SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT I [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Banglo – Kelas D, Mukim Semenyih, Daerah Hulu Langat
Percentage of Assessment: 20%
Submission Date: 1December 2016 (Thursday) at 12 noon.
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements of the chosen building.
• Pad footings including excavations from reduce level.
• Work below ground floor level including excavations, ground floor slab and apron slab etc.
• Ground floor beams
• Column stumps, columns and stiffeners
• Roof beams
Notes
• Excavate topsoil 50 mm deep to be disposed off- site, hardcore to be 150mm thick.
Assessment Criteria
Refer to matrix attached.
Assignment No.2
Teaching Objectives
• To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
• To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
• To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
• Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
• Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
• Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
• Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission rules
Individual submission to Group Leader will consist of the following:
• Billing paper (handwritten)
• Query list
• Taking-off list
• Dimension sheets
• Peer assessment Form
The group leader will collect all the members’ work and compile it in a binded document (comb binding)
with a COVER of the university's logo and all the names of all group members. He will also need to do a
SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work.
The Bill of Quantities will be arranged in the following sequence:
• Billing (to insert in front of BQ and hand written)
• Pad footings
• Work below ground floor level including excavations, ground floor slab and apron slab etc.
• Ground floor beams
• Column stumps, columns and stiffeners
Assignment No.2
• Roof beams.
Assignment No.2

Weitere ähnliche Inhalte

Was ist angesagt? (7)

Seminar 1 - Question 1
Seminar 1 - Question 1Seminar 1 - Question 1
Seminar 1 - Question 1
 
Crotti final reports_prousall
Crotti final reports_prousallCrotti final reports_prousall
Crotti final reports_prousall
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)
 
ICI FINAL PROJECT
ICI FINAL PROJECT ICI FINAL PROJECT
ICI FINAL PROJECT
 
SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
Estimation And Costing Of A Building
Estimation And Costing Of A Building Estimation And Costing Of A Building
Estimation And Costing Of A Building
 
Final project ici
Final project iciFinal project ici
Final project ici
 

Andere mochten auch

M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
Est
 
Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1
Lin Hui
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
Est
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
Est
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
Est
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
Est
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
Est
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
Est
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 an
Est
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answer
Est
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
Est
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
Est
 

Andere mochten auch (20)

M3 EG BQ timber windows
M3 EG BQ timber windowsM3 EG BQ timber windows
M3 EG BQ timber windows
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
Measurement4
Measurement4Measurement4
Measurement4
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
 
Design project one full
Design project one full   Design project one full
Design project one full
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
 
M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 an
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answer
 
Integrated project report
Integrated project reportIntegrated project report
Integrated project report
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
M3 EG BQ steel struture
M3 EG BQ steel strutureM3 EG BQ steel struture
M3 EG BQ steel struture
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
 

Ähnlich wie Measurement Assignment 2

Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
Chia Ting
 
Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
Chia Ting
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
swethasekhar5
 

Ähnlich wie Measurement Assignment 2 (20)

Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment 2 - Measurement
Assignment 2 - MeasurementAssignment 2 - Measurement
Assignment 2 - Measurement
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Assignment no.2 brief m1 sem1 degree
Assignment no.2  brief m1 sem1 degreeAssignment no.2  brief m1 sem1 degree
Assignment no.2 brief m1 sem1 degree
 
M1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEFM1 ASSIGNMENT 2 (GROUP) BRIEF
M1 ASSIGNMENT 2 (GROUP) BRIEF
 
asAssignment no.2
asAssignment no.2asAssignment no.2
asAssignment no.2
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
bqs Assignment no.2
bqs Assignment no.2 bqs Assignment no.2
bqs Assignment no.2
 
BQS bq assignment
BQS bq assignmentBQS bq assignment
BQS bq assignment
 
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
Industrial Internship at Shapoorji Pallonji & Co. Pvt. Ltd. (HBCH & RC Site)
 
Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1Estimation Costing and Valuation Unit 1
Estimation Costing and Valuation Unit 1
 
Onkar Interntship PPT.pptx
Onkar Interntship PPT.pptxOnkar Interntship PPT.pptx
Onkar Interntship PPT.pptx
 
INTERNSHIP (5).pptx
 INTERNSHIP (5).pptx INTERNSHIP (5).pptx
INTERNSHIP (5).pptx
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
 
Structure engineer slide share
Structure engineer slide shareStructure engineer slide share
Structure engineer slide share
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 
Ici & itd
Ici & itdIci & itd
Ici & itd
 

Mehr von Wan Nee

Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
Wan Nee
 

Mehr von Wan Nee (20)

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-final
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th june
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)
 
Estimating final
Estimating  final Estimating  final
Estimating final
 
Seminar question
Seminar questionSeminar question
Seminar question
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment Brief
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating Assignment
 
Supply Chain
Supply Chain Supply Chain
Supply Chain
 
Supply chain
Supply chain  Supply chain
Supply chain
 
Supply chain
Supply chainSupply chain
Supply chain
 
Management Science
Management Science Management Science
Management Science
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017
 
BS 2 PRESENTATION
BS 2 PRESENTATION BS 2 PRESENTATION
BS 2 PRESENTATION
 
CT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation SlideCT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation Slide
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment Report
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 

Kürzlich hochgeladen

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Kürzlich hochgeladen (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 

Measurement Assignment 2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT I [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Banglo – Kelas D, Mukim Semenyih, Daerah Hulu Langat Percentage of Assessment: 20% Submission Date: 1December 2016 (Thursday) at 12 noon. Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements of the chosen building. • Pad footings including excavations from reduce level. • Work below ground floor level including excavations, ground floor slab and apron slab etc. • Ground floor beams • Column stumps, columns and stiffeners • Roof beams Notes • Excavate topsoil 50 mm deep to be disposed off- site, hardcore to be 150mm thick. Assessment Criteria Refer to matrix attached. Assignment No.2
  • 2. Teaching Objectives • To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing. • To develop an awareness of the nature, content, and significance of tendering and contractual documentation. • To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to: • Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works. • Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works. • Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works. • Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission rules Individual submission to Group Leader will consist of the following: • Billing paper (handwritten) • Query list • Taking-off list • Dimension sheets • Peer assessment Form The group leader will collect all the members’ work and compile it in a binded document (comb binding) with a COVER of the university's logo and all the names of all group members. He will also need to do a SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work. The Bill of Quantities will be arranged in the following sequence: • Billing (to insert in front of BQ and hand written) • Pad footings • Work below ground floor level including excavations, ground floor slab and apron slab etc. • Ground floor beams • Column stumps, columns and stiffeners Assignment No.2