INTERNAL
Speaker’s Name, SAP
Month 00, 2017
Project Kickoff
Partner logo
2INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Agenda
Time Topic Presenter
00:00 – 00:00 Introduction and Welcome Executive Sponsor
00:00 – 00:00 Goals Customer Project Manager
Lunch
00:00 – 00:00 Solution Scope SAP Application Lead
00:00 – 00:00 Delivery Approach SAP Project Manager
Break
00:00 – 00:00 Team Roles and Responsibilities SAP Project Manager
00:00 – 00:00 Critical Success Factors and Communication SAP Project Manager
00:00 – 00:00 Next Steps All
End of the day
3INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
Agenda
4INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Confirm the Project Scope
• Understand the Delivery Approach
• Review the system landscape
• Introduce roles and responsibilities
• Learn about the enablement approach
• Examine critical success factors
Workshop Objectives
5INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP Client Partner
• <Name> , Contact Information
SAP Delivery Executive
• <Name> , Contact Information
SAP Project Manager
• <Name> , Contact Information
SAP Team Member(s)
• <Name> , Application Lead, Contact Information
• <Name> , Technology Lead, Contact Information
SAP Team Introduction
6INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Customer/Executive Sponsor
• <Name> , Department, Role, Contact Info
Customer Core Project Team Members
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
• <Name> , Department, Role, Contact Info
Customer Extended Project Team Members
• <Name> , Department, Super User, Contact Info
• <Name> , Department, UAT Tester, Contact Info
Customer Team Introduction
7INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
What Does Project Success Really Mean?
Business Goals
Achieving the requested modifications
or improvements in the business
Budget Compliance
Schedule Compliance
Functional Goals
Project Goals
8INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Success Depends on Everybody Involved
Processes
TechnologyTeam
Organization
Management
Project
Key Users
Project success is the sum of everybody’s daily work and decisions.
We look forward to realize a successful project with you.
9INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
Agenda
10INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Solution Scope
11INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Service Scope
12INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Integration Points in Scope
Integration Point From Product/Solution To Product/Solution Type Description
Short description of
integration point
From SAP product that
integrates
To SAP product that
integrates
Technical nature of
integration e.g. ALE
Longer description of scope of integration perhaps covering
business objects or data
Customer Master
Data
CRM ERP CRM Middleware Optional download and delta loads of customer master data from
ERP to Business Partners in CRM
13INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Landscape
14INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
15INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Planning
Prepare Realize Deploy
Prepare Project
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
XXX
Steps
SAP involvement
Customer involvement
X Weeks X Weeks X Weeks
Explore
Go-Live
XXX Key Activities
16INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project duration varies based on implementation scope, project resources, and desired speed of
implementation. The below chart represents a general guidance.
SAP S/4HANA Cloud Phase Duration
PhaseProject Size Small Medium Large
Prepare 5 10 20<
Explore 23 45 60<
Realize 17 30 50<
Deploy 5 12 20<
Numbers represent working days
17INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Schedule
W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12
Phase Description 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5
1 Prepare
1.1
1.2.
1.3
1.4
1.5
2 Explore
2.1
2.2
3 Realize
3.1
3.2
3.3
3.4
3.5
4 Deploy
4.1
4.2
18INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Prepare Phase
Key Prepare Activities:
• Define project goals, high-level scope, and a project plan
• Identify and quantify business value objectives
• Secure executive sponsorship
• Establish project standards, organization, and governance
• Define and secure approval for the implementation/upgrade strategy
• Define roles and responsibilities for the project team
• Validate the project objectives
• Establish project management, tracking, and reporting mechanisms for value delivery
• Begin self-enablement
• Receive and access the system
• Kick off the project
19INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Explore Phase
Key Explore Activities:
• Project Management Execution, Monitoring, and Controlling
• Customer Project Team Enablement
• Solution Validation
• Configuration Definition
• Integration Prerequisites Confirmation
• Solution Extension Preparation
• Data Load Preparation
• Phase Closure
20INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Realize Phase
Key Realize Activities:
• Establish the solution landscape
• Implement the solution in the quality environment using incremental build in time-boxed iterations
• Conduct overall end-to-end testing of the solution
• Setup production environment
• Prepare for data migration and data archiving
• Conduct project team and key user training
• Finalize end user training materials and documentation
• Track and report on value delivery
21INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Deploy Phase
Key Deploy Activities:
• Finalize the solution and business processes for production go-live
• Resolve all crucial open issues
 Conduct system tests
 Proceed with cutover activities including data migration
• Execute transition and cutover plans including organizational change management (OCM) plans
• Complete all scheduled end user training
• Track and report on value delivery
22INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Testing Approach
• Unit Testing – Performed by Configurator – Performed in Development Landscape
• Integration Testing – Performed by the Customer –Performed in Quality Assurance
Landscape
• User Acceptance Testing – Performed by the Customer – Performed in Quality
Assurance Landscape
 Who and When will Test Plans and Scripts be written
 Who will participate in Testing from the Customer?
 How long should User Acceptance Testing last?
23INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
24INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Project Team and Roles
Activity, Resource, Risk and Issue Management
Configuration Design
Configuration Validation
Training Design and Delivery
Architecture, Connectivity and Migration
Consultant
Project Manager
Functional
ExpertConsultants
Technical
Resource
Business
Resource
Trainer
Champion, Critical Decisions, Escalations
Project Sponsor(s) Project Sponsor
Process Owners /
SMEs
Technical
Resources
Business
Stakeholders
Trainers
Consultants
Customer
Project
Management
25INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Customer Role Details
Project Manager Technical
Resource
• 25 – 40% dedication
for landscape setup
• 10 – 15% dedication
during test phase
• Confirm prerequisite
components, add-ons,
SPs, notes
Key Users
• 30 – 40% dedication
throughout project
• Explain business
requirements &
processes
• Perform & confirm
configuration
• Drive decisions
Testers
• 10-15% dedication for
configuration
validation
• Confirm configuration
• Support decisions
Trainers
• 25-50% dedication for
end user training
• Create and execute
training plan
• Create training
content
26INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
SAP Role Details
Consultants
• Manage project
• Responsible for knowledge
transfer to key users
• Perform/guide the system
configuration
• Introduce integration concept
• Perform integration setup
and support integration
testing
• Coordinate additional
resources as required
Custom Development
• Provide
Project Manager
• Provide support for incidents
reported via self-service
tools, web and phone
Customer Engagement
Ensure
27INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• The SC is responsible for project control and project coordination as well as the efficient bringing
about of technical and organizational decisions.
• In SC meetings, project management reports on the project status and introduces relevant
issues that have to be decided by the SC.
• The SC assures that resources necessary for the project‘s success are available.
• The SC is the last escalation level for problems (conflict management).
• The SC assumes highest-level control on costs and budget, and is responsible for budget
release.
• The SC is responsible for inspection and approval of results and of the overall project.
Responsibilities of the Steering Committee
28INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
What is expected of key users during a SAP solution implementation project?
• Make knowledgeable business decisions in your respective area of expertise and help to define
the solution
• Complete the implementation activities as assigned
• Act as a multiplier within your organization to train and support end users
• Learn how to configure the new system.
Key Users
29INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Key User Responsibilities After Go-Live
Incident Management
• Search for solutions and process incidents from end users directly and when necessary, request
help from SAP
Manage Users and Task Assignment
• Deal with user authorization requests
• Maintain responsibilities for users in your company
• Resolve any unassigned business tasks
Manage Background Jobs, Input and Output
• Monitor background jobs
• Monitor internal/external communications such as printers and integration with third-parties
Knowledge Transfer
• Act as a multiplier within your organization to train and support new users of the SAP solution
30INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
31INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Critical Success Factors
•Scope changes will likely impact the project timeline, your required effort and consulting costs
Stay within the agreed scope
•Adjust your processes to fit the standard system functionality in order to simplify future upgrades and scope expansion.
•It doesn’t have to be perfect. You can always improve a solution later.
Have a pragmatic mindset
•The quicker you can make decisions, the quicker your project will be able to proceed into the right direction.
Make quick decisions
•Identify and involve your stakeholder early - executives, employees, labor unions, key customers,…
Involve stakeholders early
•The better you represent your business area, the better the SAP cloud solution will support your processes.
•Work with your manager to secure sufficient availability for the project.
As a key user, actively contribute to the project
•Start cleansing your data as soon as possible to prevent project issues and delays.
Start preparing data early
•Only thorough testing will result in a successful go-live and stable system.
Never cut corners on testing
32INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
Standards of Project Communication
Information
Information
Sender
Information
Recipient
Frequency Form
Status Report Customer PM SAP PM, SC Weekly Project Status Report
Workshop Protocol SAP
Key User, SAP PM,
Customer PM
After each meeting
Result Protocol
Steering Committee Report Customer PM
Customer PM, SAP PM,
Board
After each meeting Steering Committee Meeting Minutes
PM - Project Management SC - Steering Committee
33INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ
• Introduction
• Solution Scope
• Delivery Approach
• Team Roles and Responsibilities
• Critical Success Factors and Communication
• Next Steps
Agenda
Thank you.
Contact information:
F name L name
Title
Address
Phone number
Partner logo

Weitere ähnliche Inhalte

Was ist angesagt?

Target Architecture And Landscape
Target Architecture And LandscapeTarget Architecture And Landscape
Target Architecture And LandscapeAjay Kumar Uppal
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionRicardo Viana Vargas
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectSAPinsider Events
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptCarlosRodriguez703287
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesSlideTeam
 
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesProject Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesSlideTeam
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP SolutionsOpenText
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsAurelien Domont, MBA
 
IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)VSR *
 
Digital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureDigital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureAlan McSweeney
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)Nguyen Toan
 
Project Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesProject Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesSlideTeam
 
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfRDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfandy564912
 
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...Sophia Zhou
 
Application Management Service Offerings
Application Management Service OfferingsApplication Management Service Offerings
Application Management Service OfferingsGss America
 
Cutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engineCutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engineAjay Kumar Uppal
 

Was ist angesagt? (20)

Target Architecture And Landscape
Target Architecture And LandscapeTarget Architecture And Landscape
Target Architecture And Landscape
 
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified VersionPMBOK® Guide 5th edition Processes Flow in English - Simplified Version
PMBOK® Guide 5th edition Processes Flow in English - Simplified Version
 
Best Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation ProjectBest Practices for Managing a Large-Scale SAP System Consolidation Project
Best Practices for Managing a Large-Scale SAP System Consolidation Project
 
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.pptGV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
GV2-TM-CM-PR-Cutover Strategy Template-V1.ppt
 
Cutover Plan V2
Cutover Plan V2Cutover Plan V2
Cutover Plan V2
 
Kick Off Meeting Presentation
Kick Off Meeting PresentationKick Off Meeting Presentation
Kick Off Meeting Presentation
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation SlidesProject Management Kickoff Meeting Template Powerpoint Presentation Slides
Project Management Kickoff Meeting Template Powerpoint Presentation Slides
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP Solutions
 
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey ConsultantsBusiness Process Management Training | By ex-Deloitte & McKinsey Consultants
Business Process Management Training | By ex-Deloitte & McKinsey Consultants
 
IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)IT Services Delivery - Program Management Office (PMO)
IT Services Delivery - Program Management Office (PMO)
 
Digital Transformation And Solution Architecture
Digital Transformation And Solution ArchitectureDigital Transformation And Solution Architecture
Digital Transformation And Solution Architecture
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)
 
Erp-PMO
Erp-PMOErp-PMO
Erp-PMO
 
Project Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation SlidesProject Deliverables Powerpoint Presentation Slides
Project Deliverables Powerpoint Presentation Slides
 
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdfRDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
RDS_IBP_IBP1802_10_Best_Practices_Scope_Presentation_EN_XX.pdf
 
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...
Microsoft PPM tool (Project Online / Project Server) Case Study by epmsolutio...
 
PMO 101
PMO 101PMO 101
PMO 101
 
Application Management Service Offerings
Application Management Service OfferingsApplication Management Service Offerings
Application Management Service Offerings
 
Cutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engineCutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engine
 

Ähnlich wie Kickoff meeting template

SAP overview.pptx
SAP overview.pptxSAP overview.pptx
SAP overview.pptxasgharhaghi
 
Transition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdfTransition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdfSrinivasan N
 
S4H_399 2 SL _Onboarding Presentation (2).pptx
S4H_399 2  SL _Onboarding Presentation (2).pptxS4H_399 2  SL _Onboarding Presentation (2).pptx
S4H_399 2 SL _Onboarding Presentation (2).pptxchandramohan431817
 
Savic executive summary sm
Savic executive summary smSavic executive summary sm
Savic executive summary smSupriya SAVIC
 
S4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfS4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfmail2cnivas1
 
SAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Customer Experience
 
SAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationSAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationBernhard Luecke
 
Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate PresentationSupriya SAVIC
 
Agile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAPAgile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAPssuserb8dd32
 
LABS PURE Executive Presentation
LABS PURE Executive PresentationLABS PURE Executive Presentation
LABS PURE Executive PresentationAhmed Ammar
 
SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSwetha J
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjectDavid Niles
 
Succeed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer ImplementationSucceed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer ImplementationSAP Customer Experience
 
Maximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert ServicesMaximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert ServicesSAP Customer Experience
 

Ähnlich wie Kickoff meeting template (20)

SAP overview.pptx
SAP overview.pptxSAP overview.pptx
SAP overview.pptx
 
Transition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdfTransition_Roadmap__Overview_23Q1.pdf
Transition_Roadmap__Overview_23Q1.pdf
 
S4H_399 2 SL _Onboarding Presentation (2).pptx
S4H_399 2  SL _Onboarding Presentation (2).pptxS4H_399 2  SL _Onboarding Presentation (2).pptx
S4H_399 2 SL _Onboarding Presentation (2).pptx
 
Focused build overview
Focused build overviewFocused build overview
Focused build overview
 
Savic executive summary sm
Savic executive summary smSavic executive summary sm
Savic executive summary sm
 
S4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdfS4HANA_Roadmap_General_Information.pdf
S4HANA_Roadmap_General_Information.pdf
 
SAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful projectSAP Hybris Marketing Cloud Secrets for a successful project
SAP Hybris Marketing Cloud Secrets for a successful project
 
SAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for InnovationSAP Platform & S/4 HANA - Support for Innovation
SAP Platform & S/4 HANA - Support for Innovation
 
Savic Corporate Presentation
Savic Corporate PresentationSavic Corporate Presentation
Savic Corporate Presentation
 
VaidyanathKK
VaidyanathKKVaidyanathKK
VaidyanathKK
 
S4H_059.pptx
S4H_059.pptxS4H_059.pptx
S4H_059.pptx
 
PM_210 (1).pptx
PM_210 (1).pptxPM_210 (1).pptx
PM_210 (1).pptx
 
Agile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAPAgile Project Delivery Fundamentals by SAP
Agile Project Delivery Fundamentals by SAP
 
LABS PURE Executive Presentation
LABS PURE Executive PresentationLABS PURE Executive Presentation
LABS PURE Executive Presentation
 
Arago Company presentation_en
Arago Company presentation_enArago Company presentation_en
Arago Company presentation_en
 
SAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_ResumeSAP_Technical_Architect_JSwetha_Resume
SAP_Technical_Architect_JSwetha_Resume
 
Presentation_1373778041831
Presentation_1373778041831Presentation_1373778041831
Presentation_1373778041831
 
eCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration ProjecteCIO PPT Roles for a SAP and Systems Integration Project
eCIO PPT Roles for a SAP and Systems Integration Project
 
Succeed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer ImplementationSucceed with Your SAP Hybris Cloud for Customer Implementation
Succeed with Your SAP Hybris Cloud for Customer Implementation
 
Maximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert ServicesMaximize Quality with SAP Hybris Expert Services
Maximize Quality with SAP Hybris Expert Services
 

Mehr von Van Chau

Chapter 13 building information system
Chapter 13 building information systemChapter 13 building information system
Chapter 13 building information systemVan Chau
 
Chapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goodsChapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goodsVan Chau
 
Chapter 12 enhancing decision making
Chapter 12 enhancing decision makingChapter 12 enhancing decision making
Chapter 12 enhancing decision makingVan Chau
 
Chapter 11 managing knowledge
Chapter 11 managing knowledgeChapter 11 managing knowledge
Chapter 11 managing knowledgeVan Chau
 
Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...Van Chau
 
Chapter 8 securing information systems
Chapter 8 securing information systemsChapter 8 securing information systems
Chapter 8 securing information systemsVan Chau
 
Chapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technologyChapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technologyVan Chau
 
Chapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligenceChapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligenceVan Chau
 
Chapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologiesChapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologiesVan Chau
 
Chapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systemsChapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systemsVan Chau
 
Chapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaborationChapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaborationVan Chau
 
Chapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategyChapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategyVan Chau
 
Chapter 01 Information systems in global business today
Chapter 01 Information systems in global business todayChapter 01 Information systems in global business today
Chapter 01 Information systems in global business todayVan Chau
 
Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)Van Chau
 
Cntt org thadico final 12.06.2020
Cntt org thadico final  12.06.2020Cntt org thadico final  12.06.2020
Cntt org thadico final 12.06.2020Van Chau
 
CẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐCẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐVan Chau
 
DIGITAL TRANSFORMATION
DIGITAL TRANSFORMATIONDIGITAL TRANSFORMATION
DIGITAL TRANSFORMATIONVan Chau
 
UML Thiết kế CSDL
UML Thiết kế CSDLUML Thiết kế CSDL
UML Thiết kế CSDLVan Chau
 
Foodorder 170421160507 (1)
Foodorder 170421160507 (1)Foodorder 170421160507 (1)
Foodorder 170421160507 (1)Van Chau
 

Mehr von Van Chau (20)

Chapter 13 building information system
Chapter 13 building information systemChapter 13 building information system
Chapter 13 building information system
 
Chapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goodsChapter 10 ecommerce digital markets digital goods
Chapter 10 ecommerce digital markets digital goods
 
Chapter 12 enhancing decision making
Chapter 12 enhancing decision makingChapter 12 enhancing decision making
Chapter 12 enhancing decision making
 
Chapter 11 managing knowledge
Chapter 11 managing knowledgeChapter 11 managing knowledge
Chapter 11 managing knowledge
 
Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...Chapter 9 achieving operational excellence and customer intimacy enterprise a...
Chapter 9 achieving operational excellence and customer intimacy enterprise a...
 
Chapter 8 securing information systems
Chapter 8 securing information systemsChapter 8 securing information systems
Chapter 8 securing information systems
 
Chapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technologyChapter 7 telecommunications the internet and wireless technology
Chapter 7 telecommunications the internet and wireless technology
 
Chapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligenceChapter 6 foundations of business intelligence
Chapter 6 foundations of business intelligence
 
Chapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologiesChapter 5 it infrastructure and emerging technologies
Chapter 5 it infrastructure and emerging technologies
 
Chapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systemsChapter 4 ethical and social issues in information systems
Chapter 4 ethical and social issues in information systems
 
Chapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaborationChapter 02 Global ebusiness and collaboration
Chapter 02 Global ebusiness and collaboration
 
Chapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategyChapter 3 information systems organizations and strategy
Chapter 3 information systems organizations and strategy
 
Chapter 01 Information systems in global business today
Chapter 01 Information systems in global business todayChapter 01 Information systems in global business today
Chapter 01 Information systems in global business today
 
Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)Hunam and machine reimagining work in the age of ai (pptx)
Hunam and machine reimagining work in the age of ai (pptx)
 
Cntt org thadico final 12.06.2020
Cntt org thadico final  12.06.2020Cntt org thadico final  12.06.2020
Cntt org thadico final 12.06.2020
 
CẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐCẨM NANG CHUYỂN ĐỔI SỐ
CẨM NANG CHUYỂN ĐỔI SỐ
 
DIGITAL TRANSFORMATION
DIGITAL TRANSFORMATIONDIGITAL TRANSFORMATION
DIGITAL TRANSFORMATION
 
UML Thiết kế CSDL
UML Thiết kế CSDLUML Thiết kế CSDL
UML Thiết kế CSDL
 
Foodorder 170421160507 (1)
Foodorder 170421160507 (1)Foodorder 170421160507 (1)
Foodorder 170421160507 (1)
 
8815346
88153468815346
8815346
 

Kürzlich hochgeladen

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 

Kürzlich hochgeladen (20)

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 

Kickoff meeting template

  • 1. INTERNAL Speaker’s Name, SAP Month 00, 2017 Project Kickoff Partner logo
  • 2. 2INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Agenda Time Topic Presenter 00:00 – 00:00 Introduction and Welcome Executive Sponsor 00:00 – 00:00 Goals Customer Project Manager Lunch 00:00 – 00:00 Solution Scope SAP Application Lead 00:00 – 00:00 Delivery Approach SAP Project Manager Break 00:00 – 00:00 Team Roles and Responsibilities SAP Project Manager 00:00 – 00:00 Critical Success Factors and Communication SAP Project Manager 00:00 – 00:00 Next Steps All End of the day
  • 3. 3INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication Agenda
  • 4. 4INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Confirm the Project Scope • Understand the Delivery Approach • Review the system landscape • Introduce roles and responsibilities • Learn about the enablement approach • Examine critical success factors Workshop Objectives
  • 5. 5INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP Client Partner • <Name> , Contact Information SAP Delivery Executive • <Name> , Contact Information SAP Project Manager • <Name> , Contact Information SAP Team Member(s) • <Name> , Application Lead, Contact Information • <Name> , Technology Lead, Contact Information SAP Team Introduction
  • 6. 6INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Customer/Executive Sponsor • <Name> , Department, Role, Contact Info Customer Core Project Team Members • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info • <Name> , Department, Role, Contact Info Customer Extended Project Team Members • <Name> , Department, Super User, Contact Info • <Name> , Department, UAT Tester, Contact Info Customer Team Introduction
  • 7. 7INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ What Does Project Success Really Mean? Business Goals Achieving the requested modifications or improvements in the business Budget Compliance Schedule Compliance Functional Goals Project Goals
  • 8. 8INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Success Depends on Everybody Involved Processes TechnologyTeam Organization Management Project Key Users Project success is the sum of everybody’s daily work and decisions. We look forward to realize a successful project with you.
  • 9. 9INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication Agenda
  • 10. 10INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Solution Scope
  • 11. 11INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Service Scope
  • 12. 12INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Integration Points in Scope Integration Point From Product/Solution To Product/Solution Type Description Short description of integration point From SAP product that integrates To SAP product that integrates Technical nature of integration e.g. ALE Longer description of scope of integration perhaps covering business objects or data Customer Master Data CRM ERP CRM Middleware Optional download and delta loads of customer master data from ERP to Business Partners in CRM
  • 13. 13INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Landscape
  • 14. 14INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 15. 15INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Planning Prepare Realize Deploy Prepare Project XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX XXX Steps SAP involvement Customer involvement X Weeks X Weeks X Weeks Explore Go-Live XXX Key Activities
  • 16. 16INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project duration varies based on implementation scope, project resources, and desired speed of implementation. The below chart represents a general guidance. SAP S/4HANA Cloud Phase Duration PhaseProject Size Small Medium Large Prepare 5 10 20< Explore 23 45 60< Realize 17 30 50< Deploy 5 12 20< Numbers represent working days
  • 17. 17INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Schedule W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 Phase Description 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 Prepare 1.1 1.2. 1.3 1.4 1.5 2 Explore 2.1 2.2 3 Realize 3.1 3.2 3.3 3.4 3.5 4 Deploy 4.1 4.2
  • 18. 18INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Prepare Phase Key Prepare Activities: • Define project goals, high-level scope, and a project plan • Identify and quantify business value objectives • Secure executive sponsorship • Establish project standards, organization, and governance • Define and secure approval for the implementation/upgrade strategy • Define roles and responsibilities for the project team • Validate the project objectives • Establish project management, tracking, and reporting mechanisms for value delivery • Begin self-enablement • Receive and access the system • Kick off the project
  • 19. 19INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Explore Phase Key Explore Activities: • Project Management Execution, Monitoring, and Controlling • Customer Project Team Enablement • Solution Validation • Configuration Definition • Integration Prerequisites Confirmation • Solution Extension Preparation • Data Load Preparation • Phase Closure
  • 20. 20INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Realize Phase Key Realize Activities: • Establish the solution landscape • Implement the solution in the quality environment using incremental build in time-boxed iterations • Conduct overall end-to-end testing of the solution • Setup production environment • Prepare for data migration and data archiving • Conduct project team and key user training • Finalize end user training materials and documentation • Track and report on value delivery
  • 21. 21INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Deploy Phase Key Deploy Activities: • Finalize the solution and business processes for production go-live • Resolve all crucial open issues  Conduct system tests  Proceed with cutover activities including data migration • Execute transition and cutover plans including organizational change management (OCM) plans • Complete all scheduled end user training • Track and report on value delivery
  • 22. 22INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Testing Approach • Unit Testing – Performed by Configurator – Performed in Development Landscape • Integration Testing – Performed by the Customer –Performed in Quality Assurance Landscape • User Acceptance Testing – Performed by the Customer – Performed in Quality Assurance Landscape  Who and When will Test Plans and Scripts be written  Who will participate in Testing from the Customer?  How long should User Acceptance Testing last?
  • 23. 23INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 24. 24INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Project Team and Roles Activity, Resource, Risk and Issue Management Configuration Design Configuration Validation Training Design and Delivery Architecture, Connectivity and Migration Consultant Project Manager Functional ExpertConsultants Technical Resource Business Resource Trainer Champion, Critical Decisions, Escalations Project Sponsor(s) Project Sponsor Process Owners / SMEs Technical Resources Business Stakeholders Trainers Consultants Customer Project Management
  • 25. 25INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Customer Role Details Project Manager Technical Resource • 25 – 40% dedication for landscape setup • 10 – 15% dedication during test phase • Confirm prerequisite components, add-ons, SPs, notes Key Users • 30 – 40% dedication throughout project • Explain business requirements & processes • Perform & confirm configuration • Drive decisions Testers • 10-15% dedication for configuration validation • Confirm configuration • Support decisions Trainers • 25-50% dedication for end user training • Create and execute training plan • Create training content
  • 26. 26INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ SAP Role Details Consultants • Manage project • Responsible for knowledge transfer to key users • Perform/guide the system configuration • Introduce integration concept • Perform integration setup and support integration testing • Coordinate additional resources as required Custom Development • Provide Project Manager • Provide support for incidents reported via self-service tools, web and phone Customer Engagement Ensure
  • 27. 27INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • The SC is responsible for project control and project coordination as well as the efficient bringing about of technical and organizational decisions. • In SC meetings, project management reports on the project status and introduces relevant issues that have to be decided by the SC. • The SC assures that resources necessary for the project‘s success are available. • The SC is the last escalation level for problems (conflict management). • The SC assumes highest-level control on costs and budget, and is responsible for budget release. • The SC is responsible for inspection and approval of results and of the overall project. Responsibilities of the Steering Committee
  • 28. 28INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ What is expected of key users during a SAP solution implementation project? • Make knowledgeable business decisions in your respective area of expertise and help to define the solution • Complete the implementation activities as assigned • Act as a multiplier within your organization to train and support end users • Learn how to configure the new system. Key Users
  • 29. 29INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Key User Responsibilities After Go-Live Incident Management • Search for solutions and process incidents from end users directly and when necessary, request help from SAP Manage Users and Task Assignment • Deal with user authorization requests • Maintain responsibilities for users in your company • Resolve any unassigned business tasks Manage Background Jobs, Input and Output • Monitor background jobs • Monitor internal/external communications such as printers and integration with third-parties Knowledge Transfer • Act as a multiplier within your organization to train and support new users of the SAP solution
  • 30. 30INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 31. 31INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Critical Success Factors •Scope changes will likely impact the project timeline, your required effort and consulting costs Stay within the agreed scope •Adjust your processes to fit the standard system functionality in order to simplify future upgrades and scope expansion. •It doesn’t have to be perfect. You can always improve a solution later. Have a pragmatic mindset •The quicker you can make decisions, the quicker your project will be able to proceed into the right direction. Make quick decisions •Identify and involve your stakeholder early - executives, employees, labor unions, key customers,… Involve stakeholders early •The better you represent your business area, the better the SAP cloud solution will support your processes. •Work with your manager to secure sufficient availability for the project. As a key user, actively contribute to the project •Start cleansing your data as soon as possible to prevent project issues and delays. Start preparing data early •Only thorough testing will result in a successful go-live and stable system. Never cut corners on testing
  • 32. 32INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ Standards of Project Communication Information Information Sender Information Recipient Frequency Form Status Report Customer PM SAP PM, SC Weekly Project Status Report Workshop Protocol SAP Key User, SAP PM, Customer PM After each meeting Result Protocol Steering Committee Report Customer PM Customer PM, SAP PM, Board After each meeting Steering Committee Meeting Minutes PM - Project Management SC - Steering Committee
  • 33. 33INTERNAL© 2017 SAP SE or an SAP affiliate company. All rights reserved. ǀ • Introduction • Solution Scope • Delivery Approach • Team Roles and Responsibilities • Critical Success Factors and Communication • Next Steps Agenda
  • 34. Thank you. Contact information: F name L name Title Address Phone number Partner logo