CH2M Hill's Mark Alpert discussed the procurement process for design-build contracts at the American Water Works Association's ACE13 Annual Conference & Exposition.
5. Basis for Selection
Various Procurement Processes
Single-Step Two - Step
Request for
Qualifications
Request for
Qualifications
Request for
Proposals
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications
+ Costs
Request for
Qualifications
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
5
6. Single-Step Two - Step
Request for
Qualifications
Request for
Qualifications
Request for
Proposals
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
Request for
Qualifications
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
Single Step Qualifications Based Selection
ď§ If schedule is a critical
driver
ď§ If maximum
owner/design-builder
collaboration is a priority
ď§ If Owner wants best-
qualified design- builder,
not just the lowest initial
price
ď§ If state/local law allow
qualifications only
selection 6
7. Single-Step Two - Step
Request for
Qualifications
Request for
Qualifications
Request for
Proposals
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
Request for
Qualifications
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
Single Step Best Value Selection
ď§ If schedule is a critical
driver
ď§ If maximum
owner/design-builder
collaboration is a priority
ď§ If Owner prefers (or if
state/local law requires)
inclusion of cost as a
selection factor
7
8. Basis for Selection
ď§ Employ evaluation criteria that
are traditionally used for any
qualifications-based selection
ď§ Owner able to conduct process
efficiently
ď§ Reduces total time for
procurement
ď§ Reduces cost of procurement
ď§ Reduces complexity
ď§ Potentially allows for a larger pool
of qualified firms to participate
ď§ Allows price or costs to be
considered with qualifications
ď§ Total cost of construction is not a
factor
ď§ Typical cost considerations
include:
⢠Fixed fees or hourly billing rates
for design and preconstruction
services
⢠Design-builder fee or markup
percentage of allowable project
costs
⢠Fixed fees or billing rates for
General Condition costs
⢠Project Price for Best Value Fixed
Price Approach
Qualifications-based Selection Best-value Selection
8
9. Basis for Selection
Various Procurement Processes
Single-Step Two - Step
Request for
Qualifications
Request for
Qualifications
Request for
Proposals
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
Request for
Qualifications
Request for
Proposals
Qualifications
only
âBest Valueâ
Qualifications + Costs
ď§ Includes Project
Approach
ď§ Potentially greater degree
of project data provided
with RFP
ď§ Qualifications only or
best value
9
10. WHAT IS IN A REQUEST FOR
QUALIFICATIONS (RFQ)
10
15. Required Contents for Submission
Design-Builder Profile
⢠General
⢠Legal Structure
⢠Project office location
⢠Financial condition
⢠Performance bonds
⢠Insurance
⢠Material adverse changes
in financial position
⢠Legal proceedings
⢠Completion of contracts
⢠No violation of laws
⢠Not debarred from
bidding
Provides General, Legal and Financial
Information Concerning the Design-builder
15
16. Required Contents for Submission
Project Team
⢠Organization
â Roles and
responsibilities of
all firms
â Organizational charts
⢠Key Personnel
â Roles and responsibilities
defined if other firms on
proposing team
â Resumes
Describes Key Personnel And Additional Firms
Organization ⢠Roles and Responsibilities ⢠Resumes
16
17. Required Contents for Submission
Experience
⢠Reference projects â number
specified by owner
⢠Three categories:
â Design
â Construction
â Design-build
⢠Information provided for each
project:
â Name of owner
â Year started and completed
â Owner reference and contact
information
⢠Information provided for each
project:
â Firms and key personnel that
participated in the project
â Description of the project
⢠Oneâpage summary table to
cross reference the projects
with project team (firms and
key personnel)
Provides Detailed Information on Relevant Design,
Construction, Design-Build Projects Including Safety
17
19. Request for Proposals
⢠Used for both
Qualifications-based
selection and Best Value
selection
⢠RFP for Single-Step also
includes requirements
outlined in Single-Step RFQ
19
23. ⢠Transmittal Letter
⢠Executive Summary
⢠Project Approach
⢠Draft Project Agreement Markup
⢠Fee and Rate Proposal
⢠Updated Qualifications
Required Contents for Submission
Not used if âQualifications Onlyâ selection
Not used in Single-Step process
23
24. Required Contents for Submission
Project Approach
⢠Can include discussion
on:
â How collaborative
relationship with the
Owner would be
established
â How the design and
construction processes will
interface
â Critical work components
for success
â The process for GMP
development
⢠May include discussion on
approach to:
â Communications with
owner and stakeholders
â Quality management
â Risk management
â Adherence to the GMP and
schedule
24
25. Required Contents for Submission
Draft Project Agreement Markup
⢠Allows proposers to
revisions to the contract
that would more efficiently
allocate:
â Risk
â Improve parties
understanding of risk
allocation
â Improve clarity
⢠Owner is not obligated to
accept any of the suggested
revisions
Provides a Description and Discussion of the Rationale
for Proposed Revisions to the Draft PDB Contract
25
26. Required Contents for Submission
Cost Proposal
⢠Permitting, design, and
services during
construction
⢠Detailed breakdown of
cost of construction
including self-
performance,
subcontracts, vendors,
and general conditions
⢠Professional fees
⢠Markup on direct cost
of construction
⢠Direct cost of
construction
â Subcontracts
â Vendors
â General Conditions
⢠Bonds and Insurance
26
Best-value (Fixed Price) Best-value (GMP)
27. Required Contents for Submission
Updated Qualifications
⢠Any proposed changes
to the SOQ
⢠Resumes of additional
personnel proposed
⢠Proposed changes
subject to acceptance
of owner
Confirm Prior SOQ and Describes Any Changes to Project Team
or Key Personnel and Explains Reason for Change
27
29. Evaluation Criteria and Scoring Methodology
EVALUATION CRITERIA
⢠Fair
⢠Clear
⢠Transparent
⢠Pass/Fail
â Performance bond
â Net worth
â Material adverse
conditions
â Licensing and registration
â Design experience
â Construction experience
â Design-build experience
â Safety record
Should be Designed to Select a Design-Builder with the Highest
Probability of Achieving an Ownerâs Project Objectives
29
30. Evaluation Criteria and Scoring Methodology
Procurement
Approach
Document
Quals
BestValue
Design-
Builder
Key
Personnel
Organization,
Management
and Safety
Project
Approach
Cost /Fee
&
Rate
Proposal
RFQ 1200 X l l l l
RFP 1300 X l l l l l
RFQ 1400 X l l l
RFP 1500 X l l l l l
RFP 1500 X l l l l
Experience and capabilities
Two - Step
Single-Step
Evaluation Criteria
30
31. Typical/Suggested Scoring Methodology
Procurement
Approach
Document
Quals
BestValue Design-
Builder
Key
Personnel
Organization,
Management
and Safety
Project
Approach
Fee
&
Rate
Proposal
RFQ 1200 X 40% 30% 15% 15%
RFP 1300 X 30% 20% 15% 15% 20%
RFQ 1400 X 40% 40% 20%
RFP 1500 X 30% 20% 15% 15% 20%
RFP 1500 X 40% 30% 15% 15%
Experience and capabilities
Two - Step
Single-Step
Evaluation Criteria
31