VIETNAMESE NUCLEAR
DEVELOPMENT
PROGRAMME
UNCLASSIFIED

ENG. PHAN MINH TUAN
DEPUTY DIRECTOR
NINH THUAN NUCLEAR POWER PROJECT MANAGEMENT BOARD
VIETNAM ELECTRICITY

London, January 2014
I

Development policy

UNCLASSIFIED
POWER DEVELOPMENT PLAN
3

National Power Development Plan for the period 2011 – 2020, with vision to
2030 (PDP7)

Growth of power demand: 12 
15%/year
UNCLASSIFIED
TENTATIVE PLANNING SITES FOR
CONSTRUCTION OF NPPS
4

The tentative planning sites for construction
of nuclear power plants was approved by
the Prime Minister, including 07 candidate
sites, each site is potential to construct from
4-6 units.
The tentative capacity for each plant:

Plant

Capacity (MW)

Ninh Thuan 1 phase 1, unit 1+2

1000  2

Ninh Thuan 2 phase 1, unit 1+2

1000  2

Ninh Thuan 1 phase 2, unit 3+4

1000  2

Ninh Thuan 2 phase 2, unit 3+4

1000  2

5 tentative sites (4  6 units for
each)

1000 or 1300 
1500 (after 2025)
UNCLASSIFIED
DEVELOPMENT POLICY



Investment policy
•

•



First four units of Ninh Thuan are assigned to Electricity of Vietnam as
Project Owner.
The next units will be considered to assign to other State Owned
Corporations or Joint Ventures.

Technology policy
•

Selection of modern, safety and proven technology as well as possibility
of technology transfer



Localization policy



Fuel policy: up to 2030, the fuel is imported



Radioactive waste management:
•



Low radioactive waste and spent fuel are storage at NPP, Conducting
sitting for long-term low and medium radioactive waste disposal.

Intensive international cooperation in investment and technology
UNCLASSIFIED
transfer.
II

Nuclear Infrastructure

UNCLASSIFIED
KEY ISSUES



Regulatory and legislative framework



Human resources development



Nuclear safety and safeguard



Radiation protection and physical protection.



Emergency planning



Nuclear fuel and radioactive waste management

UNCLASSIFIED
INFRASTRUCTURE DEVELOPMENT STATUS

UNCLASSIFIED
LEGISLATIVE AND REGULATORY
FRAMEWORK (1)
9

Law

Decrees

Atomic Energy
Regulation & Guidance on implementing some Articles of
the Law;
Detailed Regulation & Guidance on Implementing Some
Articles of the Law relating to NPP

Decisions of
Prime Minister

Developing Orientation; Regulation on nuclear control;
Training & Development of HR; Environmental Monitoring &
Radioactive Warning; Storage, Disposal Sites of Radioactive
Waste; Measures to Guaranty Safety & Security; Capability
Building for R&D & Technical support; etc.

Circulars

Radiation activities, Regulation on Radiation safety, Inspection,
Control of Nuclear Materials, Nuclear safety for Sites of NPP,
Forms of Investment monitoring & Evaluation Reports, etc.

Codes &
Standards

Thousands of codes & standards equivalent to IEC, ISO,
CODEX, etc.
UNCLASSIFIED
LEGISLATIVE AND REGULATORY
FRAMEWORK (2)







International legal
activities in force.

instruments

governing

nuclear

Need to enact a comprehensive nuclear law.
Need to develop and promulgate other legislation
affected by nuclear power programme
Adaptation of the vendors’ regulatory system is required
great time and effort

UNCLASSIFIED
HUMAN RESOURCES DEVELOPMENT







Personnel for R&D, safety and security in atomic energy filed.

Personnel working in regulatory bodies to implement
regulations, codes and standards for plant licensing, site
approval, operator licensing, radiation protection, safeguards,
waste management, decommissioning, etc.
Expertise working in educational institutions.
Personnel for nuclear power plant management of construction
phase and operation phase.




Business and
management

technical

expertise

for

procurement

Expertise to conduct training programs for O&M

UNCLASSIFIED

and
STAFFING SCHEDULE FOR NPP PROJECT
12

NPB
Pre-Operation under NPB
Operator Organization under EVN

1200
1000

Milestone 1
Number of persons

Milestone 3

Milestone 2

800

<---Phase 1-->
600

<------------- Phase 2------------>
Bid Preparations

400
200

<------------- Phase 3 ------------>
Design, Construct, Comm'n

0
0

1

2

3

4

5

6

7

8

9

10

Year
UNCLASSIFIED

11

12

13

14

15

16
STAFFING SCHEDULE FOR NPP PROJECT
13

COD -5

COD -3
(EPC)

COD -2

COD

Participate in the installation
and commissioning activities

Establishment of the
operational takeover
procedure

OJT

Establishment of
training center

Operator training
O&M staff training

Radiation staff training

Others
UNCLASSIFIED

COD + 2
Takeover of the
operation
HUMAN RESOURCES DEVELOPMENT POLICY
14

Long-term education and training:
• Local education & training (assigned universities & training centers, training programs
of MoET and MoIT );
• Dispatching personnel abroad for Ph.D, Master/Engineer (Russia, Japan, Sweden, Czech
Republic, France, Korea, etc.)
Short-term training:
• Dispatching personnel abroad for short training courses.
• Workshops, conferences and training courses with the assistance of IAEA

Vietnam needs a strong support from nuclear developed countries in
developing human resources related to project management, nuclear safety
and security, waste management, fuel management, etc. via workshops,
conferences and long-term training programs to meet the human resource
demand timely.

UNCLASSIFIED
IIi

NPP project implementing procedure

UNCLASSIFIED
MAIN RESPONSIBILITIES OF KEY STAKEHOLDERS
16

Preparation of FS Report: EVN (future owner/operator) with
assistance from international consultants

FS Approval: Prime Minister with assistance from the National
Appraisal Committee, and

Construction:
• Construction Licensing: MoST
• Construction Monitoring: EVN

Operation:
• Trial Operation Licensing: MoIT
• Operation Licensing: MoIT

UNCLASSIFIED
FS APPROVAL PROCEDURE
17

National Appraisal Committee

EVN
Prime
Minister

FS report

FS Appraisal

FS Approval

MoST

Draft
FS

Owner’s
consultant

Verify

NCNS

Verification
of FS SAR

Comments

MONRE
Verification
of EIA report

NAEC
Comments

MoIT
Comments
on the basic
design,
technology….

Provincial People’s
Committee

Comments

UNCLASSIFIED

Prime Minister
STATE MANAGEMENT SYSTEM (1)
18

Prime Minister

National Atomic Energy
Council

National Nuclear
Safety Council

National Appraisal
Committee

Ministries

Provincial People’s
Committee

National Appraisal Committee:
Verify of FS and report the verification result to the P.M
The Committee could employ local or foreign consultants to assist the Committee in
UNCLASSIFIED
verifying or reviewing the FS report.
STATE MANAGEMENT SYSTEM (1)
19

National Atomic Energy Council:
To be an adviser to the Prime Minister on orientation, strategy and application of
atomic energy development.
Co-ordinate the operation of Ministries, ministerial organizations, etc.

Cooperation with international organizations, experienced countries in nuclear field
National Nuclear Safety Council:
To be an adviser to the Prime Minister on the policy and nuclear safety measures in
using atomic energy, in the operation of NPP and emergency response.
Review the reports on the verification results of trial operation and SAR of NPP, etc.
Taking investigation, discussion and holding the consultation with Vietnamese and
foreign experts and specialists in issues related to nuclear field.

UNCLASSIFIED
STATE MANAGEMENT SYSTEM (2)
20

MoIT

MoST

MoNRE

GDoE

VARANS

EIA

EVN

Verify
SAR

Verify
EIA
report

NPB
Authorities in charge of verifying SAR (Vietnam Agency for Radiation
and Nuclear Safety - VARANS) and EIA (Agency for Environmental
Impact Assessment and Appraisal – EIA) could employ or invite
Vietnamese or foreign organizations which have the capability for
verifying the reports partly or wholly.
UNCLASSIFIED
TWO FIRST NPP PLANT PROJECTS (1)

EVN is assigned to be the owner of the six component projects under the
Ninh Thuan nuclear power project:
1. Ninh Thuan 1 nuclear power plant project (2000MW)
2. Ninh Thuan 2 nuclear power plant project (2000MW)
3. Project on infrastructure for construction of nuclear power plants in Ninh
Thuan province (infrastructure project)
4. Project on operation management zone, expert zone, headquarters of Ninh
Thuan nuclear power project management board (EVNNPB)
5. Project on Public Relation Center for nuclear power
6. Project on human resource training for nuclear power plants in Ninh Thuan
province

UNCLASSIFIED
TWO FIRST NPP PLANT PROJECTS (2)
22

Ninh Thuan 1:
- FS & SAD development consultant: consortium E4 Group, JSC KIEP and
LLC EPT, Russia.
- Owner’s Consultant: being selected.
- The consultant on developing technical design: Russian Consultants.
The final report of FS and SAD have been submitted.
Ninh Thuan 2:
- FS & SAD development consultant: JAPC, Russia.
- Owner’s Consultant: has been selected.
-The consultant on developing technical design: not yet selected.
The final report of FS and SAD have been submitted.
Other component projects: local consultants
UNCLASSIFIED
TENTATIVE UPCOMING STEPS
23

2014: Appraisal & Approval of FS Report & SAD

2014-2016: Investigation and development of technical
design/total cost estimation for construction base; site
preparation and base mat

2015-2017: Development of Technical Design for the NPP
project, application and obtaining of construction license

2015-2017: Construction drawings and construction of
construction base; site preparation; base mat excavation and
other related works

2017-2024: EPC contract; FCD (2017); commissioning of the
first unit in 2023 and the second unit 2024
UNCLASSIFIED
SUMMARY
24

As a new emerging country in nuclear field, Vietnam has faced
many difficulties and challenges with regard to the nuclear
infrastructure
For the up-coming steps of the construction of the two first NPPs,
Vietnam calls upon the support from rich experienced countries
and organizations in nuclear field to:
Develop regulatory and legislative documents.
 Verify the reports on Safety Assessment and Environmental
Impact Assessment.
Develop Human resources

UNCLASSIFIED
THANK YOU FOR YOUR ATTENTION!

UNCLASSIFIED

Weitere ähnliche Inhalte

Was ist angesagt?

Proposed Mining Engineering Profession Bill and its Implications to Geotherma...
Proposed Mining Engineering Profession Bill and its Implications to Geotherma...Proposed Mining Engineering Profession Bill and its Implications to Geotherma...
Proposed Mining Engineering Profession Bill and its Implications to Geotherma...Fernando Penarroyo
 
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas Field
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas FieldAn Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas Field
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas FieldFernando Penarroyo
 
From sheltertonsc
From sheltertonscFrom sheltertonsc
From sheltertonscjikocho
 
The Youth’s Role in Reconciling Development and Environmental Sustainability
The Youth’s Role in Reconciling Development and Environmental SustainabilityThe Youth’s Role in Reconciling Development and Environmental Sustainability
The Youth’s Role in Reconciling Development and Environmental SustainabilityFernando Penarroyo
 
Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...theijes
 

Was ist angesagt? (6)

Proposed Mining Engineering Profession Bill and its Implications to Geotherma...
Proposed Mining Engineering Profession Bill and its Implications to Geotherma...Proposed Mining Engineering Profession Bill and its Implications to Geotherma...
Proposed Mining Engineering Profession Bill and its Implications to Geotherma...
 
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas Field
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas FieldAn Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas Field
An Educational Discussion on Dennis Uy's Acquisition of Malampaya Gas Field
 
From sheltertonsc
From sheltertonscFrom sheltertonsc
From sheltertonsc
 
The Youth’s Role in Reconciling Development and Environmental Sustainability
The Youth’s Role in Reconciling Development and Environmental SustainabilityThe Youth’s Role in Reconciling Development and Environmental Sustainability
The Youth’s Role in Reconciling Development and Environmental Sustainability
 
Ria aerb
Ria aerbRia aerb
Ria aerb
 
Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...Strengthening National Regulatory Capabilities InCountries Embarking On New C...
Strengthening National Regulatory Capabilities InCountries Embarking On New C...
 

Andere mochten auch

Market Briefing. South korea. 27th January
Market Briefing. South korea. 27th JanuaryMarket Briefing. South korea. 27th January
Market Briefing. South korea. 27th JanuaryUKTI2014
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryUKTI2014
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryUKTI2014
 
Market Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryMarket Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryUKTI2014
 
David Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th JanuaryDavid Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th JanuaryUKTI2014
 
Gerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th JanuaryGerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th JanuaryUKTI2014
 

Andere mochten auch (6)

Market Briefing. South korea. 27th January
Market Briefing. South korea. 27th JanuaryMarket Briefing. South korea. 27th January
Market Briefing. South korea. 27th January
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
 
Market Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th JanuaryMarket Briefing. Japan part 2. 28th January
Market Briefing. Japan part 2. 28th January
 
Market Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryMarket Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th January
 
David Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th JanuaryDavid Edwards. Engineering Construction Training Board. 28th January
David Edwards. Engineering Construction Training Board. 28th January
 
Gerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th JanuaryGerrit Zenner. Sarens UK Ltd. 29th January
Gerrit Zenner. Sarens UK Ltd. 29th January
 

Ähnlich wie Market Briefing. Vietnam. 27th January

Breakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power plantBreakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power planthasansust20
 
RCARO_Presentation_to_RCA_Stakeholders.ppt
RCARO_Presentation_to_RCA_Stakeholders.pptRCARO_Presentation_to_RCA_Stakeholders.ppt
RCARO_Presentation_to_RCA_Stakeholders.pptssuserb523ad
 
EXIT SPEECH FOR BANGLADESH
EXIT SPEECH FOR BANGLADESHEXIT SPEECH FOR BANGLADESH
EXIT SPEECH FOR BANGLADESHPeter ORMAI
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectivesleann_mays
 
An Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsAn Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsJoe Bacchus
 
Japan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJapan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJoe Bacchus
 
Vienna,Febbraio2010
Vienna,Febbraio2010Vienna,Febbraio2010
Vienna,Febbraio2010gbnet54
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryUKTI2014
 
Citon's involvement in the development and implementation of SMR in Romania ai
Citon's involvement in the development and implementation of SMR in Romania aiCiton's involvement in the development and implementation of SMR in Romania ai
Citon's involvement in the development and implementation of SMR in Romania aiIulianNita4
 
Current trends in EIA
Current trends in EIACurrent trends in EIA
Current trends in EIAtesdev
 
CCXG Global Forum March 2018, Reporting technology related information in Vi...
CCXG Global Forum March 2018, Reporting technology related information in Vi...CCXG Global Forum March 2018, Reporting technology related information in Vi...
CCXG Global Forum March 2018, Reporting technology related information in Vi...OECD Environment
 
CCXG Global Forum March 2018, Reporting technology related information in Vie...
CCXG Global Forum March 2018, Reporting technology related information in Vie...CCXG Global Forum March 2018, Reporting technology related information in Vie...
CCXG Global Forum March 2018, Reporting technology related information in Vie...OECD Environment
 
Localisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code OpportunitiesLocalisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code OpportunitiesMark Mitchell
 
An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAlexander Wolski
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2B. BHASKAR
 

Ähnlich wie Market Briefing. Vietnam. 27th January (20)

Breakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power plantBreakout_Infrastructure of nuclear power plant
Breakout_Infrastructure of nuclear power plant
 
RCARO_Presentation_to_RCA_Stakeholders.ppt
RCARO_Presentation_to_RCA_Stakeholders.pptRCARO_Presentation_to_RCA_Stakeholders.ppt
RCARO_Presentation_to_RCA_Stakeholders.ppt
 
EXIT SPEECH FOR BANGLADESH
EXIT SPEECH FOR BANGLADESHEXIT SPEECH FOR BANGLADESH
EXIT SPEECH FOR BANGLADESH
 
bwr-tt102es
bwr-tt102esbwr-tt102es
bwr-tt102es
 
02 orrell international perspectives
02 orrell international perspectives02 orrell international perspectives
02 orrell international perspectives
 
An Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor RestartsAn Update on Fukushima Recovery and Reactor Restarts
An Update on Fukushima Recovery and Reactor Restarts
 
Japan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy PolicyJapan’s current Nuclear Energy Policy
Japan’s current Nuclear Energy Policy
 
Vienna,Febbraio2010
Vienna,Febbraio2010Vienna,Febbraio2010
Vienna,Febbraio2010
 
Market Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th JanuaryMarket Briefing. Malaysia. 27th January
Market Briefing. Malaysia. 27th January
 
Citon's involvement in the development and implementation of SMR in Romania ai
Citon's involvement in the development and implementation of SMR in Romania aiCiton's involvement in the development and implementation of SMR in Romania ai
Citon's involvement in the development and implementation of SMR in Romania ai
 
Hidroelektrane
HidroelektraneHidroelektrane
Hidroelektrane
 
Current trends in EIA
Current trends in EIACurrent trends in EIA
Current trends in EIA
 
CCXG Global Forum March 2018, Reporting technology related information in Vi...
CCXG Global Forum March 2018, Reporting technology related information in Vi...CCXG Global Forum March 2018, Reporting technology related information in Vi...
CCXG Global Forum March 2018, Reporting technology related information in Vi...
 
CCXG Global Forum March 2018, Reporting technology related information in Vie...
CCXG Global Forum March 2018, Reporting technology related information in Vie...CCXG Global Forum March 2018, Reporting technology related information in Vie...
CCXG Global Forum March 2018, Reporting technology related information in Vie...
 
Localisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code OpportunitiesLocalisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code Opportunities
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
An Architect Engineers Response to Fukushima
An Architect Engineers Response to FukushimaAn Architect Engineers Response to Fukushima
An Architect Engineers Response to Fukushima
 
AAEA presentation.ppt
AAEA presentation.pptAAEA presentation.ppt
AAEA presentation.ppt
 
Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2Aem 606 eia eac-b9-2
Aem 606 eia eac-b9-2
 

Mehr von UKTI2014

Nuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply ChainNuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply ChainUKTI2014
 
Galleon suite 28th market briefings
Galleon suite 28th market briefingsGalleon suite 28th market briefings
Galleon suite 28th market briefingsUKTI2014
 
Galleon suite 27th market briefings
Galleon suite 27th market briefingsGalleon suite 27th market briefings
Galleon suite 27th market briefingsUKTI2014
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' UKTI2014
 
Ian Tough. Weir Group. 29th January
Ian Tough. Weir Group.  29th JanuaryIan Tough. Weir Group.  29th January
Ian Tough. Weir Group. 29th JanuaryUKTI2014
 
Richard Smith. Wall Rover Ltd. 29th January
Richard Smith. Wall Rover Ltd.  29th JanuaryRichard Smith. Wall Rover Ltd.  29th January
Richard Smith. Wall Rover Ltd. 29th JanuaryUKTI2014
 
Neil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th JanuaryNeil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th JanuaryUKTI2014
 
Ron Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th JanuaryRon Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th JanuaryUKTI2014
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryUKTI2014
 
Rob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th JanuaryRob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th JanuaryUKTI2014
 
Market Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th JanuaryMarket Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th JanuaryUKTI2014
 
India presentation 2
India presentation 2India presentation 2
India presentation 2UKTI2014
 
Cevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th JanuaryCevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th JanuaryUKTI2014
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryUKTI2014
 
Fiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th JanuaryFiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th JanuaryUKTI2014
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th JanuaryUKTI2014
 
Graham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th JanuaryGraham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th JanuaryUKTI2014
 
Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryUKTI2014
 
Market Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th JanuaryMarket Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th JanuaryUKTI2014
 
Market Briefing. India part 1. 27th January
Market Briefing. India part 1. 27th JanuaryMarket Briefing. India part 1. 27th January
Market Briefing. India part 1. 27th JanuaryUKTI2014
 

Mehr von UKTI2014 (20)

Nuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply ChainNuclear Showcase 29th January - Manufacturing and the Supply Chain
Nuclear Showcase 29th January - Manufacturing and the Supply Chain
 
Galleon suite 28th market briefings
Galleon suite 28th market briefingsGalleon suite 28th market briefings
Galleon suite 28th market briefings
 
Galleon suite 27th market briefings
Galleon suite 27th market briefingsGalleon suite 27th market briefings
Galleon suite 27th market briefings
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 
Ian Tough. Weir Group. 29th January
Ian Tough. Weir Group.  29th JanuaryIan Tough. Weir Group.  29th January
Ian Tough. Weir Group. 29th January
 
Richard Smith. Wall Rover Ltd. 29th January
Richard Smith. Wall Rover Ltd.  29th JanuaryRichard Smith. Wall Rover Ltd.  29th January
Richard Smith. Wall Rover Ltd. 29th January
 
Neil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th JanuaryNeil Foreman. Centronic Ltd. 29th January
Neil Foreman. Centronic Ltd. 29th January
 
Ron Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th JanuaryRon Gorham. Nuclear Decommissioning Authority. 29th January
Ron Gorham. Nuclear Decommissioning Authority. 29th January
 
Market Briefing. USA. 28th January
Market Briefing. USA. 28th JanuaryMarket Briefing. USA. 28th January
Market Briefing. USA. 28th January
 
Rob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th JanuaryRob Buckingham. OC Robotics. 28th January
Rob Buckingham. OC Robotics. 28th January
 
Market Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th JanuaryMarket Briefing. Japan part 1. 28th January
Market Briefing. Japan part 1. 28th January
 
India presentation 2
India presentation 2India presentation 2
India presentation 2
 
Cevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th JanuaryCevn Vibert. Thales UK. 28th January
Cevn Vibert. Thales UK. 28th January
 
Nigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th JanuaryNigel Houlton. EDF Energy. 28th January
Nigel Houlton. EDF Energy. 28th January
 
Fiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th JanuaryFiona Reilly. Price Waterhouse Cooper. 28th January
Fiona Reilly. Price Waterhouse Cooper. 28th January
 
Tim Stone. 28th January
Tim Stone. 28th JanuaryTim Stone. 28th January
Tim Stone. 28th January
 
Graham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th JanuaryGraham Fairhall. National Nuclear Laboratory. 28th January
Graham Fairhall. National Nuclear Laboratory. 28th January
 
Paul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th JanuaryPaul Littler. Atkins Global. 28th January
Paul Littler. Atkins Global. 28th January
 
Market Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th JanuaryMarket Briefing. India part 3. 27th January
Market Briefing. India part 3. 27th January
 
Market Briefing. India part 1. 27th January
Market Briefing. India part 1. 27th JanuaryMarket Briefing. India part 1. 27th January
Market Briefing. India part 1. 27th January
 

Kürzlich hochgeladen

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityWSO2
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Angeliki Cooney
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 

Kürzlich hochgeladen (20)

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 

Market Briefing. Vietnam. 27th January

  • 1. VIETNAMESE NUCLEAR DEVELOPMENT PROGRAMME UNCLASSIFIED ENG. PHAN MINH TUAN DEPUTY DIRECTOR NINH THUAN NUCLEAR POWER PROJECT MANAGEMENT BOARD VIETNAM ELECTRICITY London, January 2014
  • 3. POWER DEVELOPMENT PLAN 3 National Power Development Plan for the period 2011 – 2020, with vision to 2030 (PDP7) Growth of power demand: 12  15%/year UNCLASSIFIED
  • 4. TENTATIVE PLANNING SITES FOR CONSTRUCTION OF NPPS 4 The tentative planning sites for construction of nuclear power plants was approved by the Prime Minister, including 07 candidate sites, each site is potential to construct from 4-6 units. The tentative capacity for each plant: Plant Capacity (MW) Ninh Thuan 1 phase 1, unit 1+2 1000  2 Ninh Thuan 2 phase 1, unit 1+2 1000  2 Ninh Thuan 1 phase 2, unit 3+4 1000  2 Ninh Thuan 2 phase 2, unit 3+4 1000  2 5 tentative sites (4  6 units for each) 1000 or 1300  1500 (after 2025) UNCLASSIFIED
  • 5. DEVELOPMENT POLICY  Investment policy • •  First four units of Ninh Thuan are assigned to Electricity of Vietnam as Project Owner. The next units will be considered to assign to other State Owned Corporations or Joint Ventures. Technology policy • Selection of modern, safety and proven technology as well as possibility of technology transfer  Localization policy  Fuel policy: up to 2030, the fuel is imported  Radioactive waste management: •  Low radioactive waste and spent fuel are storage at NPP, Conducting sitting for long-term low and medium radioactive waste disposal. Intensive international cooperation in investment and technology UNCLASSIFIED transfer.
  • 7. KEY ISSUES  Regulatory and legislative framework  Human resources development  Nuclear safety and safeguard  Radiation protection and physical protection.  Emergency planning  Nuclear fuel and radioactive waste management UNCLASSIFIED
  • 9. LEGISLATIVE AND REGULATORY FRAMEWORK (1) 9 Law Decrees Atomic Energy Regulation & Guidance on implementing some Articles of the Law; Detailed Regulation & Guidance on Implementing Some Articles of the Law relating to NPP Decisions of Prime Minister Developing Orientation; Regulation on nuclear control; Training & Development of HR; Environmental Monitoring & Radioactive Warning; Storage, Disposal Sites of Radioactive Waste; Measures to Guaranty Safety & Security; Capability Building for R&D & Technical support; etc. Circulars Radiation activities, Regulation on Radiation safety, Inspection, Control of Nuclear Materials, Nuclear safety for Sites of NPP, Forms of Investment monitoring & Evaluation Reports, etc. Codes & Standards Thousands of codes & standards equivalent to IEC, ISO, CODEX, etc. UNCLASSIFIED
  • 10. LEGISLATIVE AND REGULATORY FRAMEWORK (2)     International legal activities in force. instruments governing nuclear Need to enact a comprehensive nuclear law. Need to develop and promulgate other legislation affected by nuclear power programme Adaptation of the vendors’ regulatory system is required great time and effort UNCLASSIFIED
  • 11. HUMAN RESOURCES DEVELOPMENT     Personnel for R&D, safety and security in atomic energy filed. Personnel working in regulatory bodies to implement regulations, codes and standards for plant licensing, site approval, operator licensing, radiation protection, safeguards, waste management, decommissioning, etc. Expertise working in educational institutions. Personnel for nuclear power plant management of construction phase and operation phase.   Business and management technical expertise for procurement Expertise to conduct training programs for O&M UNCLASSIFIED and
  • 12. STAFFING SCHEDULE FOR NPP PROJECT 12 NPB Pre-Operation under NPB Operator Organization under EVN 1200 1000 Milestone 1 Number of persons Milestone 3 Milestone 2 800 <---Phase 1--> 600 <------------- Phase 2------------> Bid Preparations 400 200 <------------- Phase 3 ------------> Design, Construct, Comm'n 0 0 1 2 3 4 5 6 7 8 9 10 Year UNCLASSIFIED 11 12 13 14 15 16
  • 13. STAFFING SCHEDULE FOR NPP PROJECT 13 COD -5 COD -3 (EPC) COD -2 COD Participate in the installation and commissioning activities Establishment of the operational takeover procedure OJT Establishment of training center Operator training O&M staff training Radiation staff training Others UNCLASSIFIED COD + 2 Takeover of the operation
  • 14. HUMAN RESOURCES DEVELOPMENT POLICY 14 Long-term education and training: • Local education & training (assigned universities & training centers, training programs of MoET and MoIT ); • Dispatching personnel abroad for Ph.D, Master/Engineer (Russia, Japan, Sweden, Czech Republic, France, Korea, etc.) Short-term training: • Dispatching personnel abroad for short training courses. • Workshops, conferences and training courses with the assistance of IAEA Vietnam needs a strong support from nuclear developed countries in developing human resources related to project management, nuclear safety and security, waste management, fuel management, etc. via workshops, conferences and long-term training programs to meet the human resource demand timely. UNCLASSIFIED
  • 15. IIi NPP project implementing procedure UNCLASSIFIED
  • 16. MAIN RESPONSIBILITIES OF KEY STAKEHOLDERS 16 Preparation of FS Report: EVN (future owner/operator) with assistance from international consultants FS Approval: Prime Minister with assistance from the National Appraisal Committee, and Construction: • Construction Licensing: MoST • Construction Monitoring: EVN Operation: • Trial Operation Licensing: MoIT • Operation Licensing: MoIT UNCLASSIFIED
  • 17. FS APPROVAL PROCEDURE 17 National Appraisal Committee EVN Prime Minister FS report FS Appraisal FS Approval MoST Draft FS Owner’s consultant Verify NCNS Verification of FS SAR Comments MONRE Verification of EIA report NAEC Comments MoIT Comments on the basic design, technology…. Provincial People’s Committee Comments UNCLASSIFIED Prime Minister
  • 18. STATE MANAGEMENT SYSTEM (1) 18 Prime Minister National Atomic Energy Council National Nuclear Safety Council National Appraisal Committee Ministries Provincial People’s Committee National Appraisal Committee: Verify of FS and report the verification result to the P.M The Committee could employ local or foreign consultants to assist the Committee in UNCLASSIFIED verifying or reviewing the FS report.
  • 19. STATE MANAGEMENT SYSTEM (1) 19 National Atomic Energy Council: To be an adviser to the Prime Minister on orientation, strategy and application of atomic energy development. Co-ordinate the operation of Ministries, ministerial organizations, etc. Cooperation with international organizations, experienced countries in nuclear field National Nuclear Safety Council: To be an adviser to the Prime Minister on the policy and nuclear safety measures in using atomic energy, in the operation of NPP and emergency response. Review the reports on the verification results of trial operation and SAR of NPP, etc. Taking investigation, discussion and holding the consultation with Vietnamese and foreign experts and specialists in issues related to nuclear field. UNCLASSIFIED
  • 20. STATE MANAGEMENT SYSTEM (2) 20 MoIT MoST MoNRE GDoE VARANS EIA EVN Verify SAR Verify EIA report NPB Authorities in charge of verifying SAR (Vietnam Agency for Radiation and Nuclear Safety - VARANS) and EIA (Agency for Environmental Impact Assessment and Appraisal – EIA) could employ or invite Vietnamese or foreign organizations which have the capability for verifying the reports partly or wholly. UNCLASSIFIED
  • 21. TWO FIRST NPP PLANT PROJECTS (1) EVN is assigned to be the owner of the six component projects under the Ninh Thuan nuclear power project: 1. Ninh Thuan 1 nuclear power plant project (2000MW) 2. Ninh Thuan 2 nuclear power plant project (2000MW) 3. Project on infrastructure for construction of nuclear power plants in Ninh Thuan province (infrastructure project) 4. Project on operation management zone, expert zone, headquarters of Ninh Thuan nuclear power project management board (EVNNPB) 5. Project on Public Relation Center for nuclear power 6. Project on human resource training for nuclear power plants in Ninh Thuan province UNCLASSIFIED
  • 22. TWO FIRST NPP PLANT PROJECTS (2) 22 Ninh Thuan 1: - FS & SAD development consultant: consortium E4 Group, JSC KIEP and LLC EPT, Russia. - Owner’s Consultant: being selected. - The consultant on developing technical design: Russian Consultants. The final report of FS and SAD have been submitted. Ninh Thuan 2: - FS & SAD development consultant: JAPC, Russia. - Owner’s Consultant: has been selected. -The consultant on developing technical design: not yet selected. The final report of FS and SAD have been submitted. Other component projects: local consultants UNCLASSIFIED
  • 23. TENTATIVE UPCOMING STEPS 23 2014: Appraisal & Approval of FS Report & SAD 2014-2016: Investigation and development of technical design/total cost estimation for construction base; site preparation and base mat 2015-2017: Development of Technical Design for the NPP project, application and obtaining of construction license 2015-2017: Construction drawings and construction of construction base; site preparation; base mat excavation and other related works 2017-2024: EPC contract; FCD (2017); commissioning of the first unit in 2023 and the second unit 2024 UNCLASSIFIED
  • 24. SUMMARY 24 As a new emerging country in nuclear field, Vietnam has faced many difficulties and challenges with regard to the nuclear infrastructure For the up-coming steps of the construction of the two first NPPs, Vietnam calls upon the support from rich experienced countries and organizations in nuclear field to: Develop regulatory and legislative documents.  Verify the reports on Safety Assessment and Environmental Impact Assessment. Develop Human resources UNCLASSIFIED
  • 25. THANK YOU FOR YOUR ATTENTION! UNCLASSIFIED