1. RESUME OF KEY PERSONNEL
Name : P. VINOTH KUMAR
Nationality : INDIAN
Date of Birth : JULY 29, 1984
Mobile No. : +971-565378028,569737131
+91-8098798084(India)
E-mail : vinodg20@gmail.com
JOB TITLE : QA/QC Civil Engineer
PROFESSIONAL OBJECTIVE:
A prospective career in the field of Civil Engineering amidst
challenging environments that would utilize and hone my professional and interpersonal skills and in
the process augment values to the concern.
EDUCATIONAL ATTAINMENT:
BACHELOR DEGREE IN CIVIL ENGINEERING
(Anna University – Mar. 2006 – India)
DIPLOMA IN CIVIL ENGINEERING
(DOTE Board – Mar. 2003 – India)
TRAINING/SEMINARS:
• Awarded / Received IRCA accredited QMS Lead Auditor Training course (A17118)
• Awarded / Received Diploma Programme in MS-OFFICE (CSC)
• Awarded / Received Diploma Programme in Auto-CAD (SPCU)
• Internal Audit Training programme conducted by GCC & Daewoo.
• QMIS Training Programme Conducted by SAUDI ARAMCO
• Permit To Work (PTW) Training Programme Conducted by CTJV- Ras Gas & Sadara.
• H2S Awareness & Escape training Programme conducted by SAUDI ARAMCO.
EMPLOYMENT HISTORY:
Company Name : PETROFAC INTERNATIONAL LTD., U.A.E., ABU DHABI
Position Held : Lead QA/QC Inspector -civil
Project : UZ750 Island Surface Facilities Project –EPC2(Off-Shore)(EPCC)
Client : ZADCO
Period : Jan.2014 to Till Date
Work Profile
• Construction of Piling work with help of drilling fluid & without
fluid
• Construction of off-shore surface facilities such as Sea water Intake,
Sea water outfall and storm water basin, Pipe rack foundation,
Equipment foundation, Duct bank and Infrastructure works etc..
• Construction of sub-stations, IFCC and harbour buildings
• Construction of SOTL pipe line works etc..
1 of 8
2. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Company Name : DAEWOO E&C Ltd.(EPC) – SAUDI ARABIA
Position Held : QA/QC CIVIL/STRUCTURAL – SADARA APPROVED
Badge No: 017978
Project : Sadara Tank Farm Project – K.S.A (Jubail – 2)
(Petro Chemical Plant – Aramco & Dow chemical joint venture)
Client : SADARA
Period : Dec. 2012 to Dec. 2013
Work Profile
• Construction of Roads, culvert, small bridges ,concrete paving
• Construction of cryogenic tank farm (post tensioning tank)
• Construction of UPI, FST, STF tank units
• Construction of MCC/PIB Buildings, GIS substation.
• Construction of Pipe racks and water retaining structures.
• Construction of All Steel Structural Works at Tank Farm area.
Company Name : MOHAMMAD AL-MOJIL GROUP (EPC)
Position Held : QA/QC CIVIL/STRUCTURAL – ARAMCO APPROVED
Project 1 : WASIT GAS PLANT – ARAMCO
AL-Wasit (Khursaniyah), Kingdom of Saudi Arabia
Client : Aramco
Main Contractor : SK E&C Ltd.,
Project 2 : Manifa Core Hydro Carbon Project (GAS & OIL SEPERATION
PLANT PROJECT)
Manifa, Kingdom of Saudi Arabia
Client : Aramco/ Snamprogetti Company of saipem
Period : Jan. 2011 to March 2012
Work Profile :
• Construction of Roads, culvert, small bridges, concrete paving etc..
• Construction of Sub-Stations and Process Interface Buildings (PIB)
• Construction of Flayer system for Gas Plant
• Construction of Water Retaining Structure, Pipe Rack & Vessels
Foundation, Pile Foundation
• Steel Structural Works such as Erection of Pipe Frames
• Cable Trench & Pipe Trench Works , Cable & Pipe Laying works
• Construction of Asphalt & Concrete Paving works
• Construction of Heavy Equipment Foundation such as Crude Charge
Pump & Compressor
• Pre-Cast Concrete Structures (Manhole, Sump Pit, Electrical Pull
Pit, Foundations etc.
Company Name : M/s. CODE CONTRACTING COMPANY L.L.C.,(EPC)
Position Held : QA/QC Engineer – Civil
Project : Oil & Gas Refinery Plant (ADNOC (Takreer-Ruwais))
Abu Dhabi, U.A.E.
Client : ADNOC – Abu Dhabi National Oil Company
2 of 8
3. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Consultant : Dorche Grouppe GmbH
Period : Oct. 2009 to Sept. 2010
Work profile :
• Construction of Roads, culvert, small bridges, concrete paving etc..
• Construction of New School Building (Pre-cast Structure)
• Construction of Sub-Station and Extension of Office Buildings
works.
Company Name : CONSOLIDATED CONSTRUCTION CONSORTIUM LTD.
Position Held : QA/QC Engineer – Civil
Project : Airport Expansion project at Chennai - India
Client : Airport Authority of India
Period : Oct. 2008 to Sept. 2009
Work profile :
• It has 3 substation and commercial complex (G+2)inside of Airport,
the commercial complex including car parking
• Cable trench works and Transformer Yards
• Infrastructure work including, Roads, Drainage, Service yard and
compound wall Including other services like Fire fighting & Hydro-
pneumatic system
Company Name : M/s. GULF CONTRACTING CO.
Position Held : QA/QC Engineer – Civil
Project 1 : Pearl GTL Project- Ras laffan , Qatar
Client : QP & Shell
Consultant : KBR
Period : Aug. 2007 to Sept. 2008
Work profile :
It’s the world largest Gas to liquid project including substation and pipe
line, foundations for Steel structural elements and piping ,Boiler and
storage water tank, site office building, road works and temporary and
permanent structures, and infrastructure facilities
such as roads, water & drainage service, fire
fighting and recreation areas.
Project 2 : Ras Gas Expansion 6&7 – Ras laffan, Qatar
Client : Ras Gas
Main Contractor : CTJV
Work profile :
Temporary and Permanent Structure for Expansion 6&7 area,
infrastructure works such as roads, parking facilities, water supply
facilities and fire fighting facilities, re-modification for old temporary
structures and recreation areas etc.
Project 3 : Electrical Sub-Station works – Al khore , Qatar
Client : Kahramaa
Consultant : Siemens
3 of 8
4. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Work profile :
120KV,21KV,11KV substation with Raft foundation, it supply’s the
power for alkhore core community and core junction area, it includes
transform foundation, switch gear room, panel rooms, office room ,
Landscaping for around the Substation and compound wall with pile
foundation.
Company Name : M/s. SOBHA DEVELOPERS LTD.
Position Held : QA/QC Engineer – Civil
Project : High Rise & Residential Apartments
Bangalore, India.(In-House Project)
Client : Sobha Developers Ltd.,
Period : June. 2006 to Aug. 2007
Work profile :
It has 2 towers with 2B+G+28floors Residential
Apartments with Club house, Swimming pools, open theatre, sports
ground, children’s park, library, aerobics and meditation hall, bars
and restaurant, car parks etc..,
• Architect is German based architect.
• It has connecting steel bridges at Every 6 Floors connecting with all
wings.
• Each floor has a 4 Flats, Each Flat have 3 Bed rooms, 2 attached,1
common Toilets, verandah and Balcony with fully marble Tiles
Flooring.
• Interior features with Modular furniture, Alu trac ceiling, and
Gypsum & AMF panel for false ceiling, Joineries Fully Glazed
Frameless Doors and Flooring Ceramic tile & Granite.
• Building is gladded with Structural glazing Semi unitized panels
and in combination with composite panels.
• Infrastructure work including, Roads, Drainage, Service yard and
compound wall Including other services like Fire fighting &
Hydro-pneumatic system
Company Name : INFRATECH CONSTRUCTION SERVICE INDIA (P) LTD.
Position Held : Jr.QA/QC Engineer (Part Time)
Project : Sewage Treatment Plant. Chennai – India.
Client : PWD – Chennai Metropolitan Water Supply & Sewerage Board
Period : June 2003 to Jan. 2006 (Part time work)
Work profile :
• It has 5 collecting points with over 50 manholes and one pumping station
• It has over 45 km pipe line and 5 inter connected collecting wells with pump room and
compound wall
• The STP contain Screening,Filtration,Sedimantation,Areation,Gritchamber,Skimming
tank units
• ASP is an aerobic biological oxidation process.
• After the all treatment the sludge disposal to Aerated Lagoons
4 of 8
5. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
• The sludge disposal into water courses and On to Land
ROLE AND RESPONSIBILITIES :
I) SAMPLING & TESTING OF CONSTRUCTION MATERIALS:
1 ) Sampling for concrete , Borrow Areas , Embankment, Subgrade, GSBC , WMM , WBM , DBM
and BC as per the Project Specification, BS , ASTM standards .
2 ) Conducting all the testing of Construction materials like Soil , Cement , Bitumen , Aggregates ,
used in concrete , Embankment , subgrade , GSBC , WMM , DBM & BC as required by the IS , BS ,
ASTM standards and Technical Specification.
3) Conducting the Proctor Density test and Field Density test for compacted soil as per BS & ASTM
standards.
4) Conducting the Field Density test for compacted soil as per the IS , BS , ASTM standards using
Sand Replacement method, Nuclear Density gauge method.
5 ) Conducting the Field density test for DBM & BC using CORE CUTTER method as per IS , BS
, ASTM standards.
6) Prepare the Calibration plan & conducting calibration for all equipments at correct time .
7) Conducting the Calibration of WMM plant , Batching plant , DBM plant , Weighing Batch at
regular interval.
8 ) Preparing the Cubes & Testing of Cubes and all test for Concrete , Coarse & Fine aggregate used
in Concrete as per the IS , BS , ASTM standards & as per required frequencies.
9) Maintaining frequency of tests & Documentation as per the requirements of Project Specification.
10) Prepare Daily, Weekly, Monthly progress report for the work done in quality control section.
11) Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site
laboratory & send to external laboratory for testing , receiving and reviewing of reports and
submitting to clients.
II) QUALITY CONTROL AT SITE:
1)Inspection of all the works as per the latest drawings and co-ordinate with consultant and get the
approval from the consultant for the further activities.
2)Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site
laboratory & send to external laboratory for testing , receiving and reviewing of reports and
submitting to clients.
3)Conducting a Hydro test for Pressure pipe lines & Air test for Non pressure pipelines and prepare a
test reports and get a approval from the consultant.
4)Prepare Checklist for all works and get the approval from the Consultant/Clients and maintain the
records.
5 of 8
6. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
5)Ensure that the Supervisors understand the requirements of the Works Method Statement,
specifications, drawings and Inspection and Tests Plan.
6)Maintain liaison between the project team, consultants and subcontractors to solve quality issues.
7)Educate the project team, subcontractors on the Project Quality Plan as to ensure all parties of the
project are fully aware and understand the operational procedures and the project contractual quality
requirements.
8)Taking initiatives to promote quality culture throughout the company.
9)Identify document non conformities , communicate the non- conformance to the concerned
personnel.
10)Calculating the Product Quality Rating for all works as per the CONQUAS.
11)Periodic calibration of Inspection, measuring and testing Equipments / Instruments and
maintaining related records.
12) Inspect the Structural works and ensure the structural members and bolts are with in the limits.
13) Inspect the Fire Proofing work and ensure the work is going on as per the approved method
statements and the materials using are approved.
III) QUALITY ASSURANCE:
1) Prepare & Review the ITP, CH List, MS, MVR,MAR, RFI, NCR, STQ,ITP,CAR,PAR,ITR,Test
Procedure and all Quality Assurance related documents.
2) Distribute the Project Quality Plan to the project team, inclusive of the consultants and
subcontractors. Continually review the Project Quality Plan as to ensure its effectiveness.
3) Prepare & Review the proposed Works Method Statements and getting the approval from the
Clients.
4) Conduct the Internal Quality Audits as per the Audit plan to all departments within the projects
with objective to enhance their operational effectiveness and efficiencies.
5) Prepare the project QA/QC Report on a periodical basis as agreed with the Project Manager.
6) Prepare the subcontractors / suppliers Evaluation report in the required interval.
7) Monitor and report the achievement of the company Quality Objectives.
8) Ensure that appropriate corrective and preventive actions are taken to address Non-Conformance
Reports (NCRs) and complaints from the Employer / Employer’s representative.
9) Implementation of corrective / preventive action in consultation with Project Managers wherever
required.
6 of 8
7. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
IV) SITE EXECUTION:
1) Execution of the Chemical tank foundations, Evaporator foundation, Compressor foundations,
Pipe Rack, Pipe support, Cable Tray support, Office Building, Control Building, Substation
building as per the issued “IFC” drawings.
2) Prepare the Method Statement and get the approval from the client and execute the worh as
per the method statement.
3) Check the Barbending schedule with the latest IFC drawings and ensure it is as per the latest
IFC drawings.
4) Prepare the daily, weekly and monthly schedule and plan the work as per the schedule.
5) Arrange all required material and equipments prior to start the works.
6) If any issues, consult with the superior and clients and resolve the issues immediately.
7) Monitor the progress and ensure it is matching the Schedule.
8) Submit the daily report to the managers.
9) Plan the workforce and properly distribute the workrs as per the requirement.
10) Plan the material requirement and get the approval from the clients prior to start the work.
SOFTWARE SKILLS:
Operating System: Windows 95/98/2008/2010/XP
Packages : Microsoft Office, AutoCAD, ERP, STAD Pro. QMIS
PERSONAL DETAILS
FATHER’S NAME : V. Paramasivam
D.O.B : 29 – 07 - 1984
SEX : Male
MATERIAL STATUS : Single
PASSPORT DETAILS
Passport No : G1184592
7 of 8
8. EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Date of issue & expiry : 15 – 12 – 2006 & 14 – 12 - 2016
Place of issue : Tiruchirappalli
NATIONALITY : Indian
LANGUAGES KNOWN
To Read & Write : Tamil & English
To Speak : Tamil, English & Hindi
PERMANT ADDRESS
# 1/86, Nethaji Puram, Poyyalur, Padathan patti (Po.)
Kalla (Via.), Sivagangai (Dist), Tamilnadu
India – 630 305
Declaration
I hereby declare that the Particulars in the curriculum vitae are true and
correct to the best of my knowledge and belief.
Place:
Date: (P.VINOTH KUMAR)
***** END *****
8 of 8