 60 -260Wp 220.5 30% 154.35 13200 2,037,420.00
Inverter System (1.74 MWp) 240,000.00 10% 216,000.00 2 432,000.00
Power distribution equipment 360,000.00 10% 324,000.00 1 324,000.00
Monitoring equipment 50,000.00 10% 45,000.00 1 45,000.00
Cables budges and connection
boxes
80,000.00 10% 72,000.00 1 72,000.00
Environmental monitors 5,000.00 10% 4,500.00 1 4,500.00
Other and unforeseen
expenses
30,000.00 10% 27,000.00 1 27,000.00
Sum II 2,941,920.00
Total 4,994,027.20
The table below shows a calculation of cost / yield of the carports system in Jeddah. For the
calculation 13200 pieces of modules P 60-260W with power output 260 Wp are going to be
used. The total output for this parking lot is about 3.432 MW.
PV-Carport: Calculation - Costing/Yield 3.432 MW
Power Output each Module 260 Wp
Quantity of the Modules 13200
Total PV-Output 3.432 MW
Taking into account that the total radiation is 2258 kWh / mÂČ p.a. in Jeddah, the result of PV Sol
show that the total annual energy yield of the PV Carpark is 5,491,290 kWh. The produced
electricity shall be 100% in self-consumption. According to the requirement of the customer,
some power output will be used for 480 pieces of 15W LED lights, and also for 120W street
lights. Additionally, the generated electricity will be used to supply the air conditioning system
of the university.
Carports System Jeddah 9/2/15 14
For the own consumption, we have assumed an average value of electricity costs in Jeddah ($
0.18 per kWh). The potential revenues are calculated in the table below.
Global radiation location (Jeddah) 2,258 kWh/m2
p.a.
Annual Yield, PV-Sol, totally 5,491,290 KWh
Revenue from pot. electricity sales
Power consumption (0.18$ /Kwh) 988,432 USD
Total revenue p.a. (potential) 988,432 USD
Remarks:
 The annual energy yield depends on environmental conditions.
 Experiences show that solar radiation p due to climate change increases by about 0.5%
per year.
 The calculation is valid for the first year. After that, there is a degradation of
approximately 0.15-0.25% p.a. expected, which is, however, more than offset in recent
years by the increase in solar radiation.
 The calculation includes all of the required hardware except the transformer stations.
The installation is not included.
 Due to the size of this project, a technical planning is required (not included in this
calculation).
Carports System Jeddah 9/2/15 15
4. PV Sol calculation of the PV Carport system
Below is a schematic representation of the parking area with inverters:
Description: The parking area is divided into 12 rows with a total of 13200 modules. The
generated electricity is connected to the distribution network with a total of 5 inverters. These
inverters are connected to an electricity meter which is linked to a monitoring system.
Picture 7: Schematic representation of the parking area with inverters via the PV Sol program
Carports System Jeddah 9/2/15 16
5. Attachment:
Carports System Jeddah 9/2/15 17
1 m for cleanning

Weitere Àhnliche Inhalte

Was ist angesagt?

Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
Lovit Sawhney
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2
Will Gubb
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
Vijay Kannan
 
La présentation de Solel au 1er CleanTuesday sur Cleantech Republic
La présentation de Solel au 1er CleanTuesday sur Cleantech RepublicLa présentation de Solel au 1er CleanTuesday sur Cleantech Republic
La présentation de Solel au 1er CleanTuesday sur Cleantech Republic
Cleantech Republic
 

Was ist angesagt? (20)

Solar street light
Solar street lightSolar street light
Solar street light
 
Solar Catcher
Solar CatcherSolar Catcher
Solar Catcher
 
Photovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installationsPhotovoltaic Training - Session 6 - Off-grid installations
Photovoltaic Training - Session 6 - Off-grid installations
 
Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10
 
All in one solar street light catalog pad sereis
All in one solar street light  catalog pad sereisAll in one solar street light  catalog pad sereis
All in one solar street light catalog pad sereis
 
10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system10 kwp-solar-rooftop-system
10 kwp-solar-rooftop-system
 
Solar PV panels Sungen
Solar PV panels SungenSolar PV panels Sungen
Solar PV panels Sungen
 
Small residential stand alone roof top solar pv
Small residential stand alone roof top solar pvSmall residential stand alone roof top solar pv
Small residential stand alone roof top solar pv
 
Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
 
3. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 23. Soladi Buyers Guide FA 2
3. Soladi Buyers Guide FA 2
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019
 
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
Solar PV Panels And Invertors By Euro Solar System, Gandhinagar
 
Solar Power Plant cash flow model
Solar Power Plant cash flow model Solar Power Plant cash flow model
Solar Power Plant cash flow model
 
Presentation of cylinder solar_lighting-2021
Presentation of cylinder solar_lighting-2021Presentation of cylinder solar_lighting-2021
Presentation of cylinder solar_lighting-2021
 
Rajjjjjjjjj2222
Rajjjjjjjjj2222Rajjjjjjjjj2222
Rajjjjjjjjj2222
 
La présentation de Solel au 1er CleanTuesday sur Cleantech Republic
La présentation de Solel au 1er CleanTuesday sur Cleantech RepublicLa présentation de Solel au 1er CleanTuesday sur Cleantech Republic
La présentation de Solel au 1er CleanTuesday sur Cleantech Republic
 
Design & febrication of solar automated grass cutter
Design & febrication of solar automated grass cutterDesign & febrication of solar automated grass cutter
Design & febrication of solar automated grass cutter
 
VIKRAM SOLAR'S PRODUCTS & PERFORMANCE COMMITMENT
VIKRAM SOLAR'S PRODUCTS & PERFORMANCE COMMITMENTVIKRAM SOLAR'S PRODUCTS & PERFORMANCE COMMITMENT
VIKRAM SOLAR'S PRODUCTS & PERFORMANCE COMMITMENT
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham Gaurav
 

Andere mochten auch (12)

Image180314132455
Image180314132455Image180314132455
Image180314132455
 
Image180314132719
Image180314132719Image180314132719
Image180314132719
 
Letters of recommendation
Letters of recommendationLetters of recommendation
Letters of recommendation
 
Analisis tendencias pedagĂłgicas
Analisis tendencias pedagĂłgicasAnalisis tendencias pedagĂłgicas
Analisis tendencias pedagĂłgicas
 
PV-Solar-System-Flat-Roofs-1875kwp
PV-Solar-System-Flat-Roofs-1875kwpPV-Solar-System-Flat-Roofs-1875kwp
PV-Solar-System-Flat-Roofs-1875kwp
 
Aniversari de Joan (P3 B)
Aniversari de Joan (P3 B)Aniversari de Joan (P3 B)
Aniversari de Joan (P3 B)
 
àčàžȘàž‡àžàžŁàž°àžˆàžČàžą
àčàžȘàž‡àžàžŁàž°àžˆàžČàžąàčàžȘàž‡àžàžŁàž°àžˆàžČàžą
àčàžȘàž‡àžàžŁàž°àžˆàžČàžą
 
PĂșblic potencial
PĂșblic potencialPĂșblic potencial
PĂșblic potencial
 
TIK BAB 4 KELAS 9
TIK BAB 4 KELAS 9TIK BAB 4 KELAS 9
TIK BAB 4 KELAS 9
 
Bio2556
Bio2556Bio2556
Bio2556
 
Case Study: Pollution Solution Program
Case Study: Pollution Solution ProgramCase Study: Pollution Solution Program
Case Study: Pollution Solution Program
 
Bosch Solar PV Solution-2015
Bosch Solar PV Solution-2015Bosch Solar PV Solution-2015
Bosch Solar PV Solution-2015
 

Ähnlich wie Project Jeddah 01 09 2015

Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climates
sarah7887
 
Sunpreme Company Brochure
Sunpreme Company BrochureSunpreme Company Brochure
Sunpreme Company Brochure
Mike Kabealo
 
Presentation9 1-2011
Presentation9 1-2011Presentation9 1-2011
Presentation9 1-2011
Jack Wong
 
Suntellite PPT
Suntellite PPTSuntellite PPT
Suntellite PPT
Vivian Yao
 
EL Complete Group Presentation
EL Complete Group PresentationEL Complete Group Presentation
EL Complete Group Presentation
Sanjay kumar pandey
 

Ähnlich wie Project Jeddah 01 09 2015 (20)

Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climates
 
solar street light
solar street lightsolar street light
solar street light
 
Broschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdfBroschuere_Desert_Modul_12_2020-web (1).pdf
Broschuere_Desert_Modul_12_2020-web (1).pdf
 
Sunpreme Company Brochure
Sunpreme Company BrochureSunpreme Company Brochure
Sunpreme Company Brochure
 
Solar pv-module-india
Solar pv-module-indiaSolar pv-module-india
Solar pv-module-india
 
Presentation9 1-2011
Presentation9 1-2011Presentation9 1-2011
Presentation9 1-2011
 
Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
 
LG solar presentation for customers
LG solar presentation for customersLG solar presentation for customers
LG solar presentation for customers
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modules
 
Lobel Solar Latetst Specification
Lobel Solar Latetst SpecificationLobel Solar Latetst Specification
Lobel Solar Latetst Specification
 
Suntellite PPT
Suntellite PPTSuntellite PPT
Suntellite PPT
 
GenCell Award Write Up
GenCell Award Write UpGenCell Award Write Up
GenCell Award Write Up
 
Automatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using ArduinoAutomatic Solar Panel Cleaner using Arduino
Automatic Solar Panel Cleaner using Arduino
 
Study On Diesel Power Plant In Textile Industryï»ż. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industryï»ż. Diesel Power Plant In Texti...Study On Diesel Power Plant In Textile Industryï»ż. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industryï»ż. Diesel Power Plant In Texti...
 
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
Solar PV Systems (Engineering, wiring & grid connection) - Martin Cotterell (...
 
Ultrafast screening Method for assessing photostabiliy of Thin Film solar cells
Ultrafast screening Method for assessing photostabiliy of Thin Film solar cellsUltrafast screening Method for assessing photostabiliy of Thin Film solar cells
Ultrafast screening Method for assessing photostabiliy of Thin Film solar cells
 
Jinko 315 mono split-cell
Jinko 315 mono split-cellJinko 315 mono split-cell
Jinko 315 mono split-cell
 
Building envelope power point
Building envelope power pointBuilding envelope power point
Building envelope power point
 
EL Complete Group Presentation
EL Complete Group PresentationEL Complete Group Presentation
EL Complete Group Presentation
 

Project Jeddah 01 09 2015

  • 1. Project: PV Carpark Jeddah, Saudi Arabia “The largest transparent PV-Carpark in the world” Power output approx. 3.432 MW Partially transparent Almaden Poly Module P60-260 Wp Preliminary draft and cost calculation Almaden Europe GmbH Hanauerstr. 1 - 80992 Munich, Germany Phone. +49 (89) 2196 3215 – info@almaden-europe.com
  • 2. Carports System Jeddah 9/2/15 2 Contents ............................................................................................................................................................................... 3 1. The Project “Solar Carport”................................................................................................................................ 4 1.1 Future Industry ............................................................................................................................................. 4 1.2 Location........................................................................................................................................................ 4 2. Concept of construction ..................................................................................................................................... 5 2.1 Steel supporting structure ............................................................................................................................ 5 2.2 PV Roof Construction.................................................................................................................................... 6 2.3 PV – Modules................................................................................................................................................ 7 2.4 Made in Dubai: The first world Modules ...................................................................................................... 8 2.5 Specification of the modules ...................................................................................................................... 10 2.6 Inverters ..................................................................................................................................................... 11 3. Carpark system Jeddah..................................................................................................................................... 12 3.1 Arrangement on existing parking area....................................................................................................... 12 3.2 Schematic representation of PV carport system Jeddah ............................................................................ 12 ................................................................................................................................................................................. 12 3.3 Cost and yield Calculation of the PV carport system Jeddah...................................................................... 13 4. PV Sol calculation of the PV Carport system..................................................................................................... 15
  • 3. Carports System Jeddah 9/2/15 3 0 20 40 60 80 100 120 140 160 180 200 220 240 kWh/mÂČ Feb Apr Jun Aug Oct Dec Time Period 1. 1. - 31.12. Irradiation onto Tilted Surface 2.258 kWh/mÂČ At a glance: Location: The solar carpark is located in the King Abdulaziz University “KAU” campus in Jeddah – Saudi Arabia. This is a large parking area for about 880 cars. Field: The plan is to build and operate photovoltaic systems in form of solar carports with a total size of 125 x 208 m. The total power output is about 3.432 MWp. Production and Consumption: According to the professional photovoltaic analysis software PV SOL 6.0, the annual yield of the PV system is about 5.491 MWh. The purpose of this project is the production of electricity which is used:  To power part of the air conditioners of the university  to power 480 pieces of 15W LED lamps to illuminate the parking areas  to power as many as possible 120W LED street lights on 8m poles Runtime/ Warranty: At the selection of the components and the suppliers, we assumed a runtime of at least 30 years. Shorter standard warranty periods may be extended with a surcharge. Radiation: The average annual sum of global radiation in Jeddah is about 2258 kWh / mÂČ / p.a. The actual radiation on the south and north to 5° inclined surface was determined with the professional planning program PV Sol 6.0, which takes shading in consideration; and the actual radiation is also based on the calculation of annual yield. Seasonal radiation value: In comparison to a south-south orientation, the chosen north-south orientation allows a larger consistency during different seasons of a year. Picture 1: Simulation of the radiation value in Jeddah (in kWh per month)
  • 4. Carports System Jeddah 9/2/15 4 1. The Project “Solar Carport” 1.1 Future Industry Photovoltaic is a proven technology for decades, the systems are largely maintenance-free and extremely reliable. Photovoltaic is a key technology of the 21st century. 1.2 Location The solar park will be built on a large parking area with 125 x 208 m in the King Abdulaziz University “KAU” campus of Jeddah. As it can be seen in the following picture, the complete area is totally free of shading: Picture 2: Location of the parking area in Jeddah
  • 5. Carports System Jeddah 9/2/15 5 2. Concept of construction 2.1 Steel supporting structure Acording to the size of this parking area as well as the special requirement, we suggest our proven steel supporting structure which could cover the whole parking area. Each park space is about 5.5 meter deep, 3 meter high, and about 6 meter long , the passage way is about 7 meter width. Between each field there is 1 meter empty space for modules cleaining. The support profiles are assembeld in the back side in order to facilitate the entering and exiting of the vehicles. Picture 3: Steel supporting structure
  • 6. Carports System Jeddah 9/2/15 6 2.2 PV Roof Construction Our individual construction can be assembled to almost size. For this project we use a PV roof segment as the following view from above, each segement has 60 pieces of mouldes, 15.6 KWp power output. For the total area we need 220 segments, the whole power out put is 3.432 MWp. Picture 4: PV roof constructions
  • 7. Carports System Jeddah 9/2/15 7 2.3 PV – Modules Especially for the hot climate in Jeddah we choose Almaden Desert modules P60-260Wp with the following outstanding features:  Desert modules work at temperatures up to 125°C where other panels fail  Produce more power at hot temperatures  30 year limited power output warranty  Lightweight, 12kg mÂČ ï‚· Extreme durability through Hi-Tec hardening processes  Highest wind load> 2400 Pa Hot and humid climate: Is a special threat to modules. A chemical reaction with most foils like EVA takes place and as a result citric acid builds up. Consequently, the temperature rises and the acid boils, which destroys the modules over months and years. Almaden established a unique technique in order to oppose these threats and protect the cells. Desert climate: Desert areas include very high temperatures of up to 85°C in the inside of the module. Temperatures change in fast cycles. In many cases the material doesn‘t withstand these changes over its lifespan of 30 – 50 years. As a result, Almaden modules loose very little power compared to other cells. Picture 6: Highlights of the glass - glass modules
  • 8. Carports System Jeddah 9/2/15 8 2.4 Made in Dubai: The first world Modules Why are Almaden Modules more suitable than standard Modules? Standard Modules are not suitable for desert climate Standard PV modules are made for regions with a moderate climate. They usually are made of one sheet of glass at the front side and a plastic sheet on the rear side. All tests e.g. from TUV are based on Standard Test Conditions (STC) which were developed in Germany more than 30 years ago and were therefore based on moderate weather conditions such as those found in Germany. Although the module temperature is above 25° C in most countries around the world, the tests are still based on this low temperature. Other test procedures include hail and snow loads, weather conditions which are rarely found in most countries. The resistance to sandstorms, very high temperatures and other weather conditions found in desert areas are not tested at all. Special Almaden Solar Glass for Desert Modules Almaden – a world market leader of Premium Solar Glass - has been working on special technologies for glass suitable for very rough climates with high temperatures for more than 10 years. This Premium glass is used for both sides of the Almaden desert modules. These ALMADEN DESERT MODULESÂź are produced in Silicon OasisÂź in Dubai and also tested in the new DEWA (Dubai Electricity and Water Authority) test facility. Here in the desert people know best how to produce this superior quality which will be also tested in the region. Almaden Desert Modules: Better performance & no failure in damp-heat tests A damp heat test is part of simulating how panels age. This damp-heat test increases the temperature to 85°C in combination with humidity of 85%. This process simulates 20 years’ time when the test is performed over 4,000 hours. As seen in the graph standard modules with plastic back sheet start to fail after 1,000 hours (simulating a period of only 16 years). Almaden panels can easily survive 4,000 hours in a damp heat test without any problems. This means that even in desert regions we can guarantee lifetimes of more than 30 years thus creating a huge financial advantage of more than 30 % (after considering the slightly higher costs).
  • 9. Carports System Jeddah 9/2/15 9 Not only are the power benefit and the longer lifetime major advantages of the Desert technology, but also the fact that these panels can be used in regions where other panels simply will not work. Almaden Desert ModulesÂź work at temperatures up to 125°C where other panels fail. More power when it’s hot The hotter the cell the less power comes from the panel. Because we know that every watt counts, we have developed a module and cell that will generate more wattage at the same nominal power. Normal PV panels have a temperature coefficient of about -0.5%/°C. Our specially optimized cells improve this coefficient by approx. 15 %, which leads to improved power generation. The result is shown in the graph below: A power benefit results which will increase with each degree of heat. Picture 8: Almaden Desert Modules produce more power when itÂŽs hot Almaden Desert ModuleÂź Picture 7: Damp-Heat comparison test (85°C/85% humidity)
  • 10. Carports System Jeddah 9/2/15 10 2.5 Specification of the modules The module consists of 60 polycrystalline solar cells. These provide the following data: The module has the following certifications: Picture 4: Certifications of the module Picture 9: P 60 Module
  • 11. Carports System Jeddah 9/2/15 11 2.6 Inverters In order to feed the generated direct current (DC) by the solar modules into the grid of the local utility company or to use them in the won electricity network, the DC must be converted by an inverter into grid-compliant alternating current (AC). Choosing a system specifically designed for large-scale systems is critical to the performance of a plant under different light conditions as well as their availability. Regarding the transformation of the electricity current from DC to AC. For the total power of the project, we suggest to use 2 stations, one on each side of the carpark. This reduces the length of the cables and the less of the power. Below we present you one station of a central inverter system: Bonfiglioli’s RPS Station “ICON 20 3 ND” provides a new powerful turnkey solution for complete management of a photovoltaic field up to 1.7 kVA. The station is designed for an easy transportation and a quick installation. Thanks to a cabin temperature control system and innovative dust filters, the station is suitable for use in extreme environmental conditions all around the world. To meet a large PV power plant’s demanded capacity; several RPS stations ICON 20 3ND can be combined. The RPS Station ICON 20 3 ND is suited to integrate up to four Bonfiglioli Endurance inverter systems (RPS ND) into 20 ft. high-cube (HQ) container based on ISO construction standard. The RPS Station ICON 20 3 ND is suited to integrate up to three Bonfiglioli Endurance inverter systems (RPS ND) into 20 ft. high-cube (HQ) container based on ISO construction standard. The RPS ND are centralized inverters and working by two systems in Master-Slave configuration. Besides the inverters the stations are equipped with DC cabinets including the fuse protected of connection of PV array, an UPS and an auxiliary transformer. All the devices are anchored and placed in order to guarantee the maximum stability and accessibility of the structure. The RPS station “ICON 20 3ND” requires a medium voltage transformer (two windings on the secondary) and MV switchgear to be installed outside the station. The benefits at a glance:  Plug & Play solution up to 1.72 MVA  professional and flexible Customer  High system efficiency  Modular and serviceable system  Powerful and compact wall mounted boilers  Forced air ventilation system with pre-filtering, thus reduced maintenance  Global services and support during the whole life-cycle. Remark: The inverters included in this calculation are intended for reference only. Depending on the client’s requirements, the inverters can be replaced accordingly.
  • 12. Carports System Jeddah 9/2/15 12 3. Carpark system Jeddah 3.1 Arrangement on existing parking area Picture 5: Arrangement on existing parking area, Jeddah 3.2 Schematic representation of PV carport system Jeddah Schematic presentation of our PV carpark: 2 2-Directions Passage w ay (1) (Width: 7 meters, 3.5 meters in Each Direction) 1 MAIN ROAD : ENTRANCE TO THE PARKING LOT 5 2-Directions Passage w ay (4) 4 2-Directions Passage w ay (3) 3 2-Directions Passage w ay (2) 8 2-Directions Passage w ay (7) 7 2-Directions Passage w ay (6) 6 2-Directions Passage w ay (5) MAIN ROAD : ENTRANCE TO THE PARKING LOT Rowsfrom1-to-12 12 2-Directions Passage w ay (11) 11 2-Directions Passage w ay (10) 10 2-Directions Passage w ay (9) 9 2-Directions Passage w ay (8) Segments Parkingplace Length Width Area Summe 220 880 125m 208m 26,000m 2 Picture 6: Schematic representation of the parking area, Jeddah for 880 parking spaces and 26,000 mÂČ 1 2 1 1 1 0 9 8 7 6 5 4 3 Rowsfrom1-to-12 2-Directions Passage w ay (11) 2-Directions Passage w ay (10) 2-Directions Passage w ay (9) 2-Directions Passage w ay (8) 2-Directions Passage w ay (7) 2-Directions Passage w ay (6) 2-Directions Passage w ay (5) 9 10 11 12 2-Directions Passage w ay (4) 2-Directions Passage w ay (3) 2-Directions Passage w ay (2) 1 2 3 4 2-Directions Passage w ay (1) (Width: 7 meters, 3.5 meters in Each Direction) 10 11 12 13 14 3 4 5 1 2 3 4 5 6 7 8 209 15 16 17 18 19 19 20 1 2 3 4 5 6 7 8 13 14 15 16 17 187 8 9 10 11 121 2 15 16 17 6 18 19 209 10 11 12 13 14 19 20 1 2 3 4 5 6 11 12 13 14 15 165 6 7 8 9 10 19 2014 15 1 2 3 4 5 6 7 8 13 10 11 16 17 187 8 9 10 11 12 17 18 1 2 3 4 5 6 7 8 137 8 9 10 11 121 2 3 4 5 6 9 209 10 11 12 13 14 19 2014 15 16 17 18 15 16 17 18 19 2012 13 14 20 15 16 17 18 19 1914 15 16 17 18137 8 9 10 11 121 2 3 4 5 6 19 20 1 2 3 4 5 6 7 8 13 14 15 16 17 18 15 16 17 18 19 209 10 14 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 11 12 13 7 8 9 10 11 121 2 3 4 5 6 209 10 11 12 13 14 19 2014 15 16 17 1813 15 16 17 18 19 19 16 17 18 19 10 11 121 2 15 3 4 5 6 11 12 13 14 15 16 20 1 2 3 4 5 6 7 8 13 14 15 16 17 187 8 9 1 2 3 4 5 6 209 10 11 12 13 14 1 2 3 4 5 6 7 8 209 10 19 2014 15 16 17 18 3 4 5 6 12 137 8 9 10 11 12 17 18 19 19 20 1 2 3 4 5 6 7 8 13 14 15 16 17 187 8 9 10 111 2 15 16 17 18 19 209 10 11 12 13 14 1 2 3 4 5 6 7 8 137 8 9 10 11 121 2 3 4 5 6 209 10 11 12 13 14 19 2014 15 16 17 18 15 16 17 18 19 16 17 18 1915 209 10 11 12 13 141 2 3 4 5 6 7 8
  • 13. Carports System Jeddah 9/2/15 13 3.3 Cost and yield Calculation of the PV carport system Jeddah The table below shows a calculation of the carpark structure as well as the modules and the inverter system for the PV plant in Jeddah. Please note: This is a budget calculation only. The final price will be adjusted according to the results of a detailed technical plan. Type Unit price USD Discount Price with discount USD Quantity Sum USD Steel supporting structure 5909.7 20% 4727.76 220 1,040,107.20 Roof construction 5750 20% 4600 220 1,012,000.00 Sum I 2,052,107.20 Type Unit price USD Discount Price with discount USD Quantity Sum USD Desert Modules P 60 -260Wp 220.5 30% 154.35 13200 2,037,420.00 Inverter System (1.74 MWp) 240,000.00 10% 216,000.00 2 432,000.00 Power distribution equipment 360,000.00 10% 324,000.00 1 324,000.00 Monitoring equipment 50,000.00 10% 45,000.00 1 45,000.00 Cables budges and connection boxes 80,000.00 10% 72,000.00 1 72,000.00 Environmental monitors 5,000.00 10% 4,500.00 1 4,500.00 Other and unforeseen expenses 30,000.00 10% 27,000.00 1 27,000.00 Sum II 2,941,920.00 Total 4,994,027.20 The table below shows a calculation of cost / yield of the carports system in Jeddah. For the calculation 13200 pieces of modules P 60-260W with power output 260 Wp are going to be used. The total output for this parking lot is about 3.432 MW. PV-Carport: Calculation - Costing/Yield 3.432 MW Power Output each Module 260 Wp Quantity of the Modules 13200 Total PV-Output 3.432 MW Taking into account that the total radiation is 2258 kWh / mÂČ p.a. in Jeddah, the result of PV Sol show that the total annual energy yield of the PV Carpark is 5,491,290 kWh. The produced electricity shall be 100% in self-consumption. According to the requirement of the customer, some power output will be used for 480 pieces of 15W LED lights, and also for 120W street lights. Additionally, the generated electricity will be used to supply the air conditioning system of the university.
  • 14. Carports System Jeddah 9/2/15 14 For the own consumption, we have assumed an average value of electricity costs in Jeddah ($ 0.18 per kWh). The potential revenues are calculated in the table below. Global radiation location (Jeddah) 2,258 kWh/m2 p.a. Annual Yield, PV-Sol, totally 5,491,290 KWh Revenue from pot. electricity sales Power consumption (0.18$ /Kwh) 988,432 USD Total revenue p.a. (potential) 988,432 USD Remarks:  The annual energy yield depends on environmental conditions.  Experiences show that solar radiation p due to climate change increases by about 0.5% per year.  The calculation is valid for the first year. After that, there is a degradation of approximately 0.15-0.25% p.a. expected, which is, however, more than offset in recent years by the increase in solar radiation.  The calculation includes all of the required hardware except the transformer stations. The installation is not included.  Due to the size of this project, a technical planning is required (not included in this calculation).
  • 15. Carports System Jeddah 9/2/15 15 4. PV Sol calculation of the PV Carport system Below is a schematic representation of the parking area with inverters: Description: The parking area is divided into 12 rows with a total of 13200 modules. The generated electricity is connected to the distribution network with a total of 5 inverters. These inverters are connected to an electricity meter which is linked to a monitoring system. Picture 7: Schematic representation of the parking area with inverters via the PV Sol program
  • 16. Carports System Jeddah 9/2/15 16 5. Attachment:
  • 17. Carports System Jeddah 9/2/15 17 1 m for cleanning