SlideShare ist ein Scribd-Unternehmen logo
1 von 16
ENVIRONMENTAL AND CLIMATE
                        CHANGE CHALLENGES IN RIGA
Martins Menniks
Riga City Council City Development Department
Board of Economics Head of International Projects Division
Phone: +371 67026143




                                                             RIGA
Fax.: +371 67012872
E-mail: martins.menniks@riga.lv




                                                             ENVIRONMENT
RIGA




                                                                                              ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
                                       City size:
                                       The territory of Riga - 304.05 km2
                                       Inhabitants: 703 581 (year 2011)

                                       Assessed direct climate risks:

                                       ↗The possibilities of flood in lower areas;
                                       ↗The possibility of washing away the shore and the
                                       area near the links zone;
                                       ↗Erosion of the shore line in strong storms of North
                                       Western breezes.

                                       Participation in any international climate/energy
                                       initiatives:

                                       ↗Aalborg Charter (since 1994);
                                       ↗Aalborg +10 (since 2004);
                                       ↗Local Agenda 21;
                                       ↗Covenant of Mayors (2009);
Current situation with 0,5%, 1%, 5%,   ↗European Green Cities (participated in 2006).
10%, 20% un 50% flood probability.
RIGA




                                                                                       ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
                            City targets are set in:
                            Riga Long Term Development Strategy 2025
                            Riga Development Program 2006-2012
                            Riga Spatial Plan 2006-2018
                            Riga Environmental Programme 2011-2017
                            Riga Air Quality Improvement Action Programme
                            2011-2015
                            Long term Energy action plan 2010 - 2020

                            Mitigation and adaptation achievements to date
                            (e.g. CO2 avoided, improvements in energy
                            efficiency, etc.”):
                            Since the early 90ies significantly decreased industrial
                            production;
                            Low CO2 emissions public and private transport;
                            House renovation and insulation measures.

                            Approaches used:
                            Awareness raising, planning, insulation, project
 Relief of Daugava valley   managenet (possible green procurement).
RIGA




                                                                     ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
Environmental projects in RIGA City Council:

↗ More than 20 EU co financed projects directly related to
environmental issues;
↗ Mainly referring to the energy and energoeficiency issues;
↗ Approximately 10 investment projects and 10 cooperation
projects (“soft” projects);
↗ in end of 2010 and beginning of 2011 started large scale brown
field regeneration projects;
↗ Keeping on with the heat insulation of public buildings – mainly
schools and kindergartens (Some of the social houses are
renovated)
↗ Different strategic environmental projects are in implementation
RIGA




                                                                              ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
The Ecoregion project
EcoRegion aims at developing the Baltic Sea Region into the world's first
EcoRegion, where economical growth goes hand in hand with environmental
integrity and social justice

Lead partner: Federal Ministry for the Environment, Nature Conservation and
Nuclear Safety (Germany)

Project partners: 22 from all BSR countries

Duration of the project: 36 month (Jan 2009 – Jan 2012)

Project budget: 2 983 056 EUR
RIGA




                                                                                   ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
The Ecoregion project’s specific objective at the local level is to develop Riga
Environmental programme 2011.- 2017. and as integral part Riga air quality
programme 2011.- 2015. thus ensuring sustainable development against
environmental and climate change.

The actions and the measures within Riga Environmental programme 2011.-
2017. and Riga air quality programme 2011.- 2015. :
↗ Assessed summary of the implementation of Riga Environmental strategy
2000-2010 and analyzed current situation;
↗ Identified qualitative and quantitative hindrances of environment in defined
areas;
↗ Set environmental objectives and tasks for city of Riga;
↗ Developed sustainable implementation plan linked with relevant long-term
strategies;
RIGA




                                                                               ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
                           Baseline review (up-date)
                                Core document:
                              Sustainability report


                                                         Target setting
       Evaluating and reporting
                                                        Core Document:
          Evaluation Report
                                                      Sustainability targets




            Implementation and                Political comitment
                Monitoring                 Core Document: Council
            Sustainabuility report              Aprovement
RIGA




                                                                                      ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
                           TĀD
                           UZS

                           MA


                           OG
                           ĪJU




                            PR
                            RA
                            MI




                            M
                             S
Time scale of the Program

  2011.           2013.            2015.            2017.     2018.           2020.


          2012.           2014.             2016.                     2019.

   2011    2012    2013                                2017
                            2014     2015    2016


                                                               2018    2019    2020
RIGA
Structure of the Program
                                                    The AIM of the Program
                                          (Directly linked with the strategic planning documents of Riga)

                          Task of the program Nr.1                                           Task of the program Nr.2      Task of the program Nr.3


      Criterias                   Criterias                        Criterias                  Criterias     Criterias       Criterias     Criterias


Project       Project       Project       Project                    Project                   Project      Project         Project        Project


              Project       Project                        Project             Project                                      Project        Project


                                                                               Project                                                     Projects




  Finance               Finance               Finance              Finance                   Finance             Finance                Finance
  source                source                source               source                    source              source                 source

                                                                                                                        9
RIGA




                                                                  ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
„Integrated Strategy for Riga City to Adapt to the Hydrological
Processes Intensified by Climate Change Phenomena”


↗ Part of the territory of Riga often
suffers from flooding. It causes
significant economic and moral loss to
the owners of these territories.

↗ Due to the effects of global warming
the likelihood of flooding and coastal
erosion processes in the territory of
Riga increases even to a greater scale.
RIGA




                                                    ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
  Questions that we would like to
  discuss in project:
↗ Development of flood management in your city
  - a brief look back in history;
↗ Types of flooding that your cities face;
↗ Mitigation of flood impact – solutions,
  techniques, instruments, methods etc.;
↗ Legislation of flood management;
↗ Distribution of liability in flood management;
↗ Impact of flood management on territorial
  planning;
↗ Flood management funding arrangements;
↗ Other negative impacts of hydrological
  processes (such as coastal erosion etc.) on the
  city territory;
↗ Impact of climate changes on flood
  management;
↗ Communication with the society;
↗ Recommendations for Riga City.
RIGA




                                                                                        ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
The main project actions:
    ↗ Detailed studies of hydrological processes affecting territory of Riga City and
    their current and potential impacts;
    ↗ Getting acquainted with the experience and best practices in identifying,
    planning and managing flood risk zones in 3 European cities;
    ↗ Development of Flood Risk Management Plan for Riga City;
    ↗ Development of Methodological guidelines for territorial planning of
    different flood risk zones.
RIGA




                                                                                       ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
City Environment projects in Riga:
Reconstruction of Red warehouse block in Riga by creating revitalization the
territory and the Daugava river bank (Bicycle road, bank protection, traffic safety,
more green sections)
RIGA




                                                                                  ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
Complex Grizinkalna neighborhood revitalization project:
Reconstruction of parks and gardens (4 parks and gardens);
Reconstruction of lighting system in neighborhood – 16 streets (energy
consumption, safety);
Reconstruction of streets, water-supply and sewerage – 7 streets (environmental
problems, , water-supply safety);
Reconstruction of oldest wooden house in Riga.
ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
        Partners in Environmental issues:
RIGA
RIGA




                                                              ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA
 THANK YOU
 Martins Menniks
 Riga City Council City Development Department
 Board of Economics Head of International Projects Division
 Phone: +371 67026143
 Fax.: +371 67012872
 E-mail: martins.menniks@riga.lv

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (14)

Vilniaus miesto tarybos valdantieji pateikė ieškinį teismui gindami vilniečių...
Vilniaus miesto tarybos valdantieji pateikė ieškinį teismui gindami vilniečių...Vilniaus miesto tarybos valdantieji pateikė ieškinį teismui gindami vilniečių...
Vilniaus miesto tarybos valdantieji pateikė ieškinį teismui gindami vilniečių...
 
Vilniaus šilumos ūkis. Faktai - ne emocijos
Vilniaus šilumos ūkis. Faktai - ne emocijosVilniaus šilumos ūkis. Faktai - ne emocijos
Vilniaus šilumos ūkis. Faktai - ne emocijos
 
Vilniaus šilumos kaina 2016
Vilniaus šilumos kaina 2016Vilniaus šilumos kaina 2016
Vilniaus šilumos kaina 2016
 
Vilniaus gyventojų apklausa apie Kalvarijų turgavietės rekonstrukciją
Vilniaus gyventojų apklausa apie Kalvarijų turgavietės rekonstrukcijąVilniaus gyventojų apklausa apie Kalvarijų turgavietės rekonstrukciją
Vilniaus gyventojų apklausa apie Kalvarijų turgavietės rekonstrukciją
 
Vilniuje bus tvarkoma Geležinio Vilko gatvės dalis ir statomas naujas viadukas
Vilniuje bus tvarkoma Geležinio Vilko gatvės dalis ir statomas naujas viadukasVilniuje bus tvarkoma Geležinio Vilko gatvės dalis ir statomas naujas viadukas
Vilniuje bus tvarkoma Geležinio Vilko gatvės dalis ir statomas naujas viadukas
 
UCEU Vilnius Cities Leading Change: Europe in Action
UCEU Vilnius Cities Leading Change: Europe in ActionUCEU Vilnius Cities Leading Change: Europe in Action
UCEU Vilnius Cities Leading Change: Europe in Action
 
Perkūnkiemyje ir Tarandėje bus padidinti viešojo transporto srautai, tvarkom...
 Perkūnkiemyje ir Tarandėje bus padidinti viešojo transporto srautai, tvarkom... Perkūnkiemyje ir Tarandėje bus padidinti viešojo transporto srautai, tvarkom...
Perkūnkiemyje ir Tarandėje bus padidinti viešojo transporto srautai, tvarkom...
 
Vidutinis darbo užmokestis vilniaus miesto savivaldybės viešuosiuose pirkimuose
Vidutinis darbo užmokestis vilniaus miesto savivaldybės viešuosiuose pirkimuoseVidutinis darbo užmokestis vilniaus miesto savivaldybės viešuosiuose pirkimuose
Vidutinis darbo užmokestis vilniaus miesto savivaldybės viešuosiuose pirkimuose
 
Sveikatos priežiūros įstaigų analizės išvados
Sveikatos priežiūros įstaigų analizės išvadosSveikatos priežiūros įstaigų analizės išvados
Sveikatos priežiūros įstaigų analizės išvados
 
Kultūros naktis 2014-eng
Kultūros  naktis 2014-engKultūros  naktis 2014-eng
Kultūros naktis 2014-eng
 
Studijos pristatymas
Studijos pristatymasStudijos pristatymas
Studijos pristatymas
 
"Vilniaus energijos" akcininkai
"Vilniaus energijos" akcininkai"Vilniaus energijos" akcininkai
"Vilniaus energijos" akcininkai
 
Sereikiškių parko atnaujinimo projektas
Sereikiškių parko atnaujinimo projektasSereikiškių parko atnaujinimo projektas
Sereikiškių parko atnaujinimo projektas
 
Vilnius - The Capital of Lithuania
Vilnius - The Capital of LithuaniaVilnius - The Capital of Lithuania
Vilnius - The Capital of Lithuania
 

Ähnlich wie UCEU Vilnius Riga

The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...CIFOR-ICRAF
 
TA-7779 Inception Workshop
TA-7779 Inception WorkshopTA-7779 Inception Workshop
TA-7779 Inception WorkshopSon Ha-Dang
 
P carbono acre-vcs workshop_12_jun13
P carbono acre-vcs workshop_12_jun13P carbono acre-vcs workshop_12_jun13
P carbono acre-vcs workshop_12_jun13Idesam
 
Experience from Uruguay: NAP Cities and Infrastructure
Experience from Uruguay: NAP Cities and InfrastructureExperience from Uruguay: NAP Cities and Infrastructure
Experience from Uruguay: NAP Cities and InfrastructureNAP Global Network
 
ESG Digital Transformation for Sustainability Innovation
ESG Digital Transformation for Sustainability InnovationESG Digital Transformation for Sustainability Innovation
ESG Digital Transformation for Sustainability InnovationAlex G. Lee, Ph.D. Esq. CLP
 
[Climate Change Program]City Paper Presentation : Guangzhou(China)
[Climate Change Program]City Paper Presentation : Guangzhou(China)[Climate Change Program]City Paper Presentation : Guangzhou(China)
[Climate Change Program]City Paper Presentation : Guangzhou(China)shrdcinfo
 
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)Trevor Glue
 
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...Environmental Protection Agency, Ireland
 
The Inception Report
The Inception ReportThe Inception Report
The Inception Reportjryalo
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi7391456
 
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdf
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdfItem 9b. Net Zero+ Climate and economic resilience in a changing world.pdf
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdfOECD Environment
 
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...Second meeting of the OECD Task Force on Climate Change Adaptation presentati...
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...OECD Environment
 

Ähnlich wie UCEU Vilnius Riga (20)

The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...The role of forest in climate change mitigation: Introduction to REDD+ initia...
The role of forest in climate change mitigation: Introduction to REDD+ initia...
 
TA-7779 Inception Workshop
TA-7779 Inception WorkshopTA-7779 Inception Workshop
TA-7779 Inception Workshop
 
Hydro Program
Hydro ProgramHydro Program
Hydro Program
 
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
 
Integrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning systemIntegrating River Basin Management Plans with the planning system
Integrating River Basin Management Plans with the planning system
 
P carbono acre-vcs workshop_12_jun13
P carbono acre-vcs workshop_12_jun13P carbono acre-vcs workshop_12_jun13
P carbono acre-vcs workshop_12_jun13
 
Experience from Uruguay: NAP Cities and Infrastructure
Experience from Uruguay: NAP Cities and InfrastructureExperience from Uruguay: NAP Cities and Infrastructure
Experience from Uruguay: NAP Cities and Infrastructure
 
ESG Digital Transformation for Sustainability Innovation
ESG Digital Transformation for Sustainability InnovationESG Digital Transformation for Sustainability Innovation
ESG Digital Transformation for Sustainability Innovation
 
[Climate Change Program]City Paper Presentation : Guangzhou(China)
[Climate Change Program]City Paper Presentation : Guangzhou(China)[Climate Change Program]City Paper Presentation : Guangzhou(China)
[Climate Change Program]City Paper Presentation : Guangzhou(China)
 
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)
Ricardo Implementing the Paris Climate Agreement (COP21 OECD side event)
 
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
A Green Budget for Europe Cohesion Policy contributions by Patrick ten Brink ...
 
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
5. Water Framework Directive and spatial planning - Clare Lee, Tipperary Coun...
 
The Inception Report
The Inception ReportThe Inception Report
The Inception Report
 
5.2 corfee morlot-oecd
5.2 corfee morlot-oecd5.2 corfee morlot-oecd
5.2 corfee morlot-oecd
 
EPA Horizon 2020 SC5 Roadshow presentation - UCD 04.05.16
EPA Horizon 2020 SC5 Roadshow presentation - UCD 04.05.16EPA Horizon 2020 SC5 Roadshow presentation - UCD 04.05.16
EPA Horizon 2020 SC5 Roadshow presentation - UCD 04.05.16
 
Nick Tandi
Nick TandiNick Tandi
Nick Tandi
 
Philippines - subnational development processes
Philippines - subnational development processesPhilippines - subnational development processes
Philippines - subnational development processes
 
Integration of Land-based Sectoral Program and climate-change mitigation poli...
Integration of Land-based Sectoral Program and climate-change mitigation poli...Integration of Land-based Sectoral Program and climate-change mitigation poli...
Integration of Land-based Sectoral Program and climate-change mitigation poli...
 
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdf
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdfItem 9b. Net Zero+ Climate and economic resilience in a changing world.pdf
Item 9b. Net Zero+ Climate and economic resilience in a changing world.pdf
 
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...Second meeting of the OECD Task Force on Climate Change Adaptation presentati...
Second meeting of the OECD Task Force on Climate Change Adaptation presentati...
 

Mehr von Vilniaus miesto savivaldybė / Vilnius City Municipality

Mehr von Vilniaus miesto savivaldybė / Vilnius City Municipality (20)

Vilnius logic: what makes Vilnius "Vilnius"
Vilnius logic: what makes Vilnius "Vilnius"Vilnius logic: what makes Vilnius "Vilnius"
Vilnius logic: what makes Vilnius "Vilnius"
 
Bukčiai 2014 09 17
Bukčiai 2014 09 17Bukčiai 2014 09 17
Bukčiai 2014 09 17
 
Vilniuje nauji pavadinimai suteikti 10-iai bevardžių gatvių
Vilniuje nauji pavadinimai suteikti 10-iai bevardžių gatviųVilniuje nauji pavadinimai suteikti 10-iai bevardžių gatvių
Vilniuje nauji pavadinimai suteikti 10-iai bevardžių gatvių
 
Zalatoriaus a4
Zalatoriaus a4Zalatoriaus a4
Zalatoriaus a4
 
Vaidilutes a4
Vaidilutes a4Vaidilutes a4
Vaidilutes a4
 
Raipolio a4
Raipolio a4Raipolio a4
Raipolio a4
 
Kaltanenu keitimai a4
Kaltanenu keitimai a4Kaltanenu keitimai a4
Kaltanenu keitimai a4
 
Kaltanenu a4 mxd
Kaltanenu a4 mxdKaltanenu a4 mxd
Kaltanenu a4 mxd
 
Gimzausko a4
Gimzausko a4Gimzausko a4
Gimzausko a4
 
Augustu a4 mxd
Augustu a4 mxdAugustu a4 mxd
Augustu a4 mxd
 
Anupriskiu a4
Anupriskiu a4Anupriskiu a4
Anupriskiu a4
 
Ajeru a4
Ajeru a4Ajeru a4
Ajeru a4
 
Abromiskiu a4
Abromiskiu a4Abromiskiu a4
Abromiskiu a4
 
Umiastovskienes a4
Umiastovskienes a4Umiastovskienes a4
Umiastovskienes a4
 
Zalatoriaus gatvė
Zalatoriaus gatvėZalatoriaus gatvė
Zalatoriaus gatvė
 
Vaidilutės gatvė
Vaidilutės gatvėVaidilutės gatvė
Vaidilutės gatvė
 
Umiastovskienės gatvė
Umiastovskienės gatvėUmiastovskienės gatvė
Umiastovskienės gatvė
 
Raipolio gatvė
Raipolio gatvėRaipolio gatvė
Raipolio gatvė
 
Kaltanėnų gatvė 2
Kaltanėnų gatvė 2Kaltanėnų gatvė 2
Kaltanėnų gatvė 2
 
Gimžausko gatvė
Gimžausko gatvėGimžausko gatvė
Gimžausko gatvė
 

Kürzlich hochgeladen

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 

Kürzlich hochgeladen (20)

Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

UCEU Vilnius Riga

  • 1. ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Martins Menniks Riga City Council City Development Department Board of Economics Head of International Projects Division Phone: +371 67026143 RIGA Fax.: +371 67012872 E-mail: martins.menniks@riga.lv ENVIRONMENT
  • 2. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA City size: The territory of Riga - 304.05 km2 Inhabitants: 703 581 (year 2011) Assessed direct climate risks: ↗The possibilities of flood in lower areas; ↗The possibility of washing away the shore and the area near the links zone; ↗Erosion of the shore line in strong storms of North Western breezes. Participation in any international climate/energy initiatives: ↗Aalborg Charter (since 1994); ↗Aalborg +10 (since 2004); ↗Local Agenda 21; ↗Covenant of Mayors (2009); Current situation with 0,5%, 1%, 5%, ↗European Green Cities (participated in 2006). 10%, 20% un 50% flood probability.
  • 3. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA City targets are set in: Riga Long Term Development Strategy 2025 Riga Development Program 2006-2012 Riga Spatial Plan 2006-2018 Riga Environmental Programme 2011-2017 Riga Air Quality Improvement Action Programme 2011-2015 Long term Energy action plan 2010 - 2020 Mitigation and adaptation achievements to date (e.g. CO2 avoided, improvements in energy efficiency, etc.”): Since the early 90ies significantly decreased industrial production; Low CO2 emissions public and private transport; House renovation and insulation measures. Approaches used: Awareness raising, planning, insulation, project Relief of Daugava valley managenet (possible green procurement).
  • 4. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Environmental projects in RIGA City Council: ↗ More than 20 EU co financed projects directly related to environmental issues; ↗ Mainly referring to the energy and energoeficiency issues; ↗ Approximately 10 investment projects and 10 cooperation projects (“soft” projects); ↗ in end of 2010 and beginning of 2011 started large scale brown field regeneration projects; ↗ Keeping on with the heat insulation of public buildings – mainly schools and kindergartens (Some of the social houses are renovated) ↗ Different strategic environmental projects are in implementation
  • 5. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA The Ecoregion project EcoRegion aims at developing the Baltic Sea Region into the world's first EcoRegion, where economical growth goes hand in hand with environmental integrity and social justice Lead partner: Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (Germany) Project partners: 22 from all BSR countries Duration of the project: 36 month (Jan 2009 – Jan 2012) Project budget: 2 983 056 EUR
  • 6. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA The Ecoregion project’s specific objective at the local level is to develop Riga Environmental programme 2011.- 2017. and as integral part Riga air quality programme 2011.- 2015. thus ensuring sustainable development against environmental and climate change. The actions and the measures within Riga Environmental programme 2011.- 2017. and Riga air quality programme 2011.- 2015. : ↗ Assessed summary of the implementation of Riga Environmental strategy 2000-2010 and analyzed current situation; ↗ Identified qualitative and quantitative hindrances of environment in defined areas; ↗ Set environmental objectives and tasks for city of Riga; ↗ Developed sustainable implementation plan linked with relevant long-term strategies;
  • 7. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Baseline review (up-date) Core document: Sustainability report Target setting Evaluating and reporting Core Document: Evaluation Report Sustainability targets Implementation and Political comitment Monitoring Core Document: Council Sustainabuility report Aprovement
  • 8. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA TĀD UZS MA OG ĪJU PR RA MI M S Time scale of the Program 2011. 2013. 2015. 2017. 2018. 2020. 2012. 2014. 2016. 2019. 2011 2012 2013 2017 2014 2015 2016 2018 2019 2020
  • 9. RIGA Structure of the Program The AIM of the Program (Directly linked with the strategic planning documents of Riga) Task of the program Nr.1 Task of the program Nr.2 Task of the program Nr.3 Criterias Criterias Criterias Criterias Criterias Criterias Criterias Project Project Project Project Project Project Project Project Project Project Project Project Project Project Project Project Projects Finance Finance Finance Finance Finance Finance Finance source source source source source source source 9
  • 10. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA „Integrated Strategy for Riga City to Adapt to the Hydrological Processes Intensified by Climate Change Phenomena” ↗ Part of the territory of Riga often suffers from flooding. It causes significant economic and moral loss to the owners of these territories. ↗ Due to the effects of global warming the likelihood of flooding and coastal erosion processes in the territory of Riga increases even to a greater scale.
  • 11. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Questions that we would like to discuss in project: ↗ Development of flood management in your city - a brief look back in history; ↗ Types of flooding that your cities face; ↗ Mitigation of flood impact – solutions, techniques, instruments, methods etc.; ↗ Legislation of flood management; ↗ Distribution of liability in flood management; ↗ Impact of flood management on territorial planning; ↗ Flood management funding arrangements; ↗ Other negative impacts of hydrological processes (such as coastal erosion etc.) on the city territory; ↗ Impact of climate changes on flood management; ↗ Communication with the society; ↗ Recommendations for Riga City.
  • 12. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA The main project actions: ↗ Detailed studies of hydrological processes affecting territory of Riga City and their current and potential impacts; ↗ Getting acquainted with the experience and best practices in identifying, planning and managing flood risk zones in 3 European cities; ↗ Development of Flood Risk Management Plan for Riga City; ↗ Development of Methodological guidelines for territorial planning of different flood risk zones.
  • 13. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA City Environment projects in Riga: Reconstruction of Red warehouse block in Riga by creating revitalization the territory and the Daugava river bank (Bicycle road, bank protection, traffic safety, more green sections)
  • 14. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Complex Grizinkalna neighborhood revitalization project: Reconstruction of parks and gardens (4 parks and gardens); Reconstruction of lighting system in neighborhood – 16 streets (energy consumption, safety); Reconstruction of streets, water-supply and sewerage – 7 streets (environmental problems, , water-supply safety); Reconstruction of oldest wooden house in Riga.
  • 15. ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA Partners in Environmental issues: RIGA
  • 16. RIGA ENVIRONMENTAL AND CLIMATE CHANGE CHALLENGES IN RIGA THANK YOU Martins Menniks Riga City Council City Development Department Board of Economics Head of International Projects Division Phone: +371 67026143 Fax.: +371 67012872 E-mail: martins.menniks@riga.lv