SlideShare ist ein Scribd-Unternehmen logo
1 von 189
#DAYFORACTION
WELCOME
#dayforaction
Refill partnership with
City to Sea
Chance to win a water
station worth £2000
and installed!
Deadline March 14th
Ceremony May 16th-
Leeds
#DAYFORACTION
Session 1: Top down & Bottom up
approaches to embedding sustainability
#dayforaction
Greater Manchester and Sustainability
Making a difference in health and social
care
• In 2016, Greater Manchester took control of its health
and social care system.
• At the same time we launched our five-year plan to
improve health and social care, called Taking Charge
• It involves NHS, councils, voluntary, community & social
enterprise, Healthwatch, other public services
•
•
•
•
•
•
•
•
•
•
.
Taking Charge
•
• More children reaching a good level of social and
emotional development - ready for school
• Fewer people dying from: cancer, heart and lung disease
• Supporting people to stay well and live at home for as long
as possible
• Ensuring we contribute in a leading way to a ‘sustainable’
system
•
•
•
•
•
•
.
A Reminder of Our Aims – by 2021
GMHSCP Partnership Opportunities
•
•
•
| 9
GMHSCP
Partnership
Opportunities
Carbon
Neutrality
(2038)
Environmental
Plan
GM Spatial
Framework
Industrial
Strategy
Clean Air Plan
Air Quality
Strategy
Transport
Strategy and
Made to Move
Health Benefits of
Action
•
• Cleaner Air
• Warmer Homes
• Healthier Eating
• Active Travel
• Green Space and Biodiversity
• Community Cohesiveness
• Healthier, Sustainable Economies
• Resilient communities and
health/social care system
•| 10
Locality
• Carbon Literacy Training
• Plastic & paper reduction
• Recyclable stationary
• Advocacy
• Social Value Strategy
Greater Manchester –
Advocacy
Phil Korbel
•
• Co Founder/Director Carbon Literacy Project
• Board Member, G Mcr Low Carbon Hub
•
Just think
•
• how different it would be if…
• everyone ‘got it’
• thought low carbon
• acted low carbon
• how much more effective would your existing SD measures be?
•
Carbon Literacy is
•
• a day’s-worth of adaptable, relevant, action-based
learning-and-doing on climate change that you deliver
• the foundation for upping your game on climate change
• is not about polar bears
• about health
•
•
Meanwhile, in Greater Manchester
•
•
•
•





• Carbon neutral by 2038, 15% annual reductions from
now on
•
The bosses agreed
•
• tackling climate change is part of the job
• is rarely a high priority
• why?
• “…because I won’t get fired if I don’t…”
• What gets measured gets done
•
What leeway does ‘Devo Manc’ offer?
•
• align with the GMCA plan
• standing agenda item
• Providers Board action group
• what gets measured gets done
• embed in funding contracts??
• spread best practice nationally
•
•
www.carbonliteracy.com
@Carbon_Literacy
#CarbonLit
phil@carbonliteracy.com
•
Sustainability
Solutions
14th February
2019
Paul
Broadberry
Manchester
Sustainability Solutions | CIS10315 Rev. A
Single-use device
remanufacturing
Overview -
Safety & Efficacy
Sustainability Solutions | CIS10315 Rev. A
Dedicated to your
sustainability goals
§ Remanufactured devices are backed by
Stryker’s comprehensive quality
system
§ All devices are individually tested to
ensure the highest quality
§
Patient Care sustainability
§ Maximise savings through case
support, business reviews,
education and utilising Stryker’s
entire remanufacturing program
§ Leverage partnership to provide
purchasing power and price
containment
Financial sustainability
§ Purchasing and collection processes
designed to minimise waste
§ Alignment to prioritize the reuse of
remanufactured devices
Environmental sustainability
Sustainability Solutions | CIS10315 Rev. A
Sustainability Solutions | CIS10315 Rev. A
‘Single-use’ devices (SUDs)
§ Most SUDs cannot be reused
§ The‘single use’label is determined by
the manufacturer, not the regulatory
body:
• Perceived limitation of liability
• Reduced scrutiny by regulatory body
• Increased sales and profits
§ Specialised technology and knowledge
allows manufacturers to
remanufacture certain SUDs
DVT
HARMONIC
SCALPEL
Sustainability Solutions | CIS10315 Rev. A
§ OEM devices are studied to identify critical
quality attributes and establish performance
specifications
§ Multiple Considerations:
• Analysis of the product
• Materials characterisation
• Chemical compatibility
• Generation of intermediate level
product description, including
engineering drawings
• Analysis of clinical application to
produce a specification
§
Reverse engineering
Sustainability Solutions | CIS10315 Rev. A
§ Complex medical devices must often be
disassembled
• Enables thorough cleaning
• Allows replacement of components
worn out during original use
• Increases yield
§ Replacement components are designed
and sourced based on OEM
specifications
• Validated as equivalent to new
Remanufacturing
requires
disassembly to
facilitate cleaning
Disassembly and replacement
components
Sustainability Solutions | CIS10315 Rev. A
§ Receiving and Sorting
• All orders are ticketed to ensure order
content integrity and traceability
• Gross rejects, heavily soiled items, and
unapproved products are removed
• Devices are identified according to OEM
convention
§
§ Device Marking/Tracking
• All devices are indelibly marked with
Unique Device Identifiers via pad
printing, bar coding, laser etching, etc.
• Allows traceability for cycle counts, reject
reconciliation, and potential post-market
field actions
Identification and traceability
Sustainability Solutions | CIS10315 Rev. A
§ Accepted devices undergo comprehensive cleaning that incorporates prolonged
soaking, cleaning and rinsing in pH-neutral enzymatic cleansers and sanitisers
that are compatible with all device materials
§
§ Residual levels of organic materials, such as protein, hemoglobin and total organic
carbon are quantified and compared with acceptable standards
§
Decontamination and cleaning
Sustainability Solutions | CIS10315 Rev. A
§ Performance is compared to baseline catheters
§
§ Testing performed in house and/or by third party
Material strength and
performance testing
Tensile
Strength
Tensile
Strength FatigueFatigue Joint Seal
Testing
Joint Seal
Testing
Introduction
&
Withdrawal
Introduction
&
Withdrawal
Torsion /
Deflection
Torsion /
Deflection
Bending /
Buckling
Bending /
Buckling
Sustainability Solutions | CIS10315 Rev. A
§ DEPCTS (Diagnostic EP Catheter Test System)
§
§ Complete electrical profile testing including isolation and continuity
• Isolation test
• Captures internal and/or minor insulation breakdowns that can result
in cross-talk or noise on the electrogram signals
•
• Continuity test
• Closely mimics actual clinical use
• Verifies that the signal from each electrode is consistent and unbroken
•
• Both tests are performed during active deflections of the test catheter
Electrical integrity testing
Sustainability Solutions | CIS10315 Rev. A
§ Requirements
• Package variation (i.e. lot to lot)
• Storage
• Human interaction (i.e. shipping)
§
§ Validation Steps
• Validation Plan
• Material/Design Qualification
• Performance Qualification
• Product Qualification
§
§ Testing
• Shock/Drop Test, Vibration Test, Seal/Package Strength, Ship
Test
• ISO 11607, ASTM D4169, ASTM F-1140-00, ASTM F1980-02
• Accelerated Aging (thermodynamic temperature coefficient)
Packaging and shelf life testing
Sustainability Solutions | CIS10315 Rev. A
§ Conventional Release
• Biological Indicators
• 72 hour quarantine
§
§ Sterilisation validation:
• AAMI/ANSI/ISO 11135
• EN550
• Annual Revalidation
• SAL of 10-6
• EO Residuals: ISO 10993-7; TIR 19
• Not an irritant to patients or clinicians
Sterilisation
Sustainability Solutions | CIS10315 Rev. A
37
Sustainability
Solutions
Remanufacturing
services portfolio
Sustainability Solutions | CIS10315 Rev. A
Remanufacturing
in the EP / cath lab
• Diagnostic ultrasound catheters
(3D mapping catheters)
• Electrophysiology catheters
• Electrophysiology interface
cables
• Catheter introducer sheaths
EP catheters
Diagnostic ultrasound catheters
Catheter introducer
sheaths
EP cables
Stryker Corporation or its affiliates own, use, or have applied for the following trademarks or service marks:
Stryker. All other trademarks are trademarks of their respective owners or holders.
Sustainability Solutions | CIS10315 Rev. A
• Laparoscopic devices (trocars and
directed energy – bipolar and ultrasonic)
•
• Arthroscopic devices (shavers and
wands)
•
• Orthopedic devices (bits / blades / burs
and external fixation devices)
§
Trocars
Harmonic scalpels
Sealer / dividers
Stryker Corporation or its affiliates own, use, or have applied for the following trademarks or service marks:
Stryker. All other trademarks are trademarks of their respective owners or holders.
Remanufacturing
in theatre
Sustainability Solutions | CIS10315 Rev. A
Regulatory Activities
Sustainability Solutions | CIS10315 Rev. A
Safety evidence
§ Reprocessors have been regulated since
2000
§ Millions of SUDs have been reprocessed
with no evidence of increased
infection rates.
§ No deaths have been attributed to
reprocessed devices in the FDA’s
Manufacturer and User Facility Device
Experience (MAUDE) database.
2008 GAO report: Of the 320,000+ adverse events filed with FDA between
2000 and 2006, only 65 adverse events “actually involved or were
suspected to involve a reprocessed SUD and that the reprocessed SUD
was one of several possible causal factors in the adverse event. In
reviewing these 65 reports, FDA found that the types of adverse events
reported to be associated with the use of reprocessed SUDs were the
same types of events that were reported for new devices.”
2008 Government Accountability Office (GAO) report: noted the findings
of FDA’s Medical Product Safety Network (MedSun) Program and
confirmed that “none of the representatives of MedSun hospitals who
participated in the FDA focus groups reported being aware of any
infections related to the use of reprocessed SUDs.”
Established record
Sustainability Solutions | CIS10315 Rev. A
Protecting your patients
§ Remanufacturing of single-use devices is
regulated by governmental authorities
§ Remanufactures must obtain premarket
clearance and comply with the same medical
device regulations as original equipment
manufacturers
§ Premarket clearance is intended to validate that:
• The remanufacturing is able to clean
and sterilise the device
• Functional performance of the
remanufactured device is
equivalent to the predicate device
§ NO BATCH TESTING – every device is fully
function tested
Regulatory oversight
Sustainability Solutions
§ FDA QSR compliant
§ 105+ premarket clearances
for reprocessing
§ ISO 13485 certified
Sustainability Solutions | CIS10315 Rev. A
Regulatory
§ MHRA issued remanufacturing guidance document
§
§ BSI is Stryker’s notified body
§
§ EU Council’s and Parliament’s Committees on ENVI endorsed
remanufacturing agreement
§
§ Stryker Sustainability received CE mark for select vascular devices
Market activities
Regulations
Sustainability Solutions | CIS10315 Rev. A
The
Stryker
difference
Financial &
environmental
sustainability
Sustainability Solutions | CIS10315 Rev. A
Remanufacturing: making a
difference
In 2017, our
single-use
medical device
remanufacturing
programs helped
our U.S.
customers:
$326 million
in supply costs
13.4M lbs.
of waste from landfills
Save Divert
Sustainability Solutions | CIS10315 Rev. A
3_89
Effective remanufacturing prices will be determined as a 10-45%
discount from OEM prices, depending on Market Share commitment.
• Hospitals/GPOs will provide usage data, including pricing. List price can
be used as a starting point when actuals are not available.
•
• Each individual system may have variations with OEM prices and annual
volumes.
Tier 1
Less Than
10% Market
Share
Tier 2
10% Market
Share
Tier 3
20% Market
Share
Tier 4
30% Market
Share
Tier 5
40% Market
Share
Tier 6
50% Market
Share
10% 15% 21% 28% 36% 45%
% Market Share of Customer Spend
(Please state if discount or actual price is being offered)
Pricing and contracting plan
Current
Annualized
Expenditures
Total
Remanufactured
Spend at 30%
Adjusted OEM
Spend
Total Adjusted
Spend
Total Adjusted
Savings
Total Adjusted
% Savings
£ 1,227,293 £ 143,152 £ 905,743 £ 1,048,894 £ 178,399 15%
14% 86%
Total KG
Collected
Rate
Total Waste
Savings
10,000 £ 0.20 £ 2,000
Total Savings
Remanufacturing Savings +
Waste Savings
£ 180,399
Customer Spend & Remanufacturing Savings
Summary of Total Annualized Savings
Waste Savings
3_89
Savings Opportunities:
1. Sustainability devices
2.
3. OEM price erosion
4.
5. Waste diversion
6.
7. Totals
Savings analysis
1 2
3
1 2 4
4
Case study
Sustainability Solutions | CIS10315 Rev. A
Collections process
Establish account
Collection materials
supplied
Set up & training
Collections
Shipment
Inspection, tally and
reporting
Sealer / dividers
Harmonic scalpels
Trocars
Dedicated to your
sustainability goals
§ Remanufactured devices are backed by
Stryker’s comprehensive quality
system
§ All devices are individually tested to
ensure the highest quality
§
Patient Care sustainability
§ Maximise savings through case
support, business reviews,
education and utilising Stryker’s
entire remanufacturing program
§ Leverage partnership to provide
purchasing power and price
containment
Financial sustainability
§ Purchasing and collection processes
designed to minimise waste
§ Alignment to prioritize the reuse of
remanufactured devices
Environmental sustainability
Sustainability Solutions | CIS10315 Rev. A
Questions?
Thank you!
Sustainability Solutions | CIS10315 Rev. A
52
References:
Anderson, L. (2013, April). Clinical business strategies. Retrieved from: www.hpnonline.com
Ferguson, M. & Toktay, B. (2007, July). Effects of competition on recovery strategies. Retrieved from: www.insead.edu
NuRep. (2015, April 23). Are repless models the answer to PPI cost management? Retrieved from: www.nurep.com
Scott, B. (2016, April 22). Savings war: The pros and cons of SUD reprocessing growth. Retrieved from:
www.dotmed.com
White, B. (2016, May 4). Single-use device Options – Promoting Cost Savings and Infection Prevention. Retrieved from:
www.medicaldealer.com
© 2015 JRP Solutions Ltd
The information in this document is the property of JRP Solutions Ltd and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of JRP Solutions Ltd. This information is given in good faith based upon the latest information available to JRP Solutions Ltd, no warranty or representation is given concerning
such information, which must not be taken as establishing any contractual or other commitment binding upon JRP Solutions Ltd or any of its subsidiary or associated companies.
Saving Energy Through Staff Engagement
George Richards
14th February 2019
Discussion Framework
• Introductions
• Who are JRP?
– What do we do?
– Who do we work with?
• Energy Training
– Why do it?
– Levels of training
– eLearning
– Costs
• Any questions?
•
•
Why do it?
ü NHS annual energy spend of approximately £544m
ü Increased consumption due to more energy hungry technology
ü Pressure on to deliver savings
ü Little capital available to invest in energy saving projects
ü Inefficient building stock
ü Effecting behavioural change is low cost and delivers immediate benefits
ü A 5% - 10% reduction in energy use would realise a £30 - £60m annual saving
ü We all have a moral duty to change what we do and prevent waste wherever possible as
we face ‘A Climate Emergency’
Energy Awareness Training
Harness the inherent knowledge of your staff – they know
your business better than any consultant!
JRP provide five levels of training from Level 1 General Energy
Awareness to Level 4 Embedding Energy Culture Change ensuring it
is always relevant, engaging and practical
Making it relevant
Level 1 – General Energy Awareness Training
ü Face to face or eLearning modules
ü Fundamental principles of energy – what it is, where it comes
from, what it costs, security of supply, environmental impacts
ü The impacts of inaction in the home and workplace
ü Can be bespoke for larger organisations
ü EUSR approved
Energy – the big picture
•
•
•
•
•
•
•
• Provides a universal understanding of what energy is, where it comes from and why CO2
emissions are so harmful to the planet
Energy at home
Looks at how energy is used within a typical home and provides some useful tips to help
reduce energy consumption and reduce energy bills at home
Energy at Work
Every day £000’s of energy is wasted at work with lights, heating & cooling and equipment
being left on when it’s not actually needed.
This module looks at simple ways in which energy consumption can be reduced to help make
the workplace more sustainable and save the NHS significant amounts of money.
Energy Awareness via eLearning
https://jrpsolutions.learnupon.com/users/sign_in
Making it relevant to the NHS
• Relevant to all staff – clinical, medical and support
• Builds universal understanding of energy and CO2 through modules
• Adds personal value by relating energy to the home environment
• Relates to NHS priorities and values e.g. improved patient comfort
• Can be used for Induction Training, Team Talks or as a complete course
• Very affordable @ £3k per annum with unlimited usage in each Trust
•
© 2015 JRP Solutions Ltd
The information in this document is the property of JRP Solutions Ltd and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of JRP Solutions Ltd. This information is given in good faith based upon the latest information available to JRP Solutions Ltd, no warranty or representation is given concerning
such information, which must not be taken as establishing any contractual or other commitment binding upon JRP Solutions Ltd or any of its subsidiary or associated companies.
Any Questions?
Contact: George Richards
e: george.richards@jrpsolutions.com
m: 07870 394601
Thank you
Nerys Simmons
Manchester University NHS
Foundation Trust
Embedding Reuse
Why have a reuse system?
• £100s disposing of unwanted items
• £1000s procuring same items
• Match up the 2
üAvoid waste
üReduce carbon footprint from procurement
üSave ££££££
In figures
Since February 2016 we have….
• Registered 1252 colleagues as users
• Reused 3558 items over 861 transactions
• Saved estimated £175k in procurement costs
• Avoided 25 tonnes of waste
Things to consider
• Know your stakeholders
• Know your own resources
• Know your audience
• Keep it fair
• Keep it in focus
•
Know your stakeholders
• Procurement and budget holders
• Health and Safety, Infection Prevention, Fire Safety
• Medical Engineering, Informatics
•
• Capital Works/Property and Estates
•
Know your own resources
• Time, transport, storage
• Be clear on everyone’s responsibilities
• Accept there are limitations
Know your audience
• What do people want?
• What items have restrictions on procurement
• Use popular items to promote the system
Keep it fair
• Everything for reuse goes through Warp It
• Everyone has an equal chance to claim
• Users are expected to give as well as receive
Keep it in focus
• Case studies in staff newsletter
• Sign-up at events
• Criteria for Green Impact award
•
•
Thank you
Nerys Simmons
Waste and Sustainability Officer
Nerys.simmons@mft.nhs.uk
0161 276 6349
#DAYFORACTION
Refreshment Break
#dayforaction
#DAYFORACTION
Session 2: Injecting finance into the NHS
and creating savings
#dayforaction
Reducing waste in every way
NHS Sustainability Roadshow
Manchester
14th February 2019
Introductions
MJ Rose - Business Development Manager
Kerry Jones – Sales Director
www.forwardwaste.co.uk
The importance of segregation…
The way we handle waste has to change!
Volume of wastes going to UK landfill - In 2016, 15.7 million tonnes of municipal
waste was sent to landfill. Of this, 7.7 million tonnes was biodegradable
municipal waste.
Around 10 million tonnes of food and drink was wasted in the food chain in 2015
- around 60 per cent of this is avoidable.
The problem with plastic…
8.3 billion tonnes of virgin plastic created to date
9% recycled
12% incinerated
79% accumulated in landfills
If this trend continues, roughly 12 billion tonnes will be landfilled by 2050
www.forwardwaste.co.uk
The waste hierarchy…
www.forwardwaste.co.uk
Where can your general waste go?
www.forwardwaste.co.uk
EfW
General waste incinerated to produce energy, with
incineration temperatures reaching over 850
degrees celsius
Reduction in greenhouse gas emissions between
32% - 41% compared with sending to landfill
Local EfW facility generates enough electricity for
50,000 homes
23% of renewable energy comes from energy from
waste – equivalent to 726,000 tonnes of oil
Where can your food waste go?
www.forwardwaste.co.uk
Anaerobic
Digestion
Uses microorganisms to break down food waste in
an enclosed system, without oxygen
As it breaks down, methane is produced which is
collected and converted to biogas
Biogas used to generate electricity, heat or
transport fuels
Also creates a nutrient-rich fertiliser for use in
agriculture
The importance of segregation…
Higher chance of achieving zero to landfill
Valuable, recyclable materials recovered at source with lower
disposal charges, or rebates achieved
Full traceability of waste destinations
www.forwardwaste.co.uk
Efficient waste management in the NHS
www.forwardwaste.co.uk
or…
BEDS? BINS?
Simple Choices…
Case study – the problem
NHS hospital trust
13 tonnes of unsegregated waste produced per month
general waste and cardboard all in together!
Increased container collections per annum, leading to a high carbon footprint
Health & Safety concerns and disruption to site through high container frequency
www.forwardwaste.co.uk
Case study – the solution
General waste
collected from around
the hospital
Residual general
waste loaded into
portable compactor
www.forwardwaste.co.uk
Waste taken for
onward recycling.
Cardboard segregated
at source and baled.
Collected every 2 months
with rebate achieved. Compactor emptied
once a month.
Case study – the outcome
Reduction in general waste by 50%
Collection frequency's reduced from 2 visits PCM to only 1 PCM – 50%
reduction!
Cardboard waste generating income
Carbon footprint reduction in general waste movement.
Baler hire costs covered by rebate.
www.forwardwaste.co.uk
What should be happening…
Elimination
Minimisation
Diversion
Waste
Management
Risk Reduction
Legal
Compliance
Cost Control
Environmental
Consultancy
Removal and
Disposal
www.forwardwaste.co.uk
Any questions?
Thank you for your time.
mj.rose@forwardwaste.co.uk
kerry.jones@forwardwaste.co.uk
www.forwardwaste.co.uk
In It Together:
Creating a Whole
Trust Approach
Introduction
•2.4 million patient contacts
•+- 15,000 staff
•A 900-year history
•Almost £1.5 billion annual turnover
•6,659 babies born
•+- 5,000 tonnes of waste p.a.
•Awarded TWM contract in 2014
•Close working relationship
•Education & communication
•Innovations & initiatives
•
•
About us
Partnership Approach
•Recycling & Resource Management company - contract lead
•Dedicated staffing – team of 35 on site
•Sustainability Director & Team
•
•
•
•
•
•
Head of Health &
Sustainability
Contract Manager
Key Coordinator Supervisors
Waste/ Obsolete Porters
Guy’s and St Thomas’ sites
Trust Waste Manager
Logistics Assistant
Sustainability
Team
About us
Initiatives
•SAVE - savings of up to £150,000 p.a.
•Waste data from Byweigh mini-weighbridge
•Senior Management buy in & SAVE Champions
•Support for events and sustainability activities
•Staff induction education
•
•
•
•
•
•
•
About us
Mini-weighbridge system
•Identifies and weighs every bin - ward/ department level tracking
•Bespoke software and tagging system
•Performance and cost - real-time, to pin-point problem areas
•Staffing and efficiency benefits
•
About us
Reuse and Food recycling
•Reuse
•Trust signed up to Warp-it in November 2017
•12 months savings of £76,000
•Initial Roll Out - Ward Clerks and
Procurement Buyers
•Procurement decisions for purchase are
prompted to use StockDoc
•Food waste
•Tonnage from 1 tonne to 14 tonnes per
month
•Training of Food Service Assistants
About us
Single – use packaging
•Installed August 2018 at
St Thomas’
•4,000 bottles refilled
since being introduced
•Machine also to be
installed at Guy’s and in
community sites
•
About us
Single – use packaging – market reactions
•Customer enquiries and questions
•Commitment and leadership
o Unilever – 100% plastic
packaging fully
recyclable,
compostable, reusable
by 2025. Increase
recycled content in
packaging to 25% by
2025
o Costa – 500million single-
use coffee cups recycled
in the UK
About us
Inspiring action and useful resources
•Leading by example
•Spread the word enthusiastically
•Resources out there:
•https://www.ellenmacarthurfoundation.org
/
•https://skyoceanrescue.com/
•https://thesra.org/
•https://lessplastic.co.uk/
•https://
www.flipsnack.com/Bywaters/new-flipbook-fti01qafh.html
•
•
•
The Right People
The Right People
Sustainability
Ed van Reenen
07818560650
e.vanreenen@bywaters.co.uk
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Securing funding to deliver cost-saving
energy efficient technologies
Thursday 14th February 2019
Liam Gillard, Salix Finance
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Overview of Salix Finance
Independent, not-for-profit company working in partnership with the Public Sector
since 2004
Salix provides interest-free funding to accelerate investment in energy efficient
technologies
National profile working in England, Scotland and Wales
Funded by the Department for Business, Energy and Industrial Strategy (BEIS), the
Department of Education, the Welsh Government and the Scottish Government
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Salix focus
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Funding model Funding committed
following successful
application
Project delivery and
installation
(interim payments available)
Salix loan paid out
on completion
Financial and
carbon savings
achieved
Repayments made
back to Salix
(10 equal instalments over 5
years)
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Our achievements
*calculated using emissions factors published by government for carbon foot printing
client pilot
schemes
Salix funding
allocated
£930,000
energy saving
per annum
6,000*
tonnes CO2
per annum
£3.4m19 500
client projects
committed
tCO2e*
annual
saving
766k*2301
Salix funded
projects
£692m
energy
saving per
annum
£158m
client projects
committed
16,656
Clients
supported
2004
2018
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Technologies supported
Salix funding can support over 100 energy
efficiency technologies
Boiler replacements
Building energy management systems
Combined heat and power
Heat recovery
Heat networks
Heating and hot water upgrades
Building fabric insulation
LED lighting upgrades
Street lighting
Solar PV
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Salix Finance and the NHS
Funding criteria – 5 year loan payback (no technical payback anymore), costs less
than £172 to save tCO2e over lifetime of the project
Funding can be used to improve existing equipment or to install equipment to
achieve higher standards in new build developments
Funding can be secured over multiple years to support Sustainable Development
Management Plans and long term estate strategies (including EPCs)
NHSI approve of Salix’s Invest to Save model
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
£70.5m
100,000
£19.5m 63
236
£567.5m
Salix working within the NHS
*Calculated using emission factors published by government for carbon footprinting
63
227
TOTAL TRUST ENERGY
SPEND 2017/18
£567.5m
TOTAL SALIX LOAN
VALUE
ESTIMATED ANNUAL
tCO2e*
TOTAL ANNUAL
SAVINGS
£71m
100,000
£19.5m
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Top Salix NHS clients
Imperial College Healthcare NHS Trust
East Kent University Hospitals NHS Foundation Trust
Wrightington, Wigan and Leigh NHS Foundation Trust
Frimley Health NHS Foundation Trust
George Eliot Hospital NHS Trust
Northern Devon Healthcare NHS Trust
University Hospitals of Morecambe Bay NHS Foundation Trust
Lewisham and Greenwich NHS Trust
North West Anglia NHS Foundation Trust
Northampton General Hospital NHS Trust
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Salix project knowledge slides
Sharing of knowledge between clients
Before and after project delivery
Supporting comments
Lessons learnt
Supplier information
Contact details
NHS knowledge slides
Gaining internal approval
•
•
BEFORE
• 3 x 4.5MW LTHW boilers
• Annual energy spend of £407,000 gas and £1.6m electricity at Whiston
Hospital
• Whiston Heating System is maintained by Vinci Facilities. The heating
demand from Whiston hospital is approx. 3,728Kw in the coldest
months of the year.
Project Knowledge – CHP and Heat Recovery by
St Helens & Knowsley NHS Trust
AFTER
• CHP providing 1.28MW of electricity and 1403kW of Low
Temperature Hot Water
• FluAce direct contact gas condensing economiser fitted to current
boilers to recover ~20% of the energy currently in the flu gas
•
•
•
•
•
•
Project completion date – October 2018
• Project value
£2,108,365
• 8,986,157 kWh
annual
electricity
saving (51%)
• £713,258/year
savings
• Payback 2.96
years
• 1,638 tCO2 saved
per year
•
•
•
Supporting Comments:
Project Knowledge – CHP and Heat Recovery by
St Helens & Knowsley NHS Trust
• Proposed savings derived from a)Use of expected kwh reductions from initial feasibility study ‘plugged’ into Trust invoicing
monitoring spreadsheet, and b) Pre and post consumption (kwh) figures and cost per kwh also plugged into the SALIX
compliance tool to test payback <5years.
•
• Electricity costs of 9.16 p/kWh and gas costs of 1.80 p/kWh at Whiston Hospital
•
• Clark Energy, Cogenco and Centrica put in a bid in our tender for the installation and maintenance of the CHP and Flue-Ace
heat recovery unit. Centrica was the chosen supplier.
•
• Advice/lessons learned:
• Consider whether your site has an A and B electrical supply, which is usual in modern hospitals. If this is the case
you may have to consider the electrical demand of one of these supplies, rather than total site demand, when
sizing the CHP.
• Ensure you have a good log of constant temperature hot water return data and primary heating loop temps prior to
the project.
• Be patient from initial SALIX approval through to feasibility to actual completion….. 3 years, we are however a PFI
trust so were held up with Deed of Variation and Funder approval.
• SALIX had equal patience with our delays……Thank you.
•
Measurement of Savings:
Project Knowledge – CHP and Heat Recovery by
St Helens & Knowsley NHS Trust
• The savings for December and
January are greater than the
expected savings amount.
This is because the expected
savings calculation took into
account unforeseen
downtime, scheduled
downtime, Scheduled
maintenance, and peak
summer intervals over the
course of the year.
• There aren’t any aspects of the
savings calculation we would
approach differently after
considering post verification
results.
•
Graph 2 –
Metered
consumptio
n to Jan 19
•
• Savings have been monitored on this project using manual mains meter readings, STARK smart meter readings, utilities bills
and the Web portal supplied by the CHP contractor which details Gas used as well as electrical and thermal energy
generated.
•
•
•
Graph 1 –
Metered
consumption
to Oct 18
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Salix case studies
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Supporting project delivery
FeasibilityFeasibility Internal
Consultation
Internal
Consultation ProcurementProcurement MobilisationMobilisation InstallationInstallation
Business case
checks
Meet with finance
department
Offer reservation of
funding for Trust Board
Workshops and calls with
other Trusts for advice
Interim Payments
Phase works over
financial years
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Summary
100% interest free funding available for NHS Trusts and
Foundation Trusts – no maximum loan amount
Cost neutral - loan repaid through savings
Supporting long-term funding plans, Sustainable
Development Management Plans and estates
strategies
Helping the NHS achieve energy and carbon reduction
targets
Reduce energy bills at your Trust
SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR
Thank you
liam.gillard@salixfinance.co.uk
0203 714 5655
#DAYFORACTION
Lunch
#dayforaction
#DAYFORACTION
Session 3: Sustainability in action
#dayforaction
Powering Performance:
Helping major energy users in the healthcare sector to improve
energy efficiency and operational performance through onsite
generationTony Orton
Centrica Business
Solutions
Thursday 14th February
2019
Centrica Business Solutions
The energy landscape is evolving
Powering business advantage 124124Centrica Business Solutions
CENTRALISED
ENERGY
MICROGRIDS RENEWABLES
STORAGE
DISTRIBUTED
GENERATION
DEMAND SIDE
RESPONSE
Centralised energy supply is
giving way to distributed
technology, providing
businesses with smart,
secure and affordable
solutions to the energy
challenges they face.
Centrica Business Solutions
Energy
supply
Wholesal
e
energy
Energy
insight
Energy
optimisation
Energy
solutions
Centrica Business Solutions has been created to
develop new thinking, new technologies and new
ways of working to help our healthcare customers
We assist organisations to improve their operational
efficiency, ensure site resilience and unlock new sources
of value with energy insight, optimisation and technical
solutions.
125Centrica Business Solutions
2022 annual
revenue
target
£1bn >2k
Enterprise
customers
£700m
Investment
to 2020
Centrica Business Solutions
The rising cost of non-commodity charges
126
Capacity market subsidy
A subsidy to encourage flexible
generation to meet peak demand.
Contract for difference
Subsidies for large scale low carbon
generators, to replace the closing
renewables obligation.
Feed-in tariffs
A subsidy for small scale renewable
generators, e.g. solar panels.
Transmission network
charges
Paid to National Grid to cover build
and maintenance costs of Britain’s
high voltage network.
Distribution network
charges
Paid to regional networks to cover
the cost of transporting energy from
National Grid to customer meters.
Renewables obligation
Subsidies for large scale low
carbon generators, e.g. wind
farms.
Balancing Services Charge
Paid to National Grid for their work
ensuring supply and demand are
always equal.
Supplier costs
Debt costs, operating expenses and
profit.
Wholesale energy costs
Energy purchased on the wholesale
market plus the cost of any
‘imbalance’ caused by changes to
our forecast consumption.
42%
19%
14%
8%
5%
4% 3%
2%
2%
Note: British Gas forecast 2018 costs for sample customer
Centrica Business Solutions
Tracking the continuing rise of non-commodity costs in the UK
127
Environmental Levies
Balancing Services
Transmission Network
Charges
Distribution Network
Charges
Wholesale Energy Costs
31% 57% 64% Non-Commodity cost as % of
total
Centrica Business Solutions 128
21 3
Panoramic Power’s non-invasive, self-powered wireless sensors can be
installed quickly and easily, with little or no disruption or downtime to your
operations. Enabling access to energy data and analytics through a single
platform.
Sensor installation
Easily attach the non-invasive
self-powered sensors to the
outgoing electrical wire. Each
individual sensor will start
tracking the energy usage of the
device, equipment or process.
Analysis and action
Capturing energy data in a single
platform provides a powerful interface
to monitor, measure, report, and
understand energy consumption from
multi-site level to individual device
level.
Monitoring and data
Data is continuously received from
the sensors and wirelessly
transmitted to the analytics platform
via cloud technology, all in real-time.
Panoramic Power
Energy insights
Centrica Business Solutions 129
Cloud based analytics platform for understanding your
consumption
Centrica Business Solutions 130
Energy Insights
Device level visibility and
energy insights
14bn global data points
across 53k sensors and in
30 countries
Demand Side
Response
Additional revenues from existing
assets
Europe’s #1 Demand Side Response
provider with c. 5GW under
management globally
Battery Storage
Additional revenue
Patented battery optimisation
driving industry leading
returns
Roosecote 49MW and
Gateshead 3MW battery
developed, 18MW battery live
this week in Belgium
Combined Heat and
Power
25% increase in energy
efficiency
UK’s largest CHP provider,
with over 3k units in market
Integrated
Solutions
Platform
Solar
100% renewable generation
150MW of solar power
managed globally with 6.5k
solar panels in the UK
Delivering an integrated approach
Centrica Business Solutions
Optimising the value of onsite generation
131
Connection and
supply
e.g. Bord Gáis, British
Gas and Direct Energy
Wholesale market
trading
Energy insight
Operations
and
maintenance
Power generation
e.g. back up-
generator
Automated
Demand Side
Response
Combined heat
and power
(CHP)
Energy efficiency
e.g. solar panels, LED
lighting, heating, ventilation
and
air-conditioning (HVAC)
Battery
storage
Centrica Business Solutions 132
Combined Heat and
Power
Solar
PV
Battery storage
charge
Battery storage
discharge
Grid
import
An illustrative Distributed Energy strategy
Centrica Business Solutions
CHP helps hospital cut carbon emissions to the
equivalent of removing 1,000 cars
Customer objective
• Offer healthcare services for three million
• Make cost effective energy decisions
• Produce sustainable energy
The solution
Centrica Business Solutions installed a brand new
Combined Heat & Power (CHP) unit that:
• Reduced electricity consumption
• Cut energy spending
• Slashed energy-related concerns
• Created healthcare investment opportunities
University Hospitals of the North Midlands (UHNM)
133
“We chose Centrica Business Solutions because
their product offered the best fit for our needs. It
offered the best savings in consumption, cost and
carbon over the 15 year life of the installation. I
would definitely recommend them for CHP
installation and maintenance.”
Charlie Cox
Energy Manager
University Hospitals of the North Midlands, NHS Trust
£500
K
2,000 20
CHP unit saves £500,000 annually
Carbon emissions cut by 2,000 tonnes
Carbon cuts same as hiring 20 nurses
Centrica Business Solutions 24
Thank you
If you have any questions please contact us:
Tony Orton
Distributed Energy Sales Manager
Centrica Business Solutions
Email: Tony.Orton@centrica.com
Centrica Business Solutions
Email: CentricaBusinessSolutions@centrica.com
Website: www.centricabusinesssolutions.com
Twitter: @CentricaSoln_UK
“Sustainable Solutions
for a
Circular Economy”
IntroductionTo Sterimelt
and a Sustainable Recycling Solution for
Clinical ‘SterilisationWrap’
• Burton Queen’s Hospital
• Sterilisation Wrap
• Legal and Compliance
• Sterimelt
• Benefits to Health care industry
• BBC News – NHS News - Awards - Social Media
• Ongoing Solutions, Projects and Opportunities
• Questions and Comments
•
October 2018 www.tcg.ltd136
Today’s Presentation Agenda
October 2018 www.tcg.ltd137
Where would you rather see your NHS money being spent..??
BEDS BINSOR
October, 2018
www.tcg.ltd
138
Burton NHS FoundationTrust
SterilisationTheatreWrap
Typical operating room featuring “Wrap”
• Clinical “Wrap” is a non-woven polypropylene
sterile wrap that is used to maintain the sterility
of instruments and equipment and can also be
used as bed sheets, drapes and covers in the
operating theatre.
• “Over 4 Million Operations are performed across
the NHS in England each year”- Natalie Roddis,
Waste and Sustainability Officer- NHS Burton
• WHO estimates, 75-90% of waste from healthcare
facilities is non-hazardous.
• Queen’s Hospital Burton produces about 16 tonnes
of “Sterilisation wrap”-previously sent for
incineration at very high cost.
• Merged with the Royal Derby NHS in August 2018
to become University Hospitals Of Derby And
Burton NHS FoundationTrust.
October 2018 www.tcg.ltd139
October 2018 www.tcg.ltd140
Legal and Compliance
Independent EmissionsTest
Environment Agency &
Natural ResourcesWales Independent Lab Report
October 2018 www.tcg.ltd141
Ø Reduction inVolume by 80 to 85%
Ø Operator Free for Other Duties During Densification Process
Ø Diverts From Landfill and/or Incineration - Sustainable
Ø 100% Compliant Recycling Process – Circular Economy
Ø Current Revenue Stream from PP
Ø Processed Blocks Re-Manufactured–Circular Economy
Ø
Ø ”Savings from disposal costs for the UK of Circa £12,750,000
should Sterimelt be implemented across the NHS.The
revenue created for the UK could reach £6,500,000”-
Natalie Roddis, Waste and Sustainability Officer- NHS Burton
Ø Save on disposal costs
Ø Earn Revenue for tonnages recycled
Ø
The Simple Sterimelt Process
October 2018 www.tcg.ltd143
BenefitsToThe Healthcare Industry
October 2018 www.tcg.ltd144
BBCWales – NHS – Awards – Social Media
TCG Ltd- Further Projects, Solutions and Opportunities…….
• Single Use Disposable PatientTransfer Sheets
• Successfully processed PTS supplied by
M.I.P. UK Ltd (Formerly Cromptons)
• Significant opportunity to recycle yet more
“single use disposable” products.
October 2018 www.tcg.ltd145
• Disposable Curtain Recycling – Innovate UK
• Ongoing trials of volume reduction and
recycling of disposable curtains
• Significant opportunity to recycle yet more
“single use disposable” products.
www.tcg.ltd
“World First Sustainable Healthcare Innovation”
ThankYou ForYourTime And Attention
--Any Questions….???
Delivering Energy Savings
through ‘Low Cost’ Interventions
Presented by:
Darren Jones BSc (Hons), C.Eng. FCIBSE LCC LCEA
Manchester NHS Sustainability Day Roadshow – 14th February 2019
www.lowCO2.eu
An overview
1. Hospital Energy Efficiency; the Drivers & Barriers
2. BMS Optimisation
3. Operating Theatre Optimisation - Case Studies
4. Lighting Upgrades & Controls
5. Steam and Condensate Systems
6. Chiller Upgrades & Optimisation
7. Summary - Technological Improvements
8. Summary - Non Technical Opportunities
9.
10.
Ø
Ø Economic: Electricity and other energy prices are rising, NHS Trusts
are currently in financial deficit.
Ø Political: Global, European and National Targets. Climate Change
Act, Carbon Reduction Targets.
Ø Environmental: Reducing energy waste reduces GHG emissions
and accompanying environmental impacts.
Ø Social: Energy efficiency has health benefits, both in the home and
at work. Fuel poverty impacts on the whole health economy.
Ø
Hospital Energy Efficiency – The Drivers
Common barriers include:
Ø Financial Restrictions
Ø Economic Uncertainty and Risk
Ø Information and Skill Gaps
Ø Poor Commissioning
Ø Poor Maintenance
Ø Sub-optimum Engineering Design
Hospital Energy Efficiency – The Barriers
Ø Avoid a wide range of set temperatures. Adopt a heating
schedule policy.
Ø Ensuring a dead band of at least 3 C (+/-1.5ºC) is factored into○◦
BMS strategies will help to prevent simultaneous heating
and cooling taking place.
Ø
Ø Reviewing temperature and pressure sensor calibration on a
frequent basis will help maintain optimum control
efficiency.
What you see on the BMS, is often not the reality…
•
Quick Win – BMS Control Set-point Optimisation
Recommendation – Repair Fresh Air Actuator
Issue – Faulty Actuator
Annual Energy Saving – 30,000kWh
Annual Cost Saving – £1,350
Implementation Cost – £350
Payback Period – 3 Months
Damper Actuators
Recommendation – Replace Fresh Air Actuator
Issue – Actuator Removed
Annual Energy Saving – 190,000kWh
Annual Cost Saving – £9,500
Implementation Cost – £500
Payback Period – Under 1 Month
Damper Actuators
Ø The cooling and heating control
valves on many AHUs ‘let-by’,
which isn’t always evident
from the BMS head-end.
Ø A more invasive inspection of
plant will identify this type of
issue. Replacing or repairing
control valves on AHUs will
prevent losses across the
system.
AHU Heating/Cooling Emitters
Ø Chiller Flow Temperatures – 5 Degrees C. too low!!
Ø 1 Degree C. increase equates to a 3% performance improvement…
Ø
Ø
Ø
Ø
Ø
Quick Win – Control Set-point Optimisation
Office Building Sever Room
Simultaneous Heating and Cooling
Simultaneous Heating and Cooling
Thermal Wheels - Heat/Coolth Reclaim
Can reduce plant running
costs by up to 50%
Recommendation – Clean Coil Face
(Jet or Steam)
Issue – Soiled Coil Face
Annual Energy Saving – 300,000kWh
Annual Cost Saving – £15,000
Implementation Cost – £500
Payback Period – Under 1 Month
Heating/Cooling - Soiled Coil Faces
Filter Media
What impact does dirty
filter media have on
energy consumption?
Variable Speed Drives - Interlocked with BMS
Ø Chiller Compressor Control
Ø Chiller Condensing Fan Control
Ø Chilled Water Circuits
Ø Condensing Water Circuits
Ø Heating Water Pump Control
Ø Ventilation Fan speed control
Ø We have proved that by improving
the air supply in one theatre
alone, a Trust could save in the
region of £5,000 a year.
Ø
Ø If this figure was extended to all the
Trusts in England, it could mean a
saving of more than £10m and a
reduction in carbon emissions of
80,000 tonnes a year!
Operating Theatre Optimisation
Operating Theatre Optimisation
Mile End Hospital
Rec.
No.
Complexity (1
= Simple,
3 = Complex)
Relates
To:
Recommendation Est. Cost (£) CO2 Emissions
Reductions
(Tonnes)
Annual Energy
Saving (kWh)
Annual
Saving (£)
Simple Payback
Period
(Months)
1 2 All
Theatres
Consider reducing Air Change Rate in line with
HTM requirement in order to reduce energy.
£600 14.27 26,718 £2,671 3
2 1 All
Theatres
Consider removing the HEPA filters to reduce
system pressure.
£100 5.7 10,512 £1,051 1
3 3 All
Theatres
Consideration should be given to replacing
supply fans with high efficiency units in order to
reduce power drawn by the systems.
£5,000 3.88 7,183 £718 84
4 2 All
Theatres
It is recommended that the time schedules for
the Theatre unit are changed in line with
occupancy hours.
£600 6.44 11,913 £1,190 6
5 3 Cooling
Plant
Consideration should be given to installing
variable speed drives (VSDs) and controlling
pumps based on demand, and the adoption of a
2-way valve system on the chiller plant.
£6,300 13 23,875 £2,387 32
6 2 Heating
Plant
A review of installation of a software interlock,
and the adoption of time schedule to prevent the
unnecessary operation of heating pumps during
low demand.
£600 6.2 11,466 £1,147 6
7 2 All
Theatres
Consideration could be given to reducing the
temperature set-point.
£600 16.3 88,595 £2,658 3
8 2 All
Theatres
It is recommended that the existing VSDs on the
Theatre unit are utilised by modulating the fan
speed in accordance with system demand.
£600 11.3 21,000 £2,100 3
Totals* £14,400 77 201,262 £13,922 12
*Savings are not considered cumulative, totals shown for representation purposes only.
Summary of Recommendations – Mile End Hospital
Recommendation 1
Consider Reducing Air Change Rates
Room Room Size (m²) Total Flow Rate
(m³/h)
Air Change Rate
(per hour)
Recommended Air
Changes
(per hour)
Achievement of
Design Values (%)
Theatre & Scrub 188.2 3178.8 16.9 15 113
Anaesthetic 61.0 1746.0 28.6 15 191
Prep 44.5 648.0 14.6 10 146
Air Flow Results
Ø The Theatre & Scrub AHU is running at 3,178.8 m³/h vs. the required duty of 2,813 m³/h, the volume can
therefore be reduced by 13%. The Anaesthetic & Prep AHU is running at 2,394 m³/h vs. the required duty
of 1,357.98 m³/h, a 44% reduction is therefore possible.
Ø
Ø This initiative can be achieved through modification of the operating frequency on the Variable Speed Drive
(VSD).
Ø
Ø Following the fan laws, this equates to a reduction in energy of 34% and 82.4% respectively.
Recommendation 2
Consider removing the HEPA filters from the AHUs
ØThe AHUs serving the theatres at Mile End were found to contain
HEPA filters. As HEPA filters are only a requirement for ultra
clean theatres, it is recommended that consideration be given to
their removal from the system.
Ø
ØOwing to the high pressure drops developed by HEPA filters, the
reduction in energy has been calculated to be 1.2kW, equating to
a £1,051 saving per annum.
Recommendation 7
Consider reducing temperature set-point
The existing controls for the Air Handling Units are controlled to a set-point of 25˚C; this is considered high. It is
recommended that this set-point be reviewed and adjusted to nearer 21˚C. Reducing the temperature by 4˚C
would reduce the energy consumption by approximately 27%.
Supply Air Temperature (Heating Coil) = 25.00 0
C
Total Air Volume = 0.88 m3
/s
Daily Running Hours = 24.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.00 4.53 25.00 20.47 16,473.56
Feb 309 28 11.04 1.00 4.46 25.00 20.54 14,930.23
Mar 261 31 8.42 1.00 7.08 25.00 17.92 14,421.41
Apr 197 30 6.57 1.00 8.93 25.00 16.07 12,515.41
May 111 31 3.58 1.00 11.92 25.00 13.08 10,526.34
Jun 49 30 1.63 1.00 13.87 25.00 11.13 8,668.11
Jul 20 31 0.65 1.00 14.85 25.00 10.15 8,168.38
Aug 23 31 0.74 1.00 14.76 25.00 10.24 8,240.81
Sep 53 30 1.77 1.00 13.73 25.00 11.27 8,777.14
Oct 128 31 4.13 1.00 11.37 25.00 13.63 10,968.96
Nov 234 30 7.80 1.00 7.70 25.00 17.30 13,473.34
Dec 308 31 9.94 1.00 5.56 25.00 19.44 15,644.65
Totals 2,033 365 142,808.34
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 190,411.12 kWhr
Annual Heating Cost = £5,712.33
Thames Valley - Heathrow
Supply Air Temperature (Heating Coil) = 25.00 0
C
Total Air Volume = 0.67 m3
/s
Daily Running Hours = 24.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.00 4.53 25.00 20.47 12,406.48
Feb 309 28 11.04 1.00 4.46 25.00 20.54 11,244.17
Mar 261 31 8.42 1.00 7.08 25.00 17.92 10,860.97
Apr 197 30 6.57 1.00 8.93 25.00 16.07 9,425.54
May 111 31 3.58 1.00 11.92 25.00 13.08 7,927.54
Jun 49 30 1.63 1.00 13.87 25.00 11.13 6,528.08
Jul 20 31 0.65 1.00 14.85 25.00 10.15 6,151.72
Aug 23 31 0.74 1.00 14.76 25.00 10.24 6,206.27
Sep 53 30 1.77 1.00 13.73 25.00 11.27 6,610.19
Oct 128 31 4.13 1.00 11.37 25.00 13.63 8,260.88
Nov 234 30 7.80 1.00 7.70 25.00 17.30 10,146.97
Dec 308 31 9.94 1.00 5.56 25.00 19.44 11,782.21
Totals 2,033 365 107,551.02
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 143,401.36 kWhr
Annual Heating Cost = £4,302.04
Thames Valley - Heathrow
24 Hours at 25˚C = Annual heating cost of £10,014.37
Recommendation 7
Consider reducing temperature set-point
Supply Air Temperature (Heating Coil) = 21.00 0
C
Total Air Volume = 0.88 m3
/s
Daily Running Hours = 24.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.00 4.53 21.00 16.47 13,254.50
Feb 309 28 11.04 1.00 4.46 21.00 16.54 12,022.69
Mar 261 31 8.42 1.00 7.08 21.00 13.92 11,202.35
Apr 197 30 6.57 1.00 8.93 21.00 12.07 9,400.19
May 111 31 3.58 1.00 11.92 21.00 9.08 7,307.28
Jun 49 30 1.63 1.00 13.87 21.00 7.13 5,552.89
Jul 20 31 0.65 1.00 14.85 21.00 6.15 4,949.31
Aug 23 31 0.74 1.00 14.76 21.00 6.24 5,021.74
Sep 53 30 1.77 1.00 13.73 21.00 7.27 5,661.92
Oct 128 31 4.13 1.00 11.37 21.00 9.63 7,749.90
Nov 234 30 7.80 1.00 7.70 21.00 13.30 10,358.12
Dec 308 31 9.94 1.00 5.56 21.00 15.44 12,425.59
Totals 2,033 365 104,906.48
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 139,875.31 kWhr
Annual Heating Cost = £4,196.26
Thames Valley - Heathrow
24 Hours at 21˚C = Annual heating cost of £7,356.52
Supply Air Temperature (Heating Coil) = 21.00 0
C
Total Air Volume = 0.67 m3
/s
Daily Running Hours = 24.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.00 4.53 21.00 16.47 9,982.15
Feb 309 28 11.04 1.00 4.46 21.00 16.54 9,054.46
Mar 261 31 8.42 1.00 7.08 21.00 13.92 8,436.65
Apr 197 30 6.57 1.00 8.93 21.00 12.07 7,079.42
May 111 31 3.58 1.00 11.92 21.00 9.08 5,503.22
Jun 49 30 1.63 1.00 13.87 21.00 7.13 4,181.96
Jul 20 31 0.65 1.00 14.85 21.00 6.15 3,727.40
Aug 23 31 0.74 1.00 14.76 21.00 6.24 3,781.95
Sep 53 30 1.77 1.00 13.73 21.00 7.27 4,264.07
Oct 128 31 4.13 1.00 11.37 21.00 9.63 5,836.56
Nov 234 30 7.80 1.00 7.70 21.00 13.30 7,800.85
Dec 308 31 9.94 1.00 5.56 21.00 15.44 9,357.89
Totals 2,033 365 79,006.58
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 105,342.11 kWhr
Annual Heating Cost = £3,160.26
Thames Valley - Heathrow
Ø This initiative can be achieved by a simple adjustment on the BMS.
Operating Theatre Optimisation
Newham University Hospital
Rec.
No.
Complexity (1
= Simple,
3 = Complex)
Relates
To:
Recommendation Est. Cost (£) CO2 Emissions
Reductions
(Tonnes)
Annual Energy
Saving (kWh)
Annual
Saving (£)
Simple Payback
Period
(Months)
1 2 Theatre 3 Consider reducing Air Change Rate in line with
HTM requirement in order to reduce energy.
£300 7 12,973 £1,297 3
2 1 Theatre 1 It is recommended that the run around coil
pump system be reinstated in order to reduce
load on the boilers.
£1,000 25.6 138,842 £4,165 3
3 3 All
Theatres
Consideration should be given to replacing
supply fans with high efficiency units in order to
reduce power drawn by the systems.
£29,000 34 61,854 £6,186 56
4 1 Theatre 2 Consider replacing air seals around openings in
order to reduce air leakage.
£150 0.2 328 £33 56
5 1 Theatre
4/5
Consideration should be given to repairing the
thermal wheel in order to reduce load on heating
and cooling.
£3,000 55 297,518 £8,925 4
6 2 All
Theatres
Consider adjusting the frost coil set-point in
order to reduce heating load which could be
recovered through use of the run around coil.
£1,000 210 1,141,658 £34,250 1
7 2 All
Theatres
Consideration could be given to introducing PIR
control so that energy can be reduced during
periods of inactivity.
£1,000 11 20,617 £2,062 6
Totals* £35,450 342.2 1,673,790 £56,918 8
*Savings are not considered cumulative, totals shown for representation purposes only.
Summary of Recommendations – Newham University Hospital
Recommendation 2
Consider reinstating the run around pump system
The run around coil recovery system is capable of recovering around 50% of the heating/cooling energy. With the
pumps out of order, the heating coil is operating at a higher demand than would be expected. Through the use of
simulation software, we can calculate that the heating energy used is 277,683.67kWh. By repairing the run around
coil pump we can assume that this figure will be reduced by 50%; this equates to a £4,165 saving per annum.
Supply Air Temperature (Heating Coil) = 21.00 0
C
Total Air Volume = 3.50 m3
/s
Daily Running Hours = 14.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.20 5.44 21.00 15.56 28,953.66
Feb 309 28 11.04 1.25 5.58 21.00 15.42 25,916.39
Mar 261 31 8.42 1.21 8.57 21.00 12.43 23,129.43
Apr 197 30 6.57 1.19 10.63 21.00 10.37 18,673.78
May 111 31 3.58 1.16 13.83 21.00 7.17 13,341.76
Jun 49 30 1.63 1.13 15.67 21.00 5.33 9,598.00
Jul 20 31 0.65 1.12 16.63 21.00 4.37 8,131.59
Aug 23 31 0.74 1.11 16.38 21.00 4.62 8,596.78
Sep 53 30 1.77 1.13 15.51 21.00 5.49 9,886.12
Oct 128 31 4.13 1.14 12.96 21.00 8.04 14,960.63
Nov 234 30 7.80 1.15 8.86 21.00 12.14 21,861.11
Dec 308 31 9.94 1.34 7.45 21.00 13.55 25,213.50
Totals 2,033 365 208,262.75
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 277,683.67 kWhr
Annual Heating Cost = £8,330.51
Thames Valley - Heathrow
Recommendation 5
Consider repairing the thermal wheel
At the time of inspection, the wheel serving Theatre 4/5 had failed and was therefore not rotating.
Repairing the thermal will provide savings equating to a £8,925 per annum.
Recommendation 5
Consider repairing the thermal wheel
The thermal wheel is capable of recovering around 75% of the heating energy. Through the use of simulation
software, we can calculate that the heating energy used is 396,690.96kWh. By repairing the thermal we can
assume that this figure will be reduced by 75%; this equates to a £8,925 saving per annum.
Supply Air Temperature (Heating Coil) = 21.00 0
C
Total Air Volume = 5.00 m3
/s
Daily Running Hours = 14.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 340 31 10.97 1.20 5.44 21.00 15.56 41,362.37
Feb 309 28 11.04 1.25 5.58 21.00 15.42 37,023.42
Mar 261 31 8.42 1.21 8.57 21.00 12.43 33,042.05
Apr 197 30 6.57 1.19 10.63 21.00 10.37 26,676.83
May 111 31 3.58 1.16 13.83 21.00 7.17 19,059.65
Jun 49 30 1.63 1.13 15.67 21.00 5.33 13,711.43
Jul 20 31 0.65 1.12 16.63 21.00 4.37 11,616.55
Aug 23 31 0.74 1.11 16.38 21.00 4.62 12,281.12
Sep 53 30 1.77 1.13 15.51 21.00 5.49 14,123.03
Oct 128 31 4.13 1.14 12.96 21.00 8.04 21,372.33
Nov 234 30 7.80 1.15 8.86 21.00 12.14 31,230.15
Dec 308 31 9.94 1.34 7.45 21.00 13.55 36,019.29
Totals 2,033 365 297,518.22
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 396,690.96 kWhr
Annual Heating Cost = £11,900.73
Thames Valley - Heathrow
Operating Theatre Optimisation
Whipps Cross University Hospital
*Savings are not considered cumulative, totals shown for representation purposes only.
Rec.
No.
Complexity
(1 = Simple,
3 = Complex)
Relates To: Recommendation Est. Cost (£) CO2 Emissions
Reductions (Tonnes)
Annual Energy Saving
(kWh)
Annual Saving (£) Simple Payback
Period (Months)
1 2 All Theatres Consider installing occupancy detection in order to control
ventilation on demand.
20,000 53 114,395 11,439 21
2 1 Theatres 5 - 8 Consider reviewing filter specification in order to reduce
system pressure and associated fan power requirement.
50 11 23,060 2,306 1
3 2 Theatres 5 & 6 Consider reducing the extract ventilation rate to the HTM03-01
standard so that fan power is reduced.
500 5 10,353 1,035 6
4 3 Theatres 3 & 4 Consider installing an energy recovery device to theatre 3 & 4
in order to reduce the heating requirement.
12,000 30 160,717 4,822 30
5 3 Theatres 3 & 4 Consider replacing the plant serving theatre 3 & 4 with a
packaged AHU in order to greatly improve system efficiency.
- - - - -
6 3 All Theatres Consider replacing fans with high efficiency units in order to
reduce power draw.
22,000 23 48,697 4,870 54
7 1 Theatres 5 – 8 Consider improving thermal insulation on pipework in order to
reduce system losses.
1,000 2 13,140 395 30
8 1 Boiler Plant Review boiler room insulation and pumps in order to increase
system efficiency.
4,500 12 56,502 1,971 27
9 2 All Theatres Consider reinstating automatic control in order to avoid
excessive energy use.
40,000 146 665,844 25,980 18
Totals* £100,050 282 1,092,708 52,818 23
Summary of Recommendations - Whipps Cross University Hospital
Recommendation 4
Consider Installation of an Energy Recovery Device
A run around coil system normally consists of two coils that are connected to each other via
a pumped circuit of water. The water absorbs heat from the exhaust air coil and dissipates it
through the supply air coil.
Recommendation 4
Consider Installation of an Energy Recovery Device
There is currently no heat recovery device installed within the system serving theatres 3&4. A run-around-coil energy recovery
system is typically capable of recovering around 50% of the heating/cooling energy from the extracted air, which is then
transferred to the supply air. Installing a RAC will provide savings of 50%; this equates to a £4,821 per annum.
Supply Air Temperature (Heating Coil) = 21.00 0
C
Total Air Volume = 1.92 m3
/s
Daily Running Hours = 24.00 hr
UK Geographical Location =
Month
Total Degree
Days
(K.day)
No. of Days in
Month
Mean
Deviation (∆T)
from Base
Temp (15.5)
(0
C)
Operational
Hours Load
Factor
Average Fresh
Air Temp
(0
C)
Supply Air
Temp Required
(0
C)
Mean Heating
Coil Uplift
(0C)
Mean Monthly
kWhr
Jan 351 31 11.32 1.00 4.18 21.00 16.82 29,433.12
Feb 327 28 11.68 1.00 3.82 21.00 17.18 27,153.75
Mar 283 31 9.13 1.00 6.37 21.00 14.63 25,600.86
Apr 218 30 7.27 1.00 8.23 21.00 12.77 21,625.23
May 135 31 4.35 1.00 11.15 21.00 9.85 17,236.40
Jun 68 30 2.27 1.00 13.23 21.00 7.77 13,158.03
Jul 32 31 1.03 1.00 14.47 21.00 6.53 11,426.77
Aug 38 31 1.23 1.00 14.27 21.00 6.73 11,776.75
Sep 75 30 2.50 1.00 13.00 21.00 8.00 13,547.52
Oct 158 31 5.10 1.00 10.40 21.00 10.60 18,548.81
Nov 254 30 8.47 1.00 7.03 21.00 13.97 23,657.36
Dec 324 31 10.45 1.00 5.05 21.00 15.95 27,910.71
Totals 2,263 365 241,075.31
Boiler Efficiency = 75.00 %
Gas Tariff = 3.00 p/kW
Annual Input kWhr = 321,433.75 kWhr
Annual Heating Cost = £9,643.01
South Eastern - Gatwick
Recommendation 6
Consider changing fans to high efficiency direct drive
There are multiple options for a direct drive replacement but as shown in the example below, removing the
existing fan (1) from the AHU, then enlarging the opening (2) would allow for a new plenum wall to be
installed (3), which would then facilitate the installation of a plug fan (4).
The new direct drive fan in this example has an absorbed power of 1.7kW at the same volume and
pressure as the original, this represents a 43% reduction.
Lighting upgrades & Controls
Provide advice on energy efficient lighting upgrades:
Ø LED
Ø Induction lamps
Ø Integrated sensor systems with light reflectors for optimum output
Ø Retro fit or upgrade from T12 & T8 to T5
•
Provide advice on lighting system controls and their efficiency:
Ø Dimmable control systems
Ø PIR sensors
Ø Photocells
•
Our approach is to undertake a lighting survey using calibrated Lux meters to determine current
lighting levels, which are then compared against healthcare requirements in accordance with the
relevant CIBSE Lighting Guide.
•
•
Steam and Condensate Systems
Ø Steam raising plant optimisation – pressure
regimes and boiler setback/sequencing
Ø
Ø Suitability of steam traps and associated
components
Ø
Ø Reduction of thermal losses – pipework insulation
review utilising infrared thermography
Ø
Ø Water treatment – TDS levels
Ø
Ø Heat & condensate recovery – boiler blow down,
flue gas economisers
Ø
Ø System zoning – minimisation of live circuits and
utilising motorised valves
Ø
Ø Steam metering and monitoring
Ø
Ø Condensate pump optimisation – demand control
on VSDs
Ø
Ø Oxygen trim – burner optimisation
Ø
Ø Feed pump modulation
Chiller Upgrades & Optimisation
Ø Review and improve chiller controls
Ø
Ø Establish opportunities for condenser coil heat reclaim
Ø
Ø Investigate opportunities for liquid pressure amplification (LPA)
Ø
Ø Investigate opportunities for condensing fan optimisation
Ø
Ø Review opportunities to retro-fit chiller, free-cooling circuits
•
•
•
Quick Win – Free Cooling Opportunity
Ø 7 Temperatures
Ø 2 Pressures
Ø 1 Power Input
Evaluating chiller performance & the Scope
for Optimisation
Advantages of this method:
Ø No need to install flow meters
Ø
Ø Easy to use
Ø
Ø Analysis within 30 minutes, without reliance on pre-installed
device
Ø
Ø Better field accuracy at much lower cost than traditional method
Ø
Evaluating chiller performance & the Scope
for Optimisation - Recommissioning
Performance evaluation
Ø COP (+/- 5 %)
Ø
Ø Capacity (+/- 7%)
Ø
Ø Power input
Ø Super-heat
Ø
Ø Sub-cool
Ø
Ø Evaporator performance
Ø Condenser performance
Evaluating chiller performance and the
Scope for Optimisation
Operational evaluation
Ø Correct charge
Ø
Ø Optimisation of expansion
device
Ø
Ø Compressor defects
Ø
Ø Stability or instability
Summary - Technological Improvements
Ø BMS Optimisation
Ø HVAC Optimisation
Ø Air Handling Unit Optimisation
Ø Effective control of Variable Speed Drives
Ø Improved Lighting and Lighting Controls
Ø Re-commissioning – no building is fully commissioned
Summary - Non Technical Opportunities
Ø Behavioural Change Programme
Ø Monitor Energy and Water Consumption Trends
Ø Invoice Validation
Ø CHP QA
Ø Review of Energy Tariffs
Thank you for listening…
Any Questions Please?
#DAYFORACTION
Conference close
#dayforaction

Weitere ähnliche Inhalte

Ähnlich wie NHS Sustainability Roadshow Manchester

Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices
Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices
Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices Design World
 
Understanding Safety and Product Stewardship
Understanding Safety and Product StewardshipUnderstanding Safety and Product Stewardship
Understanding Safety and Product StewardshipSAMTRAC International
 
CRI Company Overview 2013 updated 4
CRI Company Overview 2013  updated 4CRI Company Overview 2013  updated 4
CRI Company Overview 2013 updated 4jmeinertCRI
 
ecoEntrepreneurship_The_Jonano_Story
ecoEntrepreneurship_The_Jonano_StoryecoEntrepreneurship_The_Jonano_Story
ecoEntrepreneurship_The_Jonano_StoryJonano
 
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...Caribbean Development Bank
 
Intertek-Overview-2016-pdf
Intertek-Overview-2016-pdfIntertek-Overview-2016-pdf
Intertek-Overview-2016-pdfAlireza Shayan
 
medical regulation.pdf
medical regulation.pdfmedical regulation.pdf
medical regulation.pdfssuser0e9b33
 
presentation on Tuv-Sud South Asia Pvt. Ltd.
presentation on Tuv-Sud South Asia Pvt. Ltd.presentation on Tuv-Sud South Asia Pvt. Ltd.
presentation on Tuv-Sud South Asia Pvt. Ltd.Puneet Bhardwaj
 
CSCMP 2014: Voice of the Industry
CSCMP 2014: Voice of the IndustryCSCMP 2014: Voice of the Industry
CSCMP 2014: Voice of the IndustryBrady Totten
 
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...Sustainable Brands
 
5A Pragmatic Approach toLifecycle AnalysisFormal l.docx
5A Pragmatic Approach toLifecycle AnalysisFormal l.docx5A Pragmatic Approach toLifecycle AnalysisFormal l.docx
5A Pragmatic Approach toLifecycle AnalysisFormal l.docxevonnehoggarth79783
 
Together for sustainability -
Together for sustainability -Together for sustainability -
Together for sustainability -ericris
 
Reducing Single Use Plastic in the NHS
Reducing Single Use Plastic in the NHSReducing Single Use Plastic in the NHS
Reducing Single Use Plastic in the NHS4 All of Us
 
Presentation: Life cycle of medical devices
Presentation: Life cycle of medical devicesPresentation: Life cycle of medical devices
Presentation: Life cycle of medical devicesTGA Australia
 
Sterilization Standards Update: Strategies for Compliance
Sterilization Standards Update:  Strategies for ComplianceSterilization Standards Update:  Strategies for Compliance
Sterilization Standards Update: Strategies for ComplianceMedTech Review, LLC
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017Steve Halls
 
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...SPLCouncil
 

Ähnlich wie NHS Sustainability Roadshow Manchester (20)

Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices
Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices
Reducing Risk: Validated Methods for Cleaning Reusable Medical Devices
 
Understanding Safety and Product Stewardship
Understanding Safety and Product StewardshipUnderstanding Safety and Product Stewardship
Understanding Safety and Product Stewardship
 
CRI Company Overview 2013 updated 4
CRI Company Overview 2013  updated 4CRI Company Overview 2013  updated 4
CRI Company Overview 2013 updated 4
 
Designing for Composites Sustainability
Designing for Composites SustainabilityDesigning for Composites Sustainability
Designing for Composites Sustainability
 
ecoEntrepreneurship_The_Jonano_Story
ecoEntrepreneurship_The_Jonano_StoryecoEntrepreneurship_The_Jonano_Story
ecoEntrepreneurship_The_Jonano_Story
 
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...
PAHO Smart Hospitals Toolkit to Build Resilience in the Health Infrastructure...
 
Intertek-Overview-2016-pdf
Intertek-Overview-2016-pdfIntertek-Overview-2016-pdf
Intertek-Overview-2016-pdf
 
medical regulation.pdf
medical regulation.pdfmedical regulation.pdf
medical regulation.pdf
 
presentation on Tuv-Sud South Asia Pvt. Ltd.
presentation on Tuv-Sud South Asia Pvt. Ltd.presentation on Tuv-Sud South Asia Pvt. Ltd.
presentation on Tuv-Sud South Asia Pvt. Ltd.
 
Aviosat Technology Pvt Ltd
Aviosat Technology Pvt Ltd Aviosat Technology Pvt Ltd
Aviosat Technology Pvt Ltd
 
CSCMP 2014: Voice of the Industry
CSCMP 2014: Voice of the IndustryCSCMP 2014: Voice of the Industry
CSCMP 2014: Voice of the Industry
 
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...
Understanding the Most Evolved Practices in Sustainable Purchasing: Lessons i...
 
5A Pragmatic Approach toLifecycle AnalysisFormal l.docx
5A Pragmatic Approach toLifecycle AnalysisFormal l.docx5A Pragmatic Approach toLifecycle AnalysisFormal l.docx
5A Pragmatic Approach toLifecycle AnalysisFormal l.docx
 
Together for sustainability -
Together for sustainability -Together for sustainability -
Together for sustainability -
 
Reducing Single Use Plastic in the NHS
Reducing Single Use Plastic in the NHSReducing Single Use Plastic in the NHS
Reducing Single Use Plastic in the NHS
 
Presentation: Life cycle of medical devices
Presentation: Life cycle of medical devicesPresentation: Life cycle of medical devices
Presentation: Life cycle of medical devices
 
Sterilization Standards Update: Strategies for Compliance
Sterilization Standards Update:  Strategies for ComplianceSterilization Standards Update:  Strategies for Compliance
Sterilization Standards Update: Strategies for Compliance
 
Est's assessment owes 14122017
Est's assessment   owes 14122017Est's assessment   owes 14122017
Est's assessment owes 14122017
 
Global Best Practice in Cold Chain Management
Global Best Practice in Cold Chain ManagementGlobal Best Practice in Cold Chain Management
Global Best Practice in Cold Chain Management
 
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...
SPLC 2018 Summit: Making the Business Case: Measuring the Economic Outcomes o...
 

Mehr von Walt Whitman

Webinar - Creating an SDMP for your NHS trust
Webinar - Creating an SDMP for your NHS trustWebinar - Creating an SDMP for your NHS trust
Webinar - Creating an SDMP for your NHS trustWalt Whitman
 
NHS Sustainability Roadshow Cardiff
NHS Sustainability Roadshow CardiffNHS Sustainability Roadshow Cardiff
NHS Sustainability Roadshow CardiffWalt Whitman
 
Paul Dark - Biomarker guided duration of antibiotic treatment
Paul Dark - Biomarker guided duration of antibiotic treatmentPaul Dark - Biomarker guided duration of antibiotic treatment
Paul Dark - Biomarker guided duration of antibiotic treatmentWalt Whitman
 
Detecting, analysing and interpreting diagnostic devices
Detecting, analysing and interpreting diagnostic devicesDetecting, analysing and interpreting diagnostic devices
Detecting, analysing and interpreting diagnostic devicesWalt Whitman
 
Mike Wakeman - Case Study - CRP in community pharmacy
Mike Wakeman - Case Study - CRP in community pharmacyMike Wakeman - Case Study - CRP in community pharmacy
Mike Wakeman - Case Study - CRP in community pharmacyWalt Whitman
 
Main Presentation UK Diagnostic Summit 2018
Main Presentation UK Diagnostic Summit 2018Main Presentation UK Diagnostic Summit 2018
Main Presentation UK Diagnostic Summit 2018Walt Whitman
 
Real World Evaluation and implementation of a diagnostic test for pre-eclampsia
Real World Evaluation and implementation of a diagnostic test for pre-eclampsiaReal World Evaluation and implementation of a diagnostic test for pre-eclampsia
Real World Evaluation and implementation of a diagnostic test for pre-eclampsiaWalt Whitman
 
UK AMR Diagnositics Collaborative
UK AMR Diagnositics CollaborativeUK AMR Diagnositics Collaborative
UK AMR Diagnositics CollaborativeWalt Whitman
 
The State of the Nation
The State of the NationThe State of the Nation
The State of the NationWalt Whitman
 
Assay Standardisation - how this leads to improved patient results
Assay Standardisation - how this leads to improved patient resultsAssay Standardisation - how this leads to improved patient results
Assay Standardisation - how this leads to improved patient resultsWalt Whitman
 
Cancer detection therapy
Cancer detection therapyCancer detection therapy
Cancer detection therapyWalt Whitman
 
Reducing Antimicrobial Prescribing
Reducing Antimicrobial PrescribingReducing Antimicrobial Prescribing
Reducing Antimicrobial PrescribingWalt Whitman
 
In vitro Diagnostic Medical Devices
In vitro Diagnostic Medical DevicesIn vitro Diagnostic Medical Devices
In vitro Diagnostic Medical DevicesWalt Whitman
 
How diagnostics can drive efficiency within the NHS
How diagnostics can drive efficiency within the NHSHow diagnostics can drive efficiency within the NHS
How diagnostics can drive efficiency within the NHSWalt Whitman
 
Powering Performance
Powering PerformancePowering Performance
Powering PerformanceWalt Whitman
 
Sustainability in the NHS and leadership
Sustainability in the NHS and leadershipSustainability in the NHS and leadership
Sustainability in the NHS and leadershipWalt Whitman
 
Securing funding to deliver cost-saving energy efficient technologies
Securing funding to deliver cost-saving energy efficient technologiesSecuring funding to deliver cost-saving energy efficient technologies
Securing funding to deliver cost-saving energy efficient technologiesWalt Whitman
 
Quantum Waste Management Presentation
Quantum Waste Management PresentationQuantum Waste Management Presentation
Quantum Waste Management PresentationWalt Whitman
 
Is care without carbon fit for the future
Is care without carbon fit for the futureIs care without carbon fit for the future
Is care without carbon fit for the futureWalt Whitman
 

Mehr von Walt Whitman (20)

Webinar - Creating an SDMP for your NHS trust
Webinar - Creating an SDMP for your NHS trustWebinar - Creating an SDMP for your NHS trust
Webinar - Creating an SDMP for your NHS trust
 
NHS Sustainability Roadshow Cardiff
NHS Sustainability Roadshow CardiffNHS Sustainability Roadshow Cardiff
NHS Sustainability Roadshow Cardiff
 
Paul Dark - Biomarker guided duration of antibiotic treatment
Paul Dark - Biomarker guided duration of antibiotic treatmentPaul Dark - Biomarker guided duration of antibiotic treatment
Paul Dark - Biomarker guided duration of antibiotic treatment
 
Detecting, analysing and interpreting diagnostic devices
Detecting, analysing and interpreting diagnostic devicesDetecting, analysing and interpreting diagnostic devices
Detecting, analysing and interpreting diagnostic devices
 
Mike Wakeman - Case Study - CRP in community pharmacy
Mike Wakeman - Case Study - CRP in community pharmacyMike Wakeman - Case Study - CRP in community pharmacy
Mike Wakeman - Case Study - CRP in community pharmacy
 
UK Diagnostics
UK DiagnosticsUK Diagnostics
UK Diagnostics
 
Main Presentation UK Diagnostic Summit 2018
Main Presentation UK Diagnostic Summit 2018Main Presentation UK Diagnostic Summit 2018
Main Presentation UK Diagnostic Summit 2018
 
Real World Evaluation and implementation of a diagnostic test for pre-eclampsia
Real World Evaluation and implementation of a diagnostic test for pre-eclampsiaReal World Evaluation and implementation of a diagnostic test for pre-eclampsia
Real World Evaluation and implementation of a diagnostic test for pre-eclampsia
 
UK AMR Diagnositics Collaborative
UK AMR Diagnositics CollaborativeUK AMR Diagnositics Collaborative
UK AMR Diagnositics Collaborative
 
The State of the Nation
The State of the NationThe State of the Nation
The State of the Nation
 
Assay Standardisation - how this leads to improved patient results
Assay Standardisation - how this leads to improved patient resultsAssay Standardisation - how this leads to improved patient results
Assay Standardisation - how this leads to improved patient results
 
Cancer detection therapy
Cancer detection therapyCancer detection therapy
Cancer detection therapy
 
Reducing Antimicrobial Prescribing
Reducing Antimicrobial PrescribingReducing Antimicrobial Prescribing
Reducing Antimicrobial Prescribing
 
In vitro Diagnostic Medical Devices
In vitro Diagnostic Medical DevicesIn vitro Diagnostic Medical Devices
In vitro Diagnostic Medical Devices
 
How diagnostics can drive efficiency within the NHS
How diagnostics can drive efficiency within the NHSHow diagnostics can drive efficiency within the NHS
How diagnostics can drive efficiency within the NHS
 
Powering Performance
Powering PerformancePowering Performance
Powering Performance
 
Sustainability in the NHS and leadership
Sustainability in the NHS and leadershipSustainability in the NHS and leadership
Sustainability in the NHS and leadership
 
Securing funding to deliver cost-saving energy efficient technologies
Securing funding to deliver cost-saving energy efficient technologiesSecuring funding to deliver cost-saving energy efficient technologies
Securing funding to deliver cost-saving energy efficient technologies
 
Quantum Waste Management Presentation
Quantum Waste Management PresentationQuantum Waste Management Presentation
Quantum Waste Management Presentation
 
Is care without carbon fit for the future
Is care without carbon fit for the futureIs care without carbon fit for the future
Is care without carbon fit for the future
 

Kürzlich hochgeladen

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...tanu pandey
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.Christina Parmionova
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Christina Parmionova
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...Call On 6297143586  Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
Call On 6297143586 Yerwada Call Girls In All Pune 24/7 Provide Call With Bes...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
WORLD DEVELOPMENT REPORT 2024 - Economic Growth in Middle-Income Countries.
 
Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.Global debate on climate change and occupational safety and health.
Global debate on climate change and occupational safety and health.
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 

NHS Sustainability Roadshow Manchester

  • 3. Chance to win a water station worth £2000 and installed!
  • 5. #DAYFORACTION Session 1: Top down & Bottom up approaches to embedding sustainability #dayforaction
  • 6. Greater Manchester and Sustainability Making a difference in health and social care
  • 7. • In 2016, Greater Manchester took control of its health and social care system. • At the same time we launched our five-year plan to improve health and social care, called Taking Charge • It involves NHS, councils, voluntary, community & social enterprise, Healthwatch, other public services • • • • • • • • • • . Taking Charge
  • 8. • • More children reaching a good level of social and emotional development - ready for school • Fewer people dying from: cancer, heart and lung disease • Supporting people to stay well and live at home for as long as possible • Ensuring we contribute in a leading way to a ‘sustainable’ system • • • • • • . A Reminder of Our Aims – by 2021
  • 9. GMHSCP Partnership Opportunities • • • | 9 GMHSCP Partnership Opportunities Carbon Neutrality (2038) Environmental Plan GM Spatial Framework Industrial Strategy Clean Air Plan Air Quality Strategy Transport Strategy and Made to Move
  • 10. Health Benefits of Action • • Cleaner Air • Warmer Homes • Healthier Eating • Active Travel • Green Space and Biodiversity • Community Cohesiveness • Healthier, Sustainable Economies • Resilient communities and health/social care system •| 10
  • 11. Locality • Carbon Literacy Training • Plastic & paper reduction • Recyclable stationary • Advocacy • Social Value Strategy
  • 13.
  • 14. Phil Korbel • • Co Founder/Director Carbon Literacy Project • Board Member, G Mcr Low Carbon Hub •
  • 15. Just think • • how different it would be if… • everyone ‘got it’ • thought low carbon • acted low carbon • how much more effective would your existing SD measures be? •
  • 16. Carbon Literacy is • • a day’s-worth of adaptable, relevant, action-based learning-and-doing on climate change that you deliver • the foundation for upping your game on climate change • is not about polar bears • about health • •
  • 17.
  • 18. Meanwhile, in Greater Manchester • • •
  • 19. •      • Carbon neutral by 2038, 15% annual reductions from now on •
  • 20.
  • 21. The bosses agreed • • tackling climate change is part of the job • is rarely a high priority • why? • “…because I won’t get fired if I don’t…” • What gets measured gets done •
  • 22. What leeway does ‘Devo Manc’ offer? • • align with the GMCA plan • standing agenda item • Providers Board action group • what gets measured gets done • embed in funding contracts?? • spread best practice nationally •
  • 25. Single-use device remanufacturing Overview - Safety & Efficacy Sustainability Solutions | CIS10315 Rev. A
  • 26. Dedicated to your sustainability goals § Remanufactured devices are backed by Stryker’s comprehensive quality system § All devices are individually tested to ensure the highest quality § Patient Care sustainability § Maximise savings through case support, business reviews, education and utilising Stryker’s entire remanufacturing program § Leverage partnership to provide purchasing power and price containment Financial sustainability § Purchasing and collection processes designed to minimise waste § Alignment to prioritize the reuse of remanufactured devices Environmental sustainability Sustainability Solutions | CIS10315 Rev. A
  • 27. Sustainability Solutions | CIS10315 Rev. A
  • 28. ‘Single-use’ devices (SUDs) § Most SUDs cannot be reused § The‘single use’label is determined by the manufacturer, not the regulatory body: • Perceived limitation of liability • Reduced scrutiny by regulatory body • Increased sales and profits § Specialised technology and knowledge allows manufacturers to remanufacture certain SUDs DVT HARMONIC SCALPEL Sustainability Solutions | CIS10315 Rev. A
  • 29. § OEM devices are studied to identify critical quality attributes and establish performance specifications § Multiple Considerations: • Analysis of the product • Materials characterisation • Chemical compatibility • Generation of intermediate level product description, including engineering drawings • Analysis of clinical application to produce a specification § Reverse engineering Sustainability Solutions | CIS10315 Rev. A
  • 30. § Complex medical devices must often be disassembled • Enables thorough cleaning • Allows replacement of components worn out during original use • Increases yield § Replacement components are designed and sourced based on OEM specifications • Validated as equivalent to new Remanufacturing requires disassembly to facilitate cleaning Disassembly and replacement components Sustainability Solutions | CIS10315 Rev. A
  • 31. § Receiving and Sorting • All orders are ticketed to ensure order content integrity and traceability • Gross rejects, heavily soiled items, and unapproved products are removed • Devices are identified according to OEM convention § § Device Marking/Tracking • All devices are indelibly marked with Unique Device Identifiers via pad printing, bar coding, laser etching, etc. • Allows traceability for cycle counts, reject reconciliation, and potential post-market field actions Identification and traceability Sustainability Solutions | CIS10315 Rev. A
  • 32. § Accepted devices undergo comprehensive cleaning that incorporates prolonged soaking, cleaning and rinsing in pH-neutral enzymatic cleansers and sanitisers that are compatible with all device materials § § Residual levels of organic materials, such as protein, hemoglobin and total organic carbon are quantified and compared with acceptable standards § Decontamination and cleaning Sustainability Solutions | CIS10315 Rev. A
  • 33. § Performance is compared to baseline catheters § § Testing performed in house and/or by third party Material strength and performance testing Tensile Strength Tensile Strength FatigueFatigue Joint Seal Testing Joint Seal Testing Introduction & Withdrawal Introduction & Withdrawal Torsion / Deflection Torsion / Deflection Bending / Buckling Bending / Buckling Sustainability Solutions | CIS10315 Rev. A
  • 34. § DEPCTS (Diagnostic EP Catheter Test System) § § Complete electrical profile testing including isolation and continuity • Isolation test • Captures internal and/or minor insulation breakdowns that can result in cross-talk or noise on the electrogram signals • • Continuity test • Closely mimics actual clinical use • Verifies that the signal from each electrode is consistent and unbroken • • Both tests are performed during active deflections of the test catheter Electrical integrity testing Sustainability Solutions | CIS10315 Rev. A
  • 35. § Requirements • Package variation (i.e. lot to lot) • Storage • Human interaction (i.e. shipping) § § Validation Steps • Validation Plan • Material/Design Qualification • Performance Qualification • Product Qualification § § Testing • Shock/Drop Test, Vibration Test, Seal/Package Strength, Ship Test • ISO 11607, ASTM D4169, ASTM F-1140-00, ASTM F1980-02 • Accelerated Aging (thermodynamic temperature coefficient) Packaging and shelf life testing Sustainability Solutions | CIS10315 Rev. A
  • 36. § Conventional Release • Biological Indicators • 72 hour quarantine § § Sterilisation validation: • AAMI/ANSI/ISO 11135 • EN550 • Annual Revalidation • SAL of 10-6 • EO Residuals: ISO 10993-7; TIR 19 • Not an irritant to patients or clinicians Sterilisation Sustainability Solutions | CIS10315 Rev. A
  • 38. Remanufacturing in the EP / cath lab • Diagnostic ultrasound catheters (3D mapping catheters) • Electrophysiology catheters • Electrophysiology interface cables • Catheter introducer sheaths EP catheters Diagnostic ultrasound catheters Catheter introducer sheaths EP cables Stryker Corporation or its affiliates own, use, or have applied for the following trademarks or service marks: Stryker. All other trademarks are trademarks of their respective owners or holders. Sustainability Solutions | CIS10315 Rev. A
  • 39. • Laparoscopic devices (trocars and directed energy – bipolar and ultrasonic) • • Arthroscopic devices (shavers and wands) • • Orthopedic devices (bits / blades / burs and external fixation devices) § Trocars Harmonic scalpels Sealer / dividers Stryker Corporation or its affiliates own, use, or have applied for the following trademarks or service marks: Stryker. All other trademarks are trademarks of their respective owners or holders. Remanufacturing in theatre Sustainability Solutions | CIS10315 Rev. A
  • 41. Safety evidence § Reprocessors have been regulated since 2000 § Millions of SUDs have been reprocessed with no evidence of increased infection rates. § No deaths have been attributed to reprocessed devices in the FDA’s Manufacturer and User Facility Device Experience (MAUDE) database. 2008 GAO report: Of the 320,000+ adverse events filed with FDA between 2000 and 2006, only 65 adverse events “actually involved or were suspected to involve a reprocessed SUD and that the reprocessed SUD was one of several possible causal factors in the adverse event. In reviewing these 65 reports, FDA found that the types of adverse events reported to be associated with the use of reprocessed SUDs were the same types of events that were reported for new devices.” 2008 Government Accountability Office (GAO) report: noted the findings of FDA’s Medical Product Safety Network (MedSun) Program and confirmed that “none of the representatives of MedSun hospitals who participated in the FDA focus groups reported being aware of any infections related to the use of reprocessed SUDs.” Established record Sustainability Solutions | CIS10315 Rev. A
  • 42. Protecting your patients § Remanufacturing of single-use devices is regulated by governmental authorities § Remanufactures must obtain premarket clearance and comply with the same medical device regulations as original equipment manufacturers § Premarket clearance is intended to validate that: • The remanufacturing is able to clean and sterilise the device • Functional performance of the remanufactured device is equivalent to the predicate device § NO BATCH TESTING – every device is fully function tested Regulatory oversight Sustainability Solutions § FDA QSR compliant § 105+ premarket clearances for reprocessing § ISO 13485 certified Sustainability Solutions | CIS10315 Rev. A
  • 43. Regulatory § MHRA issued remanufacturing guidance document § § BSI is Stryker’s notified body § § EU Council’s and Parliament’s Committees on ENVI endorsed remanufacturing agreement § § Stryker Sustainability received CE mark for select vascular devices Market activities Regulations Sustainability Solutions | CIS10315 Rev. A
  • 45. Remanufacturing: making a difference In 2017, our single-use medical device remanufacturing programs helped our U.S. customers: $326 million in supply costs 13.4M lbs. of waste from landfills Save Divert Sustainability Solutions | CIS10315 Rev. A
  • 46. 3_89 Effective remanufacturing prices will be determined as a 10-45% discount from OEM prices, depending on Market Share commitment. • Hospitals/GPOs will provide usage data, including pricing. List price can be used as a starting point when actuals are not available. • • Each individual system may have variations with OEM prices and annual volumes. Tier 1 Less Than 10% Market Share Tier 2 10% Market Share Tier 3 20% Market Share Tier 4 30% Market Share Tier 5 40% Market Share Tier 6 50% Market Share 10% 15% 21% 28% 36% 45% % Market Share of Customer Spend (Please state if discount or actual price is being offered) Pricing and contracting plan
  • 47. Current Annualized Expenditures Total Remanufactured Spend at 30% Adjusted OEM Spend Total Adjusted Spend Total Adjusted Savings Total Adjusted % Savings £ 1,227,293 £ 143,152 £ 905,743 £ 1,048,894 £ 178,399 15% 14% 86% Total KG Collected Rate Total Waste Savings 10,000 £ 0.20 £ 2,000 Total Savings Remanufacturing Savings + Waste Savings £ 180,399 Customer Spend & Remanufacturing Savings Summary of Total Annualized Savings Waste Savings 3_89 Savings Opportunities: 1. Sustainability devices 2. 3. OEM price erosion 4. 5. Waste diversion 6. 7. Totals Savings analysis 1 2 3 1 2 4 4
  • 49. Collections process Establish account Collection materials supplied Set up & training Collections Shipment Inspection, tally and reporting Sealer / dividers Harmonic scalpels Trocars
  • 50. Dedicated to your sustainability goals § Remanufactured devices are backed by Stryker’s comprehensive quality system § All devices are individually tested to ensure the highest quality § Patient Care sustainability § Maximise savings through case support, business reviews, education and utilising Stryker’s entire remanufacturing program § Leverage partnership to provide purchasing power and price containment Financial sustainability § Purchasing and collection processes designed to minimise waste § Alignment to prioritize the reuse of remanufactured devices Environmental sustainability Sustainability Solutions | CIS10315 Rev. A
  • 52. 52 References: Anderson, L. (2013, April). Clinical business strategies. Retrieved from: www.hpnonline.com Ferguson, M. & Toktay, B. (2007, July). Effects of competition on recovery strategies. Retrieved from: www.insead.edu NuRep. (2015, April 23). Are repless models the answer to PPI cost management? Retrieved from: www.nurep.com Scott, B. (2016, April 22). Savings war: The pros and cons of SUD reprocessing growth. Retrieved from: www.dotmed.com White, B. (2016, May 4). Single-use device Options – Promoting Cost Savings and Infection Prevention. Retrieved from: www.medicaldealer.com
  • 53. © 2015 JRP Solutions Ltd The information in this document is the property of JRP Solutions Ltd and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of JRP Solutions Ltd. This information is given in good faith based upon the latest information available to JRP Solutions Ltd, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon JRP Solutions Ltd or any of its subsidiary or associated companies. Saving Energy Through Staff Engagement George Richards 14th February 2019
  • 54. Discussion Framework • Introductions • Who are JRP? – What do we do? – Who do we work with? • Energy Training – Why do it? – Levels of training – eLearning – Costs • Any questions? • •
  • 55. Why do it? ü NHS annual energy spend of approximately £544m ü Increased consumption due to more energy hungry technology ü Pressure on to deliver savings ü Little capital available to invest in energy saving projects ü Inefficient building stock ü Effecting behavioural change is low cost and delivers immediate benefits ü A 5% - 10% reduction in energy use would realise a £30 - £60m annual saving ü We all have a moral duty to change what we do and prevent waste wherever possible as we face ‘A Climate Emergency’
  • 56. Energy Awareness Training Harness the inherent knowledge of your staff – they know your business better than any consultant! JRP provide five levels of training from Level 1 General Energy Awareness to Level 4 Embedding Energy Culture Change ensuring it is always relevant, engaging and practical
  • 57. Making it relevant Level 1 – General Energy Awareness Training ü Face to face or eLearning modules ü Fundamental principles of energy – what it is, where it comes from, what it costs, security of supply, environmental impacts ü The impacts of inaction in the home and workplace ü Can be bespoke for larger organisations ü EUSR approved
  • 58. Energy – the big picture • • • • • • • • Provides a universal understanding of what energy is, where it comes from and why CO2 emissions are so harmful to the planet
  • 59. Energy at home Looks at how energy is used within a typical home and provides some useful tips to help reduce energy consumption and reduce energy bills at home
  • 60. Energy at Work Every day £000’s of energy is wasted at work with lights, heating & cooling and equipment being left on when it’s not actually needed. This module looks at simple ways in which energy consumption can be reduced to help make the workplace more sustainable and save the NHS significant amounts of money.
  • 61. Energy Awareness via eLearning https://jrpsolutions.learnupon.com/users/sign_in
  • 62. Making it relevant to the NHS • Relevant to all staff – clinical, medical and support • Builds universal understanding of energy and CO2 through modules • Adds personal value by relating energy to the home environment • Relates to NHS priorities and values e.g. improved patient comfort • Can be used for Induction Training, Team Talks or as a complete course • Very affordable @ £3k per annum with unlimited usage in each Trust •
  • 63. © 2015 JRP Solutions Ltd The information in this document is the property of JRP Solutions Ltd and may not be copied or communicated to a third party, or used for any purpose other than that for which it is supplied without the express written consent of JRP Solutions Ltd. This information is given in good faith based upon the latest information available to JRP Solutions Ltd, no warranty or representation is given concerning such information, which must not be taken as establishing any contractual or other commitment binding upon JRP Solutions Ltd or any of its subsidiary or associated companies. Any Questions? Contact: George Richards e: george.richards@jrpsolutions.com m: 07870 394601
  • 65. Nerys Simmons Manchester University NHS Foundation Trust Embedding Reuse
  • 66. Why have a reuse system? • £100s disposing of unwanted items • £1000s procuring same items • Match up the 2 üAvoid waste üReduce carbon footprint from procurement üSave ££££££
  • 67. In figures Since February 2016 we have…. • Registered 1252 colleagues as users • Reused 3558 items over 861 transactions • Saved estimated £175k in procurement costs • Avoided 25 tonnes of waste
  • 68. Things to consider • Know your stakeholders • Know your own resources • Know your audience • Keep it fair • Keep it in focus •
  • 69. Know your stakeholders • Procurement and budget holders • Health and Safety, Infection Prevention, Fire Safety • Medical Engineering, Informatics • • Capital Works/Property and Estates •
  • 70. Know your own resources • Time, transport, storage • Be clear on everyone’s responsibilities • Accept there are limitations
  • 71. Know your audience • What do people want? • What items have restrictions on procurement • Use popular items to promote the system
  • 72. Keep it fair • Everything for reuse goes through Warp It • Everyone has an equal chance to claim • Users are expected to give as well as receive
  • 73. Keep it in focus • Case studies in staff newsletter • Sign-up at events • Criteria for Green Impact award • •
  • 74. Thank you Nerys Simmons Waste and Sustainability Officer Nerys.simmons@mft.nhs.uk 0161 276 6349
  • 76. #DAYFORACTION Session 2: Injecting finance into the NHS and creating savings #dayforaction
  • 77. Reducing waste in every way NHS Sustainability Roadshow Manchester 14th February 2019
  • 78. Introductions MJ Rose - Business Development Manager Kerry Jones – Sales Director www.forwardwaste.co.uk
  • 79. The importance of segregation… The way we handle waste has to change! Volume of wastes going to UK landfill - In 2016, 15.7 million tonnes of municipal waste was sent to landfill. Of this, 7.7 million tonnes was biodegradable municipal waste. Around 10 million tonnes of food and drink was wasted in the food chain in 2015 - around 60 per cent of this is avoidable. The problem with plastic… 8.3 billion tonnes of virgin plastic created to date 9% recycled 12% incinerated 79% accumulated in landfills If this trend continues, roughly 12 billion tonnes will be landfilled by 2050 www.forwardwaste.co.uk
  • 81. Where can your general waste go? www.forwardwaste.co.uk EfW General waste incinerated to produce energy, with incineration temperatures reaching over 850 degrees celsius Reduction in greenhouse gas emissions between 32% - 41% compared with sending to landfill Local EfW facility generates enough electricity for 50,000 homes 23% of renewable energy comes from energy from waste – equivalent to 726,000 tonnes of oil
  • 82. Where can your food waste go? www.forwardwaste.co.uk Anaerobic Digestion Uses microorganisms to break down food waste in an enclosed system, without oxygen As it breaks down, methane is produced which is collected and converted to biogas Biogas used to generate electricity, heat or transport fuels Also creates a nutrient-rich fertiliser for use in agriculture
  • 83. The importance of segregation… Higher chance of achieving zero to landfill Valuable, recyclable materials recovered at source with lower disposal charges, or rebates achieved Full traceability of waste destinations www.forwardwaste.co.uk
  • 84. Efficient waste management in the NHS www.forwardwaste.co.uk or… BEDS? BINS? Simple Choices…
  • 85. Case study – the problem NHS hospital trust 13 tonnes of unsegregated waste produced per month general waste and cardboard all in together! Increased container collections per annum, leading to a high carbon footprint Health & Safety concerns and disruption to site through high container frequency www.forwardwaste.co.uk
  • 86. Case study – the solution General waste collected from around the hospital Residual general waste loaded into portable compactor www.forwardwaste.co.uk Waste taken for onward recycling. Cardboard segregated at source and baled. Collected every 2 months with rebate achieved. Compactor emptied once a month.
  • 87. Case study – the outcome Reduction in general waste by 50% Collection frequency's reduced from 2 visits PCM to only 1 PCM – 50% reduction! Cardboard waste generating income Carbon footprint reduction in general waste movement. Baler hire costs covered by rebate. www.forwardwaste.co.uk
  • 88. What should be happening… Elimination Minimisation Diversion Waste Management Risk Reduction Legal Compliance Cost Control Environmental Consultancy Removal and Disposal www.forwardwaste.co.uk
  • 90. Thank you for your time. mj.rose@forwardwaste.co.uk kerry.jones@forwardwaste.co.uk www.forwardwaste.co.uk
  • 91. In It Together: Creating a Whole Trust Approach
  • 92. Introduction •2.4 million patient contacts •+- 15,000 staff •A 900-year history •Almost £1.5 billion annual turnover •6,659 babies born •+- 5,000 tonnes of waste p.a. •Awarded TWM contract in 2014 •Close working relationship •Education & communication •Innovations & initiatives • •
  • 93. About us Partnership Approach •Recycling & Resource Management company - contract lead •Dedicated staffing – team of 35 on site •Sustainability Director & Team • • • • • • Head of Health & Sustainability Contract Manager Key Coordinator Supervisors Waste/ Obsolete Porters Guy’s and St Thomas’ sites Trust Waste Manager Logistics Assistant Sustainability Team
  • 94. About us Initiatives •SAVE - savings of up to £150,000 p.a. •Waste data from Byweigh mini-weighbridge •Senior Management buy in & SAVE Champions •Support for events and sustainability activities •Staff induction education • • • • • • •
  • 95. About us Mini-weighbridge system •Identifies and weighs every bin - ward/ department level tracking •Bespoke software and tagging system •Performance and cost - real-time, to pin-point problem areas •Staffing and efficiency benefits •
  • 96. About us Reuse and Food recycling •Reuse •Trust signed up to Warp-it in November 2017 •12 months savings of £76,000 •Initial Roll Out - Ward Clerks and Procurement Buyers •Procurement decisions for purchase are prompted to use StockDoc •Food waste •Tonnage from 1 tonne to 14 tonnes per month •Training of Food Service Assistants
  • 97. About us Single – use packaging •Installed August 2018 at St Thomas’ •4,000 bottles refilled since being introduced •Machine also to be installed at Guy’s and in community sites •
  • 98. About us Single – use packaging – market reactions •Customer enquiries and questions •Commitment and leadership o Unilever – 100% plastic packaging fully recyclable, compostable, reusable by 2025. Increase recycled content in packaging to 25% by 2025 o Costa – 500million single- use coffee cups recycled in the UK
  • 99. About us Inspiring action and useful resources •Leading by example •Spread the word enthusiastically •Resources out there: •https://www.ellenmacarthurfoundation.org / •https://skyoceanrescue.com/ •https://thesra.org/ •https://lessplastic.co.uk/ •https:// www.flipsnack.com/Bywaters/new-flipbook-fti01qafh.html • • •
  • 104. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Securing funding to deliver cost-saving energy efficient technologies Thursday 14th February 2019 Liam Gillard, Salix Finance
  • 105. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Overview of Salix Finance Independent, not-for-profit company working in partnership with the Public Sector since 2004 Salix provides interest-free funding to accelerate investment in energy efficient technologies National profile working in England, Scotland and Wales Funded by the Department for Business, Energy and Industrial Strategy (BEIS), the Department of Education, the Welsh Government and the Scottish Government
  • 106. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Salix focus
  • 107. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Funding model Funding committed following successful application Project delivery and installation (interim payments available) Salix loan paid out on completion Financial and carbon savings achieved Repayments made back to Salix (10 equal instalments over 5 years)
  • 108. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Our achievements *calculated using emissions factors published by government for carbon foot printing client pilot schemes Salix funding allocated £930,000 energy saving per annum 6,000* tonnes CO2 per annum £3.4m19 500 client projects committed tCO2e* annual saving 766k*2301 Salix funded projects £692m energy saving per annum £158m client projects committed 16,656 Clients supported 2004 2018
  • 109. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Technologies supported Salix funding can support over 100 energy efficiency technologies Boiler replacements Building energy management systems Combined heat and power Heat recovery Heat networks Heating and hot water upgrades Building fabric insulation LED lighting upgrades Street lighting Solar PV
  • 110. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Salix Finance and the NHS Funding criteria – 5 year loan payback (no technical payback anymore), costs less than £172 to save tCO2e over lifetime of the project Funding can be used to improve existing equipment or to install equipment to achieve higher standards in new build developments Funding can be secured over multiple years to support Sustainable Development Management Plans and long term estate strategies (including EPCs) NHSI approve of Salix’s Invest to Save model
  • 111. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR £70.5m 100,000 £19.5m 63 236 £567.5m Salix working within the NHS *Calculated using emission factors published by government for carbon footprinting 63 227 TOTAL TRUST ENERGY SPEND 2017/18 £567.5m TOTAL SALIX LOAN VALUE ESTIMATED ANNUAL tCO2e* TOTAL ANNUAL SAVINGS £71m 100,000 £19.5m
  • 112. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Top Salix NHS clients Imperial College Healthcare NHS Trust East Kent University Hospitals NHS Foundation Trust Wrightington, Wigan and Leigh NHS Foundation Trust Frimley Health NHS Foundation Trust George Eliot Hospital NHS Trust Northern Devon Healthcare NHS Trust University Hospitals of Morecambe Bay NHS Foundation Trust Lewisham and Greenwich NHS Trust North West Anglia NHS Foundation Trust Northampton General Hospital NHS Trust
  • 113. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Salix project knowledge slides Sharing of knowledge between clients Before and after project delivery Supporting comments Lessons learnt Supplier information Contact details NHS knowledge slides Gaining internal approval
  • 114. • • BEFORE • 3 x 4.5MW LTHW boilers • Annual energy spend of £407,000 gas and £1.6m electricity at Whiston Hospital • Whiston Heating System is maintained by Vinci Facilities. The heating demand from Whiston hospital is approx. 3,728Kw in the coldest months of the year. Project Knowledge – CHP and Heat Recovery by St Helens & Knowsley NHS Trust AFTER • CHP providing 1.28MW of electricity and 1403kW of Low Temperature Hot Water • FluAce direct contact gas condensing economiser fitted to current boilers to recover ~20% of the energy currently in the flu gas • • • • • • Project completion date – October 2018 • Project value £2,108,365 • 8,986,157 kWh annual electricity saving (51%) • £713,258/year savings • Payback 2.96 years • 1,638 tCO2 saved per year • • •
  • 115. Supporting Comments: Project Knowledge – CHP and Heat Recovery by St Helens & Knowsley NHS Trust • Proposed savings derived from a)Use of expected kwh reductions from initial feasibility study ‘plugged’ into Trust invoicing monitoring spreadsheet, and b) Pre and post consumption (kwh) figures and cost per kwh also plugged into the SALIX compliance tool to test payback <5years. • • Electricity costs of 9.16 p/kWh and gas costs of 1.80 p/kWh at Whiston Hospital • • Clark Energy, Cogenco and Centrica put in a bid in our tender for the installation and maintenance of the CHP and Flue-Ace heat recovery unit. Centrica was the chosen supplier. • • Advice/lessons learned: • Consider whether your site has an A and B electrical supply, which is usual in modern hospitals. If this is the case you may have to consider the electrical demand of one of these supplies, rather than total site demand, when sizing the CHP. • Ensure you have a good log of constant temperature hot water return data and primary heating loop temps prior to the project. • Be patient from initial SALIX approval through to feasibility to actual completion….. 3 years, we are however a PFI trust so were held up with Deed of Variation and Funder approval. • SALIX had equal patience with our delays……Thank you. •
  • 116. Measurement of Savings: Project Knowledge – CHP and Heat Recovery by St Helens & Knowsley NHS Trust • The savings for December and January are greater than the expected savings amount. This is because the expected savings calculation took into account unforeseen downtime, scheduled downtime, Scheduled maintenance, and peak summer intervals over the course of the year. • There aren’t any aspects of the savings calculation we would approach differently after considering post verification results. • Graph 2 – Metered consumptio n to Jan 19 • • Savings have been monitored on this project using manual mains meter readings, STARK smart meter readings, utilities bills and the Web portal supplied by the CHP contractor which details Gas used as well as electrical and thermal energy generated. • • • Graph 1 – Metered consumption to Oct 18
  • 117. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Salix case studies
  • 118. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Supporting project delivery FeasibilityFeasibility Internal Consultation Internal Consultation ProcurementProcurement MobilisationMobilisation InstallationInstallation Business case checks Meet with finance department Offer reservation of funding for Trust Board Workshops and calls with other Trusts for advice Interim Payments Phase works over financial years
  • 119. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Summary 100% interest free funding available for NHS Trusts and Foundation Trusts – no maximum loan amount Cost neutral - loan repaid through savings Supporting long-term funding plans, Sustainable Development Management Plans and estates strategies Helping the NHS achieve energy and carbon reduction targets Reduce energy bills at your Trust
  • 120. SOLVING ENERGY EFFICIENCY FINANCE IN THE PUBLIC SECTOR Thank you liam.gillard@salixfinance.co.uk 0203 714 5655
  • 122. #DAYFORACTION Session 3: Sustainability in action #dayforaction
  • 123. Powering Performance: Helping major energy users in the healthcare sector to improve energy efficiency and operational performance through onsite generationTony Orton Centrica Business Solutions Thursday 14th February 2019
  • 124. Centrica Business Solutions The energy landscape is evolving Powering business advantage 124124Centrica Business Solutions CENTRALISED ENERGY MICROGRIDS RENEWABLES STORAGE DISTRIBUTED GENERATION DEMAND SIDE RESPONSE Centralised energy supply is giving way to distributed technology, providing businesses with smart, secure and affordable solutions to the energy challenges they face.
  • 125. Centrica Business Solutions Energy supply Wholesal e energy Energy insight Energy optimisation Energy solutions Centrica Business Solutions has been created to develop new thinking, new technologies and new ways of working to help our healthcare customers We assist organisations to improve their operational efficiency, ensure site resilience and unlock new sources of value with energy insight, optimisation and technical solutions. 125Centrica Business Solutions 2022 annual revenue target £1bn >2k Enterprise customers £700m Investment to 2020
  • 126. Centrica Business Solutions The rising cost of non-commodity charges 126 Capacity market subsidy A subsidy to encourage flexible generation to meet peak demand. Contract for difference Subsidies for large scale low carbon generators, to replace the closing renewables obligation. Feed-in tariffs A subsidy for small scale renewable generators, e.g. solar panels. Transmission network charges Paid to National Grid to cover build and maintenance costs of Britain’s high voltage network. Distribution network charges Paid to regional networks to cover the cost of transporting energy from National Grid to customer meters. Renewables obligation Subsidies for large scale low carbon generators, e.g. wind farms. Balancing Services Charge Paid to National Grid for their work ensuring supply and demand are always equal. Supplier costs Debt costs, operating expenses and profit. Wholesale energy costs Energy purchased on the wholesale market plus the cost of any ‘imbalance’ caused by changes to our forecast consumption. 42% 19% 14% 8% 5% 4% 3% 2% 2% Note: British Gas forecast 2018 costs for sample customer
  • 127. Centrica Business Solutions Tracking the continuing rise of non-commodity costs in the UK 127 Environmental Levies Balancing Services Transmission Network Charges Distribution Network Charges Wholesale Energy Costs 31% 57% 64% Non-Commodity cost as % of total
  • 128. Centrica Business Solutions 128 21 3 Panoramic Power’s non-invasive, self-powered wireless sensors can be installed quickly and easily, with little or no disruption or downtime to your operations. Enabling access to energy data and analytics through a single platform. Sensor installation Easily attach the non-invasive self-powered sensors to the outgoing electrical wire. Each individual sensor will start tracking the energy usage of the device, equipment or process. Analysis and action Capturing energy data in a single platform provides a powerful interface to monitor, measure, report, and understand energy consumption from multi-site level to individual device level. Monitoring and data Data is continuously received from the sensors and wirelessly transmitted to the analytics platform via cloud technology, all in real-time. Panoramic Power Energy insights
  • 129. Centrica Business Solutions 129 Cloud based analytics platform for understanding your consumption
  • 130. Centrica Business Solutions 130 Energy Insights Device level visibility and energy insights 14bn global data points across 53k sensors and in 30 countries Demand Side Response Additional revenues from existing assets Europe’s #1 Demand Side Response provider with c. 5GW under management globally Battery Storage Additional revenue Patented battery optimisation driving industry leading returns Roosecote 49MW and Gateshead 3MW battery developed, 18MW battery live this week in Belgium Combined Heat and Power 25% increase in energy efficiency UK’s largest CHP provider, with over 3k units in market Integrated Solutions Platform Solar 100% renewable generation 150MW of solar power managed globally with 6.5k solar panels in the UK Delivering an integrated approach
  • 131. Centrica Business Solutions Optimising the value of onsite generation 131 Connection and supply e.g. Bord Gáis, British Gas and Direct Energy Wholesale market trading Energy insight Operations and maintenance Power generation e.g. back up- generator Automated Demand Side Response Combined heat and power (CHP) Energy efficiency e.g. solar panels, LED lighting, heating, ventilation and air-conditioning (HVAC) Battery storage
  • 132. Centrica Business Solutions 132 Combined Heat and Power Solar PV Battery storage charge Battery storage discharge Grid import An illustrative Distributed Energy strategy
  • 133. Centrica Business Solutions CHP helps hospital cut carbon emissions to the equivalent of removing 1,000 cars Customer objective • Offer healthcare services for three million • Make cost effective energy decisions • Produce sustainable energy The solution Centrica Business Solutions installed a brand new Combined Heat & Power (CHP) unit that: • Reduced electricity consumption • Cut energy spending • Slashed energy-related concerns • Created healthcare investment opportunities University Hospitals of the North Midlands (UHNM) 133 “We chose Centrica Business Solutions because their product offered the best fit for our needs. It offered the best savings in consumption, cost and carbon over the 15 year life of the installation. I would definitely recommend them for CHP installation and maintenance.” Charlie Cox Energy Manager University Hospitals of the North Midlands, NHS Trust £500 K 2,000 20 CHP unit saves £500,000 annually Carbon emissions cut by 2,000 tonnes Carbon cuts same as hiring 20 nurses
  • 134. Centrica Business Solutions 24 Thank you If you have any questions please contact us: Tony Orton Distributed Energy Sales Manager Centrica Business Solutions Email: Tony.Orton@centrica.com Centrica Business Solutions Email: CentricaBusinessSolutions@centrica.com Website: www.centricabusinesssolutions.com Twitter: @CentricaSoln_UK
  • 136. IntroductionTo Sterimelt and a Sustainable Recycling Solution for Clinical ‘SterilisationWrap’ • Burton Queen’s Hospital • Sterilisation Wrap • Legal and Compliance • Sterimelt • Benefits to Health care industry • BBC News – NHS News - Awards - Social Media • Ongoing Solutions, Projects and Opportunities • Questions and Comments • October 2018 www.tcg.ltd136 Today’s Presentation Agenda
  • 137. October 2018 www.tcg.ltd137 Where would you rather see your NHS money being spent..?? BEDS BINSOR
  • 139. SterilisationTheatreWrap Typical operating room featuring “Wrap” • Clinical “Wrap” is a non-woven polypropylene sterile wrap that is used to maintain the sterility of instruments and equipment and can also be used as bed sheets, drapes and covers in the operating theatre. • “Over 4 Million Operations are performed across the NHS in England each year”- Natalie Roddis, Waste and Sustainability Officer- NHS Burton • WHO estimates, 75-90% of waste from healthcare facilities is non-hazardous. • Queen’s Hospital Burton produces about 16 tonnes of “Sterilisation wrap”-previously sent for incineration at very high cost. • Merged with the Royal Derby NHS in August 2018 to become University Hospitals Of Derby And Burton NHS FoundationTrust. October 2018 www.tcg.ltd139
  • 140. October 2018 www.tcg.ltd140 Legal and Compliance Independent EmissionsTest Environment Agency & Natural ResourcesWales Independent Lab Report
  • 141. October 2018 www.tcg.ltd141 Ø Reduction inVolume by 80 to 85% Ø Operator Free for Other Duties During Densification Process Ø Diverts From Landfill and/or Incineration - Sustainable Ø 100% Compliant Recycling Process – Circular Economy Ø Current Revenue Stream from PP Ø Processed Blocks Re-Manufactured–Circular Economy Ø Ø ”Savings from disposal costs for the UK of Circa £12,750,000 should Sterimelt be implemented across the NHS.The revenue created for the UK could reach £6,500,000”- Natalie Roddis, Waste and Sustainability Officer- NHS Burton Ø Save on disposal costs Ø Earn Revenue for tonnages recycled Ø
  • 144. October 2018 www.tcg.ltd144 BBCWales – NHS – Awards – Social Media
  • 145. TCG Ltd- Further Projects, Solutions and Opportunities……. • Single Use Disposable PatientTransfer Sheets • Successfully processed PTS supplied by M.I.P. UK Ltd (Formerly Cromptons) • Significant opportunity to recycle yet more “single use disposable” products. October 2018 www.tcg.ltd145 • Disposable Curtain Recycling – Innovate UK • Ongoing trials of volume reduction and recycling of disposable curtains • Significant opportunity to recycle yet more “single use disposable” products.
  • 146. www.tcg.ltd “World First Sustainable Healthcare Innovation” ThankYou ForYourTime And Attention --Any Questions….???
  • 147. Delivering Energy Savings through ‘Low Cost’ Interventions Presented by: Darren Jones BSc (Hons), C.Eng. FCIBSE LCC LCEA Manchester NHS Sustainability Day Roadshow – 14th February 2019 www.lowCO2.eu
  • 148. An overview 1. Hospital Energy Efficiency; the Drivers & Barriers 2. BMS Optimisation 3. Operating Theatre Optimisation - Case Studies 4. Lighting Upgrades & Controls 5. Steam and Condensate Systems 6. Chiller Upgrades & Optimisation 7. Summary - Technological Improvements 8. Summary - Non Technical Opportunities 9. 10.
  • 149. Ø Ø Economic: Electricity and other energy prices are rising, NHS Trusts are currently in financial deficit. Ø Political: Global, European and National Targets. Climate Change Act, Carbon Reduction Targets. Ø Environmental: Reducing energy waste reduces GHG emissions and accompanying environmental impacts. Ø Social: Energy efficiency has health benefits, both in the home and at work. Fuel poverty impacts on the whole health economy. Ø Hospital Energy Efficiency – The Drivers
  • 150. Common barriers include: Ø Financial Restrictions Ø Economic Uncertainty and Risk Ø Information and Skill Gaps Ø Poor Commissioning Ø Poor Maintenance Ø Sub-optimum Engineering Design Hospital Energy Efficiency – The Barriers
  • 151. Ø Avoid a wide range of set temperatures. Adopt a heating schedule policy. Ø Ensuring a dead band of at least 3 C (+/-1.5ºC) is factored into○◦ BMS strategies will help to prevent simultaneous heating and cooling taking place. Ø Ø Reviewing temperature and pressure sensor calibration on a frequent basis will help maintain optimum control efficiency. What you see on the BMS, is often not the reality… • Quick Win – BMS Control Set-point Optimisation
  • 152. Recommendation – Repair Fresh Air Actuator Issue – Faulty Actuator Annual Energy Saving – 30,000kWh Annual Cost Saving – £1,350 Implementation Cost – £350 Payback Period – 3 Months Damper Actuators
  • 153. Recommendation – Replace Fresh Air Actuator Issue – Actuator Removed Annual Energy Saving – 190,000kWh Annual Cost Saving – £9,500 Implementation Cost – £500 Payback Period – Under 1 Month Damper Actuators
  • 154. Ø The cooling and heating control valves on many AHUs ‘let-by’, which isn’t always evident from the BMS head-end. Ø A more invasive inspection of plant will identify this type of issue. Replacing or repairing control valves on AHUs will prevent losses across the system. AHU Heating/Cooling Emitters
  • 155. Ø Chiller Flow Temperatures – 5 Degrees C. too low!! Ø 1 Degree C. increase equates to a 3% performance improvement… Ø Ø Ø Ø Ø Quick Win – Control Set-point Optimisation Office Building Sever Room
  • 158. Thermal Wheels - Heat/Coolth Reclaim Can reduce plant running costs by up to 50%
  • 159. Recommendation – Clean Coil Face (Jet or Steam) Issue – Soiled Coil Face Annual Energy Saving – 300,000kWh Annual Cost Saving – £15,000 Implementation Cost – £500 Payback Period – Under 1 Month Heating/Cooling - Soiled Coil Faces
  • 160. Filter Media What impact does dirty filter media have on energy consumption?
  • 161. Variable Speed Drives - Interlocked with BMS Ø Chiller Compressor Control Ø Chiller Condensing Fan Control Ø Chilled Water Circuits Ø Condensing Water Circuits Ø Heating Water Pump Control Ø Ventilation Fan speed control
  • 162. Ø We have proved that by improving the air supply in one theatre alone, a Trust could save in the region of £5,000 a year. Ø Ø If this figure was extended to all the Trusts in England, it could mean a saving of more than £10m and a reduction in carbon emissions of 80,000 tonnes a year! Operating Theatre Optimisation
  • 164. Rec. No. Complexity (1 = Simple, 3 = Complex) Relates To: Recommendation Est. Cost (£) CO2 Emissions Reductions (Tonnes) Annual Energy Saving (kWh) Annual Saving (£) Simple Payback Period (Months) 1 2 All Theatres Consider reducing Air Change Rate in line with HTM requirement in order to reduce energy. £600 14.27 26,718 £2,671 3 2 1 All Theatres Consider removing the HEPA filters to reduce system pressure. £100 5.7 10,512 £1,051 1 3 3 All Theatres Consideration should be given to replacing supply fans with high efficiency units in order to reduce power drawn by the systems. £5,000 3.88 7,183 £718 84 4 2 All Theatres It is recommended that the time schedules for the Theatre unit are changed in line with occupancy hours. £600 6.44 11,913 £1,190 6 5 3 Cooling Plant Consideration should be given to installing variable speed drives (VSDs) and controlling pumps based on demand, and the adoption of a 2-way valve system on the chiller plant. £6,300 13 23,875 £2,387 32 6 2 Heating Plant A review of installation of a software interlock, and the adoption of time schedule to prevent the unnecessary operation of heating pumps during low demand. £600 6.2 11,466 £1,147 6 7 2 All Theatres Consideration could be given to reducing the temperature set-point. £600 16.3 88,595 £2,658 3 8 2 All Theatres It is recommended that the existing VSDs on the Theatre unit are utilised by modulating the fan speed in accordance with system demand. £600 11.3 21,000 £2,100 3 Totals* £14,400 77 201,262 £13,922 12 *Savings are not considered cumulative, totals shown for representation purposes only. Summary of Recommendations – Mile End Hospital
  • 165. Recommendation 1 Consider Reducing Air Change Rates Room Room Size (m²) Total Flow Rate (m³/h) Air Change Rate (per hour) Recommended Air Changes (per hour) Achievement of Design Values (%) Theatre & Scrub 188.2 3178.8 16.9 15 113 Anaesthetic 61.0 1746.0 28.6 15 191 Prep 44.5 648.0 14.6 10 146 Air Flow Results Ø The Theatre & Scrub AHU is running at 3,178.8 m³/h vs. the required duty of 2,813 m³/h, the volume can therefore be reduced by 13%. The Anaesthetic & Prep AHU is running at 2,394 m³/h vs. the required duty of 1,357.98 m³/h, a 44% reduction is therefore possible. Ø Ø This initiative can be achieved through modification of the operating frequency on the Variable Speed Drive (VSD). Ø Ø Following the fan laws, this equates to a reduction in energy of 34% and 82.4% respectively.
  • 166. Recommendation 2 Consider removing the HEPA filters from the AHUs ØThe AHUs serving the theatres at Mile End were found to contain HEPA filters. As HEPA filters are only a requirement for ultra clean theatres, it is recommended that consideration be given to their removal from the system. Ø ØOwing to the high pressure drops developed by HEPA filters, the reduction in energy has been calculated to be 1.2kW, equating to a £1,051 saving per annum.
  • 167. Recommendation 7 Consider reducing temperature set-point The existing controls for the Air Handling Units are controlled to a set-point of 25˚C; this is considered high. It is recommended that this set-point be reviewed and adjusted to nearer 21˚C. Reducing the temperature by 4˚C would reduce the energy consumption by approximately 27%. Supply Air Temperature (Heating Coil) = 25.00 0 C Total Air Volume = 0.88 m3 /s Daily Running Hours = 24.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.00 4.53 25.00 20.47 16,473.56 Feb 309 28 11.04 1.00 4.46 25.00 20.54 14,930.23 Mar 261 31 8.42 1.00 7.08 25.00 17.92 14,421.41 Apr 197 30 6.57 1.00 8.93 25.00 16.07 12,515.41 May 111 31 3.58 1.00 11.92 25.00 13.08 10,526.34 Jun 49 30 1.63 1.00 13.87 25.00 11.13 8,668.11 Jul 20 31 0.65 1.00 14.85 25.00 10.15 8,168.38 Aug 23 31 0.74 1.00 14.76 25.00 10.24 8,240.81 Sep 53 30 1.77 1.00 13.73 25.00 11.27 8,777.14 Oct 128 31 4.13 1.00 11.37 25.00 13.63 10,968.96 Nov 234 30 7.80 1.00 7.70 25.00 17.30 13,473.34 Dec 308 31 9.94 1.00 5.56 25.00 19.44 15,644.65 Totals 2,033 365 142,808.34 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 190,411.12 kWhr Annual Heating Cost = £5,712.33 Thames Valley - Heathrow Supply Air Temperature (Heating Coil) = 25.00 0 C Total Air Volume = 0.67 m3 /s Daily Running Hours = 24.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.00 4.53 25.00 20.47 12,406.48 Feb 309 28 11.04 1.00 4.46 25.00 20.54 11,244.17 Mar 261 31 8.42 1.00 7.08 25.00 17.92 10,860.97 Apr 197 30 6.57 1.00 8.93 25.00 16.07 9,425.54 May 111 31 3.58 1.00 11.92 25.00 13.08 7,927.54 Jun 49 30 1.63 1.00 13.87 25.00 11.13 6,528.08 Jul 20 31 0.65 1.00 14.85 25.00 10.15 6,151.72 Aug 23 31 0.74 1.00 14.76 25.00 10.24 6,206.27 Sep 53 30 1.77 1.00 13.73 25.00 11.27 6,610.19 Oct 128 31 4.13 1.00 11.37 25.00 13.63 8,260.88 Nov 234 30 7.80 1.00 7.70 25.00 17.30 10,146.97 Dec 308 31 9.94 1.00 5.56 25.00 19.44 11,782.21 Totals 2,033 365 107,551.02 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 143,401.36 kWhr Annual Heating Cost = £4,302.04 Thames Valley - Heathrow 24 Hours at 25˚C = Annual heating cost of £10,014.37
  • 168. Recommendation 7 Consider reducing temperature set-point Supply Air Temperature (Heating Coil) = 21.00 0 C Total Air Volume = 0.88 m3 /s Daily Running Hours = 24.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.00 4.53 21.00 16.47 13,254.50 Feb 309 28 11.04 1.00 4.46 21.00 16.54 12,022.69 Mar 261 31 8.42 1.00 7.08 21.00 13.92 11,202.35 Apr 197 30 6.57 1.00 8.93 21.00 12.07 9,400.19 May 111 31 3.58 1.00 11.92 21.00 9.08 7,307.28 Jun 49 30 1.63 1.00 13.87 21.00 7.13 5,552.89 Jul 20 31 0.65 1.00 14.85 21.00 6.15 4,949.31 Aug 23 31 0.74 1.00 14.76 21.00 6.24 5,021.74 Sep 53 30 1.77 1.00 13.73 21.00 7.27 5,661.92 Oct 128 31 4.13 1.00 11.37 21.00 9.63 7,749.90 Nov 234 30 7.80 1.00 7.70 21.00 13.30 10,358.12 Dec 308 31 9.94 1.00 5.56 21.00 15.44 12,425.59 Totals 2,033 365 104,906.48 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 139,875.31 kWhr Annual Heating Cost = £4,196.26 Thames Valley - Heathrow 24 Hours at 21˚C = Annual heating cost of £7,356.52 Supply Air Temperature (Heating Coil) = 21.00 0 C Total Air Volume = 0.67 m3 /s Daily Running Hours = 24.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.00 4.53 21.00 16.47 9,982.15 Feb 309 28 11.04 1.00 4.46 21.00 16.54 9,054.46 Mar 261 31 8.42 1.00 7.08 21.00 13.92 8,436.65 Apr 197 30 6.57 1.00 8.93 21.00 12.07 7,079.42 May 111 31 3.58 1.00 11.92 21.00 9.08 5,503.22 Jun 49 30 1.63 1.00 13.87 21.00 7.13 4,181.96 Jul 20 31 0.65 1.00 14.85 21.00 6.15 3,727.40 Aug 23 31 0.74 1.00 14.76 21.00 6.24 3,781.95 Sep 53 30 1.77 1.00 13.73 21.00 7.27 4,264.07 Oct 128 31 4.13 1.00 11.37 21.00 9.63 5,836.56 Nov 234 30 7.80 1.00 7.70 21.00 13.30 7,800.85 Dec 308 31 9.94 1.00 5.56 21.00 15.44 9,357.89 Totals 2,033 365 79,006.58 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 105,342.11 kWhr Annual Heating Cost = £3,160.26 Thames Valley - Heathrow Ø This initiative can be achieved by a simple adjustment on the BMS.
  • 170. Rec. No. Complexity (1 = Simple, 3 = Complex) Relates To: Recommendation Est. Cost (£) CO2 Emissions Reductions (Tonnes) Annual Energy Saving (kWh) Annual Saving (£) Simple Payback Period (Months) 1 2 Theatre 3 Consider reducing Air Change Rate in line with HTM requirement in order to reduce energy. £300 7 12,973 £1,297 3 2 1 Theatre 1 It is recommended that the run around coil pump system be reinstated in order to reduce load on the boilers. £1,000 25.6 138,842 £4,165 3 3 3 All Theatres Consideration should be given to replacing supply fans with high efficiency units in order to reduce power drawn by the systems. £29,000 34 61,854 £6,186 56 4 1 Theatre 2 Consider replacing air seals around openings in order to reduce air leakage. £150 0.2 328 £33 56 5 1 Theatre 4/5 Consideration should be given to repairing the thermal wheel in order to reduce load on heating and cooling. £3,000 55 297,518 £8,925 4 6 2 All Theatres Consider adjusting the frost coil set-point in order to reduce heating load which could be recovered through use of the run around coil. £1,000 210 1,141,658 £34,250 1 7 2 All Theatres Consideration could be given to introducing PIR control so that energy can be reduced during periods of inactivity. £1,000 11 20,617 £2,062 6 Totals* £35,450 342.2 1,673,790 £56,918 8 *Savings are not considered cumulative, totals shown for representation purposes only. Summary of Recommendations – Newham University Hospital
  • 171. Recommendation 2 Consider reinstating the run around pump system The run around coil recovery system is capable of recovering around 50% of the heating/cooling energy. With the pumps out of order, the heating coil is operating at a higher demand than would be expected. Through the use of simulation software, we can calculate that the heating energy used is 277,683.67kWh. By repairing the run around coil pump we can assume that this figure will be reduced by 50%; this equates to a £4,165 saving per annum. Supply Air Temperature (Heating Coil) = 21.00 0 C Total Air Volume = 3.50 m3 /s Daily Running Hours = 14.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.20 5.44 21.00 15.56 28,953.66 Feb 309 28 11.04 1.25 5.58 21.00 15.42 25,916.39 Mar 261 31 8.42 1.21 8.57 21.00 12.43 23,129.43 Apr 197 30 6.57 1.19 10.63 21.00 10.37 18,673.78 May 111 31 3.58 1.16 13.83 21.00 7.17 13,341.76 Jun 49 30 1.63 1.13 15.67 21.00 5.33 9,598.00 Jul 20 31 0.65 1.12 16.63 21.00 4.37 8,131.59 Aug 23 31 0.74 1.11 16.38 21.00 4.62 8,596.78 Sep 53 30 1.77 1.13 15.51 21.00 5.49 9,886.12 Oct 128 31 4.13 1.14 12.96 21.00 8.04 14,960.63 Nov 234 30 7.80 1.15 8.86 21.00 12.14 21,861.11 Dec 308 31 9.94 1.34 7.45 21.00 13.55 25,213.50 Totals 2,033 365 208,262.75 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 277,683.67 kWhr Annual Heating Cost = £8,330.51 Thames Valley - Heathrow
  • 172. Recommendation 5 Consider repairing the thermal wheel At the time of inspection, the wheel serving Theatre 4/5 had failed and was therefore not rotating. Repairing the thermal will provide savings equating to a £8,925 per annum.
  • 173. Recommendation 5 Consider repairing the thermal wheel The thermal wheel is capable of recovering around 75% of the heating energy. Through the use of simulation software, we can calculate that the heating energy used is 396,690.96kWh. By repairing the thermal we can assume that this figure will be reduced by 75%; this equates to a £8,925 saving per annum. Supply Air Temperature (Heating Coil) = 21.00 0 C Total Air Volume = 5.00 m3 /s Daily Running Hours = 14.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 340 31 10.97 1.20 5.44 21.00 15.56 41,362.37 Feb 309 28 11.04 1.25 5.58 21.00 15.42 37,023.42 Mar 261 31 8.42 1.21 8.57 21.00 12.43 33,042.05 Apr 197 30 6.57 1.19 10.63 21.00 10.37 26,676.83 May 111 31 3.58 1.16 13.83 21.00 7.17 19,059.65 Jun 49 30 1.63 1.13 15.67 21.00 5.33 13,711.43 Jul 20 31 0.65 1.12 16.63 21.00 4.37 11,616.55 Aug 23 31 0.74 1.11 16.38 21.00 4.62 12,281.12 Sep 53 30 1.77 1.13 15.51 21.00 5.49 14,123.03 Oct 128 31 4.13 1.14 12.96 21.00 8.04 21,372.33 Nov 234 30 7.80 1.15 8.86 21.00 12.14 31,230.15 Dec 308 31 9.94 1.34 7.45 21.00 13.55 36,019.29 Totals 2,033 365 297,518.22 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 396,690.96 kWhr Annual Heating Cost = £11,900.73 Thames Valley - Heathrow
  • 174. Operating Theatre Optimisation Whipps Cross University Hospital
  • 175. *Savings are not considered cumulative, totals shown for representation purposes only. Rec. No. Complexity (1 = Simple, 3 = Complex) Relates To: Recommendation Est. Cost (£) CO2 Emissions Reductions (Tonnes) Annual Energy Saving (kWh) Annual Saving (£) Simple Payback Period (Months) 1 2 All Theatres Consider installing occupancy detection in order to control ventilation on demand. 20,000 53 114,395 11,439 21 2 1 Theatres 5 - 8 Consider reviewing filter specification in order to reduce system pressure and associated fan power requirement. 50 11 23,060 2,306 1 3 2 Theatres 5 & 6 Consider reducing the extract ventilation rate to the HTM03-01 standard so that fan power is reduced. 500 5 10,353 1,035 6 4 3 Theatres 3 & 4 Consider installing an energy recovery device to theatre 3 & 4 in order to reduce the heating requirement. 12,000 30 160,717 4,822 30 5 3 Theatres 3 & 4 Consider replacing the plant serving theatre 3 & 4 with a packaged AHU in order to greatly improve system efficiency. - - - - - 6 3 All Theatres Consider replacing fans with high efficiency units in order to reduce power draw. 22,000 23 48,697 4,870 54 7 1 Theatres 5 – 8 Consider improving thermal insulation on pipework in order to reduce system losses. 1,000 2 13,140 395 30 8 1 Boiler Plant Review boiler room insulation and pumps in order to increase system efficiency. 4,500 12 56,502 1,971 27 9 2 All Theatres Consider reinstating automatic control in order to avoid excessive energy use. 40,000 146 665,844 25,980 18 Totals* £100,050 282 1,092,708 52,818 23 Summary of Recommendations - Whipps Cross University Hospital
  • 176. Recommendation 4 Consider Installation of an Energy Recovery Device A run around coil system normally consists of two coils that are connected to each other via a pumped circuit of water. The water absorbs heat from the exhaust air coil and dissipates it through the supply air coil.
  • 177. Recommendation 4 Consider Installation of an Energy Recovery Device There is currently no heat recovery device installed within the system serving theatres 3&4. A run-around-coil energy recovery system is typically capable of recovering around 50% of the heating/cooling energy from the extracted air, which is then transferred to the supply air. Installing a RAC will provide savings of 50%; this equates to a £4,821 per annum. Supply Air Temperature (Heating Coil) = 21.00 0 C Total Air Volume = 1.92 m3 /s Daily Running Hours = 24.00 hr UK Geographical Location = Month Total Degree Days (K.day) No. of Days in Month Mean Deviation (∆T) from Base Temp (15.5) (0 C) Operational Hours Load Factor Average Fresh Air Temp (0 C) Supply Air Temp Required (0 C) Mean Heating Coil Uplift (0C) Mean Monthly kWhr Jan 351 31 11.32 1.00 4.18 21.00 16.82 29,433.12 Feb 327 28 11.68 1.00 3.82 21.00 17.18 27,153.75 Mar 283 31 9.13 1.00 6.37 21.00 14.63 25,600.86 Apr 218 30 7.27 1.00 8.23 21.00 12.77 21,625.23 May 135 31 4.35 1.00 11.15 21.00 9.85 17,236.40 Jun 68 30 2.27 1.00 13.23 21.00 7.77 13,158.03 Jul 32 31 1.03 1.00 14.47 21.00 6.53 11,426.77 Aug 38 31 1.23 1.00 14.27 21.00 6.73 11,776.75 Sep 75 30 2.50 1.00 13.00 21.00 8.00 13,547.52 Oct 158 31 5.10 1.00 10.40 21.00 10.60 18,548.81 Nov 254 30 8.47 1.00 7.03 21.00 13.97 23,657.36 Dec 324 31 10.45 1.00 5.05 21.00 15.95 27,910.71 Totals 2,263 365 241,075.31 Boiler Efficiency = 75.00 % Gas Tariff = 3.00 p/kW Annual Input kWhr = 321,433.75 kWhr Annual Heating Cost = £9,643.01 South Eastern - Gatwick
  • 178. Recommendation 6 Consider changing fans to high efficiency direct drive There are multiple options for a direct drive replacement but as shown in the example below, removing the existing fan (1) from the AHU, then enlarging the opening (2) would allow for a new plenum wall to be installed (3), which would then facilitate the installation of a plug fan (4). The new direct drive fan in this example has an absorbed power of 1.7kW at the same volume and pressure as the original, this represents a 43% reduction.
  • 179. Lighting upgrades & Controls Provide advice on energy efficient lighting upgrades: Ø LED Ø Induction lamps Ø Integrated sensor systems with light reflectors for optimum output Ø Retro fit or upgrade from T12 & T8 to T5 • Provide advice on lighting system controls and their efficiency: Ø Dimmable control systems Ø PIR sensors Ø Photocells • Our approach is to undertake a lighting survey using calibrated Lux meters to determine current lighting levels, which are then compared against healthcare requirements in accordance with the relevant CIBSE Lighting Guide. • •
  • 180. Steam and Condensate Systems Ø Steam raising plant optimisation – pressure regimes and boiler setback/sequencing Ø Ø Suitability of steam traps and associated components Ø Ø Reduction of thermal losses – pipework insulation review utilising infrared thermography Ø Ø Water treatment – TDS levels Ø Ø Heat & condensate recovery – boiler blow down, flue gas economisers Ø Ø System zoning – minimisation of live circuits and utilising motorised valves Ø Ø Steam metering and monitoring Ø Ø Condensate pump optimisation – demand control on VSDs Ø Ø Oxygen trim – burner optimisation Ø Ø Feed pump modulation
  • 181. Chiller Upgrades & Optimisation Ø Review and improve chiller controls Ø Ø Establish opportunities for condenser coil heat reclaim Ø Ø Investigate opportunities for liquid pressure amplification (LPA) Ø Ø Investigate opportunities for condensing fan optimisation Ø Ø Review opportunities to retro-fit chiller, free-cooling circuits • • •
  • 182. Quick Win – Free Cooling Opportunity
  • 183. Ø 7 Temperatures Ø 2 Pressures Ø 1 Power Input Evaluating chiller performance & the Scope for Optimisation
  • 184. Advantages of this method: Ø No need to install flow meters Ø Ø Easy to use Ø Ø Analysis within 30 minutes, without reliance on pre-installed device Ø Ø Better field accuracy at much lower cost than traditional method Ø Evaluating chiller performance & the Scope for Optimisation - Recommissioning
  • 185. Performance evaluation Ø COP (+/- 5 %) Ø Ø Capacity (+/- 7%) Ø Ø Power input Ø Super-heat Ø Ø Sub-cool Ø Ø Evaporator performance Ø Condenser performance Evaluating chiller performance and the Scope for Optimisation Operational evaluation Ø Correct charge Ø Ø Optimisation of expansion device Ø Ø Compressor defects Ø Ø Stability or instability
  • 186. Summary - Technological Improvements Ø BMS Optimisation Ø HVAC Optimisation Ø Air Handling Unit Optimisation Ø Effective control of Variable Speed Drives Ø Improved Lighting and Lighting Controls Ø Re-commissioning – no building is fully commissioned
  • 187. Summary - Non Technical Opportunities Ø Behavioural Change Programme Ø Monitor Energy and Water Consumption Trends Ø Invoice Validation Ø CHP QA Ø Review of Energy Tariffs
  • 188. Thank you for listening… Any Questions Please?

Hinweis der Redaktion

  1. 1
  2. 2
  3. 3
  4. GMHSCP is committed to partnership working to develop and implement GM wide plans in support of the Springboard to a Green City Region and Air Quality. We are working to embed public health messages (both the impact of inaction) and the benefits.All of thesepolicy areas have clear health impacts 4
  5. [PK Will need less of this as vast majority ofpeople in the room will get this. I swapped out clean water [is that an issue?] for warm homes. Does less extreme weather count has a health outcome? I’d argue it does especially as it kills the most vulnerable] 5
  6. Carbon Literacy Training 4 sessionsdelivered, 33 accreditedCarbonLiterateemployees, more sessions to be planned later this calendaryear. 1stGP practice preparing to become Carbon Literate Plastic reduction Milk received in glass bottles, commitment to ensuring no plastic crockery used at any event hosted by the CCG Paper reduction Paper-liteorganisation Commitment to reduce the amount of paper used at events hosted by the CCG. Example of this; Members event held on the 27thNovember: Use an online voting platform (slido) to carry out the evaluation, saving 250 doubled sided print copies. Replaced 20 x A3 colour prints by incorporating the document into slide presentation. Reduced the number of print outs by providing all slide presentations and supporting documents via download (links). Use recycled note pads from previous events. Recyclable Stationary Regular stationary amnesty Non-bleached paper ordered as standard Ordering other recyclable stationary when possible Advocacy Sharing our work with our Members whenever possible e.g. Members event held on the 27thNovember Plan to share at our citizens panel in the near future Strategy Currently engaging on a draft Social Value Strategy; one of the focusses will be the environment. As part of the action plan we’ll be scoping what we can be doing as an employer to support our workforce to be kinder to the environment (e.g. support physical activity and green travel), but also what we can be doing as a commissioner (e.g. holding providers to account through contract monitoring). 6
  7. March 2018 - We created the opportunity for Carbon Literacy to be presented to the Greater Manchester Health and Social Care Strategic Partnership Board April 2018 - Salford CCG created the opportunity for Carbon Literacy to be presented at an NHS Sustainable Development Unit national roadshow event, with a film created for this purpose with you promoting Carbon Literacy. To bring an awareness of Carbon Literacy to this national organisation is an important step in advocacy within the NHS commissioning and provider sectors June 2018 - You presented the detail of Carbon Literacy to the Governing Group of the Association of Greater Manchester CCGs proposing each organisation commits a Governing Body/Executive Team senior leader to attend the training which was offered in 2018; and commit to obtaining at least Bronze level Carbon Literacy certification.  October 2018 – Sat as part of the Q&amp;A panel at the Senior Officer Carbon Literacy Training during Green Great Britain Week. We’ve since been approached by Bolton CCG to support them to become Bronze Accredited. Nov – you presented the CCG’s CL story at a CL training session for GM public sector chief execs –inpsiredother AO’s &amp; LA CE’s to act You continue to advocate for Carbon Literacy to be adopted across the Greater Manchester Health and Social Care Partnership, with the CCG’s Chief Accountable Officer meeting with key Greater Manchester Leads on this matter Always keen to share our story at events similar to today; encouraging others to take action! 7
  8. Pleased to say that we are now a ‘Silver’ accredited Carbon Literate Organisation [the first NHS CLO – anywhere] Bronze obtained in July 2018 Silver obtained in January 2019 Our planned next steps: Further training to ensure more of our workforce become Carbon Literate, again, offering training places to provider and partner organisations at no cost, encouraging them to become Carbon Literate Organisations them into ; with the offer to support this if required.   Further work to ratify the Social Value Strategy and supporting action plan A commitment from our CAO and Executive Team to continue to advocate Carbon Literacy/action onCarbon Neutralityat a GM level wherever possible 8
  9. Intro tobehav. change if needed, presuming that most people in the room are already on board/involved in SDdelivery, then alook at how CL could shift SD practice in the NHS… 9
  10. Intro tobehav. change if needed, presuming that most people in the room are already on board/involved in SDdelivery [can be dropped if we’re short of time] 10
  11. VERY quick sketch 11
  12. Won’t go into detail but… gives an idea of scale/reach. Again, fast 12
  13. Intro Burnham Green City Summit 13
  14. That CO2 target is massive – imagine running your organisation without fossil fuels within19 years 14
  15. 15 This was one result of the summit – public sector chief execs from across sectors – including some health leaders
  16. Last point made by a CCG AO 16
  17. So far [and it’s early days] the CCG AO’s across half GM’s CCG’s are engaged, along with a v strong CApolicy imperative… 17
  18. So far [and it’s early days] the CCG AO’s across half GM’s CCG’s are engaged, along with a v strong CApolicy imperative… 18
  19. 10
  20. 11
  21. 12
  22. 13
  23. 20
  24. 26
  25. 1
  26. 2
  27. 11
  28. 12
  29. 1
  30. 2
  31. 3
  32. 4
  33. 5
  34. 6
  35. 7
  36. 8
  37. 9
  38. Sustainability Roadshow Manchester - Thursday 14th February 2019 www.forwardwaste.co.uk - 0345 4633 952 Forward Waste Management - Beds or Bins
  39. Sustainability Roadshow Manchester - Thursday 14th February 2019 Forward Waste Management - Beds or Bins www.forwardwaste.co.uk - 0345 4633 952
  40. 1
  41. Florence Nightingaleand MarySeacole 2
  42. £25k per month savings on disposal costs from retender. Large degree of support for on the contract from Director level atBywatersand all levels below.Eg. monthly visits from our HR Manager to site. 3
  43. 4
  44. Unileverhave committed to: ensurethat 100% of our plastic packaging will be designed to be fully reusable, recyclable or compostable by 2025. halve the waste associated with the disposal of our products by 2020 and increasing the recycled plastic content in our packaging to 25% by 2025. Costapledge for 500 million coffee cups recycled in the UK annually – that is one in every five coffee cups recycled. This is being administered through a third party who will issue the certificates for every tonne of coffee cups recycled. Note that this is a considerable effort to sort and collect with approximately 100,000 cups needed to make a tonne. However there is an economic incentive created with the payment of £70 per tonne to the waste collector.Bywatersis offering a collection service of £1 per bag of cups, the collections will be made with our new electric vehicle. In 2016, France became the first country to announce a total ban on plastic cups, plates, and cutlery, to be brought in from 2020. As of August 2017, anyone in Kenya who’s found using, producing, or selling a plastic bag faces up to four years in jail, or a $38,000 fine. In February, Taiwan announced one of the farthest-reaching bans on plastic in the world, restricting the use of single-use plastic bags, straws, utensils, and cups. The UK Parliament has committed to move to plastic free as of the end of 2018. In partnership withBywaters, they will be moving to plant based disposable packaging, 5
  45. Coffee grounds recycling 6
  46. We are hopeful that there has been a tipping point reached –it seems we are waking up to the horrific effect that single-use packaging, particularly plastics, are having on our environment, notably the oceans. Calling this the Blue Planet effect, Sir David Attenborough’s show was enormously successful in the UK, topping the ratings for 2017 with more than 14 million viewers. In China, more than 100 million tuned in online and slowed the internet down Sky TV has also led the way with their Oceans Rescue campaign whichBywaterswas very involved with, providing the plastic material from our recycling operation and beach cleans for the construction of their 250kg plastic monument to oceans plastic. The footfall at the locations that the whale toured around theUkand Europe was over 1 million. On Saturday (August 18) the government revealed it received an “unprecedented” 162,000 responses which were overwhelmingly in favour of introducing taxing measures. 15 of the worlds 20 most polluted rivers are in Asia. Marine litter is a huge concern, but only 2% of plastic waste in the oceans is estimated to come from the whole of Europe and the US combined. 7
  47. Unileverhave committed to: ensurethat 100% of our plastic packaging will be designed to be fully reusable, recyclable or compostable by 2025. halve the waste associated with the disposal of our products by 2020 and increasing the recycled plastic content in our packaging to 25% by 2025. Costapledge for 500 million coffee cups recycled in the UK annually – that is one in every five coffee cups recycled. This is being administered through a third party who will issue the certificates for every tonne of coffee cups recycled. Note that this is a considerable effort to sort and collect with approximately 100,000 cups needed to make a tonne. However there is an economic incentive created with the payment of £70 per tonne to the waste collector.Bywatersis offering a collection service of £1 per bag of cups, the collections will be made with our new electric vehicle. In 2016, France became the first country to announce a total ban on plastic cups, plates, and cutlery, to be brought in from 2020. As of August 2017, anyone in Kenya who’s found using, producing, or selling a plastic bag faces up to four years in jail, or a $38,000 fine. In February, Taiwan announced one of the farthest-reaching bans on plastic in the world, restricting the use of single-use plastic bags, straws, utensils, and cups. The UK Parliament has committed to move to plastic free as of the end of 2018. In partnership withBywaters, they will be moving to plant based disposable packaging, 8
  48. Leadingby example – as they say, change starts at home. See what your business can do. Publiseand advocate Ellen Macarthur foundation – The New Plastics Economy is an ambitious, three-year initiative to build momentum towards a plastics system that works. Applying the principles of the circular economy, it brings together key stakeholders to rethink and redesign the future of plastics, starting with packaging. big brands collaborating such as Google, Unilever, Nike, Philips, H&amp;M, Danone UN Single Use Plastics – Roadmap for Sustainability. Problematic single use plastics, Actions to minimize single use plastics, Case studies from around the world – including my home country of South Africa 9
  49. 10
  50. Include photoof Gradice above 11
  51. Split beachclean photos apart with a gap 12
  52. 13
  53. Introduction to Salix and our funding model Working within the NHS Knowledge sharing and case studies Application process Summary and questions 1
  54. Salix’s work is focused exclusively on the public sector where lack of capital has prevented the modernisation of buildings and infrastructure Aim to develop a strong, long term and positive relationship with public sector clients Salix is a well trusted, successful company that is growing Salix must ensure effective stewardship of public funds 2
  55. Need to think holistically about energy.Important to also consider behaviour change. Salix recently moved into renewables – Solar PV 3
  56. So how does our model work? A Trust or FT would come to Salix with a proposed project and the estimated savings, once we’ve assessed the project, Salix provide you with the upfront-capital that is often not available to invest in energy efficient technologies that will reduce energy bills. The savings in the energy bills are then used to repay the interest-free loan making it a cost neutral approach and Salix then re-invest the repayments in to further projects in the public sector. 4
  57. 5
  58. 6
  59. Part funded and assessed on a case by case basis if over funding criteria CRL is adjustable for Salix financing – important to get in contact with NHSI regional lead 7
  60. 8
  61. 9
  62. Over 200 PKS (project knowledge slides) 10
  63. 14
  64. Salix tendto get involved in projects once an organisation knows which technologies they want to implement and have an idea on costs and savings. Weare happy to look over yourBusiness case – gives you confidencein your savings and payback figures At the stage of getting approval – happy to meet with finance departmentsto run through the Salix offer. Salix can provide a reservation of funding once we have seen calculations if this wouldhelp you with board approval and we can put you in touch with other Trusts that have done similar projects or faced similar barriers to you to help overcome issues. Throughout installation we can pay out funds in instalments as you progress the project –eg.First interim for when you raise the order making it easier to pay contractors, with last payment being on completion of the project. 15
  65. 16
  66. 1
  67. 2
  68.   3
  69. 4
  70.   9
  71. 10
  72. 11
  73. 12
  74. 1
  75. 2
  76. 1
  77. 2
  78. 3
  79. 4 Information and Skill Gaps: There are a wide range of skills needed; from understanding the benefits of improving energy use, through to the engineering skills needed to install and optimise energy using equipment. Bounded Rationality: Using the old &amp;quot;rule of thumb&amp;quot; to problems that require a different structure to the decision making process. For example an energy efficiency upgrade may  save significantly on energy costs but the maintenance departments budget is the only part of the business that considers asset replacement, and energy costs are ignored or under estimated in their decision making. Principal-Agent Problems: Improving energy efficiency can have multiple benefits to multiple people, but the costs may not align with the benefits. For example a tenant may pay the electricity bill which doesn&amp;apos;t directly impact on the landlord, so the landlord may not want to invest in more efficient heating, cooling, air conditioning or insulation.
  80. 5
  81. 6
  82. 7
  83. 8
  84. 9
  85. 10
  86. 11
  87. 13
  88. 14
  89. 15
  90. 16
  91. The AHUs serving the theatres at Mile End were found to contain HEPA filters. As HEPA filters are only a requirement for ultra clean theatres, it is recommended that consideration be given to their removal from the system. Owing to the high pressure drops developed by HEPA filters, the reduction in energy has been calculated to be 1.2kW, equating to a £1,051 saving per annum. Additional savings are also generated through the reduced maintenance time and replacement filter costs. 18
  92. 34
  93. 35
  94. Commissioning –Plans for proper hand-over and commissioning. Sub-meters and reconciliation – strategy, commissioning reconciliation and calibration BMS – full specification, timely training, co-ordinated installation and commissioning Controls – clear, simple, intuitive, instructions and labels Lighting – performance specifications, appropriate controls, labelled and explained Fabric performance –Provision made for follow-through by builders/designers after hand over HVAC –systems to be optimised, not just meeting set-points Renewables – retain input from specialists, site resourcing Plans for proper hand-over and commissioning – programmes such as soft landing might be considered Suppliers of specialist equipment or services, retained or consulted on integration and commissioning. 201 Bishopsgate is a high spec office in the City of London, with a floorspace of more than 37,000m2 over 14 storeys, Contractors were tasked with identifying energy saving opportunities, using the BMS and metering. Good sub-metering was critical for this task. In one seven-month period in 2011, they found issues leading to a reduction of roughly 20% of the total building electricity consumption. This included refining the local BMS settings e.g. inappropriate time clock or demand settings, switching off the underfloor heating in reception in the summer, and investigating and correcting motion controlled back-of-house lighting - which was consuming energy at weekends. As part of carbon management programmes - JLP re-commissioned HVAC and controls – delivered typical savings of ~ 10% 40
  95. Commissioning –Plans for proper hand-over and commissioning. Sub-meters and reconciliation – strategy, commissioning reconciliation and calibration BMS – full specification, timely training, co-ordinated installation and commissioning Controls – clear, simple, intuitive, instructions and labels Lighting – performance specifications, appropriate controls, labelled and explained Fabric performance –Provision made for follow-through by builders/designers after hand over HVAC –systems to be optimised, not just meeting set-points Renewables – retain input from specialists, site resourcing Plans for proper hand-over and commissioning – programmes such as soft landing might be considered Suppliers of specialist equipment or services, retained or consulted on integration and commissioning. 201 Bishopsgate is a high spec office in the City of London, with a floorspace of more than 37,000m2 over 14 storeys, Contractors were tasked with identifying energy saving opportunities, using the BMS and metering. Good sub-metering was critical for this task. In one seven-month period in 2011, they found issues leading to a reduction of roughly 20% of the total building electricity consumption. This included refining the local BMS settings e.g. inappropriate time clock or demand settings, switching off the underfloor heating in reception in the summer, and investigating and correcting motion controlled back-of-house lighting - which was consuming energy at weekends. As part of carbon management programmes - JLP re-commissioned HVAC and controls – delivered typical savings of ~ 10% 41
  96. 42