SlideShare ist ein Scribd-Unternehmen logo
1 von 13
Customer Profile
Vincent Poon
• CAD/BIM Manage, Kohn Pedersen Fox Architects, New
York
• The University at Buffalo – School of Architecture,
Bachelor of Architecture, 1997
• KPF since 2003
• Architect for 5 years
KPF
• Established in 1976
• Architectural Design | Urban Design | Master Planning
– AIA Architecture Firm Award Winners, 1990
– New York | London | Shanghai
KPF on BIM
 KPF Computational Geometry Group
 2005 - First Revit pilot project
 Hotel and Mixed use tower
 Approximately 700,000 SF.
 2007 - Advance geometry with Revit
 Integration with GC, Rhino, etc
Intuitively inspired Form-ulaic
Automating analytical options
Revit?
Formulaically Intuitive
Switching families
Park Fifth, Los Angeles, CA
Case Study
 2,700,000 SF
 Residential, Retail, Public Spaces
 Schematic Design
 Rhino
 MAX
 AutoCAD
 Design Development
 Rhino
 MAX
 Revit
 AutoCAD
Conventional Process
Compiled in PhotoshopCompiled in Photoshop
Modeled in Rhino,
Rendered in 3DS MAX
Modeled in Rhino,
Rendered in 3DS MAX
Programming diagrams
drawn in AutoCAD
Programming diagrams
drawn in AutoCAD
Areas are recorded in
Excel for calculations.
Areas are recorded in
Excel for calculations.
Revit Process
Modeled and Rendered
in Revit.
Modeled and Rendered
in Revit.
Programming diagrams
are created from the
same model in Revit
which updates
concurrently as the
model updates.
Programming diagrams
are created from the
same model in Revit
which updates
concurrently as the
model updates.
Composed in RevitComposed in Revit
Area schedules are
generated in Revit and
will update with the
model
Area schedules are
generated in Revit and
will update with the
model
The Methodist Hospital, Houston, Texas
 350,000 SF
 Research Institute
 Schematic Design
 Rhino
 MAX
 AutoCAD
 Design Development
 Revit
 Rhino
 MAX
 AutoCAD
 Construction Document
 Revit
 AutoCAD

Weitere ähnliche Inhalte

Was ist angesagt?

Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
saed saffarini
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next Level
Antman1963
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
marybk
 

Was ist angesagt? (20)

Presentation BIM case studies
Presentation BIM case studiesPresentation BIM case studies
Presentation BIM case studies
 
BIM Algorithmic Workflow Case Study - Mr. Eugenio FONTAN BIM Director and Co...
BIM Algorithmic Workflow Case  Study - Mr. Eugenio FONTAN BIM Director and Co...BIM Algorithmic Workflow Case  Study - Mr. Eugenio FONTAN BIM Director and Co...
BIM Algorithmic Workflow Case Study - Mr. Eugenio FONTAN BIM Director and Co...
 
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
A Holistic BIM Framework for Structural Engineering Practices in Hong Kong - ...
 
A New World of BIM by Ir Francis Leung – Construction Department New World De...
A New World of BIM by Ir Francis Leung – Construction Department New World De...A New World of BIM by Ir Francis Leung – Construction Department New World De...
A New World of BIM by Ir Francis Leung – Construction Department New World De...
 
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNGBIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
BIM Application in Hong Kong Housing Authority by Mr. Lawrence K.W. CHUNG
 
Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01Combined BIM & Design Coordination Workflow-r01
Combined BIM & Design Coordination Workflow-r01
 
How to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilityHow to Create GIS and BIM Interoperability
How to Create GIS and BIM Interoperability
 
Generative design
Generative designGenerative design
Generative design
 
BIM for Optimising Design & Operation
BIM for Optimising Design & OperationBIM for Optimising Design & Operation
BIM for Optimising Design & Operation
 
BIM
BIMBIM
BIM
 
Green BIM
Green BIMGreen BIM
Green BIM
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next Level
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
 
The Revolution of Brownfield Project Engineering
The Revolution of Brownfield Project EngineeringThe Revolution of Brownfield Project Engineering
The Revolution of Brownfield Project Engineering
 
COBie
COBieCOBie
COBie
 
Future of Making Things for AEC Overview
Future of Making Things for AEC OverviewFuture of Making Things for AEC Overview
Future of Making Things for AEC Overview
 
Digital Engineering – Trends and Tangible Outcomes - Mr. Phil LAZARUS Digita...
Digital Engineering – Trends and  Tangible Outcomes - Mr. Phil LAZARUS Digita...Digital Engineering – Trends and  Tangible Outcomes - Mr. Phil LAZARUS Digita...
Digital Engineering – Trends and Tangible Outcomes - Mr. Phil LAZARUS Digita...
 
Bim engineering service provided by Pinnacle Infotech
Bim engineering service provided by Pinnacle InfotechBim engineering service provided by Pinnacle Infotech
Bim engineering service provided by Pinnacle Infotech
 
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
 
CH2M BIM Heriott Watts University
CH2M BIM Heriott Watts UniversityCH2M BIM Heriott Watts University
CH2M BIM Heriott Watts University
 

Andere mochten auch

Net challenge training_material_performance management_v05
Net challenge training_material_performance management_v05Net challenge training_material_performance management_v05
Net challenge training_material_performance management_v05
netchallenge
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
nevena_psu
 

Andere mochten auch (12)

Net challenge training_material_performance management_v05
Net challenge training_material_performance management_v05Net challenge training_material_performance management_v05
Net challenge training_material_performance management_v05
 
4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural Principles4D-based Teaching of High-rise Structural Principles
4D-based Teaching of High-rise Structural Principles
 
Projects
ProjectsProjects
Projects
 
Revit Work Sample
Revit Work SampleRevit Work Sample
Revit Work Sample
 
Product Marketing by Numbers - Objectives, Goals and KPI frameworks
Product Marketing by Numbers - Objectives, Goals and KPI frameworksProduct Marketing by Numbers - Objectives, Goals and KPI frameworks
Product Marketing by Numbers - Objectives, Goals and KPI frameworks
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HR
 
Developing Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance IndicatorsDeveloping Metrics and KPI (Key Performance Indicators
Developing Metrics and KPI (Key Performance Indicators
 
25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know25 KPIs Every Manager Needs To Know
25 KPIs Every Manager Needs To Know
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
Managing Customer Service
Managing Customer Service  Managing Customer Service
Managing Customer Service
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATOR
 

Ähnlich wie KPF_AU-Advanced Massing Study with Revit

BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
Gaurav Kumar
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
Graham H Stewart
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
Russell and Dawson
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 
BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
Gaurav Kumar
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
ClearEdge3D Inc
 

Ähnlich wie KPF_AU-Advanced Massing Study with Revit (20)

NW BIM 2018 3 Mabey
NW BIM 2018 3 MabeyNW BIM 2018 3 Mabey
NW BIM 2018 3 Mabey
 
Doing more with less
Doing more with lessDoing more with less
Doing more with less
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Christopher Buehler portfolio
Christopher Buehler portfolioChristopher Buehler portfolio
Christopher Buehler portfolio
 
Marcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdf
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)AEC Digital Solutions (Retail)
AEC Digital Solutions (Retail)
 
The RIBA Enterprises BIM programme
The RIBA Enterprises BIM programmeThe RIBA Enterprises BIM programme
The RIBA Enterprises BIM programme
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
BIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn HotelBIM modeling for Carmel Valley Inn Hotel
BIM modeling for Carmel Valley Inn Hotel
 
SKAFF_CVSE_1401
SKAFF_CVSE_1401SKAFF_CVSE_1401
SKAFF_CVSE_1401
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIOMEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
MEP BIM ENGINEER -RAMY ZIDAN -PORTFOLIO
 
AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)
 

KPF_AU-Advanced Massing Study with Revit

  • 2. Vincent Poon • CAD/BIM Manage, Kohn Pedersen Fox Architects, New York • The University at Buffalo – School of Architecture, Bachelor of Architecture, 1997 • KPF since 2003 • Architect for 5 years
  • 3. KPF • Established in 1976 • Architectural Design | Urban Design | Master Planning – AIA Architecture Firm Award Winners, 1990 – New York | London | Shanghai
  • 4. KPF on BIM  KPF Computational Geometry Group  2005 - First Revit pilot project  Hotel and Mixed use tower  Approximately 700,000 SF.  2007 - Advance geometry with Revit  Integration with GC, Rhino, etc
  • 10. Park Fifth, Los Angeles, CA Case Study  2,700,000 SF  Residential, Retail, Public Spaces  Schematic Design  Rhino  MAX  AutoCAD  Design Development  Rhino  MAX  Revit  AutoCAD
  • 11. Conventional Process Compiled in PhotoshopCompiled in Photoshop Modeled in Rhino, Rendered in 3DS MAX Modeled in Rhino, Rendered in 3DS MAX Programming diagrams drawn in AutoCAD Programming diagrams drawn in AutoCAD Areas are recorded in Excel for calculations. Areas are recorded in Excel for calculations.
  • 12. Revit Process Modeled and Rendered in Revit. Modeled and Rendered in Revit. Programming diagrams are created from the same model in Revit which updates concurrently as the model updates. Programming diagrams are created from the same model in Revit which updates concurrently as the model updates. Composed in RevitComposed in Revit Area schedules are generated in Revit and will update with the model Area schedules are generated in Revit and will update with the model
  • 13. The Methodist Hospital, Houston, Texas  350,000 SF  Research Institute  Schematic Design  Rhino  MAX  AutoCAD  Design Development  Revit  Rhino  MAX  AutoCAD  Construction Document  Revit  AutoCAD

Hinweis der Redaktion

  1. KPF CGG - Internal group concentrating on the generation of complex geometry in response to specific design requirements. The group uses a variety of computational (Java, C#) and geometric tools (Rhino, GC). This group also has expertise in simulation (EA, Fluid Dynamics, energy simulation) and is actively developing aspects of computational design. First Project - CDV and Autodesk Consulting
  2. Forms at KPF can be inspired by various aspects of a project. Some are program driven, some are site specific. CGG’s job is to merge that concept into reality. The concept is recorded in formulas and codes.
  3. Automated generation of thousands of design explorations along with their evaluations is produced. The successful complex geometry is then linked or exported to Building Information Modeling applications for further development.
  4. Benefits: Make coordinated changes more efficiently and accurately.
  5. Benefits: Make coordinated changes more efficiently and accurately.