Edson Engineers Page 1
EDSON ENGINEERS.
DESIGN CALCULATIONS.
LIGHTING AND POWER DESIGN CALCULATIONS.
BY
FRED BUTETE WAMBASI.
PROJECT: CITAM KAREN BOYS AND GIRLS TOILETS
JANUARY 2015
Power
Design
Calculations
Lighting
Edson Engineers Page 2
1.0 Lighting Design.
1.1 Formulae and Fundamental Considerations.
Lighting design aims at determining the number of lighting fixtures (luminaries)
required in order to achieve the recommended illumination for a given task.
Key considerations prior to design are;
 The dimensions of the room; Length, Width and mounting height of the
luminaire from working plane.
 The nature of ceiling, walls, and floors in terms of coluor and material.
 The functionally/use of the design area to be illuminated.
 Non analytical factors affecting the choice of luminaires, aesthetics and
natural lighting.
In determining the number of lighting fixtures (luminaries) required, key among
other factors; the following has to be established:
 Recommended illuminance (Lux) in Lumens/m²
 Utilization factor
 Maintenance factor of the Luminaire
 Nominal lamp Luminous flux/output in Lumens.
Quantity of light here is specified by illuminance which is measured in lux (lm/m2
of illuminated surface).
The Lumen method formula used is as below (as per CIBSE Lighting guide and a
textbook on building services engineering by David V. Chadderton: Building Services Engineering
Fifth edition (2007) - Taylor and Francis Group - New York ).
Edson Engineers Page 3
=
Øn xn xMf xUf
Where:
E = Average recommended illuminance (Lux) in Lumens/m²
A = Area of the working plane (m²)
Øn= Nominal Lamp Luminous Flux
Mf = Maintenance factor
Uf = Utilization factor
N= Number of Luminaires
n= No. of luminaire’s lamps
1.2 Definitions:
a. Utilization factor (Uf)
This represents the proportion of luminous flux of the lamp that reaches the
working plane and is dependent on the following:
 Luminaire efficiency
 Lighting fitting distribution
 Reflectances of the room surfaces i.e. ( Ceiling, walls and floor)
 Room index.
The room index represents the geometrical ratio of the area of the
horizontal surfaces to that of the Vertical surfaces measured from the
working plane in the room and is expressed as:
Ri =
(L x W)
( + )
Where:
L = Length of the room
Edson Engineers Page 4
W = Width of the room
Hm = Height of the Luminaire above the working plane.
The room reflectances depend on the room surface finishes. In my design
the ceiling is painted white, floor is terrazzo/pvc tiles in some areas and the
walls are painted white.The design reflectance ratio used is C: W: F = 0.7:
0.5: 0.2. Hm of 2.05m is used herein in design calculations.
Standard photometric tables for a combination of various values of room
indices and surface reflectances exist (given by manufacturers) from
which the value of the utilization factor (Uf) was directly obtained or
extrapolated for values of Room indices that were not integers as follows:
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
where: (U= upper Value& L= Lower Value)
b. Maintenance factor (Mf)
This gives the proportion of illuminance provided by a luminaire in normal
working conditions (dirty conditions) of both the luminaire and the room
surfaces to the illuminance of the same luminaire in clean conditions.
For this design, I used a maintenance factor of 0.8 on the assumption that
the room surfaces will be maintained very clean most of the times given
this is children’s toilet where high standards of cleanliness are desired.
c. Nominal Lamp Luminous Flux (Øn)
The value was obtained from lamp photometric data usually provided by
manufacturers in the catalogues.
d. Illumination level (E)
These were read from a chart guide used for obtaining recommended
illuminance (Lux) prepared by the Chartered Institute of Building Services
Edson Engineers Page 5
Engineers (CIBSE) and the Philips Lighting design Manual. These values
entirely depend on the type of use the room is put into. The illuminance are
as summarized in the tables below:
The following are the recommended Illumination Levels;
a) Hospital
Item Description Recommended
Lux (E) in
Lumens/M2
1.0 Corridors: Night
Daytime/ Evening
50
200
2.0 Wards: Circulation at night
Observation at night
General Lighting
Simple Examination/Reading
30
5
150
300
3.0 Examination Rooms: General Lighting
Local Examination
Lighting
500
1000
4.0 Intensive therapy: Bedhead
Observation
50
750
5.0 Nurses Stations 300
6.0 Operating Theaters: Pre-Op room
General theater lighting
-
500
1000
-
7.0 Laboratories & Pharmacies: General Lighting
Local
750
1000
8.0 Consulting Rooms: General Lighting
Local
500
750
9.0 Autopsy Rooms: General Lighting
Local
750
5000
Edson Engineers Page 6
b) Offices
Item Description Recommended
Lux E in Lumens/M2
1.0 General offices with typing, computers e.t.c 500
2.0 Conference rooms 300
3.0 Archives 200
c) General Building areas
Item Description Recommended
Lux E in Lumens/M2
1.0 Circulation areas, corridors 100
2.0 Cloak rooms, toilets 100
3.0 Stores, Stock rooms 100
4.0 Stairs, escalators 150
d) Kitchen Block
Item Description Recommended
Lux E in Lumens/M2
1.0 Servery 300
2.0 Kitchen 500
3.0 Food stores 150
4.0 Food preparation area 500
5.0 Cold store 300
6.0 Office 500
7.0 Kitchen yard 30
Edson Engineers Page 7
e) Laundry Block
Item Description Recommended
Lux E in Lumens/M2
1.0 Pressing 500
2.0 Sewing/Mending 750
3.0 Gents/Ladies 100
f) Workshop Block
Item Description Recommended
Lux E in Lumens/M2
1.0 Welding 300
2.0 Machine work, coil winding 500
3.0 Fine bench & Machine work 750
4.0 Testing/ adjusting Electrical components 1000
2.0 Lighting Design Task.
2.1 Boys Toilets.
2.1.1 Area Outside toilets having whbs within toilet block.
The room dimensions are:
Length of the room, L = 8.9m
Width of the room, W = 5.8m
Edson Engineers Page 8
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 1200mm 1x36W
ELECTRONIC BALLAST single batten fluorescent fitting with acrylic diffuser as
pierlite. For this fitting, the nominal luminous flux Øn = 5400 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 8.9 x 5.8 = 1.40
2.05(8.9+5.8)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
= 59 + (1.40 − 1.25) . .
=62.09% = 0.6209
The number of luminaires is given as,
=
100 51.62
3450 x1 x0.8 x0.6209
= 3.0122
Edson Engineers Page 9
Thus we use 3 No.Luminaires,1200mm 1x36W Electronic Ballast single
batten fluorescent fitting with acrylic diffuser as pierlite to provide lighting for the
area.
This gives an illuminance of :
=
Øn xn xMf xUfxN
A
=
3450 x1 x0.8 x0.6209x3
51.62
= 99.59
Thislevel of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.
2.1.2 Area inside toilets having wcs but within toilet block.
The room dimensions are:
Length of the room, L = 4.5m
Width of the room, W = 2.0m
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp
downlighter with
white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Edson Engineers Page 10
Therefore the room index Ri = L x W
Hm (L + W)
= 4.5 x 2.0 = 0.555351682
2.05(4.5+2.0)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
= 48 + (0.56 − 0.75) . .
=44.10% = 0.441
The number of luminaires is given as,
=
100 9.08
1250 x1 x0.8 x0.441
= 2.058
Thus we use 2 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
. This gives an illuminance of:
=
Øn xn xMf xUfxN
A
Edson Engineers Page 11
=
1250 x1 x0.8 x0.441x2
9.08
= 97.14
Thislevel of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.
2.1.3 Paraplegic toilets.
The room dimensions are:
Length of the room, L = 2.38m
Width of the room, W = 1.5m
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp
downlighter with
white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 2.38 x 1.5 = 0.448830
2.05(2.38+1.5)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
Edson Engineers Page 12
= 48 + (0.449 − 0.75) . .
=41.98% = 0.42
The number of luminaires is given as,
=
100 3.57
1250 x1 x0.8 x0.42
= 0.85
Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
. This gives an illuminance of:
=
Øn xn xMf xUfxN
A
=
1250 x1 x0.8 x0.42x1
3.57
= 117.64
This level of illumination is acceptable (within + 30%) as the luminaires will
therefore provide adequate lighting for the area required.
2.1.4 Showers.
The room dimensions are:
Length of the room, L = 2.0m
Width of the room, W = 1.5m
Edson Engineers Page 13
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp
downlighter with
white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 2.0 x 1.5 = 0.418
2.05(2.0+1.5)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
= 48 + (0.418 − 0.75) . .
=41.36% = 0.41
The number of luminaires is given as,
=
100 3.0
1250 x1 x0.8 x0.41
= 0.73
Edson Engineers Page 14
Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
This gives an illuminance of:
=
Øn xn xMf xUfxN
A
=
1250 x1 x0.8 x0.41x1
3.57
= 114.85
This level of illumination is acceptable (within + 30%) as the luminaires will
therefore provide adequate lighting for the area required.
2.1.5 Area in front of cleaners’ room (corridor space).
The room dimensions are:
Length of the room, L = 2.23m
Width of the room, W = 2.17m
For this toilets, the design illuminance E = 150 Lux as the lighting requirements for
this space. The luminaire chosen was 16W Polo Opal C/W lamp downlighter
with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per
lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 2.23 x 2.17 = 0.536
2.05(2.23+2.17)
Edson Engineers Page 15
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
Uf = 48 + (0.536 − 0.75) . .
=43.72% = 0.44
The number of luminaires is given as,
=
150 3.0
1250 x1 x0.8 x0.44
= 1.023
Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
This gives an illuminance of:
=
Øn xn xMf xUfxN
A
=
1250 x1 x0.8 x0.44x1
3.0
= 146.67
This level of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.Being a room that is not used all day
illumination levels are however not as significant as in other areas of the block.
Edson Engineers Page 16
2.2 Girls Toilets.
2.2.1 Area Outside toilets having whbs within toilet block.
The room dimensions are:
Length of the room, L = 11.9m
Width of the room, W = 4.02
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 1200mm 1x36W
ELECTRONIC BALLAST single
batten fluorescent fitting with acrylic diffuser as pierlite. For this fitting, the
nominal luminous flux Øn = 5400 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 11.9 x 4.02 = 1.47
2.05(11.9+4.02)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
Edson Engineers Page 17
= 59 + (1.47 − 1.25) . .
=63.4% = 0.634
The number of luminaires is given as,
=
100 47.84
3450 x1 x0.8 x0.634
= 2.73
Thus we use 3 No.Luminaires, 1200mm 1x36W Electronic Ballast single
batten fluorescent fitting with acrylic diffuser as pierlite. to provide lighting for
the area.
This gives an illuminance of :
=
Øn xn xMf xUfxN
A
=
3450 x1 x0.8 x0.634x3
47.84
= 109.73
Thislevel of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.
2.2.2 Area inside toilets having wcs but within toilet block.
The room dimensions are:
Length of the room, L = 10.215m
Width of the room, W = 2.0m
Edson Engineers Page 18
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp
downlighter with
white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 10.215 x 2.0 = 0.816
2.05(10.215+2.0)
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
= 48 + (0.816 − 0.75) . .
=49.32% = 0.4932
The number of luminaires is given as,
=
100 20.43
1250 x1 x0.8 x0.4932
= 4.142
Thus we use 4 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
Edson Engineers Page 19
This gives an illuminance of:
=
Øn xn xMf xUfxN
A
=
1250 x1 x0.8 x0.49x4
20.43
= 95.94
This level of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.
2.2.3 Paraplegic toilets.
The room dimensions are:
Length of the room, L = 2.0m
Width of the room, W = 1.5m
For this toilets, the design illuminance E = 100 Lux as the lighting requirements are
for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp
downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250
lumens per lamp.
Height of the luminaire above the working plane Hm = 2.05m
Therefore the room index Ri = L x W
Hm (L + W)
= 2.0 x 1.5 = 0.585
2.05(2.0+1.5)
Edson Engineers Page 20
From the photometric tables, and by extrapolation, the utilization factor is
obtained as
= ( ) + ( − ( )
( ) − ( )
( ) − ( )
= 48 + (0.585 − 0.75) . .
=44.7%=0.447
The number of luminaires is given as,
=
100 3.0
1250 x1 x0.8 x0.447
= 0.67
Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with
White lining to provide lighting for the area.
. This gives an illuminance of:
=
Øn xn xMf xUfxN
A
=
1250 x1 x0.8 x0.447x1
3.0
= 149
This level of illumination is acceptable as the luminaires will therefore provide
adequate lighting for the area required.
Edson Engineers Page 21
3.0 Power Design.
3.1 Formulae and Fundamental Considerations.
The following formulae as provided in the IEE Wiring regulations 17th Edition (BS
7671:2008) and its guide: Design and Verification of Electrical Installations by
Brian Scaddan( IEng, MIET) – Newnes Publishers UK (2008) were used in
calculations pertaining to power.
3.1.1 Design current I b
This is defined as ‘the magnitude of the current to be carried by a circuit in
normal service ’ , and is either determined directly from manufacturers’ details
or calculated using the following formulae as provided by 17th Edition of IEE
wiring regulations :
3.1.1 (a) Single phase loads.
= or =
3.1.1 (b) Three phase load
=
√
or =
√ %
In both cases where:
P _ power in watts
V _ line to neutral voltage in volts
V L _ line to line voltage in volts
Eff% _ efficiency
PF _ power factor.
Edson Engineers Page 22
3.1.2 Diversity
The application of diversity to an installation permits, by assuming that not all loads
will be energized at the same time, thus a reduction in main or distribution circuit
cable sizes. The IEE Regulations Guidance Notes or On-Site Guide tabulate diversity in
the form of percentages of full load for various circuits in a range of installations.
However, it is for the designer to make a careful judgement as to the exact level of
diversity to be applied by consideration of the actual design intended, most a times
designer judgement is employeds .
3.1.3 Nominal rating or setting of protection In.
In is that it should be greater than or equal to I b. We can select for this condition
from IEE Regulations Tables 41.2, 41.3 or 41.4. For types and sizes outside the scope of
these tables, details from the manufacturer will need to be sought.
3.1.4 Selection of suitable conductor size .
Based on the quantity of current anticipated. This is obtainable from calculations and
reference to standard cable rating tables.
3.1.5 Sizing the protective device
According to IEE regulations:
Ib≤ II ≤ Ic
Where:
Ib= Design current of the circuit
II = Nominal current or current setting of the protective device
Ic = Current carrying capacity of the conductor in the particular installation
conditions
3.1.6 Voltage drop
In many instances this may well be the most onerous condition to affect cable sizes.
The Regulations require that the voltage at the terminals of fixed equipment should
be greater than the lower limit permitted by the British Standard for that equipment,
Edson Engineers Page 23
or in the absence of a British Standard, that the safe functioning of the equipment
should not be impaired. These requirements are fulfilled if the voltage drop between
the origin of the installation and any load point does not exceed the following values
(IEE Regulations, Appendix 12) ( Table 3.1 Below ). Standard cable current ratings are
tabulated against voltage drop in milli-volts (mV) dropped for every ampere of
design current (A), for every metre of conductor length(m), case of Tables 9D1, 9D2,
9D3, 9E1 etc in BS Code i.e.
Volt drop = mV/A/m (IEE 17th Edition)
Table 3.1
Lighting Power
3% 5%
240V Single phase 7.2V 12V
415V three phase 12.5V 20.8V
or fully translated with Ib for A and L (length in metres) as below formulae:
Formulae.
= volts = Vd = I x ∂ x L Volts (IEE 17th Edition)
3.2 Power Calculations for Both toilet Blocks.
3.2.1 Fixed power loads on distribution boards calculations, power supply cable and
protective switch gear sizing.
The ratings of the cable size and protective switch gear at the distribution board for
individual equipment /appliance is established from its load current during starting
operation voltage drops are pertinent in proper cable sizing and safety of operation.
Edson Engineers Page 24
3.2.1( a ) Calculations.
The loads are single phase and thus single phase distribution supply adopted for
economic justification.
Formulae for calculation is provided above (also indicated below) as per IEE Wiring
standards .
=
( )
or =
( )
3.2.1(b) Hand drier spur point Cable Sizing and Circuit breaker rating.
Consideration during design is made for each spur point.This is performed assuming
the hand drier is in full operation. Ideal Load due to hand drier is used, Assuming
diversity of 1.
= =
3000
240 0.8
= 15.63
From IEE Wiring Regulations tables, a cable of 2.5mm2 SC PVC insulated copper
cables is sufficient for the operation, however considering the overshoot during start
operation 4.0 mm2 SC Insulated by PVC copper cables can be used to cater for the
in currents rush as the case of a childrens’ toilet and also considering that the
distance from the DB to the spur point is very short, thus negligible economic
implications. (BS 6004 , BS 6346)
Thus a 20 A Double pole switch is chosen for the hand drier.
A protective circuit breaker of 20 A TP MCB is chosen for hand drier circuit.
Edson Engineers Page 25
3.2.2 Current to CU’s, Cable Sizing for Armoured Cable and Choice of MCCB.
3.2.2(a) CU – CA , Girls toilets.
Total load on CU – CA in Kw is given in the table below.
ITEM NO RATING Total
Wattage(KW)
Total
Wattage x
1.8
Total
Wattage
for
Fluorescent
(Watts)
Fittings
Diversity Applying a
Diversity
(KW)
Flourescent
Lights
3 0.036 0.108 0.194 0.9 0.175
Security
Lights
4 0.060 0.240 - 0.5 0.120
Down
Lights
5 0.016 0.080 - 0.9 0.072
Double
Poles
1 3.0 3.000 - 0.7 2.100
TOTAL KW 2.467
ASSUMING PF = 0.8 KVA 1.974
Table3.2
Total load supplied to CU – CA was 2.467 Kw.
Allowing for 10% Extra Load for future additional load.
2.467Kw + 10/100*2.467Kw = 2.714 Kw
Design Load Current =
.
= 14.14 A
The maximum allowed voltage drop is 5% of 240 V0lts = 12V
= volts = Vd = I x ∂ x L Volts
Since the CU’s are approximately 45 m from Maintenance workshop,
Maximum value of ∂ = Vd /( Ib x L) Volts = 12 / (14.14 x 45) = 18.86 Mv/A/m ,thus a
Edson Engineers Page 26
Armorued cable of 4mm2 with a voltage drop of 12 Mv/A/m is chosen. Giving a total
voltage drop of:
Vd = 14.14 x 12 x 45 x 10-3 Volts = 7.64 Volts.
The MCCB chosen is 20 A.
Since ; Ib≤ II ≤ Ic
Where:
Ib= Design current of the circuit
II = Nominal current or current setting of the protective device
Ic = Current carrying capacity of the conductor in the particular installation
conditions
Ib = 14.14 A, II = 20 A Ic = 37 A.
3.2.2(b) CU – CB , Boys toilets.
Total load on CU – CA in Kw is given in the table below.
ITEM NO RATING Total
Wattage(KW)
Total
Wattage x
1.8
Total
Wattage
for
Fluorescent
(Watts)
Fittings
Diversity Applying a
Diversity
(KW)
Flourescent
Lights
3 0.036 0.108 0.194 0.9 0.175
Security
Lights
5 0.060 0.300 - 0.5 0.150
Down
Lights
6 0.016 0.096 - 0.9 0.086
Double
Poles
1 3.0 3.000 - 0.7 2.100
TOTAL KW 2.511
ASSUMING PF = 0.8 KVA 2.009
Table3.3
Total load supplied to CU – Cb was 2.511 Kw.
Allowing for 30% Extra Load for future additional load.
Edson Engineers Page 27
2.511Kw + 10/100*2.511Kw = 2.762 Kw
Design Load Current =
.
= 14.39 A
The maximum allowed voltage drop is 5% of 240 V0lts = 12V
= volts = Vd = I x ∂ x L Volts
Since the CU’s are approximately 45 m from Maintenance workshop,
Maximum value of ∂ = Vd /( Ib x L) Volts = 12 / (14.39 x 45) = 18.53 Mv/A/m ,thus a
Armorued cable of 4mm2 with a voltage drop of 12 Mv/A/m is chosen. Giving a total
voltage drop of:
Vd = 14.39 x 12 x 45 x 10-3 Volts = 7.77 Volts.
The MCCB chosen is 20 A.
Since ; Ib≤ II ≤ Ic
Where:
Ib= Design current of the circuit
II = Nominal current or current setting of the protective device
Ic = Current carrying capacity of the conductor in the particular installation
conditions
Ib = 14.39 A, II = 20 A Ic = 37 A.
……………………………………………..end……………………………………………

Weitere ähnliche Inhalte

Was ist angesagt?

Lightning and surge transfer to systems presentation by jmv lps
Lightning and surge  transfer to systems presentation by jmv lpsLightning and surge  transfer to systems presentation by jmv lps
Lightning and surge transfer to systems presentation by jmv lpsMahesh Chandra Manav
 
Wideband power amplifier based on Wilkinson power divider for s-band satellit...
Wideband power amplifier based on Wilkinson power divider for s-band satellit...Wideband power amplifier based on Wilkinson power divider for s-band satellit...
Wideband power amplifier based on Wilkinson power divider for s-band satellit...journalBEEI
 
Metro rail project in india year 2017
Metro rail project in india year 2017Metro rail project in india year 2017
Metro rail project in india year 2017Mahesh Chandra Manav
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyMahesh Chandra Manav
 
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORK
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORKENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORK
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORKijejournal
 
RF MEMS in Energy Harvesting
RF MEMS in Energy HarvestingRF MEMS in Energy Harvesting
RF MEMS in Energy HarvestingAalay Kapadia
 
Latest ese type la nfc17 102(2011) -1
Latest ese type la nfc17 102(2011) -1Latest ese type la nfc17 102(2011) -1
Latest ese type la nfc17 102(2011) -1Mahesh Chandra Manav
 
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICS
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICSWI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICS
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICSAparna Vijayan
 
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...Review on Design and Performance Analysis of Low Power Transceiver Circuit in...
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...iosrjce
 
Energy harvesting using mems
Energy harvesting using memsEnergy harvesting using mems
Energy harvesting using memsRichu Jose Cyriac
 
Reconfigurable RF MEMS Bandpass Filter
Reconfigurable RF MEMS Bandpass FilterReconfigurable RF MEMS Bandpass Filter
Reconfigurable RF MEMS Bandpass FilterWEI WEI
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversionrob_1v
 

Was ist angesagt? (14)

Lightning and surge transfer to systems presentation by jmv lps
Lightning and surge  transfer to systems presentation by jmv lpsLightning and surge  transfer to systems presentation by jmv lps
Lightning and surge transfer to systems presentation by jmv lps
 
Wideband power amplifier based on Wilkinson power divider for s-band satellit...
Wideband power amplifier based on Wilkinson power divider for s-band satellit...Wideband power amplifier based on Wilkinson power divider for s-band satellit...
Wideband power amplifier based on Wilkinson power divider for s-band satellit...
 
Metro rail project in india year 2017
Metro rail project in india year 2017Metro rail project in india year 2017
Metro rail project in india year 2017
 
Indian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periortyIndian railway&metro rail,others electrical safety first periorty
Indian railway&metro rail,others electrical safety first periorty
 
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORK
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORKENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORK
ENERGY HARVESTING METHOD IN WIRELESS SENSOR NETWORK
 
RF MEMS in Energy Harvesting
RF MEMS in Energy HarvestingRF MEMS in Energy Harvesting
RF MEMS in Energy Harvesting
 
opto1st
opto1stopto1st
opto1st
 
Latest ese type la nfc17 102(2011) -1
Latest ese type la nfc17 102(2011) -1Latest ese type la nfc17 102(2011) -1
Latest ese type la nfc17 102(2011) -1
 
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICS
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICSWI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICS
WI:PIE- ENERGY HARVESTING IN MOBILE ELECTRONICS
 
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...Review on Design and Performance Analysis of Low Power Transceiver Circuit in...
Review on Design and Performance Analysis of Low Power Transceiver Circuit in...
 
Energy harvesting using mems
Energy harvesting using memsEnergy harvesting using mems
Energy harvesting using mems
 
Multi chip module
Multi chip moduleMulti chip module
Multi chip module
 
Reconfigurable RF MEMS Bandpass Filter
Reconfigurable RF MEMS Bandpass FilterReconfigurable RF MEMS Bandpass Filter
Reconfigurable RF MEMS Bandpass Filter
 
Renewable Energy Conversion
Renewable Energy ConversionRenewable Energy Conversion
Renewable Energy Conversion
 

Andere mochten auch

Typical Electrical Design philosophy.
Typical Electrical Design philosophy.Typical Electrical Design philosophy.
Typical Electrical Design philosophy.Wambasi Fred
 
UPS Electrical Design and Installation
UPS Electrical Design and InstallationUPS Electrical Design and Installation
UPS Electrical Design and InstallationJason Koffler
 
Portfolio Assignmnet Final Draft
Portfolio Assignmnet Final DraftPortfolio Assignmnet Final Draft
Portfolio Assignmnet Final DraftSean Hazzard
 
Illumination Example 3
Illumination Example 3Illumination Example 3
Illumination Example 3Vijay Raskar
 
Illumination Example 6
Illumination Example 6Illumination Example 6
Illumination Example 6Vijay Raskar
 
Commercial Project
Commercial ProjectCommercial Project
Commercial ProjectCkurdi
 
Illumination Example 4
Illumination Example 4Illumination Example 4
Illumination Example 4Vijay Raskar
 
Illumination Example 1
Illumination Example 1Illumination Example 1
Illumination Example 1Vijay Raskar
 
Introduction & design cable pathways
Introduction & design cable pathwaysIntroduction & design cable pathways
Introduction & design cable pathwaysJeffrey Lam
 
electrical lighting calculation
electrical lighting calculationelectrical lighting calculation
electrical lighting calculationKamesh M
 
BEAMA Best Practice Guide to Cable Ladder & Cable Tray Systems
BEAMA Best Practice Guide to Cable Ladder & Cable Tray SystemsBEAMA Best Practice Guide to Cable Ladder & Cable Tray Systems
BEAMA Best Practice Guide to Cable Ladder & Cable Tray SystemsThorne & Derrick International
 
Cable management powerpoint introductory presentation
Cable management powerpoint introductory presentation Cable management powerpoint introductory presentation
Cable management powerpoint introductory presentation Multi-D
 
A step-by-step approach to prepare fault studies of electrical power systems
A step-by-step approach to prepare fault studies of electrical power systemsA step-by-step approach to prepare fault studies of electrical power systems
A step-by-step approach to prepare fault studies of electrical power systemsH. Kheir
 
Top 10 electrical design engineer interview questions and answers
Top 10 electrical design engineer interview questions and answersTop 10 electrical design engineer interview questions and answers
Top 10 electrical design engineer interview questions and answersrivherjonh
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculationsmichaeljmack
 

Andere mochten auch (20)

Typical Electrical Design philosophy.
Typical Electrical Design philosophy.Typical Electrical Design philosophy.
Typical Electrical Design philosophy.
 
UPS Electrical Design and Installation
UPS Electrical Design and InstallationUPS Electrical Design and Installation
UPS Electrical Design and Installation
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
Portfolio Assignmnet Final Draft
Portfolio Assignmnet Final DraftPortfolio Assignmnet Final Draft
Portfolio Assignmnet Final Draft
 
Illumination Example 3
Illumination Example 3Illumination Example 3
Illumination Example 3
 
Illumination Example 6
Illumination Example 6Illumination Example 6
Illumination Example 6
 
Commercial Project
Commercial ProjectCommercial Project
Commercial Project
 
Illumination Example 4
Illumination Example 4Illumination Example 4
Illumination Example 4
 
Illumination Example 1
Illumination Example 1Illumination Example 1
Illumination Example 1
 
Introduction & design cable pathways
Introduction & design cable pathwaysIntroduction & design cable pathways
Introduction & design cable pathways
 
unchachar
unchacharunchachar
unchachar
 
PG Diploma in Oil & Gas Engineering Management in Noida
PG Diploma in Oil & Gas Engineering Management in NoidaPG Diploma in Oil & Gas Engineering Management in Noida
PG Diploma in Oil & Gas Engineering Management in Noida
 
electrical lighting calculation
electrical lighting calculationelectrical lighting calculation
electrical lighting calculation
 
Balanced faults
Balanced faultsBalanced faults
Balanced faults
 
BEAMA Best Practice Guide to Cable Ladder & Cable Tray Systems
BEAMA Best Practice Guide to Cable Ladder & Cable Tray SystemsBEAMA Best Practice Guide to Cable Ladder & Cable Tray Systems
BEAMA Best Practice Guide to Cable Ladder & Cable Tray Systems
 
Cable tray manual
Cable tray manualCable tray manual
Cable tray manual
 
Cable management powerpoint introductory presentation
Cable management powerpoint introductory presentation Cable management powerpoint introductory presentation
Cable management powerpoint introductory presentation
 
A step-by-step approach to prepare fault studies of electrical power systems
A step-by-step approach to prepare fault studies of electrical power systemsA step-by-step approach to prepare fault studies of electrical power systems
A step-by-step approach to prepare fault studies of electrical power systems
 
Top 10 electrical design engineer interview questions and answers
Top 10 electrical design engineer interview questions and answersTop 10 electrical design engineer interview questions and answers
Top 10 electrical design engineer interview questions and answers
 
Symmetrical Components Fault Calculations
Symmetrical Components Fault CalculationsSymmetrical Components Fault Calculations
Symmetrical Components Fault Calculations
 

Ähnlich wie Lighting & power design citam

B science II Report
B science II Report B science II Report
B science II Report Carmen Chee
 
Bsc 2 project 2 report
Bsc 2 project 2 reportBsc 2 project 2 report
Bsc 2 project 2 reportKC Wong
 
Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculationsMusaib ul Hassan Bhat
 
Building Science II
Building Science IIBuilding Science II
Building Science IIVansC
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building ScienceClement Seong
 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTYvonne Chin
 
Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)Aaron Chong Yu Ho
 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2xinhuaee123
 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 finalKhoo Zer Kai
 
Light analysis
Light analysisLight analysis
Light analysismrstore
 
Bs calculation
Bs calculationBs calculation
Bs calculationong93
 
How to measure illumination
How to measure illuminationHow to measure illumination
How to measure illuminationajsatienza
 
Lighting and Acoustics Proposal Report & Calculation
Lighting and Acoustics Proposal Report & CalculationLighting and Acoustics Proposal Report & Calculation
Lighting and Acoustics Proposal Report & CalculationLiew Hong Zhi
 
Lighting architecture notes lectureLighting architecture lecture 5
Lighting architecture notes lectureLighting architecture  lecture 5Lighting architecture notes lectureLighting architecture  lecture 5
Lighting architecture notes lectureLighting architecture lecture 5MRKextreme
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integrationCrysmond Goh
 
Lighting design lecture
Lighting design lectureLighting design lecture
Lighting design lectureHytham Bardecy
 

Ähnlich wie Lighting & power design citam (20)

B science II Report
B science II Report B science II Report
B science II Report
 
seminar 2021.pptx
seminar 2021.pptxseminar 2021.pptx
seminar 2021.pptx
 
Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Bsc 2 project 2 report
Bsc 2 project 2 reportBsc 2 project 2 report
Bsc 2 project 2 report
 
Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculations
 
Building Science II
Building Science IIBuilding Science II
Building Science II
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building Science
 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORT
 
Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)
 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2
 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 final
 
Light analysis
Light analysisLight analysis
Light analysis
 
Bs calculation
Bs calculationBs calculation
Bs calculation
 
Illumination
IlluminationIllumination
Illumination
 
How to measure illumination
How to measure illuminationHow to measure illumination
How to measure illumination
 
Bscience 2
Bscience 2Bscience 2
Bscience 2
 
Lighting and Acoustics Proposal Report & Calculation
Lighting and Acoustics Proposal Report & CalculationLighting and Acoustics Proposal Report & Calculation
Lighting and Acoustics Proposal Report & Calculation
 
Lighting architecture notes lectureLighting architecture lecture 5
Lighting architecture notes lectureLighting architecture  lecture 5Lighting architecture notes lectureLighting architecture  lecture 5
Lighting architecture notes lectureLighting architecture lecture 5
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integration
 
Lighting design lecture
Lighting design lectureLighting design lecture
Lighting design lecture
 

Kürzlich hochgeladen

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Lighting & power design citam

  • 1. Edson Engineers Page 1 EDSON ENGINEERS. DESIGN CALCULATIONS. LIGHTING AND POWER DESIGN CALCULATIONS. BY FRED BUTETE WAMBASI. PROJECT: CITAM KAREN BOYS AND GIRLS TOILETS JANUARY 2015 Power Design Calculations Lighting
  • 2. Edson Engineers Page 2 1.0 Lighting Design. 1.1 Formulae and Fundamental Considerations. Lighting design aims at determining the number of lighting fixtures (luminaries) required in order to achieve the recommended illumination for a given task. Key considerations prior to design are;  The dimensions of the room; Length, Width and mounting height of the luminaire from working plane.  The nature of ceiling, walls, and floors in terms of coluor and material.  The functionally/use of the design area to be illuminated.  Non analytical factors affecting the choice of luminaires, aesthetics and natural lighting. In determining the number of lighting fixtures (luminaries) required, key among other factors; the following has to be established:  Recommended illuminance (Lux) in Lumens/m²  Utilization factor  Maintenance factor of the Luminaire  Nominal lamp Luminous flux/output in Lumens. Quantity of light here is specified by illuminance which is measured in lux (lm/m2 of illuminated surface). The Lumen method formula used is as below (as per CIBSE Lighting guide and a textbook on building services engineering by David V. Chadderton: Building Services Engineering Fifth edition (2007) - Taylor and Francis Group - New York ).
  • 3. Edson Engineers Page 3 = Øn xn xMf xUf Where: E = Average recommended illuminance (Lux) in Lumens/m² A = Area of the working plane (m²) Øn= Nominal Lamp Luminous Flux Mf = Maintenance factor Uf = Utilization factor N= Number of Luminaires n= No. of luminaire’s lamps 1.2 Definitions: a. Utilization factor (Uf) This represents the proportion of luminous flux of the lamp that reaches the working plane and is dependent on the following:  Luminaire efficiency  Lighting fitting distribution  Reflectances of the room surfaces i.e. ( Ceiling, walls and floor)  Room index. The room index represents the geometrical ratio of the area of the horizontal surfaces to that of the Vertical surfaces measured from the working plane in the room and is expressed as: Ri = (L x W) ( + ) Where: L = Length of the room
  • 4. Edson Engineers Page 4 W = Width of the room Hm = Height of the Luminaire above the working plane. The room reflectances depend on the room surface finishes. In my design the ceiling is painted white, floor is terrazzo/pvc tiles in some areas and the walls are painted white.The design reflectance ratio used is C: W: F = 0.7: 0.5: 0.2. Hm of 2.05m is used herein in design calculations. Standard photometric tables for a combination of various values of room indices and surface reflectances exist (given by manufacturers) from which the value of the utilization factor (Uf) was directly obtained or extrapolated for values of Room indices that were not integers as follows: = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) where: (U= upper Value& L= Lower Value) b. Maintenance factor (Mf) This gives the proportion of illuminance provided by a luminaire in normal working conditions (dirty conditions) of both the luminaire and the room surfaces to the illuminance of the same luminaire in clean conditions. For this design, I used a maintenance factor of 0.8 on the assumption that the room surfaces will be maintained very clean most of the times given this is children’s toilet where high standards of cleanliness are desired. c. Nominal Lamp Luminous Flux (Øn) The value was obtained from lamp photometric data usually provided by manufacturers in the catalogues. d. Illumination level (E) These were read from a chart guide used for obtaining recommended illuminance (Lux) prepared by the Chartered Institute of Building Services
  • 5. Edson Engineers Page 5 Engineers (CIBSE) and the Philips Lighting design Manual. These values entirely depend on the type of use the room is put into. The illuminance are as summarized in the tables below: The following are the recommended Illumination Levels; a) Hospital Item Description Recommended Lux (E) in Lumens/M2 1.0 Corridors: Night Daytime/ Evening 50 200 2.0 Wards: Circulation at night Observation at night General Lighting Simple Examination/Reading 30 5 150 300 3.0 Examination Rooms: General Lighting Local Examination Lighting 500 1000 4.0 Intensive therapy: Bedhead Observation 50 750 5.0 Nurses Stations 300 6.0 Operating Theaters: Pre-Op room General theater lighting - 500 1000 - 7.0 Laboratories & Pharmacies: General Lighting Local 750 1000 8.0 Consulting Rooms: General Lighting Local 500 750 9.0 Autopsy Rooms: General Lighting Local 750 5000
  • 6. Edson Engineers Page 6 b) Offices Item Description Recommended Lux E in Lumens/M2 1.0 General offices with typing, computers e.t.c 500 2.0 Conference rooms 300 3.0 Archives 200 c) General Building areas Item Description Recommended Lux E in Lumens/M2 1.0 Circulation areas, corridors 100 2.0 Cloak rooms, toilets 100 3.0 Stores, Stock rooms 100 4.0 Stairs, escalators 150 d) Kitchen Block Item Description Recommended Lux E in Lumens/M2 1.0 Servery 300 2.0 Kitchen 500 3.0 Food stores 150 4.0 Food preparation area 500 5.0 Cold store 300 6.0 Office 500 7.0 Kitchen yard 30
  • 7. Edson Engineers Page 7 e) Laundry Block Item Description Recommended Lux E in Lumens/M2 1.0 Pressing 500 2.0 Sewing/Mending 750 3.0 Gents/Ladies 100 f) Workshop Block Item Description Recommended Lux E in Lumens/M2 1.0 Welding 300 2.0 Machine work, coil winding 500 3.0 Fine bench & Machine work 750 4.0 Testing/ adjusting Electrical components 1000 2.0 Lighting Design Task. 2.1 Boys Toilets. 2.1.1 Area Outside toilets having whbs within toilet block. The room dimensions are: Length of the room, L = 8.9m Width of the room, W = 5.8m
  • 8. Edson Engineers Page 8 For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 1200mm 1x36W ELECTRONIC BALLAST single batten fluorescent fitting with acrylic diffuser as pierlite. For this fitting, the nominal luminous flux Øn = 5400 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 8.9 x 5.8 = 1.40 2.05(8.9+5.8) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) = 59 + (1.40 − 1.25) . . =62.09% = 0.6209 The number of luminaires is given as, = 100 51.62 3450 x1 x0.8 x0.6209 = 3.0122
  • 9. Edson Engineers Page 9 Thus we use 3 No.Luminaires,1200mm 1x36W Electronic Ballast single batten fluorescent fitting with acrylic diffuser as pierlite to provide lighting for the area. This gives an illuminance of : = Øn xn xMf xUfxN A = 3450 x1 x0.8 x0.6209x3 51.62 = 99.59 Thislevel of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required. 2.1.2 Area inside toilets having wcs but within toilet block. The room dimensions are: Length of the room, L = 4.5m Width of the room, W = 2.0m For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m
  • 10. Edson Engineers Page 10 Therefore the room index Ri = L x W Hm (L + W) = 4.5 x 2.0 = 0.555351682 2.05(4.5+2.0) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) = 48 + (0.56 − 0.75) . . =44.10% = 0.441 The number of luminaires is given as, = 100 9.08 1250 x1 x0.8 x0.441 = 2.058 Thus we use 2 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area. . This gives an illuminance of: = Øn xn xMf xUfxN A
  • 11. Edson Engineers Page 11 = 1250 x1 x0.8 x0.441x2 9.08 = 97.14 Thislevel of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required. 2.1.3 Paraplegic toilets. The room dimensions are: Length of the room, L = 2.38m Width of the room, W = 1.5m For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 2.38 x 1.5 = 0.448830 2.05(2.38+1.5) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( )
  • 12. Edson Engineers Page 12 = 48 + (0.449 − 0.75) . . =41.98% = 0.42 The number of luminaires is given as, = 100 3.57 1250 x1 x0.8 x0.42 = 0.85 Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area. . This gives an illuminance of: = Øn xn xMf xUfxN A = 1250 x1 x0.8 x0.42x1 3.57 = 117.64 This level of illumination is acceptable (within + 30%) as the luminaires will therefore provide adequate lighting for the area required. 2.1.4 Showers. The room dimensions are: Length of the room, L = 2.0m Width of the room, W = 1.5m
  • 13. Edson Engineers Page 13 For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 2.0 x 1.5 = 0.418 2.05(2.0+1.5) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) = 48 + (0.418 − 0.75) . . =41.36% = 0.41 The number of luminaires is given as, = 100 3.0 1250 x1 x0.8 x0.41 = 0.73
  • 14. Edson Engineers Page 14 Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area. This gives an illuminance of: = Øn xn xMf xUfxN A = 1250 x1 x0.8 x0.41x1 3.57 = 114.85 This level of illumination is acceptable (within + 30%) as the luminaires will therefore provide adequate lighting for the area required. 2.1.5 Area in front of cleaners’ room (corridor space). The room dimensions are: Length of the room, L = 2.23m Width of the room, W = 2.17m For this toilets, the design illuminance E = 150 Lux as the lighting requirements for this space. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 2.23 x 2.17 = 0.536 2.05(2.23+2.17)
  • 15. Edson Engineers Page 15 From the photometric tables, and by extrapolation, the utilization factor is obtained as Uf = 48 + (0.536 − 0.75) . . =43.72% = 0.44 The number of luminaires is given as, = 150 3.0 1250 x1 x0.8 x0.44 = 1.023 Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area. This gives an illuminance of: = Øn xn xMf xUfxN A = 1250 x1 x0.8 x0.44x1 3.0 = 146.67 This level of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required.Being a room that is not used all day illumination levels are however not as significant as in other areas of the block.
  • 16. Edson Engineers Page 16 2.2 Girls Toilets. 2.2.1 Area Outside toilets having whbs within toilet block. The room dimensions are: Length of the room, L = 11.9m Width of the room, W = 4.02 For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 1200mm 1x36W ELECTRONIC BALLAST single batten fluorescent fitting with acrylic diffuser as pierlite. For this fitting, the nominal luminous flux Øn = 5400 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 11.9 x 4.02 = 1.47 2.05(11.9+4.02) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( )
  • 17. Edson Engineers Page 17 = 59 + (1.47 − 1.25) . . =63.4% = 0.634 The number of luminaires is given as, = 100 47.84 3450 x1 x0.8 x0.634 = 2.73 Thus we use 3 No.Luminaires, 1200mm 1x36W Electronic Ballast single batten fluorescent fitting with acrylic diffuser as pierlite. to provide lighting for the area. This gives an illuminance of : = Øn xn xMf xUfxN A = 3450 x1 x0.8 x0.634x3 47.84 = 109.73 Thislevel of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required. 2.2.2 Area inside toilets having wcs but within toilet block. The room dimensions are: Length of the room, L = 10.215m Width of the room, W = 2.0m
  • 18. Edson Engineers Page 18 For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 10.215 x 2.0 = 0.816 2.05(10.215+2.0) From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) = 48 + (0.816 − 0.75) . . =49.32% = 0.4932 The number of luminaires is given as, = 100 20.43 1250 x1 x0.8 x0.4932 = 4.142 Thus we use 4 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area.
  • 19. Edson Engineers Page 19 This gives an illuminance of: = Øn xn xMf xUfxN A = 1250 x1 x0.8 x0.49x4 20.43 = 95.94 This level of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required. 2.2.3 Paraplegic toilets. The room dimensions are: Length of the room, L = 2.0m Width of the room, W = 1.5m For this toilets, the design illuminance E = 100 Lux as the lighting requirements are for cloak rooms and toilets. The luminaire chosen was 16W Polo Opal C/W lamp downlighter with white lining. For this fitting, the nominal luminous flux Øn = 1250 lumens per lamp. Height of the luminaire above the working plane Hm = 2.05m Therefore the room index Ri = L x W Hm (L + W) = 2.0 x 1.5 = 0.585 2.05(2.0+1.5)
  • 20. Edson Engineers Page 20 From the photometric tables, and by extrapolation, the utilization factor is obtained as = ( ) + ( − ( ) ( ) − ( ) ( ) − ( ) = 48 + (0.585 − 0.75) . . =44.7%=0.447 The number of luminaires is given as, = 100 3.0 1250 x1 x0.8 x0.447 = 0.67 Thus we use 1 No.Luminaires, as 16W Polo Opal C/W lamp downlighter with White lining to provide lighting for the area. . This gives an illuminance of: = Øn xn xMf xUfxN A = 1250 x1 x0.8 x0.447x1 3.0 = 149 This level of illumination is acceptable as the luminaires will therefore provide adequate lighting for the area required.
  • 21. Edson Engineers Page 21 3.0 Power Design. 3.1 Formulae and Fundamental Considerations. The following formulae as provided in the IEE Wiring regulations 17th Edition (BS 7671:2008) and its guide: Design and Verification of Electrical Installations by Brian Scaddan( IEng, MIET) – Newnes Publishers UK (2008) were used in calculations pertaining to power. 3.1.1 Design current I b This is defined as ‘the magnitude of the current to be carried by a circuit in normal service ’ , and is either determined directly from manufacturers’ details or calculated using the following formulae as provided by 17th Edition of IEE wiring regulations : 3.1.1 (a) Single phase loads. = or = 3.1.1 (b) Three phase load = √ or = √ % In both cases where: P _ power in watts V _ line to neutral voltage in volts V L _ line to line voltage in volts Eff% _ efficiency PF _ power factor.
  • 22. Edson Engineers Page 22 3.1.2 Diversity The application of diversity to an installation permits, by assuming that not all loads will be energized at the same time, thus a reduction in main or distribution circuit cable sizes. The IEE Regulations Guidance Notes or On-Site Guide tabulate diversity in the form of percentages of full load for various circuits in a range of installations. However, it is for the designer to make a careful judgement as to the exact level of diversity to be applied by consideration of the actual design intended, most a times designer judgement is employeds . 3.1.3 Nominal rating or setting of protection In. In is that it should be greater than or equal to I b. We can select for this condition from IEE Regulations Tables 41.2, 41.3 or 41.4. For types and sizes outside the scope of these tables, details from the manufacturer will need to be sought. 3.1.4 Selection of suitable conductor size . Based on the quantity of current anticipated. This is obtainable from calculations and reference to standard cable rating tables. 3.1.5 Sizing the protective device According to IEE regulations: Ib≤ II ≤ Ic Where: Ib= Design current of the circuit II = Nominal current or current setting of the protective device Ic = Current carrying capacity of the conductor in the particular installation conditions 3.1.6 Voltage drop In many instances this may well be the most onerous condition to affect cable sizes. The Regulations require that the voltage at the terminals of fixed equipment should be greater than the lower limit permitted by the British Standard for that equipment,
  • 23. Edson Engineers Page 23 or in the absence of a British Standard, that the safe functioning of the equipment should not be impaired. These requirements are fulfilled if the voltage drop between the origin of the installation and any load point does not exceed the following values (IEE Regulations, Appendix 12) ( Table 3.1 Below ). Standard cable current ratings are tabulated against voltage drop in milli-volts (mV) dropped for every ampere of design current (A), for every metre of conductor length(m), case of Tables 9D1, 9D2, 9D3, 9E1 etc in BS Code i.e. Volt drop = mV/A/m (IEE 17th Edition) Table 3.1 Lighting Power 3% 5% 240V Single phase 7.2V 12V 415V three phase 12.5V 20.8V or fully translated with Ib for A and L (length in metres) as below formulae: Formulae. = volts = Vd = I x ∂ x L Volts (IEE 17th Edition) 3.2 Power Calculations for Both toilet Blocks. 3.2.1 Fixed power loads on distribution boards calculations, power supply cable and protective switch gear sizing. The ratings of the cable size and protective switch gear at the distribution board for individual equipment /appliance is established from its load current during starting operation voltage drops are pertinent in proper cable sizing and safety of operation.
  • 24. Edson Engineers Page 24 3.2.1( a ) Calculations. The loads are single phase and thus single phase distribution supply adopted for economic justification. Formulae for calculation is provided above (also indicated below) as per IEE Wiring standards . = ( ) or = ( ) 3.2.1(b) Hand drier spur point Cable Sizing and Circuit breaker rating. Consideration during design is made for each spur point.This is performed assuming the hand drier is in full operation. Ideal Load due to hand drier is used, Assuming diversity of 1. = = 3000 240 0.8 = 15.63 From IEE Wiring Regulations tables, a cable of 2.5mm2 SC PVC insulated copper cables is sufficient for the operation, however considering the overshoot during start operation 4.0 mm2 SC Insulated by PVC copper cables can be used to cater for the in currents rush as the case of a childrens’ toilet and also considering that the distance from the DB to the spur point is very short, thus negligible economic implications. (BS 6004 , BS 6346) Thus a 20 A Double pole switch is chosen for the hand drier. A protective circuit breaker of 20 A TP MCB is chosen for hand drier circuit.
  • 25. Edson Engineers Page 25 3.2.2 Current to CU’s, Cable Sizing for Armoured Cable and Choice of MCCB. 3.2.2(a) CU – CA , Girls toilets. Total load on CU – CA in Kw is given in the table below. ITEM NO RATING Total Wattage(KW) Total Wattage x 1.8 Total Wattage for Fluorescent (Watts) Fittings Diversity Applying a Diversity (KW) Flourescent Lights 3 0.036 0.108 0.194 0.9 0.175 Security Lights 4 0.060 0.240 - 0.5 0.120 Down Lights 5 0.016 0.080 - 0.9 0.072 Double Poles 1 3.0 3.000 - 0.7 2.100 TOTAL KW 2.467 ASSUMING PF = 0.8 KVA 1.974 Table3.2 Total load supplied to CU – CA was 2.467 Kw. Allowing for 10% Extra Load for future additional load. 2.467Kw + 10/100*2.467Kw = 2.714 Kw Design Load Current = . = 14.14 A The maximum allowed voltage drop is 5% of 240 V0lts = 12V = volts = Vd = I x ∂ x L Volts Since the CU’s are approximately 45 m from Maintenance workshop, Maximum value of ∂ = Vd /( Ib x L) Volts = 12 / (14.14 x 45) = 18.86 Mv/A/m ,thus a
  • 26. Edson Engineers Page 26 Armorued cable of 4mm2 with a voltage drop of 12 Mv/A/m is chosen. Giving a total voltage drop of: Vd = 14.14 x 12 x 45 x 10-3 Volts = 7.64 Volts. The MCCB chosen is 20 A. Since ; Ib≤ II ≤ Ic Where: Ib= Design current of the circuit II = Nominal current or current setting of the protective device Ic = Current carrying capacity of the conductor in the particular installation conditions Ib = 14.14 A, II = 20 A Ic = 37 A. 3.2.2(b) CU – CB , Boys toilets. Total load on CU – CA in Kw is given in the table below. ITEM NO RATING Total Wattage(KW) Total Wattage x 1.8 Total Wattage for Fluorescent (Watts) Fittings Diversity Applying a Diversity (KW) Flourescent Lights 3 0.036 0.108 0.194 0.9 0.175 Security Lights 5 0.060 0.300 - 0.5 0.150 Down Lights 6 0.016 0.096 - 0.9 0.086 Double Poles 1 3.0 3.000 - 0.7 2.100 TOTAL KW 2.511 ASSUMING PF = 0.8 KVA 2.009 Table3.3 Total load supplied to CU – Cb was 2.511 Kw. Allowing for 30% Extra Load for future additional load.
  • 27. Edson Engineers Page 27 2.511Kw + 10/100*2.511Kw = 2.762 Kw Design Load Current = . = 14.39 A The maximum allowed voltage drop is 5% of 240 V0lts = 12V = volts = Vd = I x ∂ x L Volts Since the CU’s are approximately 45 m from Maintenance workshop, Maximum value of ∂ = Vd /( Ib x L) Volts = 12 / (14.39 x 45) = 18.53 Mv/A/m ,thus a Armorued cable of 4mm2 with a voltage drop of 12 Mv/A/m is chosen. Giving a total voltage drop of: Vd = 14.39 x 12 x 45 x 10-3 Volts = 7.77 Volts. The MCCB chosen is 20 A. Since ; Ib≤ II ≤ Ic Where: Ib= Design current of the circuit II = Nominal current or current setting of the protective device Ic = Current carrying capacity of the conductor in the particular installation conditions Ib = 14.39 A, II = 20 A Ic = 37 A. ……………………………………………..end……………………………………………