SlideShare ist ein Scribd-Unternehmen logo
1 von 8
RESUME OF KEY PERSONNEL
Name : P. VINOTH KUMAR
Nationality : INDIAN
Date of Birth : JULY 29, 1984
Mobile No. : +971-565378028,569737131
+91-8098798084(India)
E-mail : vinodg20@gmail.com
JOB TITLE : QA/QC Civil Engineer
PROFESSIONAL OBJECTIVE:
A prospective career in the field of Civil Engineering amidst
challenging environments that would utilize and hone my professional and interpersonal skills and in
the process augment values to the concern.
EDUCATIONAL ATTAINMENT:
BACHELOR DEGREE IN CIVIL ENGINEERING
(Anna University – Mar. 2006 – India)
DIPLOMA IN CIVIL ENGINEERING
(DOTE Board – Mar. 2003 – India)
TRAINING/SEMINARS:
• Awarded / Received IRCA accredited QMS Lead Auditor Training course (A17118)
• Awarded / Received Diploma Programme in MS-OFFICE (CSC)
• Awarded / Received Diploma Programme in Auto-CAD (SPCU)
• Internal Audit Training programme conducted by GCC & Daewoo.
• QMIS Training Programme Conducted by SAUDI ARAMCO
• Permit To Work (PTW) Training Programme Conducted by CTJV- Ras Gas & Sadara.
• H2S Awareness & Escape training Programme conducted by SAUDI ARAMCO.
EMPLOYMENT HISTORY:
Company Name : PETROFAC INTERNATIONAL LTD., U.A.E., ABU DHABI
Position Held : Lead QA/QC Inspector -civil
Project : UZ750 Island Surface Facilities Project –EPC2(Off-Shore)(EPCC)
Client : ZADCO
Period : Jan.2014 to Till Date
Work Profile
• Construction of Piling work with help of drilling fluid & without
fluid
• Construction of off-shore surface facilities such as Sea water Intake,
Sea water outfall and storm water basin, Pipe rack foundation,
Equipment foundation, Duct bank and Infrastructure works etc..
• Construction of sub-stations, IFCC and harbour buildings
• Construction of SOTL pipe line works etc..
1 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Company Name : DAEWOO E&C Ltd.(EPC) – SAUDI ARABIA
Position Held : QA/QC CIVIL/STRUCTURAL – SADARA APPROVED
Badge No: 017978
Project : Sadara Tank Farm Project – K.S.A (Jubail – 2)
(Petro Chemical Plant – Aramco & Dow chemical joint venture)
Client : SADARA
Period : Dec. 2012 to Dec. 2013
Work Profile
• Construction of Roads, culvert, small bridges ,concrete paving
• Construction of cryogenic tank farm (post tensioning tank)
• Construction of UPI, FST, STF tank units
• Construction of MCC/PIB Buildings, GIS substation.
• Construction of Pipe racks and water retaining structures.
• Construction of All Steel Structural Works at Tank Farm area.
Company Name : MOHAMMAD AL-MOJIL GROUP (EPC)
Position Held : QA/QC CIVIL/STRUCTURAL – ARAMCO APPROVED
Project 1 : WASIT GAS PLANT – ARAMCO
AL-Wasit (Khursaniyah), Kingdom of Saudi Arabia
Client : Aramco
Main Contractor : SK E&C Ltd.,
Project 2 : Manifa Core Hydro Carbon Project (GAS & OIL SEPERATION
PLANT PROJECT)
Manifa, Kingdom of Saudi Arabia
Client : Aramco/ Snamprogetti Company of saipem
Period : Jan. 2011 to March 2012
Work Profile :
• Construction of Roads, culvert, small bridges, concrete paving etc..
• Construction of Sub-Stations and Process Interface Buildings (PIB)
• Construction of Flayer system for Gas Plant
• Construction of Water Retaining Structure, Pipe Rack & Vessels
Foundation, Pile Foundation
• Steel Structural Works such as Erection of Pipe Frames
• Cable Trench & Pipe Trench Works , Cable & Pipe Laying works
• Construction of Asphalt & Concrete Paving works
• Construction of Heavy Equipment Foundation such as Crude Charge
Pump & Compressor
• Pre-Cast Concrete Structures (Manhole, Sump Pit, Electrical Pull
Pit, Foundations etc.
Company Name : M/s. CODE CONTRACTING COMPANY L.L.C.,(EPC)
Position Held : QA/QC Engineer – Civil
Project : Oil & Gas Refinery Plant (ADNOC (Takreer-Ruwais))
Abu Dhabi, U.A.E.
Client : ADNOC – Abu Dhabi National Oil Company
2 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Consultant : Dorche Grouppe GmbH
Period : Oct. 2009 to Sept. 2010
Work profile :
• Construction of Roads, culvert, small bridges, concrete paving etc..
• Construction of New School Building (Pre-cast Structure)
• Construction of Sub-Station and Extension of Office Buildings
works.
Company Name : CONSOLIDATED CONSTRUCTION CONSORTIUM LTD.
Position Held : QA/QC Engineer – Civil
Project : Airport Expansion project at Chennai - India
Client : Airport Authority of India
Period : Oct. 2008 to Sept. 2009
Work profile :
• It has 3 substation and commercial complex (G+2)inside of Airport,
the commercial complex including car parking
• Cable trench works and Transformer Yards
• Infrastructure work including, Roads, Drainage, Service yard and
compound wall Including other services like Fire fighting & Hydro-
pneumatic system
Company Name : M/s. GULF CONTRACTING CO.
Position Held : QA/QC Engineer – Civil
Project 1 : Pearl GTL Project- Ras laffan , Qatar
Client : QP & Shell
Consultant : KBR
Period : Aug. 2007 to Sept. 2008
Work profile :
It’s the world largest Gas to liquid project including substation and pipe
line, foundations for Steel structural elements and piping ,Boiler and
storage water tank, site office building, road works and temporary and
permanent structures, and infrastructure facilities
such as roads, water & drainage service, fire
fighting and recreation areas.
Project 2 : Ras Gas Expansion 6&7 – Ras laffan, Qatar
Client : Ras Gas
Main Contractor : CTJV
Work profile :
Temporary and Permanent Structure for Expansion 6&7 area,
infrastructure works such as roads, parking facilities, water supply
facilities and fire fighting facilities, re-modification for old temporary
structures and recreation areas etc.
Project 3 : Electrical Sub-Station works – Al khore , Qatar
Client : Kahramaa
Consultant : Siemens
3 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Work profile :
120KV,21KV,11KV substation with Raft foundation, it supply’s the
power for alkhore core community and core junction area, it includes
transform foundation, switch gear room, panel rooms, office room ,
Landscaping for around the Substation and compound wall with pile
foundation.
Company Name : M/s. SOBHA DEVELOPERS LTD.
Position Held : QA/QC Engineer – Civil
Project : High Rise & Residential Apartments
Bangalore, India.(In-House Project)
Client : Sobha Developers Ltd.,
Period : June. 2006 to Aug. 2007
Work profile :
It has 2 towers with 2B+G+28floors Residential
Apartments with Club house, Swimming pools, open theatre, sports
ground, children’s park, library, aerobics and meditation hall, bars
and restaurant, car parks etc..,
• Architect is German based architect.
• It has connecting steel bridges at Every 6 Floors connecting with all
wings.
• Each floor has a 4 Flats, Each Flat have 3 Bed rooms, 2 attached,1
common Toilets, verandah and Balcony with fully marble Tiles
Flooring.
• Interior features with Modular furniture, Alu trac ceiling, and
Gypsum & AMF panel for false ceiling, Joineries Fully Glazed
Frameless Doors and Flooring Ceramic tile & Granite.
• Building is gladded with Structural glazing Semi unitized panels
and in combination with composite panels.
• Infrastructure work including, Roads, Drainage, Service yard and
compound wall Including other services like Fire fighting &
Hydro-pneumatic system
Company Name : INFRATECH CONSTRUCTION SERVICE INDIA (P) LTD.
Position Held : Jr.QA/QC Engineer (Part Time)
Project : Sewage Treatment Plant. Chennai – India.
Client : PWD – Chennai Metropolitan Water Supply & Sewerage Board
Period : June 2003 to Jan. 2006 (Part time work)
Work profile :
• It has 5 collecting points with over 50 manholes and one pumping station
• It has over 45 km pipe line and 5 inter connected collecting wells with pump room and
compound wall
• The STP contain Screening,Filtration,Sedimantation,Areation,Gritchamber,Skimming
tank units
• ASP is an aerobic biological oxidation process.
• After the all treatment the sludge disposal to Aerated Lagoons
4 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
• The sludge disposal into water courses and On to Land
ROLE AND RESPONSIBILITIES :
I) SAMPLING & TESTING OF CONSTRUCTION MATERIALS:
1 ) Sampling for concrete , Borrow Areas , Embankment, Subgrade, GSBC , WMM , WBM , DBM
and BC as per the Project Specification, BS , ASTM standards .
2 ) Conducting all the testing of Construction materials like Soil , Cement , Bitumen , Aggregates ,
used in concrete , Embankment , subgrade , GSBC , WMM , DBM & BC as required by the IS , BS ,
ASTM standards and Technical Specification.
3) Conducting the Proctor Density test and Field Density test for compacted soil as per BS & ASTM
standards.
4) Conducting the Field Density test for compacted soil as per the IS , BS , ASTM standards using
Sand Replacement method, Nuclear Density gauge method.
5 ) Conducting the Field density test for DBM & BC using CORE CUTTER method as per IS , BS
, ASTM standards.
6) Prepare the Calibration plan & conducting calibration for all equipments at correct time .
7) Conducting the Calibration of WMM plant , Batching plant , DBM plant , Weighing Batch at
regular interval.
8 ) Preparing the Cubes & Testing of Cubes and all test for Concrete , Coarse & Fine aggregate used
in Concrete as per the IS , BS , ASTM standards & as per required frequencies.
9) Maintaining frequency of tests & Documentation as per the requirements of Project Specification.
10) Prepare Daily, Weekly, Monthly progress report for the work done in quality control section.
11) Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site
laboratory & send to external laboratory for testing , receiving and reviewing of reports and
submitting to clients.
II) QUALITY CONTROL AT SITE:
1)Inspection of all the works as per the latest drawings and co-ordinate with consultant and get the
approval from the consultant for the further activities.
2)Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site
laboratory & send to external laboratory for testing , receiving and reviewing of reports and
submitting to clients.
3)Conducting a Hydro test for Pressure pipe lines & Air test for Non pressure pipelines and prepare a
test reports and get a approval from the consultant.
4)Prepare Checklist for all works and get the approval from the Consultant/Clients and maintain the
records.
5 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
5)Ensure that the Supervisors understand the requirements of the Works Method Statement,
specifications, drawings and Inspection and Tests Plan.
6)Maintain liaison between the project team, consultants and subcontractors to solve quality issues.
7)Educate the project team, subcontractors on the Project Quality Plan as to ensure all parties of the
project are fully aware and understand the operational procedures and the project contractual quality
requirements.
8)Taking initiatives to promote quality culture throughout the company.
9)Identify document non conformities , communicate the non- conformance to the concerned
personnel.
10)Calculating the Product Quality Rating for all works as per the CONQUAS.
11)Periodic calibration of Inspection, measuring and testing Equipments / Instruments and
maintaining related records.
12) Inspect the Structural works and ensure the structural members and bolts are with in the limits.
13) Inspect the Fire Proofing work and ensure the work is going on as per the approved method
statements and the materials using are approved.
III) QUALITY ASSURANCE:
1) Prepare & Review the ITP, CH List, MS, MVR,MAR, RFI, NCR, STQ,ITP,CAR,PAR,ITR,Test
Procedure and all Quality Assurance related documents.
2) Distribute the Project Quality Plan to the project team, inclusive of the consultants and
subcontractors. Continually review the Project Quality Plan as to ensure its effectiveness.
3) Prepare & Review the proposed Works Method Statements and getting the approval from the
Clients.
4) Conduct the Internal Quality Audits as per the Audit plan to all departments within the projects
with objective to enhance their operational effectiveness and efficiencies.
5) Prepare the project QA/QC Report on a periodical basis as agreed with the Project Manager.
6) Prepare the subcontractors / suppliers Evaluation report in the required interval.
7) Monitor and report the achievement of the company Quality Objectives.
8) Ensure that appropriate corrective and preventive actions are taken to address Non-Conformance
Reports (NCRs) and complaints from the Employer / Employer’s representative.
9) Implementation of corrective / preventive action in consultation with Project Managers wherever
required.
6 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
IV) SITE EXECUTION:
1) Execution of the Chemical tank foundations, Evaporator foundation, Compressor foundations,
Pipe Rack, Pipe support, Cable Tray support, Office Building, Control Building, Substation
building as per the issued “IFC” drawings.
2) Prepare the Method Statement and get the approval from the client and execute the worh as
per the method statement.
3) Check the Barbending schedule with the latest IFC drawings and ensure it is as per the latest
IFC drawings.
4) Prepare the daily, weekly and monthly schedule and plan the work as per the schedule.
5) Arrange all required material and equipments prior to start the works.
6) If any issues, consult with the superior and clients and resolve the issues immediately.
7) Monitor the progress and ensure it is matching the Schedule.
8) Submit the daily report to the managers.
9) Plan the workforce and properly distribute the workrs as per the requirement.
10) Plan the material requirement and get the approval from the clients prior to start the work.
SOFTWARE SKILLS:
Operating System: Windows 95/98/2008/2010/XP
Packages : Microsoft Office, AutoCAD, ERP, STAD Pro. QMIS
PERSONAL DETAILS
FATHER’S NAME : V. Paramasivam
D.O.B : 29 – 07 - 1984
SEX : Male
MATERIAL STATUS : Single
PASSPORT DETAILS
Passport No : G1184592
7 of 8
EMPLOYMENT HISTORY: (Continuation)
PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION
Date of issue & expiry : 15 – 12 – 2006 & 14 – 12 - 2016
Place of issue : Tiruchirappalli
NATIONALITY : Indian
LANGUAGES KNOWN
To Read & Write : Tamil & English
To Speak : Tamil, English & Hindi
PERMANT ADDRESS
# 1/86, Nethaji Puram, Poyyalur, Padathan patti (Po.)
Kalla (Via.), Sivagangai (Dist), Tamilnadu
India – 630 305
Declaration
I hereby declare that the Particulars in the curriculum vitae are true and
correct to the best of my knowledge and belief.
Place:
Date: (P.VINOTH KUMAR)
***** END *****
8 of 8

Weitere ähnliche Inhalte

Was ist angesagt?

Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
SURENDRA BABU
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
hitesh desai
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
VEERAKAMU C
 
CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssss
bhagyesh thorat
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
ashwin mahale
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
aqeel ahmed
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
ranganathan shankar
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
Yeoh KS
 

Was ist angesagt? (20)

Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_CV_VEERAKAMU.C_PIPING_
CV_VEERAKAMU.C_PIPING_
 
CIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssssCIVIL ENGINEER ,ssssssss
CIVIL ENGINEER ,ssssssss
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Rajinder kumar updated resume
Rajinder  kumar updated resumeRajinder  kumar updated resume
Rajinder kumar updated resume
 
ASHWIN Piping Engineer
ASHWIN Piping EngineerASHWIN Piping Engineer
ASHWIN Piping Engineer
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
 
Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
EDUARDO H. PARE CV - STRUCTURAL ENGINEER - 30 NOV 2021
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
RESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPATRESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPAT
 

Andere mochten auch

PALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEERPALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEER
Palani Manickam
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
Mohamed Sayed
 
CV_Rabbi_10-07-2015
CV_Rabbi_10-07-2015CV_Rabbi_10-07-2015
CV_Rabbi_10-07-2015
Fazle Rabbi
 

Andere mochten auch (20)

Resume Zeeshan
Resume ZeeshanResume Zeeshan
Resume Zeeshan
 
Foundations and Introduction
Foundations and IntroductionFoundations and Introduction
Foundations and Introduction
 
Shan raza cv
Shan raza cvShan raza cv
Shan raza cv
 
PALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEERPALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEER
 
Physical Modelling Of Improving Bearing Capacity For Foundations By Geo Fabrics
Physical Modelling Of Improving Bearing Capacity For Foundations By Geo FabricsPhysical Modelling Of Improving Bearing Capacity For Foundations By Geo Fabrics
Physical Modelling Of Improving Bearing Capacity For Foundations By Geo Fabrics
 
CV-ARS-2015
CV-ARS-2015CV-ARS-2015
CV-ARS-2015
 
David T.Wright Visual CV / resume
David T.Wright Visual CV / resumeDavid T.Wright Visual CV / resume
David T.Wright Visual CV / resume
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Temeltas Jet Grout
Temeltas Jet GroutTemeltas Jet Grout
Temeltas Jet Grout
 
Erim Gurdal CV
Erim Gurdal CVErim Gurdal CV
Erim Gurdal CV
 
Shanin cv
Shanin cvShanin cv
Shanin cv
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Resume 2013
Resume 2013Resume 2013
Resume 2013
 
Muhammad Ajmal Khan
Muhammad Ajmal KhanMuhammad Ajmal Khan
Muhammad Ajmal Khan
 
My Visual Resume / CV Bonetto
My Visual Resume / CV BonettoMy Visual Resume / CV Bonetto
My Visual Resume / CV Bonetto
 
CV_Rabbi_10-07-2015
CV_Rabbi_10-07-2015CV_Rabbi_10-07-2015
CV_Rabbi_10-07-2015
 
Dluge Edward J Resume 6
Dluge Edward J Resume 6Dluge Edward J Resume 6
Dluge Edward J Resume 6
 
Bilal CV
Bilal CVBilal CV
Bilal CV
 
Draftsman CV
Draftsman CVDraftsman CV
Draftsman CV
 
Luciano Palma's Résumé
Luciano Palma's RésuméLuciano Palma's Résumé
Luciano Palma's Résumé
 

Ähnlich wie Vinoth2016 - CV

Ähnlich wie Vinoth2016 - CV (20)

RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Manoj resume
Manoj resumeManoj resume
Manoj resume
 
MCV
MCVMCV
MCV
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
CURRICULAM_VITAE_QC
CURRICULAM_VITAE_QCCURRICULAM_VITAE_QC
CURRICULAM_VITAE_QC
 
Manish Ray - CV
Manish Ray - CVManish Ray - CV
Manish Ray - CV
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
V.BASKAR CV
V.BASKAR CVV.BASKAR CV
V.BASKAR CV
 
aditi
aditiaditi
aditi
 
CV Updated
CV UpdatedCV Updated
CV Updated
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)Tanveer_Phansopkar_-__piping_Draughtsman (1)
Tanveer_Phansopkar_-__piping_Draughtsman (1)
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
Sunil-CV-Latest
Sunil-CV-LatestSunil-CV-Latest
Sunil-CV-Latest
 

Vinoth2016 - CV

  • 1. RESUME OF KEY PERSONNEL Name : P. VINOTH KUMAR Nationality : INDIAN Date of Birth : JULY 29, 1984 Mobile No. : +971-565378028,569737131 +91-8098798084(India) E-mail : vinodg20@gmail.com JOB TITLE : QA/QC Civil Engineer PROFESSIONAL OBJECTIVE: A prospective career in the field of Civil Engineering amidst challenging environments that would utilize and hone my professional and interpersonal skills and in the process augment values to the concern. EDUCATIONAL ATTAINMENT: BACHELOR DEGREE IN CIVIL ENGINEERING (Anna University – Mar. 2006 – India) DIPLOMA IN CIVIL ENGINEERING (DOTE Board – Mar. 2003 – India) TRAINING/SEMINARS: • Awarded / Received IRCA accredited QMS Lead Auditor Training course (A17118) • Awarded / Received Diploma Programme in MS-OFFICE (CSC) • Awarded / Received Diploma Programme in Auto-CAD (SPCU) • Internal Audit Training programme conducted by GCC & Daewoo. • QMIS Training Programme Conducted by SAUDI ARAMCO • Permit To Work (PTW) Training Programme Conducted by CTJV- Ras Gas & Sadara. • H2S Awareness & Escape training Programme conducted by SAUDI ARAMCO. EMPLOYMENT HISTORY: Company Name : PETROFAC INTERNATIONAL LTD., U.A.E., ABU DHABI Position Held : Lead QA/QC Inspector -civil Project : UZ750 Island Surface Facilities Project –EPC2(Off-Shore)(EPCC) Client : ZADCO Period : Jan.2014 to Till Date Work Profile • Construction of Piling work with help of drilling fluid & without fluid • Construction of off-shore surface facilities such as Sea water Intake, Sea water outfall and storm water basin, Pipe rack foundation, Equipment foundation, Duct bank and Infrastructure works etc.. • Construction of sub-stations, IFCC and harbour buildings • Construction of SOTL pipe line works etc.. 1 of 8
  • 2. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION Company Name : DAEWOO E&C Ltd.(EPC) – SAUDI ARABIA Position Held : QA/QC CIVIL/STRUCTURAL – SADARA APPROVED Badge No: 017978 Project : Sadara Tank Farm Project – K.S.A (Jubail – 2) (Petro Chemical Plant – Aramco & Dow chemical joint venture) Client : SADARA Period : Dec. 2012 to Dec. 2013 Work Profile • Construction of Roads, culvert, small bridges ,concrete paving • Construction of cryogenic tank farm (post tensioning tank) • Construction of UPI, FST, STF tank units • Construction of MCC/PIB Buildings, GIS substation. • Construction of Pipe racks and water retaining structures. • Construction of All Steel Structural Works at Tank Farm area. Company Name : MOHAMMAD AL-MOJIL GROUP (EPC) Position Held : QA/QC CIVIL/STRUCTURAL – ARAMCO APPROVED Project 1 : WASIT GAS PLANT – ARAMCO AL-Wasit (Khursaniyah), Kingdom of Saudi Arabia Client : Aramco Main Contractor : SK E&C Ltd., Project 2 : Manifa Core Hydro Carbon Project (GAS & OIL SEPERATION PLANT PROJECT) Manifa, Kingdom of Saudi Arabia Client : Aramco/ Snamprogetti Company of saipem Period : Jan. 2011 to March 2012 Work Profile : • Construction of Roads, culvert, small bridges, concrete paving etc.. • Construction of Sub-Stations and Process Interface Buildings (PIB) • Construction of Flayer system for Gas Plant • Construction of Water Retaining Structure, Pipe Rack & Vessels Foundation, Pile Foundation • Steel Structural Works such as Erection of Pipe Frames • Cable Trench & Pipe Trench Works , Cable & Pipe Laying works • Construction of Asphalt & Concrete Paving works • Construction of Heavy Equipment Foundation such as Crude Charge Pump & Compressor • Pre-Cast Concrete Structures (Manhole, Sump Pit, Electrical Pull Pit, Foundations etc. Company Name : M/s. CODE CONTRACTING COMPANY L.L.C.,(EPC) Position Held : QA/QC Engineer – Civil Project : Oil & Gas Refinery Plant (ADNOC (Takreer-Ruwais)) Abu Dhabi, U.A.E. Client : ADNOC – Abu Dhabi National Oil Company 2 of 8
  • 3. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION Consultant : Dorche Grouppe GmbH Period : Oct. 2009 to Sept. 2010 Work profile : • Construction of Roads, culvert, small bridges, concrete paving etc.. • Construction of New School Building (Pre-cast Structure) • Construction of Sub-Station and Extension of Office Buildings works. Company Name : CONSOLIDATED CONSTRUCTION CONSORTIUM LTD. Position Held : QA/QC Engineer – Civil Project : Airport Expansion project at Chennai - India Client : Airport Authority of India Period : Oct. 2008 to Sept. 2009 Work profile : • It has 3 substation and commercial complex (G+2)inside of Airport, the commercial complex including car parking • Cable trench works and Transformer Yards • Infrastructure work including, Roads, Drainage, Service yard and compound wall Including other services like Fire fighting & Hydro- pneumatic system Company Name : M/s. GULF CONTRACTING CO. Position Held : QA/QC Engineer – Civil Project 1 : Pearl GTL Project- Ras laffan , Qatar Client : QP & Shell Consultant : KBR Period : Aug. 2007 to Sept. 2008 Work profile : It’s the world largest Gas to liquid project including substation and pipe line, foundations for Steel structural elements and piping ,Boiler and storage water tank, site office building, road works and temporary and permanent structures, and infrastructure facilities such as roads, water & drainage service, fire fighting and recreation areas. Project 2 : Ras Gas Expansion 6&7 – Ras laffan, Qatar Client : Ras Gas Main Contractor : CTJV Work profile : Temporary and Permanent Structure for Expansion 6&7 area, infrastructure works such as roads, parking facilities, water supply facilities and fire fighting facilities, re-modification for old temporary structures and recreation areas etc. Project 3 : Electrical Sub-Station works – Al khore , Qatar Client : Kahramaa Consultant : Siemens 3 of 8
  • 4. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION Work profile : 120KV,21KV,11KV substation with Raft foundation, it supply’s the power for alkhore core community and core junction area, it includes transform foundation, switch gear room, panel rooms, office room , Landscaping for around the Substation and compound wall with pile foundation. Company Name : M/s. SOBHA DEVELOPERS LTD. Position Held : QA/QC Engineer – Civil Project : High Rise & Residential Apartments Bangalore, India.(In-House Project) Client : Sobha Developers Ltd., Period : June. 2006 to Aug. 2007 Work profile : It has 2 towers with 2B+G+28floors Residential Apartments with Club house, Swimming pools, open theatre, sports ground, children’s park, library, aerobics and meditation hall, bars and restaurant, car parks etc.., • Architect is German based architect. • It has connecting steel bridges at Every 6 Floors connecting with all wings. • Each floor has a 4 Flats, Each Flat have 3 Bed rooms, 2 attached,1 common Toilets, verandah and Balcony with fully marble Tiles Flooring. • Interior features with Modular furniture, Alu trac ceiling, and Gypsum & AMF panel for false ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite. • Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels. • Infrastructure work including, Roads, Drainage, Service yard and compound wall Including other services like Fire fighting & Hydro-pneumatic system Company Name : INFRATECH CONSTRUCTION SERVICE INDIA (P) LTD. Position Held : Jr.QA/QC Engineer (Part Time) Project : Sewage Treatment Plant. Chennai – India. Client : PWD – Chennai Metropolitan Water Supply & Sewerage Board Period : June 2003 to Jan. 2006 (Part time work) Work profile : • It has 5 collecting points with over 50 manholes and one pumping station • It has over 45 km pipe line and 5 inter connected collecting wells with pump room and compound wall • The STP contain Screening,Filtration,Sedimantation,Areation,Gritchamber,Skimming tank units • ASP is an aerobic biological oxidation process. • After the all treatment the sludge disposal to Aerated Lagoons 4 of 8
  • 5. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION • The sludge disposal into water courses and On to Land ROLE AND RESPONSIBILITIES : I) SAMPLING & TESTING OF CONSTRUCTION MATERIALS: 1 ) Sampling for concrete , Borrow Areas , Embankment, Subgrade, GSBC , WMM , WBM , DBM and BC as per the Project Specification, BS , ASTM standards . 2 ) Conducting all the testing of Construction materials like Soil , Cement , Bitumen , Aggregates , used in concrete , Embankment , subgrade , GSBC , WMM , DBM & BC as required by the IS , BS , ASTM standards and Technical Specification. 3) Conducting the Proctor Density test and Field Density test for compacted soil as per BS & ASTM standards. 4) Conducting the Field Density test for compacted soil as per the IS , BS , ASTM standards using Sand Replacement method, Nuclear Density gauge method. 5 ) Conducting the Field density test for DBM & BC using CORE CUTTER method as per IS , BS , ASTM standards. 6) Prepare the Calibration plan & conducting calibration for all equipments at correct time . 7) Conducting the Calibration of WMM plant , Batching plant , DBM plant , Weighing Batch at regular interval. 8 ) Preparing the Cubes & Testing of Cubes and all test for Concrete , Coarse & Fine aggregate used in Concrete as per the IS , BS , ASTM standards & as per required frequencies. 9) Maintaining frequency of tests & Documentation as per the requirements of Project Specification. 10) Prepare Daily, Weekly, Monthly progress report for the work done in quality control section. 11) Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site laboratory & send to external laboratory for testing , receiving and reviewing of reports and submitting to clients. II) QUALITY CONTROL AT SITE: 1)Inspection of all the works as per the latest drawings and co-ordinate with consultant and get the approval from the consultant for the further activities. 2)Checking for slump & Temperature of concrete at site , casting & Testing of cubes in site laboratory & send to external laboratory for testing , receiving and reviewing of reports and submitting to clients. 3)Conducting a Hydro test for Pressure pipe lines & Air test for Non pressure pipelines and prepare a test reports and get a approval from the consultant. 4)Prepare Checklist for all works and get the approval from the Consultant/Clients and maintain the records. 5 of 8
  • 6. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION 5)Ensure that the Supervisors understand the requirements of the Works Method Statement, specifications, drawings and Inspection and Tests Plan. 6)Maintain liaison between the project team, consultants and subcontractors to solve quality issues. 7)Educate the project team, subcontractors on the Project Quality Plan as to ensure all parties of the project are fully aware and understand the operational procedures and the project contractual quality requirements. 8)Taking initiatives to promote quality culture throughout the company. 9)Identify document non conformities , communicate the non- conformance to the concerned personnel. 10)Calculating the Product Quality Rating for all works as per the CONQUAS. 11)Periodic calibration of Inspection, measuring and testing Equipments / Instruments and maintaining related records. 12) Inspect the Structural works and ensure the structural members and bolts are with in the limits. 13) Inspect the Fire Proofing work and ensure the work is going on as per the approved method statements and the materials using are approved. III) QUALITY ASSURANCE: 1) Prepare & Review the ITP, CH List, MS, MVR,MAR, RFI, NCR, STQ,ITP,CAR,PAR,ITR,Test Procedure and all Quality Assurance related documents. 2) Distribute the Project Quality Plan to the project team, inclusive of the consultants and subcontractors. Continually review the Project Quality Plan as to ensure its effectiveness. 3) Prepare & Review the proposed Works Method Statements and getting the approval from the Clients. 4) Conduct the Internal Quality Audits as per the Audit plan to all departments within the projects with objective to enhance their operational effectiveness and efficiencies. 5) Prepare the project QA/QC Report on a periodical basis as agreed with the Project Manager. 6) Prepare the subcontractors / suppliers Evaluation report in the required interval. 7) Monitor and report the achievement of the company Quality Objectives. 8) Ensure that appropriate corrective and preventive actions are taken to address Non-Conformance Reports (NCRs) and complaints from the Employer / Employer’s representative. 9) Implementation of corrective / preventive action in consultation with Project Managers wherever required. 6 of 8
  • 7. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION IV) SITE EXECUTION: 1) Execution of the Chemical tank foundations, Evaporator foundation, Compressor foundations, Pipe Rack, Pipe support, Cable Tray support, Office Building, Control Building, Substation building as per the issued “IFC” drawings. 2) Prepare the Method Statement and get the approval from the client and execute the worh as per the method statement. 3) Check the Barbending schedule with the latest IFC drawings and ensure it is as per the latest IFC drawings. 4) Prepare the daily, weekly and monthly schedule and plan the work as per the schedule. 5) Arrange all required material and equipments prior to start the works. 6) If any issues, consult with the superior and clients and resolve the issues immediately. 7) Monitor the progress and ensure it is matching the Schedule. 8) Submit the daily report to the managers. 9) Plan the workforce and properly distribute the workrs as per the requirement. 10) Plan the material requirement and get the approval from the clients prior to start the work. SOFTWARE SKILLS: Operating System: Windows 95/98/2008/2010/XP Packages : Microsoft Office, AutoCAD, ERP, STAD Pro. QMIS PERSONAL DETAILS FATHER’S NAME : V. Paramasivam D.O.B : 29 – 07 - 1984 SEX : Male MATERIAL STATUS : Single PASSPORT DETAILS Passport No : G1184592 7 of 8
  • 8. EMPLOYMENT HISTORY: (Continuation) PERIOD COMPANY/PROJECT/POSITION/WORK DESCRIPTION Date of issue & expiry : 15 – 12 – 2006 & 14 – 12 - 2016 Place of issue : Tiruchirappalli NATIONALITY : Indian LANGUAGES KNOWN To Read & Write : Tamil & English To Speak : Tamil, English & Hindi PERMANT ADDRESS # 1/86, Nethaji Puram, Poyyalur, Padathan patti (Po.) Kalla (Via.), Sivagangai (Dist), Tamilnadu India – 630 305 Declaration I hereby declare that the Particulars in the curriculum vitae are true and correct to the best of my knowledge and belief. Place: Date: (P.VINOTH KUMAR) ***** END ***** 8 of 8