CompuCom Institute of Information Technology & Management 
Jaipur 
Department of Electronics & Communication Engineering 
A Practical Training Seminar 
on 
NTPC Kahalgaon 
Presented to: Presented by: 
Mr. Lokesh Kumar Arya VML Group 
(HOD, ECE Department) IVth year, ECE Department
CONTENT 
• Introduction 
• History 
• Process of Generation of Electricity 
Coal to Steam 
Steam to Mechanical Power 
Power generation , Transmission & Distribution 
• Electrical Equipment 
• Rankin cycle 
• Conclusion 
• References
National Thermal Power Corporation 
(NTPC)
INTRODUCTION 
• NTPC, the largest power Company in India, was setup in 1975 to accelerate power 
development in the country. 
• NTPC has installed capacity of 29,394 MW. 
• It has 15 coal based power stations (23,395 MW) 
• 7 gas based power stations (3,955 MW) 
• 4 power stations in Joint Ventures (1,794 MW). 
• The company has power generating facilities in all major regions of the country. 
• It plans to be a 75,000 MW company by 2017.
HISTORY 
 India's largest power company, NTPC was set up in 1975 to 
accelerate power development. 
 NTPC is emerging as a diversified power major with presence in the 
entire value chain of the power generation business. 
 Apart from power generation, which is the mainstay of the company, 
NTPC has already ventured into consultancy, power trading, ash 
utilization and coal mining. 
 NTPC ranked 341st in the „2010, Forbes Global 2000‟ ranking of the 
World's biggest companies. 
 NTPC became a Maharatna company in May, 2010, one of the only 
four companies to be awarded this status in India.
NTPC KAHALGAON
Step-1 
coal to steam 
Step-2 
steam to mechanical power 
Step-3 
power generation , transmission & 
distribution
Step1:- Coal to Steam (Coal Handling 
Plant) 
 The coal is unloaded either manually or with the help of wagon 
tippler into the hopper to the conveyer belt. 
 Coal is passed through metal detectors in order to remove metals 
present in coal. 
 Stones from coal is removed manually in its journey through 
conveyer belt. 
 Then the coal is passed through vibrating screen where coal of 5mm 
is separated from large coals. 
 Then coal is crushed in crusher and passed through metal detectors to 
remove iron particles. 
 Coal is then supplied from coal bunker to mill. Coal dust comes out 
of this mill
Step-2: Steam to Mechanical Power(Turbines) 
High pressure turbine 
• It is of single flow 
design with eight 
stages of blading. 
• Each stage has moving 
and stationary blades. 
• Superheated steam(at 
1100⁰c) from boiler 
drum enters in to it. 
• Speed-3000rpm 
Intermediate pressure 
turbine 
• Double flow design 
with seven stages of 
blading on either side. 
• Each stage has moving 
and stationary blades. 
• Reheated steam(at 535⁰ 
c) from H.P turbine 
outlet enters in to it. 
• Speed-3000rpm 
Low pressure turbine 
• It is also of double 
flow design with 6 
stages in front and rear 
flow paths. 
• Each stage has moving 
and stationary blades. 
• Stem out of I.P. turbine 
directly enters in to it. 
• Speed-3000rpm
Step-3: Power Generation,Transmission&Distribution 
Rating Continuous 
Active Output 110 MW 
Rated Voltage 11000+/-5%V 
Rated Current 7220 A 
Power Factor 0.8 lagging 
Frequency 50 Hz 
Excitation System Static type 
Field current at rated 
output 
1335 A 
Type of cooling system Hydrogen Cooled 
Hydrogen Pressure 2 Ata 
No. Of H₂ cooled 
elements 
06 
Cooling medium for H₂ Soft water
GENERATION 
 Mechanical power produced at the shaft of the turbine is used to 
rotate rotor. 
 Rotating Magnetic flux produced by rotor cuts stator conductor 
and from electromagnetic induction, electricity is produced . 
 rotor runs at 3000 rpm, produces 3-phase voltage at 11kv , and 
of 50 HZ frequency. 
 Oil shielded hydrogen is used for the cooling purpose of 
generator. 
 In case of any fault if production of plants stops then bearing 
motor rotates rotor shaft of turbine continuously at 65 rpm. This 
is because if shaft doesn’t rotate then due to load it may bend.
TRANSMISSION 
• NTPC has a capacity to generate 2340 MW of electricity. 
• The transmission is done through 3-phase , double circuit 
system. 
• With the help of station transformer 11kv is step up to 220 
kv and fed to substation.
DISTRIBUTION 
Voltmeter and ammeter 
• As the names imply they are used for measuring voltage and 
current respectively. 
Power meter 
• Used to measure the power in standard unit of MW or 
KW. 
Crt screen 
• A computer arrangement in which current information about 
transmission line is seen. 
Battery room 
Consists of several batteries and chargers for emergency purpose.
Current transformer 
• Used to reduce the current level such that it can be measured easily. 
Bus isolators 
• Used to isolate bus bars. 
Lightning arrestor 
• Used to protect the transmission line and connected equipment 
during lightening . 
Wave trap wave trap which changes the frequency 50Hz to 500Hz 
can be used for communicate between power plants.
Electrical Equipments 
Alternator 
An alternator is coupled to a steam turbine and converts mechanical 
energy of the turbine into electrical energy. 
It may be hydrogen or air cooled. 
The necessary excitation is provided by means of main and pilot exciters 
directly coupled to the alternator shaft. 
Transformers 
(a) main step-transformers, which steps-up generated voltage 
transmission of power 
(b) station transformers, general purpose 
(c) auxiliary transformers, which supply to individual unit-auxiliaries. 
Switchgear 
which locates fault on the system and isolate faulty part from healthy 
section. 
It contains circuit breakers, relays, switches and other control devices.
Process 
1-2 
•working fluid is pumped from low to high pressure. 
Process 
2-3 
• high pressure liquid enters a boiler where it is 
heated at constant pressure by an external heat 
source to become a dry saturated vapor. 
Process 
3-4 
• The dry saturated vapor expands through a turbine, 
generating power. 
Process 
4-1 
• The wet vapor then enters a condenser where it is 
condensed at a constant temperature to become 
a saturated liquid. 
Process 
3-3’ 
• After the vapor has passed through H.P. it is 
reheated before passing through I.P. turbine. 
• this prevents the vapor from condensing during its 
expansion which can seriously damage the turbine 
blades, and improves the efficiency of the cycle
CONCLUSIONS 
Engineering students gain theoretical knowledge through 
books. It is volatile and not of much use without knowing its 
practical implementation. 
Training is one of the important aspects for an engineering 
student's carrier to strengthen the practical concepts. It was 
an awesome experience in training as the things we all learnt 
in our previous year was seen implemented practically. We 
got to see the live performing equipment like Coal Handling 
Plant, Turbines, Switch Yard and many more in NTPC.
REFERENCES 
• www.wikipedia.in/ntpc 
• www.goolge.co.images 
• NTPC Guide Manual
ANY QUERY
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadriVirat Shishodia
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauliDevanshu Yadav
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALMilind Punj
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)kota super thermal power plant (kstps)
kota super thermal power plant (kstps)vaibyfrndz
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTSubarna Poddar
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORTAnkur Pal
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarRishikesh .
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC Shivam Singh
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli Ram Narayan Shah
 

Was ist angesagt? (20)

gas power plant ntpc dadri
gas power plant ntpc dadrigas power plant ntpc dadri
gas power plant ntpc dadri
 
Final reprt at ntpc vindhyanagar , singrauli
Final  reprt at ntpc vindhyanagar , singrauliFinal  reprt at ntpc vindhyanagar , singrauli
Final reprt at ntpc vindhyanagar , singrauli
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHALVOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
VOCATIONAL TRAINING REPORT @ NTPC VINDHYACHAL
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
kota super thermal power plant (kstps)
kota super thermal power plant (kstps)kota super thermal power plant (kstps)
kota super thermal power plant (kstps)
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
CONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANTCONTROL AND INSTRUMENTATION OF POWER PLANT
CONTROL AND INSTRUMENTATION OF POWER PLANT
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Industrial training report of NTPC
Industrial training report of NTPC Industrial training report of NTPC
Industrial training report of NTPC
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 

Ähnlich wie ntpc khalgaon

FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptaryan5808
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharABHINAV KUMAR
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTShivam Sharma
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPTankit shrivastava
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladeshImran Hossain
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON pptRanjan kumar
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal powerShishupal03012015
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.pptAbhishek Awasthi
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil Singh
 

Ähnlich wie ntpc khalgaon (20)

FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
NTPC,muzaffarpur
NTPC,muzaffarpurNTPC,muzaffarpur
NTPC,muzaffarpur
 
thermal power station
thermal power stationthermal power station
thermal power station
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Parichha thermal power point PPT
Parichha thermal power point PPTParichha thermal power point PPT
Parichha thermal power point PPT
 
Kstps ppt niet
Kstps  ppt  nietKstps  ppt  niet
Kstps ppt niet
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
Power plants in bangladesh
Power plants in bangladeshPower plants in bangladesh
Power plants in bangladesh
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 

Mehr von Vimal Tripathi

Light ferdelity report Li-Fi
Light ferdelity report Li-FiLight ferdelity report Li-Fi
Light ferdelity report Li-FiVimal Tripathi
 
basic embedded system presentation
basic embedded system presentationbasic embedded system presentation
basic embedded system presentationVimal Tripathi
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system pptVimal Tripathi
 

Mehr von Vimal Tripathi (6)

Quality manegment
Quality manegmentQuality manegment
Quality manegment
 
Light ferdelity report Li-Fi
Light ferdelity report Li-FiLight ferdelity report Li-Fi
Light ferdelity report Li-Fi
 
Presentation on li fi
Presentation on li fiPresentation on li fi
Presentation on li fi
 
expense maneger
expense maneger expense maneger
expense maneger
 
basic embedded system presentation
basic embedded system presentationbasic embedded system presentation
basic embedded system presentation
 
indian railway signal system ppt
indian railway signal system pptindian railway signal system ppt
indian railway signal system ppt
 

Kürzlich hochgeladen

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 

Kürzlich hochgeladen (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

ntpc khalgaon

  • 1. CompuCom Institute of Information Technology & Management Jaipur Department of Electronics & Communication Engineering A Practical Training Seminar on NTPC Kahalgaon Presented to: Presented by: Mr. Lokesh Kumar Arya VML Group (HOD, ECE Department) IVth year, ECE Department
  • 2. CONTENT • Introduction • History • Process of Generation of Electricity Coal to Steam Steam to Mechanical Power Power generation , Transmission & Distribution • Electrical Equipment • Rankin cycle • Conclusion • References
  • 3. National Thermal Power Corporation (NTPC)
  • 4. INTRODUCTION • NTPC, the largest power Company in India, was setup in 1975 to accelerate power development in the country. • NTPC has installed capacity of 29,394 MW. • It has 15 coal based power stations (23,395 MW) • 7 gas based power stations (3,955 MW) • 4 power stations in Joint Ventures (1,794 MW). • The company has power generating facilities in all major regions of the country. • It plans to be a 75,000 MW company by 2017.
  • 5. HISTORY  India's largest power company, NTPC was set up in 1975 to accelerate power development.  NTPC is emerging as a diversified power major with presence in the entire value chain of the power generation business.  Apart from power generation, which is the mainstay of the company, NTPC has already ventured into consultancy, power trading, ash utilization and coal mining.  NTPC ranked 341st in the „2010, Forbes Global 2000‟ ranking of the World's biggest companies.  NTPC became a Maharatna company in May, 2010, one of the only four companies to be awarded this status in India.
  • 7. Step-1 coal to steam Step-2 steam to mechanical power Step-3 power generation , transmission & distribution
  • 8. Step1:- Coal to Steam (Coal Handling Plant)  The coal is unloaded either manually or with the help of wagon tippler into the hopper to the conveyer belt.  Coal is passed through metal detectors in order to remove metals present in coal.  Stones from coal is removed manually in its journey through conveyer belt.  Then the coal is passed through vibrating screen where coal of 5mm is separated from large coals.  Then coal is crushed in crusher and passed through metal detectors to remove iron particles.  Coal is then supplied from coal bunker to mill. Coal dust comes out of this mill
  • 9. Step-2: Steam to Mechanical Power(Turbines) High pressure turbine • It is of single flow design with eight stages of blading. • Each stage has moving and stationary blades. • Superheated steam(at 1100⁰c) from boiler drum enters in to it. • Speed-3000rpm Intermediate pressure turbine • Double flow design with seven stages of blading on either side. • Each stage has moving and stationary blades. • Reheated steam(at 535⁰ c) from H.P turbine outlet enters in to it. • Speed-3000rpm Low pressure turbine • It is also of double flow design with 6 stages in front and rear flow paths. • Each stage has moving and stationary blades. • Stem out of I.P. turbine directly enters in to it. • Speed-3000rpm
  • 10. Step-3: Power Generation,Transmission&Distribution Rating Continuous Active Output 110 MW Rated Voltage 11000+/-5%V Rated Current 7220 A Power Factor 0.8 lagging Frequency 50 Hz Excitation System Static type Field current at rated output 1335 A Type of cooling system Hydrogen Cooled Hydrogen Pressure 2 Ata No. Of H₂ cooled elements 06 Cooling medium for H₂ Soft water
  • 11. GENERATION  Mechanical power produced at the shaft of the turbine is used to rotate rotor.  Rotating Magnetic flux produced by rotor cuts stator conductor and from electromagnetic induction, electricity is produced .  rotor runs at 3000 rpm, produces 3-phase voltage at 11kv , and of 50 HZ frequency.  Oil shielded hydrogen is used for the cooling purpose of generator.  In case of any fault if production of plants stops then bearing motor rotates rotor shaft of turbine continuously at 65 rpm. This is because if shaft doesn’t rotate then due to load it may bend.
  • 12. TRANSMISSION • NTPC has a capacity to generate 2340 MW of electricity. • The transmission is done through 3-phase , double circuit system. • With the help of station transformer 11kv is step up to 220 kv and fed to substation.
  • 13. DISTRIBUTION Voltmeter and ammeter • As the names imply they are used for measuring voltage and current respectively. Power meter • Used to measure the power in standard unit of MW or KW. Crt screen • A computer arrangement in which current information about transmission line is seen. Battery room Consists of several batteries and chargers for emergency purpose.
  • 14. Current transformer • Used to reduce the current level such that it can be measured easily. Bus isolators • Used to isolate bus bars. Lightning arrestor • Used to protect the transmission line and connected equipment during lightening . Wave trap wave trap which changes the frequency 50Hz to 500Hz can be used for communicate between power plants.
  • 15. Electrical Equipments Alternator An alternator is coupled to a steam turbine and converts mechanical energy of the turbine into electrical energy. It may be hydrogen or air cooled. The necessary excitation is provided by means of main and pilot exciters directly coupled to the alternator shaft. Transformers (a) main step-transformers, which steps-up generated voltage transmission of power (b) station transformers, general purpose (c) auxiliary transformers, which supply to individual unit-auxiliaries. Switchgear which locates fault on the system and isolate faulty part from healthy section. It contains circuit breakers, relays, switches and other control devices.
  • 16. Process 1-2 •working fluid is pumped from low to high pressure. Process 2-3 • high pressure liquid enters a boiler where it is heated at constant pressure by an external heat source to become a dry saturated vapor. Process 3-4 • The dry saturated vapor expands through a turbine, generating power. Process 4-1 • The wet vapor then enters a condenser where it is condensed at a constant temperature to become a saturated liquid. Process 3-3’ • After the vapor has passed through H.P. it is reheated before passing through I.P. turbine. • this prevents the vapor from condensing during its expansion which can seriously damage the turbine blades, and improves the efficiency of the cycle
  • 17. CONCLUSIONS Engineering students gain theoretical knowledge through books. It is volatile and not of much use without knowing its practical implementation. Training is one of the important aspects for an engineering student's carrier to strengthen the practical concepts. It was an awesome experience in training as the things we all learnt in our previous year was seen implemented practically. We got to see the live performing equipment like Coal Handling Plant, Turbines, Switch Yard and many more in NTPC.
  • 18. REFERENCES • www.wikipedia.in/ntpc • www.goolge.co.images • NTPC Guide Manual