SlideShare ist ein Scribd-Unternehmen logo
1 von 1
To the Legislative Assembly of Ontario


Whereas in Ontario, Line 9 travels through densely populated areas; crossing farmlands and rivers
which flow into the Great Lakes and which provide 80% of the drinking water for Ontario's residents.

Whereas Ontario's water resources provides for municipal industrial and agricultural use and is a
fundamental part of Ontario's economy

Whereas recent weakened federal oversight limits reviews to only 2 years duration in the absence of
scientific evidence to prove this time frame is reasonable to assess all risks

Whereas the Province has the mandate to protect source water, environment and economy

Whereas a document filed with the National Energy Board, shows that Enbridge Inc. plans to apply to
change what the pipeline can carry, from conventional oil to diluted bitumen, and dramatically expand
the amount of oil carried by the pipeline

Whereas citizens do not want Ontario to be a passive conduit of tar sands oil for export, forced to
accept all of the environmental and economic risks of this project with little reward

We the undersigned residents of the Province of Ontario call upon the Legislative Assembly of
Ontario to initiate a formal review of the Line 9 reversal project.


         NAME: PRINT                          ADDRESS                             Signature

Weitere ähnliche Inhalte

Mehr von louisette lanteigne

Mehr von louisette lanteigne (12)

DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015
 
Pipelinespillsprevention
PipelinespillspreventionPipelinespillsprevention
Pipelinespillsprevention
 
Raceway
RacewayRaceway
Raceway
 
Enbridge line 9 earthquake risks
Enbridge line 9 earthquake risksEnbridge line 9 earthquake risks
Enbridge line 9 earthquake risks
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plant
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
Brant's Water Risks
Brant's Water RisksBrant's Water Risks
Brant's Water Risks
 
Brant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risksBrant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risks
 
Waterloo Region’s drained ponds
Waterloo Region’s drained pondsWaterloo Region’s drained ponds
Waterloo Region’s drained ponds
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron
 
Ara submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impactsAra submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impacts
 
Aggregateact
AggregateactAggregateact
Aggregateact
 

Line9OntarioReview

  • 1. To the Legislative Assembly of Ontario Whereas in Ontario, Line 9 travels through densely populated areas; crossing farmlands and rivers which flow into the Great Lakes and which provide 80% of the drinking water for Ontario's residents. Whereas Ontario's water resources provides for municipal industrial and agricultural use and is a fundamental part of Ontario's economy Whereas recent weakened federal oversight limits reviews to only 2 years duration in the absence of scientific evidence to prove this time frame is reasonable to assess all risks Whereas the Province has the mandate to protect source water, environment and economy Whereas a document filed with the National Energy Board, shows that Enbridge Inc. plans to apply to change what the pipeline can carry, from conventional oil to diluted bitumen, and dramatically expand the amount of oil carried by the pipeline Whereas citizens do not want Ontario to be a passive conduit of tar sands oil for export, forced to accept all of the environmental and economic risks of this project with little reward We the undersigned residents of the Province of Ontario call upon the Legislative Assembly of Ontario to initiate a formal review of the Line 9 reversal project. NAME: PRINT ADDRESS Signature