SlideShare ist ein Scribd-Unternehmen logo
1 von 9
Downloaden Sie, um offline zu lesen
Lunette Series
Home Theater Curved Fixed Frame Projection Screen
User’s Guide

Important Safety and Warning Precautions
Please follow these instructions carefully to ensure proper maintenance and safety with your Lunette
Series Fixed Frame Curved Screen
1. When hanging the screen up, please make sure that no other objects – such as power switches, outlets,
furniture, ladders, windows, etc., occupy the space designated for your Fixed-Frame screen.
2. Regardless if the screen is hung on or installed into the wall, make sure that the proper mounting anchors
are used and that the weight is supported appropriately by a strong and structurally sound surface just as
any large and heavy picture frame should.
(Please consult a home improvement specialist for the best advice on installation.)
3. Frame parts are made of high quality velour-surfaced aluminum and should be handled with care.
4. When not in use, cover over the screen with a furniture sheet to protect it from dirt, grime, paint, or any
other impurities.
5. When cleaning, use a soft cloth moistened with warm water to remove any marks on the frame or
screen surface.
6. Never attempt to use any solutions, chemicals, or abrasive cleaners on the screen surface.
7. In order to avoid damaging the screen, avoid touching it directly with your fingers, writing
stationary, tools, or any other sharp or abrasive objects.
8. Spare parts should be placed out of reach of small children in accordance with household safety guidelines.

CAUTION:
The projection screen frame is made of high-quality aluminum alloy and should be handled with
care.
Use a soft cloth with warm water to remove any spots on the screen material surface.
To avoid damaging the screen material, never attempt to use any solutions, chemicals, or
abrasive cleaners on the screen itself, and never attempt to touch screen with your fingers or
sharps/abrasive objects.
Rev101012-JL

www.elitescreens.com

1
Hardware and Parts List

A. Dry-wall anchor

B. 1.77” L-Bracket

G. Fix Plate

K. Butterfly Screw

C. 3.54” L-Bracket

J. Elbow Joint

D. Lower bracket

E. M5 Screw

F. Wood screw

H. Center Support Bar
Note: Center support bar may be packed in a plastic
tube with the screen material.

L. Tension Rods

M. Screen Material

N. Vertical Upright Frame

O. Horizontal Curved Frame

Rev101012-JL

www.elitescreens.com

2
Frame Assembly
1. Insert both Elbow Joints (J) into each Horizontal Curved Frame (N) and join all four frame
parts together as shown below.

2. After making sure that all four corners join at right angles (forming a perfect rectangle),
fasten the four angles together by using x8 M5 screws (E).

Minimal gap is normal here

3.
Layout the Screen Material and Tension Rods on a clean and dry surface. Then, gently
roll out the screen material over the back of the fixed frame.
Vertical Upright Fame

Horizontal Curved Frame
Black Backing of the screen material

Rev101012-JL

www.elitescreens.com

3
4. Insert Tension Rods through the sleeves. The longer rods are used on the horizontal edges of the
screen material, and the shorter rods are used on the vertical edges, as seen below.

5. Slip the screen tension rods into the grooves running along the back of the frame. Clip on the
Fix Plates to the back of the frame to secure the rods into place forming a tight and flat surface.
See Attaching the Fix Plates section below for details.

Tension Rod

Fix Plate

Viewing Surface

Rev101012-JL

www.elitescreens.com

4
Black backing for AcousticPro models
This procedure only applies to AcousticPro models. Disregard this section if your Fixed Frame
does not include an acoustic transparent screen material. The purpose of the black backing
material is to block out any light penetration that may reflect off of anything mounted behind
the screen, which can cause distortion to the projected image.
The black backing is held in place by the Velcro that is on the fix plates.
Black backing

Interval markings reveal the best points for inserting the fix plates (Fig. 1). The prongs on the fix plates insert to the lip on
the back of the frame creating a friction hold that will firmly keep the material and black backing in place (Fig. 2-3). After
the material has been installed, the backing will lie over the back of the white (Acoustic) material and then be held in place
by the Velcro on the fix plates (Fig 4).

Fig. 2

Fig. 1

Fig. 4

Fig. 3

Rev101012-JL

www.elitescreens.com

5
Attaching the Fix Plates
1. Make sure that the material and frame are both lying face down on a clean, dry, and nonabrasive surface.
2. Center the material inside the frame.
Please note the material will be noticeably smaller than the frame, as the material must be
stretched to create a sufficient amount of tension for perfect material flatness.
3. Start attaching the Fix Plates in the corner of the frame’s horizontal edge, and then alternate
with the corners of the frame’s vertical edge as shown in diagram.

Fig. 5
Fix Plate Push

4. Attach the fix plates starting from the ends and moving towards the center as shown in the
diagram below to create an evenly tensioned surface.
Example 1

Example 2

Fig. 6

Rev101012-JL

www.elitescreens.com

6
Center Support Bar
1. Center Support Bar may be packed in a plastic tube with the screen material.

Center support bar
支

2. Insert the Center Support Bar into the upper top groove on the back of the frame (note: this not
the same groove where the fix plate inserts) with the bottom end near the center point of the
frame, and place it in at an angle so that both ends of the bar are aligned with the groove.
3. Slide the top end of the bar into the top center point location (as shown below) to complete the
center support bar installation. This will provide added stability to the frame and added
tension to the material.

For 165” and above models

Rev101012-JL

www.elitescreens.com

7
Installation
1. Use butterfly screws to install the upper bracket as shown in diagram:

Use butterfly screws to assemble a 1.77” L-Bracket and a 3.54”L-Bracket into an upper bracket

2. Locate the height where you want to set up, and draw an upper base line. Confirm the distance
between the two brackets on the level direction following the data E of P10 diagram. Mark the
hole location on the wall by following the base line and the upper bracket’s screw hole site, and
then drill the hole. Insert the wall anchor and tighten the upper bracket using the provided screw.
(The base line must be on the level.)
Upper bracket

Wood screw
Hollow wall anchor

Wall
Upper base line

3. Draw a lower base line according to the data F of P10 diagram and the upper base line, and then
make a hole on the wall according to the screw hole location for the lower bracket, then insert
the anchor and tighten the lower bracket with the provided screw.
Upper bracket

Hollow wall anchor Wood screw

Wall
Lower bracket

Rev101012-JL

www.elitescreens.com

8
4. Place the upper frame on the upper brackets, and gently pull the frame down onto the bracket.
The lower bracket will also slide into the groove of the lower frame.

Upper base line

Lower base line

5. Mounting the frame to the brackets will finish your installation.

Installation diagram
of frame and
bracket

Base line

Swing the bottom
bracket to the left or
right to fit it in the
groove of the lower
frame.

Note: Two (2) or more people must install the frame for added safety.

Rev101012-JL

www.elitescreens.com

9

Weitere ähnliche Inhalte

Andere mochten auch

Serra de tramuntana i (de ii)
Serra de tramuntana i (de ii)Serra de tramuntana i (de ii)
Serra de tramuntana i (de ii)
Jaume Estarellas
 

Andere mochten auch (16)

Dukane imagepro 8979 wu
Dukane imagepro 8979 wuDukane imagepro 8979 wu
Dukane imagepro 8979 wu
 
Dukane image pro 8938w
Dukane image pro 8938wDukane image pro 8938w
Dukane image pro 8938w
 
Dukane projector glossary
Dukane projector glossaryDukane projector glossary
Dukane projector glossary
 
蘋果樹
蘋果樹蘋果樹
蘋果樹
 
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
Navigating the World of SharePoint 2010 and All It Encompasses - Part 1 - EPC...
 
Introduction to Statistics presentation
Introduction to Statistics presentationIntroduction to Statistics presentation
Introduction to Statistics presentation
 
Negotiating security en_web
Negotiating security en_webNegotiating security en_web
Negotiating security en_web
 
Serra de tramuntana i (de ii)
Serra de tramuntana i (de ii)Serra de tramuntana i (de ii)
Serra de tramuntana i (de ii)
 
Bollywood, Diaspora and Social Media
Bollywood, Diaspora and Social MediaBollywood, Diaspora and Social Media
Bollywood, Diaspora and Social Media
 
Brochure- Law Firm Tirana Albania - CLO Legal Solutions
Brochure- Law Firm Tirana Albania - CLO Legal SolutionsBrochure- Law Firm Tirana Albania - CLO Legal Solutions
Brochure- Law Firm Tirana Albania - CLO Legal Solutions
 
DITEC - Expose yourself to Internet & E-mail (second update)
DITEC - Expose yourself to Internet & E-mail (second update) DITEC - Expose yourself to Internet & E-mail (second update)
DITEC - Expose yourself to Internet & E-mail (second update)
 
DIWE - File handling with PHP
DIWE - File handling with PHPDIWE - File handling with PHP
DIWE - File handling with PHP
 
DIWE - Advanced PHP Concepts
DIWE - Advanced PHP ConceptsDIWE - Advanced PHP Concepts
DIWE - Advanced PHP Concepts
 
Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016Ricoh (RPL) Sustainability Oct 2016
Ricoh (RPL) Sustainability Oct 2016
 
DIWE - Multimedia Technologies
DIWE - Multimedia TechnologiesDIWE - Multimedia Technologies
DIWE - Multimedia Technologies
 
UNFV OBSTE Sist. Muscular 2015
UNFV OBSTE Sist. Muscular 2015UNFV OBSTE Sist. Muscular 2015
UNFV OBSTE Sist. Muscular 2015
 

Ähnlich wie Ug lunette

Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
Western-Building-Center
 
Draft Instructions Outdoor Events Australia New Screen set up your new sc...
Draft Instructions Outdoor Events Australia New  Screen  set up your  new  sc...Draft Instructions Outdoor Events Australia New  Screen  set up your  new  sc...
Draft Instructions Outdoor Events Australia New Screen set up your new sc...
Throwhammer
 
EconoClosure Installation Instructions
EconoClosure Installation InstructionsEconoClosure Installation Instructions
EconoClosure Installation Instructions
Meghan Marker
 
Sliding Door Installation Procedure
Sliding Door Installation ProcedureSliding Door Installation Procedure
Sliding Door Installation Procedure
Justin Bucher
 

Ähnlich wie Ug lunette (20)

Folding Table Compact - User Manual Rev. 04
Folding Table Compact - User Manual Rev. 04Folding Table Compact - User Manual Rev. 04
Folding Table Compact - User Manual Rev. 04
 
FrameWRX Installation Instructions
FrameWRX Installation InstructionsFrameWRX Installation Instructions
FrameWRX Installation Instructions
 
How to assemble a sink base vanity
How to assemble a sink base vanityHow to assemble a sink base vanity
How to assemble a sink base vanity
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60
 
Installation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panelsInstallation instruction Mineral wool sandwich panels
Installation instruction Mineral wool sandwich panels
 
How to assemble a base blind corner 1 drawer 1 door cabinet
How to assemble a base blind corner 1 drawer 1 door cabinetHow to assemble a base blind corner 1 drawer 1 door cabinet
How to assemble a base blind corner 1 drawer 1 door cabinet
 
How To Assemble A Base Trash Can
 How To Assemble A Base Trash Can How To Assemble A Base Trash Can
How To Assemble A Base Trash Can
 
How To Assemble A Base Trash Can
How To Assemble A Base Trash CanHow To Assemble A Base Trash Can
How To Assemble A Base Trash Can
 
Quad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation GuideQuad-Lock Insulated Concrete Forms Installation Guide
Quad-Lock Insulated Concrete Forms Installation Guide
 
Installation Instructions
Installation InstructionsInstallation Instructions
Installation Instructions
 
How to Assemble a Sink Base Vanity
How to Assemble a Sink Base Vanity How to Assemble a Sink Base Vanity
How to Assemble a Sink Base Vanity
 
Folding Table - User Manual Rev. 03
Folding Table - User Manual Rev. 03Folding Table - User Manual Rev. 03
Folding Table - User Manual Rev. 03
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
 
Draft Instructions Outdoor Events Australia New Screen set up your new sc...
Draft Instructions Outdoor Events Australia New  Screen  set up your  new  sc...Draft Instructions Outdoor Events Australia New  Screen  set up your  new  sc...
Draft Instructions Outdoor Events Australia New Screen set up your new sc...
 
Folding Table Standard - User Manual Rev. 05
Folding Table Standard - User Manual Rev. 05Folding Table Standard - User Manual Rev. 05
Folding Table Standard - User Manual Rev. 05
 
EVANNEX Tesla Model S Accent-I Installation
EVANNEX Tesla Model S Accent-I InstallationEVANNEX Tesla Model S Accent-I Installation
EVANNEX Tesla Model S Accent-I Installation
 
EconoClosure Installation Instructions
EconoClosure Installation InstructionsEconoClosure Installation Instructions
EconoClosure Installation Instructions
 
Nec wall mount user manual
Nec wall mount user manualNec wall mount user manual
Nec wall mount user manual
 
Sliding Door Installation Procedure
Sliding Door Installation ProcedureSliding Door Installation Procedure
Sliding Door Installation Procedure
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 

Mehr von SchoolVision Inc.

Mehr von SchoolVision Inc. (20)

Fl 910 ultra short throw lens
Fl 910 ultra short throw lensFl 910 ultra short throw lens
Fl 910 ultra short throw lens
 
Bill McIntosh, itutor
Bill McIntosh, itutorBill McIntosh, itutor
Bill McIntosh, itutor
 
Dukane digital signage
Dukane digital signageDukane digital signage
Dukane digital signage
 
Ipad cases from dukane
Ipad cases from dukaneIpad cases from dukane
Ipad cases from dukane
 
Dukane mcc3 a cart usermanual
Dukane mcc3 a cart usermanualDukane mcc3 a cart usermanual
Dukane mcc3 a cart usermanual
 
Dukane 8120 wia projector
Dukane 8120 wia projectorDukane 8120 wia projector
Dukane 8120 wia projector
 
Dukane 6430 hd projector
Dukane 6430 hd projectorDukane 6430 hd projector
Dukane 6430 hd projector
 
Dukane 6430 hd 6433w-usermanual
 Dukane 6430 hd 6433w-usermanual Dukane 6430 hd 6433w-usermanual
Dukane 6430 hd 6433w-usermanual
 
Dukane wired headset
Dukane wired headsetDukane wired headset
Dukane wired headset
 
Dukane products
Dukane products Dukane products
Dukane products
 
Dukane 6340 dlp projector
Dukane 6340 dlp projectorDukane 6340 dlp projector
Dukane 6340 dlp projector
 
Dukane itp84 pictures and screenshoots
Dukane itp84 pictures and screenshootsDukane itp84 pictures and screenshoots
Dukane itp84 pictures and screenshoots
 
Dukane ITP 84 monitor features
Dukane ITP 84 monitor featuresDukane ITP 84 monitor features
Dukane ITP 84 monitor features
 
Sr598 Floor Mount
Sr598 Floor MountSr598 Floor Mount
Sr598 Floor Mount
 
Sf680 wall moount for 84' disdplay
Sf680 wall moount for 84' disdplaySf680 wall moount for 84' disdplay
Sf680 wall moount for 84' disdplay
 
New dukane camera 122w
New dukane camera 122wNew dukane camera 122w
New dukane camera 122w
 
Dukane imagepro 8931 wb projector
Dukane imagepro 8931 wb projectorDukane imagepro 8931 wb projector
Dukane imagepro 8931 wb projector
 
Dukane image pro 8930b
Dukane image pro 8930bDukane image pro 8930b
Dukane image pro 8930b
 
Dukane 8940 w projector
Dukane 8940 w projectorDukane 8940 w projector
Dukane 8940 w projector
 
New dukane classroom projectors.
New dukane classroom projectors. New dukane classroom projectors.
New dukane classroom projectors.
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Kürzlich hochgeladen (20)

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 

Ug lunette

  • 1. Lunette Series Home Theater Curved Fixed Frame Projection Screen User’s Guide Important Safety and Warning Precautions Please follow these instructions carefully to ensure proper maintenance and safety with your Lunette Series Fixed Frame Curved Screen 1. When hanging the screen up, please make sure that no other objects – such as power switches, outlets, furniture, ladders, windows, etc., occupy the space designated for your Fixed-Frame screen. 2. Regardless if the screen is hung on or installed into the wall, make sure that the proper mounting anchors are used and that the weight is supported appropriately by a strong and structurally sound surface just as any large and heavy picture frame should. (Please consult a home improvement specialist for the best advice on installation.) 3. Frame parts are made of high quality velour-surfaced aluminum and should be handled with care. 4. When not in use, cover over the screen with a furniture sheet to protect it from dirt, grime, paint, or any other impurities. 5. When cleaning, use a soft cloth moistened with warm water to remove any marks on the frame or screen surface. 6. Never attempt to use any solutions, chemicals, or abrasive cleaners on the screen surface. 7. In order to avoid damaging the screen, avoid touching it directly with your fingers, writing stationary, tools, or any other sharp or abrasive objects. 8. Spare parts should be placed out of reach of small children in accordance with household safety guidelines. CAUTION: The projection screen frame is made of high-quality aluminum alloy and should be handled with care. Use a soft cloth with warm water to remove any spots on the screen material surface. To avoid damaging the screen material, never attempt to use any solutions, chemicals, or abrasive cleaners on the screen itself, and never attempt to touch screen with your fingers or sharps/abrasive objects. Rev101012-JL www.elitescreens.com 1
  • 2. Hardware and Parts List A. Dry-wall anchor B. 1.77” L-Bracket G. Fix Plate K. Butterfly Screw C. 3.54” L-Bracket J. Elbow Joint D. Lower bracket E. M5 Screw F. Wood screw H. Center Support Bar Note: Center support bar may be packed in a plastic tube with the screen material. L. Tension Rods M. Screen Material N. Vertical Upright Frame O. Horizontal Curved Frame Rev101012-JL www.elitescreens.com 2
  • 3. Frame Assembly 1. Insert both Elbow Joints (J) into each Horizontal Curved Frame (N) and join all four frame parts together as shown below. 2. After making sure that all four corners join at right angles (forming a perfect rectangle), fasten the four angles together by using x8 M5 screws (E). Minimal gap is normal here 3. Layout the Screen Material and Tension Rods on a clean and dry surface. Then, gently roll out the screen material over the back of the fixed frame. Vertical Upright Fame Horizontal Curved Frame Black Backing of the screen material Rev101012-JL www.elitescreens.com 3
  • 4. 4. Insert Tension Rods through the sleeves. The longer rods are used on the horizontal edges of the screen material, and the shorter rods are used on the vertical edges, as seen below. 5. Slip the screen tension rods into the grooves running along the back of the frame. Clip on the Fix Plates to the back of the frame to secure the rods into place forming a tight and flat surface. See Attaching the Fix Plates section below for details. Tension Rod Fix Plate Viewing Surface Rev101012-JL www.elitescreens.com 4
  • 5. Black backing for AcousticPro models This procedure only applies to AcousticPro models. Disregard this section if your Fixed Frame does not include an acoustic transparent screen material. The purpose of the black backing material is to block out any light penetration that may reflect off of anything mounted behind the screen, which can cause distortion to the projected image. The black backing is held in place by the Velcro that is on the fix plates. Black backing Interval markings reveal the best points for inserting the fix plates (Fig. 1). The prongs on the fix plates insert to the lip on the back of the frame creating a friction hold that will firmly keep the material and black backing in place (Fig. 2-3). After the material has been installed, the backing will lie over the back of the white (Acoustic) material and then be held in place by the Velcro on the fix plates (Fig 4). Fig. 2 Fig. 1 Fig. 4 Fig. 3 Rev101012-JL www.elitescreens.com 5
  • 6. Attaching the Fix Plates 1. Make sure that the material and frame are both lying face down on a clean, dry, and nonabrasive surface. 2. Center the material inside the frame. Please note the material will be noticeably smaller than the frame, as the material must be stretched to create a sufficient amount of tension for perfect material flatness. 3. Start attaching the Fix Plates in the corner of the frame’s horizontal edge, and then alternate with the corners of the frame’s vertical edge as shown in diagram. Fig. 5 Fix Plate Push 4. Attach the fix plates starting from the ends and moving towards the center as shown in the diagram below to create an evenly tensioned surface. Example 1 Example 2 Fig. 6 Rev101012-JL www.elitescreens.com 6
  • 7. Center Support Bar 1. Center Support Bar may be packed in a plastic tube with the screen material. Center support bar 支 2. Insert the Center Support Bar into the upper top groove on the back of the frame (note: this not the same groove where the fix plate inserts) with the bottom end near the center point of the frame, and place it in at an angle so that both ends of the bar are aligned with the groove. 3. Slide the top end of the bar into the top center point location (as shown below) to complete the center support bar installation. This will provide added stability to the frame and added tension to the material. For 165” and above models Rev101012-JL www.elitescreens.com 7
  • 8. Installation 1. Use butterfly screws to install the upper bracket as shown in diagram: Use butterfly screws to assemble a 1.77” L-Bracket and a 3.54”L-Bracket into an upper bracket 2. Locate the height where you want to set up, and draw an upper base line. Confirm the distance between the two brackets on the level direction following the data E of P10 diagram. Mark the hole location on the wall by following the base line and the upper bracket’s screw hole site, and then drill the hole. Insert the wall anchor and tighten the upper bracket using the provided screw. (The base line must be on the level.) Upper bracket Wood screw Hollow wall anchor Wall Upper base line 3. Draw a lower base line according to the data F of P10 diagram and the upper base line, and then make a hole on the wall according to the screw hole location for the lower bracket, then insert the anchor and tighten the lower bracket with the provided screw. Upper bracket Hollow wall anchor Wood screw Wall Lower bracket Rev101012-JL www.elitescreens.com 8
  • 9. 4. Place the upper frame on the upper brackets, and gently pull the frame down onto the bracket. The lower bracket will also slide into the groove of the lower frame. Upper base line Lower base line 5. Mounting the frame to the brackets will finish your installation. Installation diagram of frame and bracket Base line Swing the bottom bracket to the left or right to fit it in the groove of the lower frame. Note: Two (2) or more people must install the frame for added safety. Rev101012-JL www.elitescreens.com 9