THE DELHI METRO PROJECT
EFFECTIVE PROJECT MANAGEMENT IN PUBLIC SECTOR
INTRODUCTION

   The need for a reliable public transportation was felt in Delhi
    for a long time. A comprehensive traffic and transportation
    study completed in 1990 highlighted the urgent need for a
    rail-based transit system comprising a network of
    underground elevated and surface corridors to meet the
    traffic demand projected for 2021. To make this dream a
    reality , the Delhi Metro Rail Corporation Limited (DMRC)
    was registered on 3rd May 1995 and it is solely responsible
    for the construction and operation.
Reason
   Population of over 1 million.

   More registered vehicles than Mumbai, Kolkata & Chennai
    put together.

   Automobiles contributing to more than two – thirds of the
    total atmospheric pollution.

   High rate of road accidents

   More than 35 studies recommended Mass Rapid Transit
    System.
Challenges
   DMP is the biggest urban invention in India since
    independence in 1947
   Project has to be executed in very difficult urban
    environment
   Being the capital city, all actions under close scrutiny of
    VIPs
   Project implementation period compressed from 10 years
    to 7 years
   Metro being constructed to world class standards with
    frontline technologies
   Expertise and technology not available in the country.
The Delhi Metro Project
   Second project in country after Kolkata Metro:1984.

   A 50:50 joint venture of GoI and GNCTD

   DMRC incorporated under Companies Act 1995

   Duration of completion of Phase – 10 years by the end of 2005

   Get approved by GoI in Sept 1996 (after civic organizations
    recommendations)

   P-I to connect Delhi’s business, education and shopping districts.

   Total land needed 340 hectares (58% govt., 39% private agriculture
    and 3% private urban land)

   P-I consists 3 Lines, total length 56 km, 50 stations (10
    underground) and 3 maintenance depots.
Line                 Length of Line   Route
Line 1 Red Line      22km             Shahdara to Rithala

Line 2 Yellow Line   11km             Vishwa Vidyalaya to Central Secretariat

Line 3 Blue Line     23km             Barakhamba to Dwarka
Funding the Project
   GoI and GNCTD arranged the all capital required.

   Initial estimation of cost in 1996 Rs 60 billion

   Revised estimation cost in 2002 was Rs 89.27 billion

   Final cost of project approx Rs 99 billion with Rs 7 billion saving

   2.2 million passenger/day to become the project viable later revised
    to 1.5 million passenger/day

   Economic IRR 21.4%

   Financial IRR 3% (low IRR some minister suggested to drop the
    project)

   Social sector project can benefit the regional economy in more than
    one ways.
Cost Structure
S. No.   Source of Fund            % of total cost Remark
1        Equity                    28%               Equally subscribed by GoI
                                                     & GNCTD
2        Interest Free Loan        5%                Land Acquisition
3         JBIC                     64%               Time Sliced Soft Loan
4        Property Development      3%                Commercial activities


   Repayment period 30 years including 10 years grace period.

   Debt to equity ratio 2:1

   Exchange rate risk bore equally by GoI and GNCTD.

   Sources of Revenues: fares, property development, taxes on local public.

   Property Development: Shopping Mall, IT Part, Multiplex, Restaurant and
    Stores etc.

   This project was exempted from custom and excise duties.
The project team
   Mr. E. Sreedharan was appointed as project manager and
    managing director in Nov 1997.

   A technocrat retired from IR in 1990.

   Earned reputation for completing the project on time and within
    budget.

   70% of senior staff hired on deputation from IR

   DMRC opted lean structure.

   Effective contract awarding and procurement process (to tackle
    with time, cost and corruption)

   Contract awarding process transparent and simple & fair and just

   Removed subjectivity from tender evaluation.
Contd…
   Had two departments: project organization and operation & maintenance

   Experts required from: Civil, electrical and communications area etc.

   Young 18-30 years motivated team of professionals personally interviewed
    by MD.

   Faced skill shortage problem everyone was new to metro project

   No technical institute of such kind in the country.

   Suitable candidates sent HongKong MTRC for training.

   Metro Training School at Shastri Park

   Unique work culture: hard working, dedicated and professionally
    competent
The Project Plan
   Individual accountability.

   Daily monitoring of progress.

   Weekly reviews and targets.

   Delhi Metro Act, 2002
     Superseded Delhi Municipal Laws.
     Lower courts barred from issuing stay orders.
     Dedicated team of lawyers to prevent property disputes.
 Cost centers
      Manpower.
      Energy.
      Material & maintenance.
Road Blocks
   Low Financial IRR prompted second thoughts on the
    project

   Criticism due to inability to recruit, 70% were deputed
    from Indian Railways

   Lack of experience & specialized experts in Civil,
    Electrical & Communication Engineering

   Loss of Rs 5 million if one day lost

   Difference of opinion on gauge to be adopted
Critical Success Factors

   ‘We mean business’ attitudes.

   Efficiency, courtesy & integrity in corporate culture.

   Corruption    free   Contract    Awarding    System      &
    Procurement Process.

   Autonomy in decision making.

   Advance planning in utility diversion, minimizing
    public inconvenience.

Weitere ähnliche Inhalte

Was ist angesagt?

Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
jerry christo
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
SAKSHI AGHI
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
Amit Trivedi
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
Vimal Maurya
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
satish choudhari
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
Aashna Sharma
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
Pramod Kumar
 

Was ist angesagt? (20)

Stakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi MetroStakeholder analysis of Delhi Metro
Stakeholder analysis of Delhi Metro
 
Metro Rail and the City
Metro Rail and the CityMetro Rail and the City
Metro Rail and the City
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
 
Delhi metro rail corporation slides slides
Delhi metro rail corporation slides slidesDelhi metro rail corporation slides slides
Delhi metro rail corporation slides slides
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
Delhi metro case solution by nitin bana
Delhi metro case solution by nitin banaDelhi metro case solution by nitin bana
Delhi metro case solution by nitin bana
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management Delhi Metro Railway's Stakeholder Management
Delhi Metro Railway's Stakeholder Management
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
Trasnportation system of mumbai
Trasnportation system of  mumbaiTrasnportation system of  mumbai
Trasnportation system of mumbai
 
Mumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metroMumbai traffic scenario & mumbai metro
Mumbai traffic scenario & mumbai metro
 
Delhi Metro
Delhi MetroDelhi Metro
Delhi Metro
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)Delhi metro presentation(SCHOOL/COLLEGE)
Delhi metro presentation(SCHOOL/COLLEGE)
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 

Ähnlich wie The delhi-metro-project

Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
Anil Kumar Gupta
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
Shabaz Khan
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
Akhil Padiga
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
Md Shadab
 

Ähnlich wie The delhi-metro-project (20)

Infrastructure Management - DMRC Study
Infrastructure Management - DMRC StudyInfrastructure Management - DMRC Study
Infrastructure Management - DMRC Study
 
Mumbai Metro Phase 1
Mumbai Metro Phase 1Mumbai Metro Phase 1
Mumbai Metro Phase 1
 
E. Sreedharan as Project manager
E. Sreedharan as Project managerE. Sreedharan as Project manager
E. Sreedharan as Project manager
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Bot(build operate transfr)
Bot(build operate transfr)Bot(build operate transfr)
Bot(build operate transfr)
 
Hyd metro rail
Hyd metro railHyd metro rail
Hyd metro rail
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
Public Private Partnership in Civil Engineering
Public Private Partnership in Civil EngineeringPublic Private Partnership in Civil Engineering
Public Private Partnership in Civil Engineering
 
Emerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway EngineersEmerging Professional and Ethical Challenges for Railway Engineers
Emerging Professional and Ethical Challenges for Railway Engineers
 
Case Study of Tolled Road Project
Case Study of Tolled Road ProjectCase Study of Tolled Road Project
Case Study of Tolled Road Project
 
Public private partnership in development of road network
Public private partnership in development of road networkPublic private partnership in development of road network
Public private partnership in development of road network
 
Kushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analyticsKushal vashishth dm17 e26_finance-analytics
Kushal vashishth dm17 e26_finance-analytics
 
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAYSTUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
STUDY ON BOT PROJECT WITH A CASE STUDY OF DELHI GURGAON EXPRESSWAY
 
hyderabad outer ring road
hyderabad outer ring roadhyderabad outer ring road
hyderabad outer ring road
 
Ppp
PppPpp
Ppp
 
CONNECTKaro 2015 - Session 4A - Smart Lifestyle and Transit Oriented Development
CONNECTKaro 2015 - Session 4A - Smart Lifestyle and Transit Oriented DevelopmentCONNECTKaro 2015 - Session 4A - Smart Lifestyle and Transit Oriented Development
CONNECTKaro 2015 - Session 4A - Smart Lifestyle and Transit Oriented Development
 
Introduction to metro system (1).pptx
Introduction to metro system (1).pptxIntroduction to metro system (1).pptx
Introduction to metro system (1).pptx
 
Ppp
PppPpp
Ppp
 
DMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTIONDMRC REPORT ON UNDERGROUND CONSTRUCTION
DMRC REPORT ON UNDERGROUND CONSTRUCTION
 
The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.The PPP model- Delhi Gurgaon Expressway.
The PPP model- Delhi Gurgaon Expressway.
 

Mehr von Vikas Saini

Mehr von Vikas Saini (10)

Telecom ppt
Telecom pptTelecom ppt
Telecom ppt
 
Metropolis Healthcare Ltd
Metropolis Healthcare LtdMetropolis Healthcare Ltd
Metropolis Healthcare Ltd
 
Green product brm
Green product brmGreen product brm
Green product brm
 
Classical mgmt
Classical mgmtClassical mgmt
Classical mgmt
 
Bop marketing
Bop marketingBop marketing
Bop marketing
 
Bivariate
BivariateBivariate
Bivariate
 
Porter 5 forces
Porter 5 forcesPorter 5 forces
Porter 5 forces
 
Securitas
SecuritasSecuritas
Securitas
 
Ratio
RatioRatio
Ratio
 
Metropolis healthcare ltd
Metropolis healthcare ltdMetropolis healthcare ltd
Metropolis healthcare ltd
 

Kürzlich hochgeladen

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Kürzlich hochgeladen (20)

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 

The delhi-metro-project

  • 1. THE DELHI METRO PROJECT EFFECTIVE PROJECT MANAGEMENT IN PUBLIC SECTOR
  • 2. INTRODUCTION  The need for a reliable public transportation was felt in Delhi for a long time. A comprehensive traffic and transportation study completed in 1990 highlighted the urgent need for a rail-based transit system comprising a network of underground elevated and surface corridors to meet the traffic demand projected for 2021. To make this dream a reality , the Delhi Metro Rail Corporation Limited (DMRC) was registered on 3rd May 1995 and it is solely responsible for the construction and operation.
  • 3. Reason  Population of over 1 million.  More registered vehicles than Mumbai, Kolkata & Chennai put together.  Automobiles contributing to more than two – thirds of the total atmospheric pollution.  High rate of road accidents  More than 35 studies recommended Mass Rapid Transit System.
  • 4. Challenges  DMP is the biggest urban invention in India since independence in 1947  Project has to be executed in very difficult urban environment  Being the capital city, all actions under close scrutiny of VIPs  Project implementation period compressed from 10 years to 7 years  Metro being constructed to world class standards with frontline technologies  Expertise and technology not available in the country.
  • 5. The Delhi Metro Project  Second project in country after Kolkata Metro:1984.  A 50:50 joint venture of GoI and GNCTD  DMRC incorporated under Companies Act 1995  Duration of completion of Phase – 10 years by the end of 2005  Get approved by GoI in Sept 1996 (after civic organizations recommendations)  P-I to connect Delhi’s business, education and shopping districts.  Total land needed 340 hectares (58% govt., 39% private agriculture and 3% private urban land)  P-I consists 3 Lines, total length 56 km, 50 stations (10 underground) and 3 maintenance depots.
  • 6. Line Length of Line Route Line 1 Red Line 22km Shahdara to Rithala Line 2 Yellow Line 11km Vishwa Vidyalaya to Central Secretariat Line 3 Blue Line 23km Barakhamba to Dwarka
  • 7. Funding the Project  GoI and GNCTD arranged the all capital required.  Initial estimation of cost in 1996 Rs 60 billion  Revised estimation cost in 2002 was Rs 89.27 billion  Final cost of project approx Rs 99 billion with Rs 7 billion saving  2.2 million passenger/day to become the project viable later revised to 1.5 million passenger/day  Economic IRR 21.4%  Financial IRR 3% (low IRR some minister suggested to drop the project)  Social sector project can benefit the regional economy in more than one ways.
  • 8. Cost Structure S. No. Source of Fund % of total cost Remark 1 Equity 28% Equally subscribed by GoI & GNCTD 2 Interest Free Loan 5% Land Acquisition 3 JBIC 64% Time Sliced Soft Loan 4 Property Development 3% Commercial activities  Repayment period 30 years including 10 years grace period.  Debt to equity ratio 2:1  Exchange rate risk bore equally by GoI and GNCTD.  Sources of Revenues: fares, property development, taxes on local public.  Property Development: Shopping Mall, IT Part, Multiplex, Restaurant and Stores etc.  This project was exempted from custom and excise duties.
  • 9. The project team  Mr. E. Sreedharan was appointed as project manager and managing director in Nov 1997.  A technocrat retired from IR in 1990.  Earned reputation for completing the project on time and within budget.  70% of senior staff hired on deputation from IR  DMRC opted lean structure.  Effective contract awarding and procurement process (to tackle with time, cost and corruption)  Contract awarding process transparent and simple & fair and just  Removed subjectivity from tender evaluation.
  • 10. Contd…  Had two departments: project organization and operation & maintenance  Experts required from: Civil, electrical and communications area etc.  Young 18-30 years motivated team of professionals personally interviewed by MD.  Faced skill shortage problem everyone was new to metro project  No technical institute of such kind in the country.  Suitable candidates sent HongKong MTRC for training.  Metro Training School at Shastri Park  Unique work culture: hard working, dedicated and professionally competent
  • 11. The Project Plan  Individual accountability.  Daily monitoring of progress.  Weekly reviews and targets.  Delhi Metro Act, 2002  Superseded Delhi Municipal Laws.  Lower courts barred from issuing stay orders.  Dedicated team of lawyers to prevent property disputes.  Cost centers  Manpower.  Energy.  Material & maintenance.
  • 12. Road Blocks  Low Financial IRR prompted second thoughts on the project  Criticism due to inability to recruit, 70% were deputed from Indian Railways  Lack of experience & specialized experts in Civil, Electrical & Communication Engineering  Loss of Rs 5 million if one day lost  Difference of opinion on gauge to be adopted
  • 13. Critical Success Factors  ‘We mean business’ attitudes.  Efficiency, courtesy & integrity in corporate culture.  Corruption free Contract Awarding System & Procurement Process.  Autonomy in decision making.  Advance planning in utility diversion, minimizing public inconvenience.