1. RESUME
Name : Vijay Sethuramalingam
Total Work
Experience
: Total 5.4years of experience in Software Testing
Technical
Knowledge
: Experience in Water fall model, Manual Testing
and Regression testing
Good exposure to banking domain
Specialties: Testing approaches (Gray-box, Black-
box, White-box, configuration, compatibility,
usability, localization, dynamic & static, system
testing, SIT and business user coordination for
UAT),
Experience in Designing Test Plans, Test
Scenarios, Test Cases and Requirement
Traceability Matrix based on business
requirements
Have very good knowledge in Negative testing,
Acceptance testing, Impact Analysis and Root
Cause analysis for existing defects in the current
system.
involving all entities such as creating account,
lead, opportunity, jobs, creation of Reports
Experience in UAT for Customer Risk Rating
System (NORKOM – BAE) and also has End to
End Knowledge on AML Screening and Risk
Rating.
Best practices implemented as part of continuous
improvement initiatives – Static testing, Reuse of
Test cases across test phases, root cause analysis
of defects etc.
Familiar with all the stages of Software Test Life
Cycle (STLC), with good exposure towards testing
techniques and methodologies and sound
awareness of all the stages of Defect Tracking Life
Cycle (DTLC).
Operating System: Windows,
XP/Vista/2000/2003/2007
Testing Tools: Quality Centre 9.2/11 ALM; Toad for
DB2,
2. Areas of
Strengths
: Direct Co-ordination with Asset Team and
Business Team on Regular basis
Experience in MTP and TSR creation for the
Project
Experience with planning and coordinating the
activities of test, integration, and project teams
Extensive experience with test plan, test
procedure, and test script design, and execution
Develop and maintain an effective working
relationship with customer and third-party
stakeholders
Ability to adapt quickly, work under pressure.
Generate various reports - Daily Status report,
weekly status report, Defect reports, Test
Summary reports etc.
Strong ability to communicate with both technical
(developers) and non-technical (customers,
management).
Excellent Analytical skills
People/Project Skills: Creative / Innovative ideas
for problem solving, Team Building, Written and
oral Communication.
Asset Knowledge:
Have immense knowledge and experience on below assets
• e-BOBS
• Siebel
• Internet Banking
• Mobile Internet Banking(MIB)
• Connex
• B2K
• Finsim
• Tibco
• Payments(SWIFT)
• CBP
• CSU
• Customer Central
3. • Norkom
• Relationship and systems
• U bank
• AUSTRAC
RECENT PROJECT EXPERIENCE:
1. Client: National Australia Bank
Project Duration: Sep - Oct 2016
Location: Australia - Melbourne
Project Description: Coin Deposit Machine Certification
By late 2016 the current model CDM (CDS830) will reach end of life and
will no longer be supplied by the vendor, Squint quip. In its place will be
model CDS9 which has the same features; however this will have a
different design footprint and will need to be certified by NAB.
Responsibilities: Played the role of Test Lead and Test Analyst
Requirement analysis, test case preparation and review, execution.
Running triages and engaging in discussions among various stakeholders
Managing test closure activities
2. Client: National Australia Bank
Project Duration: Mar - Sep 2016
Location: Australia - Melbourne
Project Description: Mobile Payments
The Mobile Payments Project will change card-present commerce by
enabling new shopping experiences for customers and unprecedented
opportunity for retailers and payment service providers to connect and
interact with customers
Responsibilities: Played the role of Test Lead and Test Analyst
Requirement analysis, test case preparation and review, execution.
Running triages and engaging in discussions among various stakeholders
3. Client: National Australia Bank
4. Project Duration: Dec - Mar 2016
Location: Australia - Melbourne
Project Description: ASX-T+2 Settlements
The settlement period for Australian share market trades will be shortened
by one day. Settlement of the trade will be required to occur two business
days after the day a trade takes place. This settlement period will be
called T+2 (trade date plus 2 business days). The change to T+2
settlements is proposed to take place for trades conducted on or after
Monday 7 March 2016, with the date to be confirmed by ASX.
This change will affect all financial products traded on a securities market1
in Australia, including shares, units, bonds, hybrids, CDIs, exchange-
traded Australian Government Bonds, exchange-traded products
(including exchange-traded funds), warrants and installments
Responsibilities
Involved in Integration Testing and acceptance testing for different
banking areas which has undergone settlement changes like NATL ,Nab
connect, Nabtrade ,Antares Equities, Specialized Products such as
creating new account, lead, opportunity, jobs, creation of Reports
Involved in UAT Testing, interacted with business Team regularly for UAT
Results.
Involved in Hyper care process meeting and provided the Testing support
for closing the Defects.
4. Client: National Australian Bank
Project Duration: Apr 2015 - Nov 2015
Location: Australia - Melbourne
Project Description: AML Reforms UAT
Project AML Reforms is the compliance Project which is implemented
across the bank to make sure that all the customers from different source
system is scanned and verified for AML Process.
The Purpose of this program is to make sure all the customers on boarded
from different upstream system (Redstar, Wholesale & Wealth) have been
Risk Rated accordingly and also verify whether KYC (Review) is
performed for all the customers based on their calculated Risk Levels.
Responsibilities
Involved in UAT Testing, interacted with business Team regularly
Co-ordinated with different Streams (Redstar, wholesale and Wealth) so
that the customers are on boarded from all the front end system.
5. Co-ordinated with all the intermediate systems (GDW, EDW, ME) to make
sure the files from source is been transferred successfully to the
downstream systems.
Involved in Functional and Integration Testing for Redstar, Wholesale and
Wealth
Prepared MTP, Test scripts, Test Data
Test Script Execution, Defect Management Meeting TSR Preparation.
Involved in MTP Review and TSR Review Meetings.
5. Client: National Australian Bank
Project Duration: Jan2015 – Mar 2015
Location: Mysore
Project Description: SAM 15.2
This Project deals with the front end change in the valuation and
cancellation functionality for different types of securities in Siebel
application.
Responsibilities
Requirement analysis
Preparing Master Test Plan
Test Case Preparation
Test Case Execution (System Integration Testing)
Defect coordination
Conducting defect triage session daily
Daily status Report
Publish Test Summary Report
6. Client: National Australian Bank
Project Duration: April 2012 – Dec 2014
Location: Mysore
Project Description: Release Management
RELEASE MANAGEMENT aligns multiple technology initiatives
throughout their lifecycle and provides shared services. This
enables increased volumes of change, improved quality outcomes
and increased efficiency in the build and test of change.
Under Release Management, Technology will now bundle changes
into packages and assess them as a whole before they deliver the
changes at regular pre- determined intervals known as a ‘release’.
6. NAB has defined different release types to cater for various
business requirements and change complexity. Under Release
Management, all of the release types involve 'bundling' changes
together for more efficient delivery, although release type
schedules may differ based on their complexity. All projects
generally default to the Enterprise Release.
Responsibilities
Plays the role of member of a governing body/council for the testing
activities carried out by the projects in the release and is also
responsible for the following activities:
Regression Test Execution during SIT Cycles - Scope of Release
regression testing can be found in release specific Test scoping
document and Enterprise Release level Master Test
Plan. (Offshore driven)
Defect Triage / governance - This activity involves conducting daily
defect meetings and monitoring project defects against resolution
progress.
Batch Calendar Creation and Coordination - Collecting batch
requirements from projects participating in release and deriving
batch calendar to fulfil those during SIT/UAT execution. This activity
involves extensive co-ordination between Testing team, Release
Test Manager/Lead and Batch services team.
Enterprise Status Reporting - This activity involves creation of
release level test execution report. Input for this report comes from
reports of projects participating in Release.
Communicate/co-ordinate all release updates with testing teams
Played the role of KM Anchor and CM Anchor for the portfolio
Personal Details:
Date of Birth: 18/10/1989
Passport Number: J0015499
Passport validity: June 2021
VISA Details: UC-457 (Valid until SEP 2018)
Father’s Name: Sethuramalingam
Educational qualifications: Bachelor of Engineering (Electrical and Electronics)