SlideShare ist ein Scribd-Unternehmen logo
1 von 6
VIJAY MAHADEO PAWAR
404, Bramhraj Plaza
Plot no. 73 Sector 8A
Airoli Navi Mumbai
Maharashtra - India
Cell No.: 9769192138
9821068973
Email: vijaypawar1983@gmail.com
-----------------------------------------------------------------------------------------------------------------------------------------------------------
EDUCATION QUALIFICATION
• B.E in Electrical from Smt Indira Gandhi College Of Engineering Mumbai in 2006-Percentage-63.47%
• H.S.C from Maharashtra Board in 2001- Percentage 73.50%
• S.S.C from Maharashtra Board in 1999 –Percentage 72.27%
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Total Experience : 11 Years
Details (From Present) As Below:
KEY QUALIFICATIONS
A graduate electrical engineer with 9 years of continuous experience in electrical engineering design: Four years as Sr. Electrical
Engineer and Five years as Electrical design engineer.
Experience in conceptual to detail engineering design of HT and LT distribution systems and all associated electrical installations in
large and medium size refinery, Petrochemical, Chemical, Metallurgical & Cement Industries projects.
Working in different aspects of electrical design like basic calculations, preparation of SLDs, developing specifications for electrical
equipment and systems, vendor drawing review, development of layout drawings through various stages of design up to construction.
Extensive co-ordination with piping & civil department for electrical layouts, process and rotating and package groups for electrical
load data update, detailed engineering, vendor interfacing.
Conversant with specifying and selection of electrical equipment and installations used in hazardous environments.
Conversant with relevant International and European Standards such as IEC, BS, NEC, IEEE, IS, OISD etc. and design practices in
oil industry.
WORK EXPERIENCE
• Currently working with M/s Mott MacDonald Pvt. Ltd. company with ISO 9001, ISO 14001, OHSAS 18001 and
ISO/ TS 29001 certification, as Sr. Electrical Engineer in Engineering Department since July 2011 to Till Date.
Company has specialise in Conceptual Studies, Front-End, Basic Engineering, Detailed Design of Upstream and
Downstream Process, Facilities and Pipelines and Construction Supervision Services
• M/s Furnace Fabrica (India) Limited, Navi Mumbai an EPC company with ISO 14001:2004 certification, as Sr.
Electrical Design Engineer in Engineering Department since 2007 to 2011.
The company undertakes projects in Oil & Gas, Fertilizers, Petrochemical, Chemical, Metallurgical & Cement
Industries on LSTK basis.
Company has joint venture with M/s Al Zahem as Al-Zahem & Furnace Fabrica General Trading & Contracting Co.
W.L.L at Kuwait & also has technical collabration with M/s Outokumpu GmbH earlier known as Lurgi
Metallurgie,GmbH, at Germany for Sulphuric Acid Plant. It has own workshop with “U Stamp’ & IBR approval &
almost all third party approvals.
Company has its branch offices at Delhi & Kochin in India & in Middle East at Kuwait, Qatar & Abu Dhabi.
• Worked as Graduate Trainee Engineer with M/s Mukand Engineers Limited. Thane-Belapur Road, an EPC
company with ISO 9000:2001 certification, Thane From 2006 to 2007
The company undertakes Project in Oil & Gas, Hydro Plant on LSTK basis. Major jobs are executed for BHEL, IOCL, &
NTPC.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
COMPUTER PROFICIENCY
• Knowledge of ETAP 7.0, 7.5 (Beginner) , AutoCAD (2004/2006/2007/2008) and other software such as Word, Power
Point, MS Access and Excel., Dilux Lighting Software
------------------------------------------------------------------------------------------------------------------------------------------------------------
JOB PROFILE
Responsibilities
• Involvement in preparation of Electrical Document control register of project, detail review of FEED document and
technical query discussion with client from Tender document.
• Attending the Kick Of Meeting, Discussion with End Client for finalization of scope of work, deliverable schedule, detail
technical discussion on electrical scope. Having experience to work with Client office on KEIL and KOC project
• Site visit for obtaining the existing details.
• Preparation of Electrical Load list and finalized the load distribution in the MV & LV Panels,
• Development of Single Line Diagrams for MV and LV Switchgear like PCC, MCC, MLDB, SLDB, ESLD, APFC Panel,
AC & DC UPS & Other Misc. DB for Industrial Plant Systems.
• Selection of MV and LV Circuit Breakers ,Protection Relays, Power Transformer, Cables, Battery, UPS, DC Battery &
Battery Charger, DG Set Etc.
• Sizing calculation of electrical Equipment like MV & LV cable, DG & GG Set, Distribution & Lighting Transformer,
AC UPS, DC Battery & Battery Charger, Capacitor, Earthing & Bonding of equipment, Indoor and Outdoor Area
Lighting.
• Prepare Load flow Study analysis & Motor Starting study on ETAP from Electrical load list.
• Preparation of technical specifications, data sheets of electrical equipment like MV & LV Switchgear, MV & LV Cable,
Transformer, VFD & Soft Starter Panel, MV & LV Motor, AC & DC UPS, Solar System, Flame proof & Non-Flame
proof material.
• Preparation of Cable and drum Schedules, E-SCADA/PLC Signal list, material take off of bulk material, Interconnection
schedule.
• Vendor offer evaluation & preparation of TBE of various electrical Equipment like High Mast, Electrical Panel (MV &
LV Switchboard), AC UPS, DC Battery & Battery Charger, DG Set, Distribution & Lighting Transformer, VFD & Soft
Starter Panel, Bus Duct, Solar System, flame proof & non flame proof material etc.
• Floating enquires for electrical panels and equipments with detailed technical specifications to Panel Suppliers/Venders
on behalf of end customer.
• Coordination with Purchase and Procurement Department for placing the orders to successful vendor.
• Detailed Technical discussion with vendor regarding the control schemes, Panel & Bus Duct General Arrangement
layout as per floor cutout and equipment location.
• Involvement in finalization of Power Distribution scheme flow line diagram, MV & LV Switchgear Protection SLD,
Lighting and small Power DB SLD, Standard Installation Power/Earting /Lighting drawing, Overall and area Power ,
Earthing and Lighting Layout, electrical equipment layout, Bus duct routing layout as per panel & Transformer location,
cable Tray/ trench routing & support inside cable cellar/in outdoor area etc.
• Indoor & outdoor Lighting calculations by special software such as Crompton, Bajaj Photolux Software.
• Checking the Vendor GA & Control wiring of 33kV GIS Switchboard, Power & Distribution Transformer, Lighting
Transformer, High Mast, DG & GG Set, AC UPS, DC Battery & Battery Charger, Soft Starter, VFD Panel, MV/LV
Motors drawings etc.
• Construction activity such as erection of MV & LV Panels, Transformer, Bus Duct, VFD/Soft Starter Panel, laying of
cable tray, MV/LV cables, Installation of lighting fitting, pole, earthing of equipment as per Standard Installation
Power/Earthing & Lighting drawing.
• Checking & coordination with the System and other services including cable trays, conduits etc.
• Co-ordination with other discipline for better detail design.
• Submission of Various project Reports, As Built Drawings etc to Client.
• Assign work and coordinate to Draughtsman & Engineer.
-----------------------------------------------------------------------------------------------------------------------------------------------------------
PROJECTS HANDLED AT MOTT MAC DONALD
Work as a Lead Electrical Engineer on following projects;
• Construction of Remote Header Manifold & Associate work in South & east Kuwait Area
Client : Kuwait Oil Company
Contractor : Alghanim International General Trading Contracting Co. W.L.L.
• Pasir Gudang LPG Plant Expansion Project
Client : M/s NGC Energy
• FEED For Strategic Petroleum Products Storage Facilities Phase-1 (MESAIEED)
Client : M/s Qatar Petroleum
: Shell DEP Standards
• Upgradiation of Konaban GGS & Pipeline Grid Project-Tripura Asset
Client : Oil & natural Gas Corporation Limited, India
: ONGC Standards
• Sonamura GGS & Pipeline Grid Project-Tripura Asset
Client : Oil & natural Gas Corporation Limited, India
: ONGC Standards
• Bharat Oman Refinery Expansion Project
Client : Bharat Oman Refinery Limited, Bina, India
Work as a team member in following Projects;
• Siba Filed Development Project
Client : Kuwait Energy Iraq Limited
Contractor : Petrojet
• Assam Renewal Project Group A
Client : M/s Oil & Natural Gas Corporation
• EPMC Service For Uran-Chakan-Shikrapur-LPG Pipeline Project
Client : M/s Hindustan Petroleum Corporation Limited
• EPMC services for Mangalore-Hassan-Bangalore-Mysore LPG Pipeline Project
Client : M/s Hindustan Petroleum Corporation Limited
• Project Management Consultancy (EPCM) Services for Kota – Jobner (Jaipur) Pipeline Project
Client : Bharat Petroleum Corporation Ltd
PROJECTS HANDLED AT FURNACE FABRICA (I) LIMITED
• U263 12000 TPD Sulphur Melting & Filteration Plant OCP, JORF LASFER, MOROCCO from March 2011
onward (Details Engineering)
Contractual Completion Period : 7 Months
Client : M/s OCP Morocco
Consultant : M/s Jacobs Engineering
• Debari Zinc Smelter-Mercury Removal System from Nov. 2010 to December 2010
Contractual Completion Period : 2 Months
Client : Hindustan Zinc Limited
• Chanderiya Zinc Smelter- Mercury Removal System from Nov. 2010 to December 2010
Contractual Completion Period : 2 Months
Client : Hindustan Zinc Limited
• 4 L TPA Copper Smelter Expansion (SAP Plant, Tuticorin) from May 2010 onward
Contractual Completion Period : 6 Months
Client : Sterlite Industries (INDIA) Limited
Consultant : M/s Aker Solution Pvt. Limited, Kanjur Marg, Mumbai-400 042
• 300 TPD Sulphuric Saudi Arabia from December 2009 onwards
Contractual Completion Period : 8 Months
Client : M/s RAEZ SULPHATE FACTORY, JUBAIL, SAUDI ARABIA
• 3 x 3300 TPD Calciner & Hydrate Filteration Plant Vedanta, Lanjigarh Orissa from October’2008 to December
2009.
Contractual Completion Period : 14 Months
Client : M/s Vedanta Aliumina Limited Limited, Lanjigarh, Orissa.
PMC : M/s OUTOTECH
• U263 12000 TPD Sulphur Melting & Filteration Plant OCP, JORF LASFER, MOROCCO from March 2009 to
May 2009 (Basic Engineering)
Contractual Completion Period : 3 Months
Client : M/s OCP Morocco
• 210000 TPA Dariba Zinc Smelter from August 2008 to January 2009
Contractual Completion Period : 6 Months
Client : M/s Hindusta Zinc Limited, Dariba, Rajasthan
PMC : M/s Aker Solution Pvt. Limited, Kalina, Mumbai-400098
• Uttarakhand Zinc INGOT Project from November 2007 to July 2008
Contractual Completion Period : 8 Months
Client : M/s Hindustan Zinc Limited, Haridwar, Uttarakhand
PMC : M/s Mecon Limited.
-----------------------------------------------------------------------------------------------------------------------------------------------------------
AREA OF INTEREST
• Detail Engineering Department
PASSPORT DETAIL
• Passport No : G2422949
• Date of Issue : 14/03/2007
• Date of Expiry : 13/03/2017
• Place of Issue : Mumbai
PERSONAL DETAILS
• Date of Birth : 8th
March, 1984
• Sex : Male
• Nationality : Indian
• Marital Status : Married
• Languages Known : English, Hindi & Marathi
• Notice Period Required : 1 Months from Date of Offer Letter
DECLARATION:
I hereby declare that the above mentioned information is true to my knowledge & I bear the responsibility for the correctness of
the above mentioned particulars.
Place :
Date :
(Vijay M Pawar)
• Date of Expiry : 13/03/2017
• Place of Issue : Mumbai
PERSONAL DETAILS
• Date of Birth : 8th
March, 1984
• Sex : Male
• Nationality : Indian
• Marital Status : Married
• Languages Known : English, Hindi & Marathi
• Notice Period Required : 1 Months from Date of Offer Letter
DECLARATION:
I hereby declare that the above mentioned information is true to my knowledge & I bear the responsibility for the correctness of
the above mentioned particulars.
Place :
Date :
(Vijay M Pawar)

Weitere ähnliche Inhalte

Was ist angesagt?

Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical EnginnerNikhil Garde
 
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...Bajaj Electricals Ltd
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanRazu Khan
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copyarmando doria
 

Was ist angesagt? (20)

CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)CV-Electrical-Engineer (1)
CV-Electrical-Engineer (1)
 
Resume electrical engineer- for oil & gas
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gas
 
Ravi_ElectricalEngineer
Ravi_ElectricalEngineerRavi_ElectricalEngineer
Ravi_ElectricalEngineer
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
pradip updated c v
pradip updated c vpradip updated c v
pradip updated c v
 
SAGAR RESUME
SAGAR RESUMESAGAR RESUME
SAGAR RESUME
 
MEP - Electrical Enginner
MEP - Electrical EnginnerMEP - Electrical Enginner
MEP - Electrical Enginner
 
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...4 & 1/2 yrs experience  in ICT Infra E- Governance Project Management in HCL ...
4 & 1/2 yrs experience in ICT Infra E- Governance Project Management in HCL ...
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 
Raju cv
Raju cv Raju cv
Raju cv
 
CEB Presentation 2073
CEB Presentation 2073CEB Presentation 2073
CEB Presentation 2073
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
RAM-CV
RAM-CVRAM-CV
RAM-CV
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Electrical Engineer Mafijur Rahman
Electrical Engineer Mafijur RahmanElectrical Engineer Mafijur Rahman
Electrical Engineer Mafijur Rahman
 
Arman, Resume - edited - Copy
Arman, Resume - edited - CopyArman, Resume - edited - Copy
Arman, Resume - edited - Copy
 

Ähnlich wie Vijay_04_ 16-Photo-2

Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceNagaraj Maradi
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalSAYANTAN GHOSH
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERGopi s
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Prashant Maulikar
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detailFarhan Arif
 

Ähnlich wie Vijay_04_ 16-Photo-2 (20)

Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
Athavulla khan (2)
Athavulla khan (2)Athavulla khan (2)
Athavulla khan (2)
 
PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Sr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of ExperineceSr.Electrical Engineer_13years of Experinece
Sr.Electrical Engineer_13years of Experinece
 
ameen cv new
ameen cv newameen cv new
ameen cv new
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
DESIGN
DESIGNDESIGN
DESIGN
 
Saravana Kumar_CV
Saravana Kumar_CVSaravana Kumar_CV
Saravana Kumar_CV
 
Rajesh CV -
Rajesh CV - Rajesh CV -
Rajesh CV -
 
ELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEERELECTRICAL DESIGN & ESTIMATION ENGINEER
ELECTRICAL DESIGN & ESTIMATION ENGINEER
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)PDV narasimha Rao 6+ (2)
PDV narasimha Rao 6+ (2)
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
Udaya CV 10
Udaya CV 10Udaya CV 10
Udaya CV 10
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 

Vijay_04_ 16-Photo-2

  • 1. VIJAY MAHADEO PAWAR 404, Bramhraj Plaza Plot no. 73 Sector 8A Airoli Navi Mumbai Maharashtra - India Cell No.: 9769192138 9821068973 Email: vijaypawar1983@gmail.com ----------------------------------------------------------------------------------------------------------------------------------------------------------- EDUCATION QUALIFICATION • B.E in Electrical from Smt Indira Gandhi College Of Engineering Mumbai in 2006-Percentage-63.47% • H.S.C from Maharashtra Board in 2001- Percentage 73.50% • S.S.C from Maharashtra Board in 1999 –Percentage 72.27% ----------------------------------------------------------------------------------------------------------------------------------------------------------- Total Experience : 11 Years Details (From Present) As Below: KEY QUALIFICATIONS A graduate electrical engineer with 9 years of continuous experience in electrical engineering design: Four years as Sr. Electrical Engineer and Five years as Electrical design engineer. Experience in conceptual to detail engineering design of HT and LT distribution systems and all associated electrical installations in large and medium size refinery, Petrochemical, Chemical, Metallurgical & Cement Industries projects. Working in different aspects of electrical design like basic calculations, preparation of SLDs, developing specifications for electrical equipment and systems, vendor drawing review, development of layout drawings through various stages of design up to construction. Extensive co-ordination with piping & civil department for electrical layouts, process and rotating and package groups for electrical load data update, detailed engineering, vendor interfacing. Conversant with specifying and selection of electrical equipment and installations used in hazardous environments. Conversant with relevant International and European Standards such as IEC, BS, NEC, IEEE, IS, OISD etc. and design practices in oil industry. WORK EXPERIENCE • Currently working with M/s Mott MacDonald Pvt. Ltd. company with ISO 9001, ISO 14001, OHSAS 18001 and ISO/ TS 29001 certification, as Sr. Electrical Engineer in Engineering Department since July 2011 to Till Date. Company has specialise in Conceptual Studies, Front-End, Basic Engineering, Detailed Design of Upstream and Downstream Process, Facilities and Pipelines and Construction Supervision Services • M/s Furnace Fabrica (India) Limited, Navi Mumbai an EPC company with ISO 14001:2004 certification, as Sr. Electrical Design Engineer in Engineering Department since 2007 to 2011.
  • 2. The company undertakes projects in Oil & Gas, Fertilizers, Petrochemical, Chemical, Metallurgical & Cement Industries on LSTK basis. Company has joint venture with M/s Al Zahem as Al-Zahem & Furnace Fabrica General Trading & Contracting Co. W.L.L at Kuwait & also has technical collabration with M/s Outokumpu GmbH earlier known as Lurgi Metallurgie,GmbH, at Germany for Sulphuric Acid Plant. It has own workshop with “U Stamp’ & IBR approval & almost all third party approvals. Company has its branch offices at Delhi & Kochin in India & in Middle East at Kuwait, Qatar & Abu Dhabi. • Worked as Graduate Trainee Engineer with M/s Mukand Engineers Limited. Thane-Belapur Road, an EPC company with ISO 9000:2001 certification, Thane From 2006 to 2007 The company undertakes Project in Oil & Gas, Hydro Plant on LSTK basis. Major jobs are executed for BHEL, IOCL, & NTPC. ------------------------------------------------------------------------------------------------------------------------------------------------------------- COMPUTER PROFICIENCY • Knowledge of ETAP 7.0, 7.5 (Beginner) , AutoCAD (2004/2006/2007/2008) and other software such as Word, Power Point, MS Access and Excel., Dilux Lighting Software ------------------------------------------------------------------------------------------------------------------------------------------------------------ JOB PROFILE Responsibilities • Involvement in preparation of Electrical Document control register of project, detail review of FEED document and technical query discussion with client from Tender document. • Attending the Kick Of Meeting, Discussion with End Client for finalization of scope of work, deliverable schedule, detail technical discussion on electrical scope. Having experience to work with Client office on KEIL and KOC project • Site visit for obtaining the existing details. • Preparation of Electrical Load list and finalized the load distribution in the MV & LV Panels, • Development of Single Line Diagrams for MV and LV Switchgear like PCC, MCC, MLDB, SLDB, ESLD, APFC Panel, AC & DC UPS & Other Misc. DB for Industrial Plant Systems. • Selection of MV and LV Circuit Breakers ,Protection Relays, Power Transformer, Cables, Battery, UPS, DC Battery & Battery Charger, DG Set Etc. • Sizing calculation of electrical Equipment like MV & LV cable, DG & GG Set, Distribution & Lighting Transformer, AC UPS, DC Battery & Battery Charger, Capacitor, Earthing & Bonding of equipment, Indoor and Outdoor Area Lighting. • Prepare Load flow Study analysis & Motor Starting study on ETAP from Electrical load list. • Preparation of technical specifications, data sheets of electrical equipment like MV & LV Switchgear, MV & LV Cable, Transformer, VFD & Soft Starter Panel, MV & LV Motor, AC & DC UPS, Solar System, Flame proof & Non-Flame proof material. • Preparation of Cable and drum Schedules, E-SCADA/PLC Signal list, material take off of bulk material, Interconnection schedule. • Vendor offer evaluation & preparation of TBE of various electrical Equipment like High Mast, Electrical Panel (MV & LV Switchboard), AC UPS, DC Battery & Battery Charger, DG Set, Distribution & Lighting Transformer, VFD & Soft Starter Panel, Bus Duct, Solar System, flame proof & non flame proof material etc. • Floating enquires for electrical panels and equipments with detailed technical specifications to Panel Suppliers/Venders on behalf of end customer. • Coordination with Purchase and Procurement Department for placing the orders to successful vendor. • Detailed Technical discussion with vendor regarding the control schemes, Panel & Bus Duct General Arrangement layout as per floor cutout and equipment location. • Involvement in finalization of Power Distribution scheme flow line diagram, MV & LV Switchgear Protection SLD, Lighting and small Power DB SLD, Standard Installation Power/Earting /Lighting drawing, Overall and area Power , Earthing and Lighting Layout, electrical equipment layout, Bus duct routing layout as per panel & Transformer location, cable Tray/ trench routing & support inside cable cellar/in outdoor area etc. • Indoor & outdoor Lighting calculations by special software such as Crompton, Bajaj Photolux Software.
  • 3. • Checking the Vendor GA & Control wiring of 33kV GIS Switchboard, Power & Distribution Transformer, Lighting Transformer, High Mast, DG & GG Set, AC UPS, DC Battery & Battery Charger, Soft Starter, VFD Panel, MV/LV Motors drawings etc. • Construction activity such as erection of MV & LV Panels, Transformer, Bus Duct, VFD/Soft Starter Panel, laying of cable tray, MV/LV cables, Installation of lighting fitting, pole, earthing of equipment as per Standard Installation Power/Earthing & Lighting drawing. • Checking & coordination with the System and other services including cable trays, conduits etc. • Co-ordination with other discipline for better detail design. • Submission of Various project Reports, As Built Drawings etc to Client. • Assign work and coordinate to Draughtsman & Engineer. ----------------------------------------------------------------------------------------------------------------------------------------------------------- PROJECTS HANDLED AT MOTT MAC DONALD Work as a Lead Electrical Engineer on following projects; • Construction of Remote Header Manifold & Associate work in South & east Kuwait Area Client : Kuwait Oil Company Contractor : Alghanim International General Trading Contracting Co. W.L.L. • Pasir Gudang LPG Plant Expansion Project Client : M/s NGC Energy • FEED For Strategic Petroleum Products Storage Facilities Phase-1 (MESAIEED) Client : M/s Qatar Petroleum : Shell DEP Standards • Upgradiation of Konaban GGS & Pipeline Grid Project-Tripura Asset Client : Oil & natural Gas Corporation Limited, India : ONGC Standards • Sonamura GGS & Pipeline Grid Project-Tripura Asset Client : Oil & natural Gas Corporation Limited, India : ONGC Standards • Bharat Oman Refinery Expansion Project Client : Bharat Oman Refinery Limited, Bina, India Work as a team member in following Projects; • Siba Filed Development Project Client : Kuwait Energy Iraq Limited Contractor : Petrojet • Assam Renewal Project Group A Client : M/s Oil & Natural Gas Corporation • EPMC Service For Uran-Chakan-Shikrapur-LPG Pipeline Project Client : M/s Hindustan Petroleum Corporation Limited • EPMC services for Mangalore-Hassan-Bangalore-Mysore LPG Pipeline Project Client : M/s Hindustan Petroleum Corporation Limited • Project Management Consultancy (EPCM) Services for Kota – Jobner (Jaipur) Pipeline Project Client : Bharat Petroleum Corporation Ltd
  • 4. PROJECTS HANDLED AT FURNACE FABRICA (I) LIMITED • U263 12000 TPD Sulphur Melting & Filteration Plant OCP, JORF LASFER, MOROCCO from March 2011 onward (Details Engineering) Contractual Completion Period : 7 Months Client : M/s OCP Morocco Consultant : M/s Jacobs Engineering • Debari Zinc Smelter-Mercury Removal System from Nov. 2010 to December 2010 Contractual Completion Period : 2 Months Client : Hindustan Zinc Limited • Chanderiya Zinc Smelter- Mercury Removal System from Nov. 2010 to December 2010 Contractual Completion Period : 2 Months Client : Hindustan Zinc Limited • 4 L TPA Copper Smelter Expansion (SAP Plant, Tuticorin) from May 2010 onward Contractual Completion Period : 6 Months Client : Sterlite Industries (INDIA) Limited Consultant : M/s Aker Solution Pvt. Limited, Kanjur Marg, Mumbai-400 042 • 300 TPD Sulphuric Saudi Arabia from December 2009 onwards Contractual Completion Period : 8 Months Client : M/s RAEZ SULPHATE FACTORY, JUBAIL, SAUDI ARABIA • 3 x 3300 TPD Calciner & Hydrate Filteration Plant Vedanta, Lanjigarh Orissa from October’2008 to December 2009. Contractual Completion Period : 14 Months Client : M/s Vedanta Aliumina Limited Limited, Lanjigarh, Orissa. PMC : M/s OUTOTECH • U263 12000 TPD Sulphur Melting & Filteration Plant OCP, JORF LASFER, MOROCCO from March 2009 to May 2009 (Basic Engineering) Contractual Completion Period : 3 Months Client : M/s OCP Morocco • 210000 TPA Dariba Zinc Smelter from August 2008 to January 2009 Contractual Completion Period : 6 Months Client : M/s Hindusta Zinc Limited, Dariba, Rajasthan PMC : M/s Aker Solution Pvt. Limited, Kalina, Mumbai-400098 • Uttarakhand Zinc INGOT Project from November 2007 to July 2008 Contractual Completion Period : 8 Months Client : M/s Hindustan Zinc Limited, Haridwar, Uttarakhand PMC : M/s Mecon Limited. ----------------------------------------------------------------------------------------------------------------------------------------------------------- AREA OF INTEREST • Detail Engineering Department PASSPORT DETAIL • Passport No : G2422949 • Date of Issue : 14/03/2007
  • 5. • Date of Expiry : 13/03/2017 • Place of Issue : Mumbai PERSONAL DETAILS • Date of Birth : 8th March, 1984 • Sex : Male • Nationality : Indian • Marital Status : Married • Languages Known : English, Hindi & Marathi • Notice Period Required : 1 Months from Date of Offer Letter DECLARATION: I hereby declare that the above mentioned information is true to my knowledge & I bear the responsibility for the correctness of the above mentioned particulars. Place : Date : (Vijay M Pawar)
  • 6. • Date of Expiry : 13/03/2017 • Place of Issue : Mumbai PERSONAL DETAILS • Date of Birth : 8th March, 1984 • Sex : Male • Nationality : Indian • Marital Status : Married • Languages Known : English, Hindi & Marathi • Notice Period Required : 1 Months from Date of Offer Letter DECLARATION: I hereby declare that the above mentioned information is true to my knowledge & I bear the responsibility for the correctness of the above mentioned particulars. Place : Date : (Vijay M Pawar)