Weitere ähnliche Inhalte
Mehr von Valeria Ducharne (20)
Kürzlich hochgeladen (20)
P.primer piso
- 1. ESTACIONAMIENTO
PISO 2 +6 mts.
544.312 544.278
544.279
540.957 540.324
540.743
541.361
541.361
544.51
541.836
541.798
541.572
541.387
541.53
541.568
541.528
544.92
547.476
548.529
547.946
547.946
548.463
548.463
547.897
547.897
547.855 546.741
547.028
547.834
541.324
545.397
542.357
543.068
542.901
546.037
ACERA
ACERA
ACERA
ACERA
ACERA
COTA 550
+ 9 mts. + 9 mts.
+ 6 mts.
+ 6 mts.
+ 7 mts.
550.646 551.134
+ 8 mts.
+ 4 mts.
+ 3 mts.
PRIMER PISO.
%$f2
CABALLERO
UMA.
CUARTO DE
BASURA-LAVA
MOPAS
%$f2'$0$
DEPOSITO.
DEPOSITO.
ADMIISTRACION.
DEPOSITO.
GUARDERIA
AREA DE SERVICIOS
PARA CONFERENCIAS.
542.447
542.869
544.279
544.215 544.449 545.632
544.255
540.957 540.324
540.297 540.219
540.195
539.913 540.773
545
544.51
541.836
541.798
541.572
541.387
541.53
541.568
541.528
547.476
548.739 548.529
547.855
547.028
547.834
547.978
545.397
543.068
543.648
544.965
547.037
545.849
545.13
543.02
543.385
546.738
549.098
548.1
549.356
$9025È1
CARRERA 22
CALLE 8
CARRERA 23
UCLA
DECANATO DE
CONTADURIA
ACERA
545
545.738
544
547