Challenge: Keeping Up With Utah's Growing Pains
OGDEN
INFRASTRUCTURE
Mayor Mike Caldwell
The challenges facing Utah cities
to build, maintain, and operate
all types of transportation infrastructure.
Ogden Infrastructure
Overview of Current Maintenance Responsibilities
• 712 Lane Miles of Roadways in Ogden (305 road miles)
• about 14% maintained by UDOT – street surfaces only
• Street Maintenance:
• Provided by City crews

• Tree Maintenance in Park Strips:
• Urban Forester oversees in-house

as well as contracted work
• Curb & Gutter and Sidewalk Repair:
• Contracted to vendors by annual contract
Ogden Infrastructure
State of Current Infrastructure
Street Maintenance
1,079,813
756,077

70,000

48,000
10

Square Yards of
Paving

Budgeted

Square Yards of
Chip Seal

Backlog

backlog vs.

94

Lane Miles of
Crack Seal

annual budget for materials
25% of our Total B/C Allocation
Ogden Infrastructure
State of Current Infrastructure
Curb & Gutter

Not rated
17%
No Curb
and Gutter
12%
Poor to
Very Poor
27%

Very Good
17%

Good
27%

to replace nonfunctional
curb and gutter
Ogden Infrastructure
State of Current Infrastructure
Sidewalks

Poor to
Very Poor
33%

No sidewalk
29%

Fair to Very
Good
38%
to replace 33%
of sidewalk system
Ogden Infrastructure
Funding Demands
Street Maintenance
Curb & Gutter
Sidewalks
Backlog

• Actual spent: $5,454,053

in past six fiscal years
combined
• TOTAL Class C allocation:

$2,576,000 and we still
haven’t addressed any
other transportation needs
Ogden Infrastructure
Infrastructure’s Impact on Economic Development
Project Benefits
• Interstate access
• Grant Ave traffic signal
• Improved stacking control at

Wall Ave
• Safety at the high school
• Improved storm water control
• Grant Ave promenade

20th Street Reconstruction
Estimated Cost
Ogden Infrastructure
Infrastructure’s Impact on Economic Development
Impacts
• LDS Temple Reconstruction
• Town House Development
• School Development
• Mixed Use Developer

Opportunities
• And to the west of Lincoln,
New Juvenile Court

Revitalized 20th and Grant Ave
Ogden Infrastructure
Infrastructure’s Impact on Economic Development
Potential Benefits
• Ogden City development
•
•
•
•
•
•

opportunities
Connection to Marriott–Slaterville
Increase traffic volume capacity
Increase pavement weight
carrying capacity
Eliminate safety hazards
Improve alignment
Manage storm water

Estimated Cost

17th Street West - Wall to Gibson
Ogden Infrastructure
Infrastructure’s Impact on Economic Development

Open irrigation ditch

Uncontrolled shoulder widths
cause drainage issues

• Difficult to attract new

17th Street West

business because of
inadequate infrastructure.
Ogden Infrastructure
Ogden Infrastructure
Transportation Paradigm
Ogden Infrastructure

• America’s Fastest

• Best Bike-Friendly

Growing Cities

Cities in America

http://www.forbes.com/sites/morganbrennan/2
013/01/23/americas-fastest-growing-cities/

http://www.bicycling.com/news/featuredstories/bicyclings-top-50
Ogden Infrastructure
Vision of Active Transportation Corridors

Weitere ähnliche Inhalte

Was ist angesagt? (7)

Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4   ppt CM ReportAlamo Heights CCM 01.08.18 - Item #4   ppt CM Report
Alamo Heights CCM 01.08.18 - Item #4 ppt CM Report
 
Gbfw 2016 beef day alus
Gbfw 2016  beef day alusGbfw 2016  beef day alus
Gbfw 2016 beef day alus
 
F2 Restoring Vibrant Downtowns
F2 Restoring Vibrant DowntownsF2 Restoring Vibrant Downtowns
F2 Restoring Vibrant Downtowns
 
Northstar Business Park 5.7.11
Northstar Business Park 5.7.11Northstar Business Park 5.7.11
Northstar Business Park 5.7.11
 
Item # 10 - PPT COAH & TxDOT Resolution
Item # 10 - PPT COAH & TxDOT ResolutionItem # 10 - PPT COAH & TxDOT Resolution
Item # 10 - PPT COAH & TxDOT Resolution
 
Hebden Bridge Flood Alleviation Scheme
Hebden Bridge Flood Alleviation SchemeHebden Bridge Flood Alleviation Scheme
Hebden Bridge Flood Alleviation Scheme
 
Kirby Road Emergency Gravity Sewer Repair Completed November 2020
Kirby Road Emergency Gravity Sewer Repair Completed November 2020Kirby Road Emergency Gravity Sewer Repair Completed November 2020
Kirby Road Emergency Gravity Sewer Repair Completed November 2020
 

Ähnlich wie Governor's Transportation Summit - Municipal Highway Infrastructure Overview

Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Crosstown TO
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
UGPTI
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern Works
Crosstown TO
 

Ähnlich wie Governor's Transportation Summit - Municipal Highway Infrastructure Overview (20)

2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review2017 Comp Plan/UDO Review
2017 Comp Plan/UDO Review
 
Brad_Jones.ppt
Brad_Jones.pptBrad_Jones.ppt
Brad_Jones.ppt
 
Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016Pardon Our Dust meeting, March 9, 2016
Pardon Our Dust meeting, March 9, 2016
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
DC Buys 2018 - DDOT Infrastructure Project Management Division - Full Present...
 
sr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e studysr 90 sw 8th street at sw 87 avenue pd&e study
sr 90 sw 8th street at sw 87 avenue pd&e study
 
DOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant WorkshopDOPWIC Program Year 2020 Applicant Workshop
DOPWIC Program Year 2020 Applicant Workshop
 
Charlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program ProposalCharlotte Capital Improvement Program Proposal
Charlotte Capital Improvement Program Proposal
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
CIP Budget PC PowerPoint.pdf
CIP Budget PC PowerPoint.pdfCIP Budget PC PowerPoint.pdf
CIP Budget PC PowerPoint.pdf
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016Huntington Levee Community Meeting: Feb. 23, 2016
Huntington Levee Community Meeting: Feb. 23, 2016
 
County and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsCounty and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure Needs
 
Needs Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status ReportNeeds Study of North Dakota Roads and Bridges Status Report
Needs Study of North Dakota Roads and Bridges Status Report
 
Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017Huntington Levee Community Meeting: Nov. 1, 2017
Huntington Levee Community Meeting: Nov. 1, 2017
 
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
SMART Seminar Series: Public Infrastructure Investment in the 2000s: Lessons ...
 
Virtual Open House: Eastern Works
Virtual Open House: Eastern WorksVirtual Open House: Eastern Works
Virtual Open House: Eastern Works
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 

Mehr von Utah Department of Transportation

Mehr von Utah Department of Transportation (20)

Comprehensive RUC Presentation
Comprehensive RUC PresentationComprehensive RUC Presentation
Comprehensive RUC Presentation
 
UDOT Funding
UDOT FundingUDOT Funding
UDOT Funding
 
Appropriations 2015
Appropriations 2015Appropriations 2015
Appropriations 2015
 
Traffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs ReportTraffic Management Division Accomplishments and Needs Report
Traffic Management Division Accomplishments and Needs Report
 
Governor's Transportation Summit - UDOT Challenges
Governor's Transportation Summit - UDOT ChallengesGovernor's Transportation Summit - UDOT Challenges
Governor's Transportation Summit - UDOT Challenges
 
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
Governor's Transportation Summit - Salt Lake Chamber Utah Transportation Coal...
 
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...Governor's Transportation Summit - The Integral Relationship Between Freigh a...
Governor's Transportation Summit - The Integral Relationship Between Freigh a...
 
Governor's Transportation Summit - Ski Utah
Governor's Transportation Summit - Ski UtahGovernor's Transportation Summit - Ski Utah
Governor's Transportation Summit - Ski Utah
 
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...Governor's Transportation Summit - Reliable Mass Transportation Importance to...
Governor's Transportation Summit - Reliable Mass Transportation Importance to...
 
Governor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim CommitteeGovernor's Transportation Summit - Transportation Interim Committee
Governor's Transportation Summit - Transportation Interim Committee
 
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
Governor's Transportation Summit - The Transit Challenge: A Century of Moveme...
 
Governor's Transportation Summit - Transportation Funding
Governor's Transportation Summit - Transportation FundingGovernor's Transportation Summit - Transportation Funding
Governor's Transportation Summit - Transportation Funding
 
Vision for UDOT's Future
Vision for UDOT's FutureVision for UDOT's Future
Vision for UDOT's Future
 
Utah Highway Users Fall Meeting
Utah Highway Users Fall MeetingUtah Highway Users Fall Meeting
Utah Highway Users Fall Meeting
 
UDOT Program Update
UDOT Program UpdateUDOT Program Update
UDOT Program Update
 
Uintah Basin Energy and Transportation Study
Uintah Basin Energy and Transportation StudyUintah Basin Energy and Transportation Study
Uintah Basin Energy and Transportation Study
 
Utah Transportation Funding
Utah Transportation FundingUtah Transportation Funding
Utah Transportation Funding
 
ITE Presentation January 2013
ITE Presentation January 2013ITE Presentation January 2013
ITE Presentation January 2013
 
Utah's State Infrastructur Bank (Experience & Perspectives)
Utah's State Infrastructur Bank (Experience & Perspectives)Utah's State Infrastructur Bank (Experience & Perspectives)
Utah's State Infrastructur Bank (Experience & Perspectives)
 
UDOT Funding
UDOT FundingUDOT Funding
UDOT Funding
 

Kürzlich hochgeladen

CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
CaseThe legal victory in the turmeric patent case safeguarded traditional kno...CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
alpha012343210
 
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
Maurílio Júnior
 
#become occult member for money ritual +2349028448088
#become occult member for money ritual +2349028448088#become occult member for money ritual +2349028448088
#become occult member for money ritual +2349028448088
HOW TO JOIN SECRET OCCULT FOR MONEY RITUAL +2349028448088
 
World Politics as Black & White Iran and Israel or how people fall victims of...
World Politics as Black & White Iran and Israel or how people fall victims of...World Politics as Black & White Iran and Israel or how people fall victims of...
World Politics as Black & White Iran and Israel or how people fall victims of...
Muhammad Shamsaddin Megalommatis
 

Kürzlich hochgeladen (18)

CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
CaseThe legal victory in the turmeric patent case safeguarded traditional kno...CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
CaseThe legal victory in the turmeric patent case safeguarded traditional kno...
 
Embed-3-1-1.pdf The ECI direction on April 2, 2024 can be read here:
Embed-3-1-1.pdf  The ECI direction on April 2, 2024 can be read here:Embed-3-1-1.pdf  The ECI direction on April 2, 2024 can be read here:
Embed-3-1-1.pdf The ECI direction on April 2, 2024 can be read here:
 
israeil_bnetaniahou_panel_report_eng.pdf
israeil_bnetaniahou_panel_report_eng.pdfisraeil_bnetaniahou_panel_report_eng.pdf
israeil_bnetaniahou_panel_report_eng.pdf
 
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatóriosR$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
R$ 78 milhões: Estado aprova 593 propostas para acordos diretos de precatórios
 
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
Embed-4-3 (1).pdf cvxx'f['df[p'lf][l][fl][fl][][l[
 
17052024_First India Newspaper Jaipur.pdf
17052024_First India Newspaper Jaipur.pdf17052024_First India Newspaper Jaipur.pdf
17052024_First India Newspaper Jaipur.pdf
 
#become occult member for money ritual +2349028448088
#become occult member for money ritual +2349028448088#become occult member for money ritual +2349028448088
#become occult member for money ritual +2349028448088
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Musina
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In MusinaTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Musina
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Musina
 
Dominican American Coalition PAC Executive Summary
Dominican American Coalition PAC Executive SummaryDominican American Coalition PAC Executive Summary
Dominican American Coalition PAC Executive Summary
 
Press-Information-Bureau-14-given-citizenship.pdf
Press-Information-Bureau-14-given-citizenship.pdfPress-Information-Bureau-14-given-citizenship.pdf
Press-Information-Bureau-14-given-citizenship.pdf
 
Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!Have A Complimentary Cheat Sheet, On Us!!!
Have A Complimentary Cheat Sheet, On Us!!!
 
16052024_First India Newspaper Jaipur.pdf
16052024_First India Newspaper Jaipur.pdf16052024_First India Newspaper Jaipur.pdf
16052024_First India Newspaper Jaipur.pdf
 
World Politics as Black & White Iran and Israel or how people fall victims of...
World Politics as Black & White Iran and Israel or how people fall victims of...World Politics as Black & White Iran and Israel or how people fall victims of...
World Politics as Black & White Iran and Israel or how people fall victims of...
 
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;jEmbed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
Embed-4-1-1.pdf vm ;sdkp[kdp[kpdkpodp;p;j
 
Encore portal Project PPt on live portal
Encore portal Project PPt on live portalEncore portal Project PPt on live portal
Encore portal Project PPt on live portal
 
19052024_First India Newspaper Jaipur.pdf
19052024_First India Newspaper Jaipur.pdf19052024_First India Newspaper Jaipur.pdf
19052024_First India Newspaper Jaipur.pdf
 
Positive Effects Of Social Media On Mental Health
Positive Effects Of Social Media On Mental HealthPositive Effects Of Social Media On Mental Health
Positive Effects Of Social Media On Mental Health
 
21052024_First India Newspaper Jaipur.pdf
21052024_First India Newspaper Jaipur.pdf21052024_First India Newspaper Jaipur.pdf
21052024_First India Newspaper Jaipur.pdf
 

Governor's Transportation Summit - Municipal Highway Infrastructure Overview

  • 1. MUNICIPAL HIGHWAY INFRASTRUCTURE OVERVIEW November 5, 2013 Governor’s Transportation Summit Challenge: Keeping Up With Utah's Growing Pains
  • 2. OGDEN INFRASTRUCTURE Mayor Mike Caldwell The challenges facing Utah cities to build, maintain, and operate all types of transportation infrastructure.
  • 3. Ogden Infrastructure Overview of Current Maintenance Responsibilities • 712 Lane Miles of Roadways in Ogden (305 road miles) • about 14% maintained by UDOT – street surfaces only • Street Maintenance: • Provided by City crews • Tree Maintenance in Park Strips: • Urban Forester oversees in-house as well as contracted work • Curb & Gutter and Sidewalk Repair: • Contracted to vendors by annual contract
  • 4. Ogden Infrastructure State of Current Infrastructure Street Maintenance 1,079,813 756,077 70,000 48,000 10 Square Yards of Paving Budgeted Square Yards of Chip Seal Backlog backlog vs. 94 Lane Miles of Crack Seal annual budget for materials 25% of our Total B/C Allocation
  • 5. Ogden Infrastructure State of Current Infrastructure Curb & Gutter Not rated 17% No Curb and Gutter 12% Poor to Very Poor 27% Very Good 17% Good 27% to replace nonfunctional curb and gutter
  • 6. Ogden Infrastructure State of Current Infrastructure Sidewalks Poor to Very Poor 33% No sidewalk 29% Fair to Very Good 38% to replace 33% of sidewalk system
  • 7. Ogden Infrastructure Funding Demands Street Maintenance Curb & Gutter Sidewalks Backlog • Actual spent: $5,454,053 in past six fiscal years combined • TOTAL Class C allocation: $2,576,000 and we still haven’t addressed any other transportation needs
  • 8. Ogden Infrastructure Infrastructure’s Impact on Economic Development Project Benefits • Interstate access • Grant Ave traffic signal • Improved stacking control at Wall Ave • Safety at the high school • Improved storm water control • Grant Ave promenade 20th Street Reconstruction Estimated Cost
  • 9. Ogden Infrastructure Infrastructure’s Impact on Economic Development Impacts • LDS Temple Reconstruction • Town House Development • School Development • Mixed Use Developer Opportunities • And to the west of Lincoln, New Juvenile Court Revitalized 20th and Grant Ave
  • 10. Ogden Infrastructure Infrastructure’s Impact on Economic Development Potential Benefits • Ogden City development • • • • • • opportunities Connection to Marriott–Slaterville Increase traffic volume capacity Increase pavement weight carrying capacity Eliminate safety hazards Improve alignment Manage storm water Estimated Cost 17th Street West - Wall to Gibson
  • 11. Ogden Infrastructure Infrastructure’s Impact on Economic Development Open irrigation ditch Uncontrolled shoulder widths cause drainage issues • Difficult to attract new 17th Street West business because of inadequate infrastructure.
  • 14. Ogden Infrastructure • America’s Fastest • Best Bike-Friendly Growing Cities Cities in America http://www.forbes.com/sites/morganbrennan/2 013/01/23/americas-fastest-growing-cities/ http://www.bicycling.com/news/featuredstories/bicyclings-top-50
  • 15. Ogden Infrastructure Vision of Active Transportation Corridors