SlideShare ist ein Scribd-Unternehmen logo
1 von 75
Rule Levels and  Gate Operation ,[object Object],[object Object],[object Object],[object Object]
Operation  Of  Reservoir ,[object Object],[object Object],[object Object]
Maximum Water Level. (MWL). ,[object Object]
Minimum Draw Down Level(MDDL) ,[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object]
STORAGE ,[object Object],[object Object],[object Object],[object Object]
STORAGE ,[object Object],[object Object],[object Object],[object Object]
STORAGE ,[object Object],[object Object],[object Object],[object Object]
Reservoir  Routing ,[object Object]
Rule Level
Rule Level ,[object Object]
Purpose of Rule Level ,[object Object],[object Object],[object Object],[object Object],[object Object]
CONCEPT OF STORAGE ZONING Crest RL MDDL Surcharge Storage MWL Dead Storage Conservation Storage Flood Control Storage Top of dam Spillway Undersluices Dam River Free board FRL Rule Level
Space between FRL And MWL ,[object Object],[object Object],Crest RL MDDL Surcharge   Storage MWL Dead Storage Conservation Storage Flood Control Storage Top of dam Spillway Under sluices Dam River Free board FRL Temporary Storage for Controlling flood by increasing outflow. Rule Level
Rule Curve ,[object Object]
Rule Curves A reservoir is operated according to prevailing water level, demands for various purposes,  and the elevation of rule levels for different purposes  To increase the flexibility of operation,  different  rule curves may be derived for  different purposes depending on their  priority.
Role of Rule Levels ,[object Object],[object Object],[object Object],[object Object]
Min. required flow Natural flow D I S C H A R G E Non-damaging flow Water deficit Flood damage Demand Time Min. flow deficit
Flood Space ,[object Object],[object Object],[object Object],[object Object]
Basis For Rule Level. ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
CONSERVATION OPERATION URC MRC LRC
CONSERVATION OPERATION ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],CONSERVATION OPERATION
CONSERVATION OPERATION Operation of a reservoir using Rule Curves: If reservoir level falls below LRC, meet only  partial highest priority demands Basic principle – It is always better to meet reduced demands throughout the year than to meet full  demands in the beginning with no water at the end.
Two or More Reservoir ,[object Object]
Initial/First Filling Of Reservoir. ,[object Object],[object Object],[object Object],[object Object],[object Object]
Initial/First Filling Of Reservoir. ,[object Object],[object Object],[object Object],[object Object],[object Object]
How Rule Level Decided In First Filling  Of  Reservoir. ,[object Object],[object Object],[object Object]
How Rule Levels are Derived?
How Rule Levels are Derived? ,[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],System Engineering Techniques
Optimisation of Rule Levels ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
How Daily Rule Levels are Derived? ,[object Object],[object Object],[object Object]
Quick method ,[object Object],[object Object],[object Object],[object Object],[object Object]
Working Table Analysis ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Data required ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO OF R.L.   Reservoir             SCHEME     level as  1-07 1-08 1-09 1-10 16-10     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   RAJKOT IRRIGATION PROJECT CIRCLE , RAJKOT 1 UND-II 12.15 18.25 13.90 17.75 17.75 18.25 18.25 18.25 2 VARTU-II 33.85 39.95 33.12 39.65 39.95 39.95 39.95 39.95 3 FULZAR(K.B) 89.75 95.85 89.75 94.85 94.85 95.35 95.85 95.85 4 DEMI-III 19.50 25.60 -- 23.60 24.30 25.00 25.60 25.60 5 SURVO 93.75 99.85 96.00 99.00 99.50 99.85 99.85 99.85 6 DONDI 100.67 103.70 0.00 102.80 102.80 102.80 102.80 102.80 7 KARNUKI 161.45 164.50 159.00 162.00 162.50 163.00 163.50 163.50 8 BANTWA KHARO 13.20 16.25 13.60 15.25 15.75 16.25 16.25 16.25
SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO. OF R.L.   Reservoir             SCHEME     level as  1-07-09 1-08-09 1-09-09 1-10-09 16-10-09     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   RAJKOT IRRIGATION  CIRCLE , RAJKOT 1 MOTISAR 141.00 143.00 139.50 143.00 143.00 143.00 143.00 143.00 2 BHADAR - I 106.09 107.92 103.08 107.30 107.60 107.92 107.92 107.92 3 MOJ 71.02 72.54 64.40 72.54 72.54 72.54 72.54 72.54 4 VENU-II 48.91 55.00 47.40 54.00 54.50 55.00 55.00 55.00 5 BANGAWADI 41.05 42.65 36.32 42.65 42.65 42.65 42.65 42.65 6 NYARI-II 82.40 88.50 85.00 88.50 88.50 88.50 88.50 88.50 7 GHODADHROI 92.20 98.30 Nil 97.70 98.00 98.00 98.30 98.30 8 CHHAPARWADI-II 90.15 98.38 Nil 98.00 98.38 98.38 98.38 98.38 9 KARMAL 162.90 169.00 Nil 168.70 169.00 169.00 169.00 169.00 10 NIMBHANI 131.45 134.50 Nil 134.20 134.50 134.50 134.50 134.50
SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO. OF R.L.   Reservoir             SCHEME     level as  1-07-09 1-08-09 1-09-09 1-10-09 16-10-09     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   BHAVNAGAR IRRIGATION CIRCLE , BHAVNAGAR 1 SHETRUNJI 54.63 55.55 46.67 55.25 55.25 55.55 55.55 55.55 2 HAMIRPARA 81.70 87.80 -- 87.00 87.50 87.50 87.80 87.80 3 LAKHANKA 38.12 44.22 -- 44.22 44.22 44.22 44.22 44.22 4 KHODIYAR 196.58 202.68 193.50 201.00 202.25 202.50 202.68 202.68 5 SUKHBHADAR 103.10 109.20 102.50 107.20 107.70 109.20 109.20 109.20 6 KHAMBHADA 46.69 50.35 48.30 49.00 49.75 50.35 50.35 50.35 7 RANGHOLA 60.98 62.50 -- 62.50 62.50 62.50 62.50 62.50 8 MALAN 102.74 104.25 -- 104.25 104.25 104.25 104.25 104.25 9 MALPARA 72.00 78.10 -- 76.50 77.25 77.80 78.10 78.10
Points To Be Examined Critically. ,[object Object],[object Object],[object Object]
Computational procedure DATA RL-Cap-Area Chart
Computational procedure DATA- DEMANDS Sr Period Demand Evap Depth   From To irri WS m 1   1-Oct 0 0 0 2 21-Sep 30-Sep 112.00 0 0.029 3 11-Sep 30-Sep 255.10 0 0.058 4 1-Sep 30-Sep 372.52 0 0.088 5 21-Aug 30-Sep 541.88 0 0.114 6 11-Aug 30-Sep 698.28 0 0.141 7 1-Aug 30-Sep 844.95 0 0.167 8 21-Jul 30-Sep 887.63 0 0.198 9 11-Jul 30-Sep 919.45 0 0.229 10 1-Jul 30-Sep 968.30 0 0.260
Computational procedure DATA- 10-DAILY INFLOW SERIES
Computational procedure DATA- 10-DAILY INFLOW SERIES ARRANGED IN DESCENDING ORDER
COMPUTATION OF RULE LEVELS FRL = 105.157 m (345 FT) Surplus = (Inflow – Total Demand)
UKAI RES. PROJ.(1973-2006,  CARR  ( By RWT.exe ) -------------------------------- RESERVOIR  WORKING  TABLE ------------------------- ****************************** ** ALL FIGURES ARE IN  MKS ** PAGE  1 ****************************** F.R.L.  ....................  105.150 L.W.L.  ....................  82.300 CAPACITY  AT  F.R.L.  ......  7497.000 CAPACITY  AT  L.W.L.  ......  882.000 DESIGN  CARRYOVER  .........  .000 WATER  SUPPLY  RESERVATION..  .000 IRRIGABLE AREA..............  10000.00 JUL  AUG  SEP  OCT  NOV  DEC  JAN  FEB  MAR  APR  MAY  JUN   IRRI. REQ.  123.3  472.4  372.5  260.3  326.9  349.1  404.6  444.1  413.2  436.7  470.0  314.5  ****** TOTAL REQ.  123.3  472.4  372.5  260.3  326.9  349.1  404.6  444.1  413.2  436.7  470.0  314.5  ****** EVAP. DEP.  .101  .101  .152  .203  .152  .127  .127  .127  .203  .229  .254  .203  1.98 --------------------------------------------------------------------------------------------------------- OPEN.  CORS. IN  ABSTRACT  RES.  EVEP TOT.  CORS  SPI  %  YEAR MON  TOTAL  ----------  AREA  AL  BAL  LL TH  BAL.  RL  FLOW  IRRI  W/S (AV)  LOSS ABST  RL.  DEF ---------------------------------------------------------------------------------------------------------- 2001 JUL  882.0  82.3 1153.0 2035.0  123.3  .0  166.0  16.8  140.1 1894.9  89.2  .0  .0 AUG 1894.9  89.2 2386.0 4280.9  472.4  .0  255.9  25.8  498.3 3782.6  95.9  .0  .0 SEP 3782.6  95.9  943.0 4725.6  372.5  .0  334.3  50.8  423.3 4302.3  97.3  .0  .0 OCT 4302.3  97.3  508.0 4810.3  260.3  .0  352.1  71.5  331.7 4478.5  97.8  .0  .0 NOV 4478.5  97.8  333.0 4811.5  326.9  .0  355.8  54.1  381.0 4430.6  97.7  .0  .0 DEC 4430.6  97.7  281.0 4711.6  349.1  .0  351.3  44.6  393.7 4317.9  97.3  .0  .0 JAN 4317.9  97.3  265.0 4582.9  404.6  .0  343.9  43.7  448.3 4134.6  96.8  .0  .0 FEB 4134.6  96.8  191.0 4325.6  444.1  .0  331.6  42.1  486.2 3839.4  96.0  .0  .0 MAR 3839.4  96.0  222.0 4061.4  413.2  .0  315.9  64.1  477.3 3584.1  95.3  .0  .0 APR 3584.1  95.3  224.0 3808.1  436.7  .0  298.3  68.3  505.0 3303.1  94.4  .0  .0 MAY 3303.1  94.4  266.0 3569.1  470.0  .0  281.4  71.5  541.4 3027.7  93.5  .0  .0 JUN 3027.7  93.5  374.0 3401.7  314.5  .0  273.5  55.5  370.1 3031.6  93.5  .0  .0       NO. OF FAIL YEARS =  0   %AGE RELIABILITY =100.0
UKAI RES. PROJ.(1973-2006,  CARR -------------------------------- RESERVOIR  WORKING  TABLE ------------------------- ****************************** ** ALL FIGURES ARE IN  MKS ** PAGE  1 ****************************** F.R.L.  ....................  105.150 L.W.L.  ....................  82.300 CAPACITY  AT  F.R.L.  ......  7497.000 CAPACITY  AT  L.W.L.  ......  882.000 DESIGN  CARRYOVER  .........  1699.000 WATER  SUPPLY  RESERVATION..  .000 IRRIGABLE AREA..............  10000.00 JUL  AUG  SEP  OCT  NOV  DEC  JAN  FEB  MAR  APR  MAY  JUN   IRRI. REQ.  123.3  472.4  372.5  260.3  326.9  349.1  404.6  444.1  413.2  436.7  470.0  314.5  ******   TOTAL REQ.  123.3  472.4  372.5  260.3  326.9  349.1  404.6  444.1  413.2  436.7  470.0  314.5  ******   EVAP. DEP.  .101  .101  .152  .203  .152  .127  .127  .127  .203  .229  .254  .203  1.98 --------------------------------------------------------------------------------------------------------- OPEN.  CORS. IN  ABSTRACT  RES.  EVEP  TOT.  CORS  SPI  %  YEAR MON  TOTAL----------  AREA  AL  BAL  LL TH  BAL.  RL  FLOW  IRRI  W/S  (AV)  LOSS  ABST  RL.  DEF --------------------------------------------------------------------------------------------------------- 2001 JUL 2581.0  92.0 1153.0 3734.0  123.3  .0  275.2  27.8  151.1 3582.9  95.2  .0  .0 AUG 3582.9  95.2 2386.0 5968.9  472.4  .0  357.0  36.1  508.5 5460.4  100.3  .0  .0 SEP 5460.4  100.3  943.0 6403.4  372.5  .0  429.9  65.3  437.9 5965.5  101.5  .0  .0 OCT 5965.5  101.5  508.0 6473.5  260.3  .0  451.3  91.6  351.9 6121.6  101.9  .0  .0 NOV 6121.6  101.9  333.0 6454.6  326.9  .0  454.3  69.1  395.9 6058.7  101.8  .0  .0 DEC 6058.7  101.8  281.0 6339.7  349.1  .0  448.3  56.9  406.0 5933.7  101.5  .0  .0 JAN 5933.7  101.5  265.0 6198.7  404.6  .0  437.8  55.6  460.2 5738.5  101.0  .0  .0 FEB 5738.5  101.0  191.0 5929.5  444.1  .0  421.5  53.5  497.6 5431.9  100.2  .0  .0 MAR 5431.9  100.2  222.0 5653.9  413.2  .0  404.3  82.1  495.3 5158.6  99.6  .0  .0 APR 5158.6  99.6  224.0 5382.6  436.7  .0  387.1  88.6  525.3 4857.3  98.8  .0  .0 MAY 4857.3  98.8  266.0 5123.3  470.0  .0  370.2  94.0  564.0 4559.3  98.0  .0  .0 JUN 4559.3  98.0  374.0 4933.3  314.5  .0  361.4  73.4  387.9 4545.4  98.0  .0  .0 --------------------------------------------------------------------------------------------------------- NO. OF FAIL YEARS =  0 %AGE RELIABILITY =100.0
UKAI RESERVOIR PROJECT 10-daily Rule Levels with capacity of 1992-93 sedimentation survey F.R.L. 105.157 m Sr Period Inflow Demand Evap  Total Surplus Res. Res. Rule Level   From To       Depth Losses Demand   Cap R.L.           irri WS m           m 1   01-Oct 0.00 0.00 0.00 0.000 0.0000 0.00 0.00 7497.00 105.16 105.00 2 21-Sep 30-Sep 30.10 112.00 0.00 0.029 16.4305 128.43 0.00 7497.00 105.16 105.00 3 11-Sep 30-Sep 154.68 255.10 0.00 0.058 32.8611 287.96 0.00 7497.00 105.16 105.00 4 01-ep 30-Sep 296.79 372.52 0.00 0.088 49.8582 422.38 0.00 7497.00 105.16 105.00 5 21-Aug 30-Sep 1072.80 541.88 0.00 0.114 59.9273 601.81 470.99 7026.01 104.06 104.00 6 11-Aug 30-Sep 2402.32 698.28 0.00 0.141 61.9216 760.20 1642.12 5854.88 101.27 101.00 7 01-ug 30-Sep 2720.95 844.95 0.00 0.167 71.5751 916.53 1804.42 5692.58 100.88 101.00 8 21-Jul 30-Sep 3646.63 887.63 0.00 0.198 74.4870 962.12 2684.51 4812.49 98.67 99.00 9 11-Jul 30-Sep 4231.68 919.45 0.00 0.229 79.2032 998.65 3233.03 4263.97 97.20 97.00 10 01-Jul 30-Sep 4399.68 968.30 0.00 0.260 88.4701 1056.77 3342.91 4154.09 96.90 97.00
UKAI RESERVOIR PROJECT 10-daily Rule Levels (75% dependability with capacity of 2003 sedimentation survey F.R.L. 105.157 m Sr Period   Inflow Demand Evap Evap  Total  Surplus Cap Res. RL Rule    From To       depth losses demand       level         irri WS m             1   1-Oct 0.00 0.00 0.00 0.000 0.0000 0.00 0.00 7414.29 105.16 105.00 2 21-Sep 30-Sep 134.33 112.00 0.00 0.029 17.7535 129.75 4.58 7409.71 105.15 105.00 3 11-Sep 30-Sep 345.12 255.10 0.00 0.058 35.3237 290.42 54.70 7359.59 105.06 105.00 4 1-Sep 30-Sep 735.78 372.52 0.00 0.088 52.1710 424.69 311.09 7103.20 104.62 105.00 5 21-Aug 30-Sep 1622.43 541.88 0.00 0.114 62.5135 604.39 1018.04 6396.25 103.39 103.00 6 11-Aug 30-Sep 3074.63 698.28 0.00 0.141 65.9070 764.19 2310.44 5103.85 100.84 101.00 7 1-Aug 30-Sep 4227.87 844.95 0.00 0.167 67.5210 912.47 3315.40 4098.89 98.53 99.00 8 21-Jul 30-Sep 4859.18 887.63 0.00 0.198 72.9897 960.62 3898.56 3515.73 97.02 97.00 9 11-Jul 30-Sep 5431.59 919.45 0.00 0.229 77.3732 996.82 4434.77 2979.52 95.51 96.00 10 1-Jul 30-Sep 5488.46 968.30 0.00 0.260 87.8869 1056.19 4432.27 2982.02 95.52 96.00
RULE CURVES BASED ON 1992-93 & 2003 RESERVOIR CAPACITY
In following cases  concurrence  of concerned  C. E. is  required. ,[object Object],[object Object],[object Object]
Rule Level for  Flood Control ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Rule Level for Flood Control ,[object Object],[object Object],[object Object],[object Object],[object Object]
Rule Level for Flood Control ,[object Object],[object Object],[object Object],[object Object],[object Object]
MWL/OUTFLOW ATTAINED FOR VARIOUS FLOODS ROUTED AT DIFF. ELEVATIONS MULTIPLYING FACTOR RESERVOIR LEVEL IN M 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 122.00 123.06 124.00 124.95 125.83 126.69 127.48 128.29 129.10 4750. 5941. 7238. 8521. 9870. 11170. 12532. 13914. 122.50 123.27 124.14 125.04 125.89 126.73 127.51 128.31 129.11 5006. 6121. 7359. 8608. 9927. 11214. 12565. 13940. 123.00 123.49 124.29 125.14 125.96 126.78 127.54 128.33 129.13 5289. 6320. 7506. 8726. 10004. 11271. 12612. 13975. 123.50 123.73 124.46 125.26 126.06 126.84 127.59 128.37 129.16 5583. 6559. 7682. 8879. 10107. 11351. 12676. 14026. 124.00 124.06 124.70 125.42 126.20 126.93 127.66 128.43 129.21 6016. 6884. 7920. 9087. 10259. 11472. 12773. 14101. 124.50 124.50 124.95 125.60 126.34 127.04 127.75 128.50 129.26 6610. 7229. 8186. 9315. 10436. 11624. 12896. 14199.
MWL/OUTFLOW ATTAINED FOR VARIOUS FLOODS ROUTED AT DIFF. ELEVATIONS MULTIPLYING FACTOR RESERVOIR LEVEL IN M 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 125.00 125.00 125.20 125.81 126.50 127.17 127.86 128.59 129.34 7306. 7593. 8497. 9568. 10648. 11812. 13052. 14325. 125.50 125.50 125.55 126.07 126.69 127.33 128.01 128.71 129.44 8031. 8107. 8890. 9866. 10916. 12055. 13260. 14501. 126.00 126.00 126.00 126.34 126.90 127.50 128.16 128.85 129.56 8784. 8784. 9311. 10203. 11203. 12319. 13495. 14703. 126.50 126.50 126.50 126.64 127.12 127.69 128.33 129.00 129.70 9563. 9563. 9781. 10566. 11521. 12606. 13755. 14936. 127.00 127.00 127.00 127.02 127.40 127.95 128.54 129.19 129.87 10368. 10368. 10396 11033. 11950. 12968. 14080. 15233. 127.41 127.41 127.41 127.41 127.65 128.16 128.74 129.36 130.02 11046. 11046. 11046. 11449. 12315. 13297. 14357. 15483.
Space between FRL And MWL ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
GATE OPERATION ,[object Object],[object Object],[object Object],[object Object]
Computer Programming For Gate Operation ( PGCP.EXE ) Data File :  PGDAT Line 1 : Name of Scheme Line 2 : Hd  CRL  FRL  Avg Bed RL  No.of Gate  Wg  Hg  0 Line 3 : X-ordinate of Gate Seat  Radius of Gate  Xt  Yt  1  0 Example :  PGDAT SURVO WATER RESOURCES PROJECT 20  307  575  327  588  303  17  16  30  20  0 5.712  24  28.661  6.0367  1  0 Output File : File 1  PGCPO File 2  PGOUT Note : Conversion Factor from meter to ft. is only 3.28 Correct. Because 3.28 is used for programming.
SURVO WATER RESOURCES PROJECT ( Partial Gate Opening ) RES.  DISC. AT VARIOUS GATE OPENINGS IN M. IN  CUMECS ELEV. IN M.  .15  .30  .60  .90  1.20  1.50  1.80  2.10  2.40  2.70  3.00  3.30  3.60  3.90  4.20  4.50  4.80  5.10  5.40  5.70  6.00 -------------------------------------------------------------------------------------------------------------------------------------------------- 93.75  0 93.80  0  0 94.00  0  0  0 94.20  46  87  0  0 94.40  53  101  0  0  0 94.60  59  114  210  0  0  0 94.80  64  125  235  0  0  0  0 95.00  69  135  258  364  0  0  0  0 95.20  73  145  278  398  0  0  0  0  0 95.40  78  154  297  429  546  0  0  0  0  0 95.60  82  162  316  458  588  0  0  0  0  0  0 95.80  86  170  333  485  626  755  0  0  0  0  0  0 96.00  90  178  349  511  663  803  0  0  0  0  0  0  0 96.20  93  185  365  536  698  849  988  0  0  0  0  0  0  0 96.40  97  192  380  559  730  892  1043  0  0  0  0  0  0  0  0 96.60  100  199  394  582  762  934  1095  1246  0  0  0  0  0  0  0  0 96.80  103  206  408  604  793  974  1145  1307  0  0  0  0  0  0  0  0  0 97.00  106  212  421  625  822  1011  1193  1365  1527  0  0  0  0  0  0  0  0  0 97.20  109  219  434  645  850  1048  1239  1421  1593  0  0  0  0  0  0  0  0  0  0 97.40  112  225  447  665  877  1084  1283  1475  1658  1831  0  0  0  0  0  0  0  0  0  0 97.60  115  230  459  684  903  1118  1326  1527  1719  1903  0  0  0  0  0  0  0  0  0  0  0 97.80  118  236  471  702  929  1151  1368  1577  1779  1973  0  0  0  0  0  0  0  0  0  0  0 98.00  121  242  483  721  954  1184  1408  1626  1837  2041  2238  0  0  0  0  0  0  0  0  0  0 98.20  123  247  494  738  979  1215  1447  1673  1893  2106  2313  0  0  0  0  0  0  0  0  0  0 98.40  126  253  505  756  1002  1246  1485  1719  1947  2169  2386  2596  0  0  0  0  0  0  0  0  0 98.60  129  258  516  772  1026  1276  1523  1764  2000  2231  2457  2677  0  0  0  0  0  0  0  0  0 98.80  131  263  527  789  1048  1305  1559  1808  2052  2290  2525  2755  2979  0  0  0  0  0  0  0  0 99.00  134  268  537  805  1071  1334  1594  1850  2102  2349  2592  2832  3065  0  0  0  0  0  0  0  0 99.20  136  273  547  821  1092  1362  1629  1892  2151  2406  2658  2906  3149  3385  0  0  0  0  0  0  0 99.40  139  278  557  836  1114  1390  1663  1933  2199  2461  2721  2978  3230  3476  0  0  0  0  0  0  0 99.60  141  283  567  852  1135  1417  1696  1973  2246  2516  2784  3049  3309  3565  3815  0  0  0  0  0  0 99.80  143  287  577  867  1155  1443  1729  2012  2292  2569  2845  3118  3387  3652  3912  0  0  0  0  0  0 99.85  144  289  579  871  1160  1450  1737  2022  2304  2583  2860  3135  3406  3673  3936  4195  0  0  0  0  0 100.00  0  292  586  881  1176  1469  1761  2050  2337  2621  2904  3185  3463  3736  4005  4271  0  0  0  0  0 100.20  0  0  596  896  1195  1495  1792  2088  2381  2673  2963  3252  3537  3819  4098  4373  0  0  0  0  0 100.40  0  0  0  910  1215  1520  1823  2125  2425  2723  3020  3316  3610  3900  4187  4472  4753  0  0  0  0 100.60  0  0  0  0  1234  1545  1854  2162  2468  2772  3076  3380  3681  3979  4275  4569  4859  0  0  0  0 100.80  0  0  0  0  0  1569  1884  2197  2510  2820  3132  3442  3751  4057  4361  4664  4964  5262  0  0  0 101.00  0  0  0  0  0  1593  1913  2233  2551  2868  3186  3504  3820  4133  4446  4757  5066  5374  0  0  0 101.20  0  0  0  0  0  0  1942  2267  2591  2915  3239  3564  3887  4208  4528  4848  5166  5483  5798  0  0 101.40  0  0  0  0  0  0  0  0  2632  2961  3292  3623  3953  4282  4610  4938  5264  5591  5915  0  0 101.60  0  0  0  0  0  0  0  0  0  3006  3343  3681  4018  4354  4690  5026  5360  5696  6029  6360  0 101.80  0  0  0  0  0  0  0  0  0  0  3394  3738  4082  4426  4769  5112  5455  5799  6141  6482  0 102.00  0  0  0  0  0  0  0  0  0  0  0  3795  4146  4496  4846  5197  5548  5900  6252  6602  6951 102.20  0  0  0  0  0  0  0  0  0  0  0  0  0  4565  4922  5281  5639  6000  6360  6719  7077 102.40  0  0  0  0  0  0  0  0  0  0  0  0  0  0  4997  5363  5729  6098  6467  6834  7202 102.60  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  5818  6195  6572  6948  7325 102.80  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  7060  7445 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Table : 1
SURVO WATER RESOURCES PROJECT ( Free Discharge ) SPILLWAY RATING TABLE FOR 16 NO.OF RADIAL GATES OF SIZE 30. X 20. -------------------------------------------------------------------------------------------------------------------------------   RES.  DISCHARGE IN CUMECS ELEV. IN m.  .00  .05  .10  .15  .20  .25  .30  .35  .40  .45  .50  .55  .60  .65  .70  .75  .80  .85  .90  .95 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 93.00  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  0  6  12  19  25 94.00  32  38  50  62  74  87  99  111  126  142  159  175  191  207  225  245  265  284  304  323 95.00  344  367  389  412  434  457  481  506  532  557  582  608  634  662  690  718  746  774  803  833 96.00  864  895  925  956  987  1020  1053  1086  1119  1152  1185  1221  1256  1291  1327  1362  1398  1436  1474  1511 97.00  1549  1587  1625  1665  1705  1745  1785  1826  1866  1908  1950  1992  2034  2076  2118  2162  2207  2251  2295  2340 98.00  2384  2430  2476  2522  2568  2614  2660  2708  2756  2804  2852  2900  2949  2998  3048  3098  3149  3199  3249  3300 99.00  3353  3405  3458  3510  3562  3615  3669  3723  3777  3831  3886  3940  3996  4052  4108  4164  4220  4277  4334  4391 100.00  4449  4506  4563  4620  4680  4739  4798  4857  4916  4975  5036  5097  5158  5219  5280  5341  5404  5467  5530  5593 101.00  5655  5718  5782  5845  5909  5973  6037  6100  6165  6231  6296  6361  6427  6492  6559  6626  6693  6760  6827  6894 102.00  6962  7031  7100  7169  7237  7306  7375  7445  7515  7585  7655  7725  7795  7867  7938  8010  8081  8153  8224  8297 103.00  8369  8442  8514  8586  8659  8733  8807  8881  8955  9029  9103  9177  9252  9327  9402  9476  9551  9627  9703  9780 104.00  9856  9932 10008 10085 10163 10241 10318 10396 10474 10552 10631 10710 10789 10869 10948 11027 11108 11188 11269 11349 105.00 11430 11511 11593 11675 11757 11839 11921 12003 12086 12170 12253 12336 12419 12503 12586 12669 12753 12836 12919 13003 106.00 13086 13169 13253 13336 13419 13503 13586 13669 13752 13836 13919 14002 14086 14169 14252 14336 14419 14502 14586 14669 ------------------------------------------------------------------------------------------------------------------------------------  ----------------------------------------------------------------------------------------------------- Table : 1(a)
Plate - 1 Note : 1.Spillway is equipped with 7 No.of  Vertical Lift Gate of Size 9.14 m X 3.05 m.( 30’ X 10’ ) 2. All Gates are assumed to be opened uniformly. 3. Gate opening Represents vertical distance of lower edge of gate above gate seat in cms. 4. As the FRL & MWL of Kaniyad W.R.Project are same ( 02.25m.) Free & Partial discharge curves up to RL 102.25m.have been drawn. 5. Partial Curve indicates discharge through all Gates. 6. Transition Zone in corporate here is subject to modification on model Run.
(A)Operation guidelines for reservoir condition below FRL When flood starts impounding reservoir, the following guide lines may be observed. 1)  Note the rule level  fixed for  the current period. 2)  Note the PWL and its corresponding discharging capacity at current elevation from free discharge curve in Plate-1. 3)  If the PWL is below rule level , fill the reservoir up to scheduled rule level. Example: Current rule level = 46.00m Current reservoir level = 43.00m Operation: Fill the reservoir up to RL 46.00m
4)  Thereafter, release outflow corresponding to inflow rate by gate operation either partially or under free discharge from the graph as shown in  Plate-1 or Table no.1 Example: Radial gates 22 No. Size 14.93m x 10.67m FRL =  53.10m Current rule level = 46.00m   Current reservoir level = 46.0m   Q free at RL 46.00m =  3965 m 3 /s   Operation:  Generally there will be two cases  (a)  Inflow rate is less than free discharging capacity. ( Q = 2790 m 3 /s )  (b) Inflow rate is more than free discharging capacity.( Q = 6000 m 3 /s  ) So for each case, it would be necessary to maintain current rule level by controlling the discharge in the following way. a)Example:  For inflow rate = 2790 m 3 /s (Less than free discharging capacity 3965 m 3 /s), reduce outflow equal to inflow by opening all gates partially with gate opening =180cm b) Example: For inflow rate =  6000 m 3 /s (more than free discharging capacity 3965 m3/s), allow free discharge of 6000 m 3 /s by opening all gates above water profile( above RL 46.00m). So  that the level will build up resulting in to increased free outflow.
5)  Repeat this procedure for making outflow equal to inflow approximately until reservoir elevation stops raising and information is received from u/s wireless system that the recession of flood has been started. 6) Operate gates at 1 hr. to 2 hr. intervals , following Plate-1 and decrease  outflow gradually when the flood starts receding and rate of rise in water level  decreased or fall in water level has been observed. During the process of fall in water level of reservoir, take care that the water level does not fall below scheduled rule level, by suitable gate operation , keeping the outflow restricted within maximum safe carrying capacity of river channel d/s of dam. 7) Close all the gates  gradually when water level in the reservoir is again back to the scheduled rule curve level. 8) Know Inflow from forecast station in u/s of dam or u/s projects. 9) To know inflow from rise/fall of water level in reservoir when there is  no existence of forecast station in u/s of dam for information of inflow rate  incoming when inflow rate can be decided earlier observed rate of rise or fall in the reservoir water levels by using  Plate-2
How Plate-2 can be used is shown in the below illustrated example .
Example : Survo.dat SURVO WATER RESOURCES PROJECT 16  93.75  99.85 93.75  94.0  94.5  95.0  95.5  96.0  96.5  97.0  97.5  98.0  98.5  99.0 99.5  100.0  100.5  101.0 0.87  1.01  1.48  1.95  2.56  3.16  4.11  5.05  6.20  7.35  8.93  10.50 12.50  14.61  17.18  19.75 For Rate of Change of Storage per Hour in Equivalent Discharge Computer Programme :  RMK.EXE Line 1 : Name of Scheme Line 2 : No.of RL-Cap Ordinates CRL FRL  Line 3 : RL Ordinates. Line 4 : Capacity Ordinates.
Survo.out ( RMK.EXE ) Table no.3 SURVO WATER RESOURCES PROJECT Table Showing Rate of Change of Storage per Hour in Equivalent Discharge Reservoir   EQ. DISCHARGE ( Cumec )  AT VARIOUS RISE/FALL( m / hr)     Level                     m 0.30 0.60 0.90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 1 2 3 4 5 6 7 8 9 10 11 93.75 49.31 111.81 174.31 236.81 309.03 383.06 456.39 544.31 646.81 748.61 94.50 78.33 155.28 229.45 303.06 376.39 478.89 581.11 682.78 796.11 915.28 95.00 90.00 179.72 268.89 366.94 469.44 571.11 678.61 797.78 916.94 1036.11 95.50 100.83 207.50 325.83 443.61 561.11 680.28 799.44 918.61 1061.67 1216.67 96.00 129.17 258.33 387.50 520.55 655.56 790.56 932.22 1087.22 1241.67 1395.83 96.50 157.50 311.11 456.95 603.33 750.00 920.84 1091.39 1261.39 1444.72 1634.72 97.00 174.17 348.61 523.61 703.05 884.72 1066.39 1256.11 1461.95 1673.89 1888.89 97.50 191.67 389.44 599.45 809.44 1019.45 1236.11 1456.11 1682.78 1927.22 2180.56 98.00 227.50 454.72 681.39 920.28 1165.28 1420.28 1678.33 1942.50 2207.22 2472.22 98.50 262.50 525.00 787.50 1056.11 1327.78 1620.28 1913.06 2206.39 2480.28 2744.45 99.00 297.50 598.33 905.84 1215.00 1525.00 1835.00 2139.17 2431.67 2724.72 3018.06 99.50 342.50 685.83 1030.84 1376.39 1722.22 2032.23 2342.22 2652.23 2950.55 3243.06 99.85 370.84 753.19 1128.06 1473.05 1818.47 2164.31 2480.28 2790.28 3100.28 3401.53
 
USE OF PLATE ;  2   ( Table Showing Rate of Change of Storage per Hour in  Equivalent Discharge) CASE-I a)Observations:---- Reservoir level at 10:00hr  46.00m Reservoir level at 10:30hr  46.15m So, rise in water level = (46.15 – 46.00)/ 0.50 hr = 0.30m / hr  (30cm/hr.) Outflow released between 10:00 to 10:30hr –Nil Earlier observed rate of rise in the reservoir  2)Actions:- i) Read change in storage. Flow rate from Plate-2 or Table no.3 corresponding to current elevation of  46.00m and rise/fall rate of 0.30m/hr @ 10:00hr is 240 m3/s. ii)  Now inflow rate on average can be found out by using the following  storage equation I – O =  ∆ S   ∆ S  +ve for Rise  Where, I = Average Inflow rate I = ∆ S + O   --ve for Fall   O= Average Outflow rate = 240 +  Nil   = 240 m 3 /s Therefore, average Inflow rate during 10:00hr to 10:30 hr =240 m 3 /s. Therefore from Plate-1 or Table no.2 release 240m 3 /s with 15cm by partial opening of all gates if conservation of storage is not required.
CASE-II  Observations: Reservoir level @ 12:00hr  47.00m Reservoir level @ 12:30hr  47.60m Therefore, rate of rise is (47.60 – 47.00) / 0.5hr =  1.20m/hr  (120cm/hr.) Outflow released between 12:00 to 12:30 hr =500 m 3 /s From Plate-2 or Table no.3,  flow rate corresponding to RL 47.00m and rise/fall  rate of 1.20m/hr is read as 1150 m 3 /s. So, by equation I =  ∆S + O (Where O is the average outflow rate)   = 1150+500  =  1650m 3 /s Therefore average inflow rate between 12:00 to 12:30 hr = 1650m 3 /s 8.1.0  Release outflow as shown in Plate-1 corresponding to inflow rate worked out. To release Q = 1650m 3/ s , open all  gates, if conservation of storage is not required. 8.2.0  When water level starts to decrease after peak inflow, then flood is on recession and therefore decrease outflow gradual say at an interval of 1hr to 2hr and allow water level to decrease up to rule level prescribed, but not below the Rule curve level. 8.3.0  Close all the gates where inflow rate under observation become equal to base flow rate and ensure that no successive flood is incoming in to reservoir.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
THANKS

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Spillways
SpillwaysSpillways
Spillways
 
presentation : cross drainage work
presentation : cross drainage workpresentation : cross drainage work
presentation : cross drainage work
 
Spillway gates
Spillway gatesSpillway gates
Spillway gates
 
CH-2.pptx
CH-2.pptxCH-2.pptx
CH-2.pptx
 
Types of earth dams
Types of earth damsTypes of earth dams
Types of earth dams
 
Flood routing
Flood routingFlood routing
Flood routing
 
Computation of Runoff
Computation of RunoffComputation of Runoff
Computation of Runoff
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
Canal Regulation Work
Canal Regulation WorkCanal Regulation Work
Canal Regulation Work
 
Hydrology and Water Resources Engineering
Hydrology and Water Resources EngineeringHydrology and Water Resources Engineering
Hydrology and Water Resources Engineering
 
Earthen Dams
Earthen DamsEarthen Dams
Earthen Dams
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Dams and spillways
Dams and spillwaysDams and spillways
Dams and spillways
 
Diversion Headworks
Diversion HeadworksDiversion Headworks
Diversion Headworks
 
Spillways & energy dissipator
Spillways & energy dissipatorSpillways & energy dissipator
Spillways & energy dissipator
 
Reservoir
ReservoirReservoir
Reservoir
 
Unit 4-canal
Unit 4-canalUnit 4-canal
Unit 4-canal
 
Spillways
SpillwaysSpillways
Spillways
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 

Andere mochten auch

Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...HydrologyWebsite
 
Radial gates psc ancho
Radial gates psc anchoRadial gates psc ancho
Radial gates psc anchoBhanu Prasad
 
Hydraulic Structures
Hydraulic StructuresHydraulic Structures
Hydraulic StructuresPilar Torres
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipatorsSudhir Jagtap
 
Hydraulics structures
Hydraulics  structuresHydraulics  structures
Hydraulics structuresThanarajS
 
Types of Hydraulic Structures
Types of Hydraulic StructuresTypes of Hydraulic Structures
Types of Hydraulic Structuresadityas29
 
Chapter 3 channel design
Chapter 3  channel designChapter 3  channel design
Chapter 3 channel designMohsin Siddique
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic StructureVidhi Khokhani
 
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especialesSoledad Cabrera Anahua
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic StructuresGAURAV. H .TANDON
 

Andere mochten auch (20)

Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...Real time decision support system in reserrvoir and flood management system f...
Real time decision support system in reserrvoir and flood management system f...
 
Radial gates psc ancho
Radial gates psc anchoRadial gates psc ancho
Radial gates psc ancho
 
Hydraulic Structures
Hydraulic StructuresHydraulic Structures
Hydraulic Structures
 
Manual ana
Manual anaManual ana
Manual ana
 
Manual hcanales
Manual hcanalesManual hcanales
Manual hcanales
 
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
Ce154   lecture 3 reservoirs, spillways, & energy dissipatorsCe154   lecture 3 reservoirs, spillways, & energy dissipators
Ce154 lecture 3 reservoirs, spillways, & energy dissipators
 
Hydraulics structures
Hydraulics  structuresHydraulics  structures
Hydraulics structures
 
Hydraulic structures
Hydraulic structuresHydraulic structures
Hydraulic structures
 
Open channelhydraulics2
Open channelhydraulics2Open channelhydraulics2
Open channelhydraulics2
 
Lecture notes 04
Lecture notes 04Lecture notes 04
Lecture notes 04
 
Types of Hydraulic Structures
Types of Hydraulic StructuresTypes of Hydraulic Structures
Types of Hydraulic Structures
 
Chapter 3 channel design
Chapter 3  channel designChapter 3  channel design
Chapter 3 channel design
 
Transición de un canal
Transición de un canalTransición de un canal
Transición de un canal
 
Design of Hydraulic Structure
Design of Hydraulic StructureDesign of Hydraulic Structure
Design of Hydraulic Structure
 
Fpu y diseño de canales
Fpu y diseño de canalesFpu y diseño de canales
Fpu y diseño de canales
 
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales
105256711 seccion-4-obras-de-toma-diseno-de-canales-y-estructuras-especiales
 
Open channel design
Open channel designOpen channel design
Open channel design
 
Design of Hydraulic Structures
Design of Hydraulic StructuresDesign of Hydraulic Structures
Design of Hydraulic Structures
 
7. permeabilidad en suelossss
7. permeabilidad en suelossss7. permeabilidad en suelossss
7. permeabilidad en suelossss
 
Irrigation Channels
Irrigation ChannelsIrrigation Channels
Irrigation Channels
 

Ähnlich wie Rule level & gate operation

Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacityonyx3
 
IRO ppt Final (2) (3).pptx
IRO ppt Final (2) (3).pptxIRO ppt Final (2) (3).pptx
IRO ppt Final (2) (3).pptxamit437062
 
Reserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesReserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesammar gulzar
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesignSiam Kak
 
Dam Engineering.pptx
Dam Engineering.pptxDam Engineering.pptx
Dam Engineering.pptxssuser3f22f9
 
1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirs1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirsShane_mira
 
Irrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typesIrrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typeskiran yadav
 
Rule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxRule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxManish Khandelwal
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxSsgTiger
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecFu Michael Justin
 
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Texas Alliance of Groundwater Districts
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantParamjeet Singh Jamwal
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureDave Campbell
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 

Ähnlich wie Rule level & gate operation (20)

Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
IRO ppt Final (2) (3).pptx
IRO ppt Final (2) (3).pptxIRO ppt Final (2) (3).pptx
IRO ppt Final (2) (3).pptx
 
1235456568 (1)
1235456568 (1)1235456568 (1)
1235456568 (1)
 
Reserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and usesReserviors its purpose and there main functions and uses
Reserviors its purpose and there main functions and uses
 
2 c 9detentionstoragedesign
2 c 9detentionstoragedesign2 c 9detentionstoragedesign
2 c 9detentionstoragedesign
 
Dam Engineering.pptx
Dam Engineering.pptxDam Engineering.pptx
Dam Engineering.pptx
 
Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013Design manual chapter7_revjan_2013
Design manual chapter7_revjan_2013
 
1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirs1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirs
 
Irrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and typesIrrigation and hydraulic structures, reservoirs and types
Irrigation and hydraulic structures, reservoirs and types
 
Rule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptxRule Level & Gate Operation in a Dam.pptx
Rule Level & Gate Operation in a Dam.pptx
 
WATER RESERVOIR.pptx
WATER RESERVOIR.pptxWATER RESERVOIR.pptx
WATER RESERVOIR.pptx
 
WATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptxWATER RESOURCES ENGINEERING.pptx
WATER RESOURCES ENGINEERING.pptx
 
Virginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design SpecVirginia Constructed Wetlands Design Spec
Virginia Constructed Wetlands Design Spec
 
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
Estimated Recoverable Storage: What it does, doesn't and might mean for plann...
 
7th class
7th class7th class
7th class
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain Future
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 

Mehr von Tushar Dholakia

Iirs overview -Remote sensing and GIS application in Water Resources Management
Iirs overview -Remote sensing and GIS application in Water Resources ManagementIirs overview -Remote sensing and GIS application in Water Resources Management
Iirs overview -Remote sensing and GIS application in Water Resources ManagementTushar Dholakia
 
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecure notes for Remote sensing –An Overview of Decision MakerIirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecure notes for Remote sensing –An Overview of Decision MakerTushar Dholakia
 
Iirs lecturers & gis for regional planning
Iirs lecturers & gis for regional planningIirs lecturers & gis for regional planning
Iirs lecturers & gis for regional planningTushar Dholakia
 
Iirs lecture space inputs to disaster management in india
Iirs lecture space inputs to disaster management in indiaIirs lecture space inputs to disaster management in india
Iirs lecture space inputs to disaster management in indiaTushar Dholakia
 
Operational Remote sensing Applications
Operational Remote sensing ApplicationsOperational Remote sensing Applications
Operational Remote sensing ApplicationsTushar Dholakia
 
Iirs Institutions-Geospatial services in India
Iirs Institutions-Geospatial services in IndiaIirs Institutions-Geospatial services in India
Iirs Institutions-Geospatial services in IndiaTushar Dholakia
 
Iirs Artificial Naural network based Urban growth Modeling
Iirs Artificial Naural network based Urban growth ModelingIirs Artificial Naural network based Urban growth Modeling
Iirs Artificial Naural network based Urban growth ModelingTushar Dholakia
 
Iirs remote sensing data policy (RSDP)
Iirs remote sensing data policy (RSDP)Iirs remote sensing data policy (RSDP)
Iirs remote sensing data policy (RSDP)Tushar Dholakia
 
Iirs Role of Remote sensing and GIS in Ground water studies
Iirs Role of Remote sensing and GIS in Ground water studiesIirs Role of Remote sensing and GIS in Ground water studies
Iirs Role of Remote sensing and GIS in Ground water studiesTushar Dholakia
 
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing and GIS application in Agricultur- Indian ExperienceIirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing and GIS application in Agricultur- Indian ExperienceTushar Dholakia
 
Iirs Remote sensing application in Urban Planning
Iirs Remote sensing application in Urban PlanningIirs Remote sensing application in Urban Planning
Iirs Remote sensing application in Urban PlanningTushar Dholakia
 
Iirs- Opensources software solutions and Data services for Domain
Iirs- Opensources software solutions and Data services for DomainIirs- Opensources software solutions and Data services for Domain
Iirs- Opensources software solutions and Data services for DomainTushar Dholakia
 
effective use of consultant
effective use of consultanteffective use of consultant
effective use of consultantTushar Dholakia
 
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM Tushar Dholakia
 
Panam Project Presentation
Panam Project PresentationPanam Project Presentation
Panam Project PresentationTushar Dholakia
 

Mehr von Tushar Dholakia (20)

Iirs rstechnologypdf
Iirs rstechnologypdfIirs rstechnologypdf
Iirs rstechnologypdf
 
Iirs overview -Remote sensing and GIS application in Water Resources Management
Iirs overview -Remote sensing and GIS application in Water Resources ManagementIirs overview -Remote sensing and GIS application in Water Resources Management
Iirs overview -Remote sensing and GIS application in Water Resources Management
 
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecure notes for Remote sensing –An Overview of Decision MakerIirs lecure notes for Remote sensing –An Overview of Decision Maker
Iirs lecure notes for Remote sensing –An Overview of Decision Maker
 
Iirs lecturers & gis for regional planning
Iirs lecturers & gis for regional planningIirs lecturers & gis for regional planning
Iirs lecturers & gis for regional planning
 
Iirs lecture space inputs to disaster management in india
Iirs lecture space inputs to disaster management in indiaIirs lecture space inputs to disaster management in india
Iirs lecture space inputs to disaster management in india
 
Operational Remote sensing Applications
Operational Remote sensing ApplicationsOperational Remote sensing Applications
Operational Remote sensing Applications
 
Iirs Institutions-Geospatial services in India
Iirs Institutions-Geospatial services in IndiaIirs Institutions-Geospatial services in India
Iirs Institutions-Geospatial services in India
 
Iirs Artificial Naural network based Urban growth Modeling
Iirs Artificial Naural network based Urban growth ModelingIirs Artificial Naural network based Urban growth Modeling
Iirs Artificial Naural network based Urban growth Modeling
 
Iirs district plan1
Iirs district plan1Iirs district plan1
Iirs district plan1
 
Iirs remote sensing data policy (RSDP)
Iirs remote sensing data policy (RSDP)Iirs remote sensing data policy (RSDP)
Iirs remote sensing data policy (RSDP)
 
Iirs Role of Remote sensing and GIS in Ground water studies
Iirs Role of Remote sensing and GIS in Ground water studiesIirs Role of Remote sensing and GIS in Ground water studies
Iirs Role of Remote sensing and GIS in Ground water studies
 
Iirs gps dmc 2010
Iirs gps dmc 2010Iirs gps dmc 2010
Iirs gps dmc 2010
 
Iirs - Overview of GIS
Iirs - Overview of GISIirs - Overview of GIS
Iirs - Overview of GIS
 
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing and GIS application in Agricultur- Indian ExperienceIirs Remote sensing and GIS application in Agricultur- Indian Experience
Iirs Remote sensing and GIS application in Agricultur- Indian Experience
 
Iirs Remote sensing application in Urban Planning
Iirs Remote sensing application in Urban PlanningIirs Remote sensing application in Urban Planning
Iirs Remote sensing application in Urban Planning
 
Iirs- Opensources software solutions and Data services for Domain
Iirs- Opensources software solutions and Data services for DomainIirs- Opensources software solutions and Data services for Domain
Iirs- Opensources software solutions and Data services for Domain
 
effective use of consultant
effective use of consultanteffective use of consultant
effective use of consultant
 
Nashik photos
Nashik photosNashik photos
Nashik photos
 
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
 
Panam Project Presentation
Panam Project PresentationPanam Project Presentation
Panam Project Presentation
 

Kürzlich hochgeladen

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Kürzlich hochgeladen (20)

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Rule level & gate operation

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 11.
  • 12.
  • 13. CONCEPT OF STORAGE ZONING Crest RL MDDL Surcharge Storage MWL Dead Storage Conservation Storage Flood Control Storage Top of dam Spillway Undersluices Dam River Free board FRL Rule Level
  • 14.
  • 15.
  • 16. Rule Curves A reservoir is operated according to prevailing water level, demands for various purposes, and the elevation of rule levels for different purposes To increase the flexibility of operation, different rule curves may be derived for different purposes depending on their priority.
  • 17.
  • 18. Min. required flow Natural flow D I S C H A R G E Non-damaging flow Water deficit Flood damage Demand Time Min. flow deficit
  • 19.
  • 20.
  • 22.
  • 23.
  • 24. CONSERVATION OPERATION Operation of a reservoir using Rule Curves: If reservoir level falls below LRC, meet only partial highest priority demands Basic principle – It is always better to meet reduced demands throughout the year than to meet full demands in the beginning with no water at the end.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29. How Rule Levels are Derived?
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37. SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO OF R.L.   Reservoir             SCHEME     level as 1-07 1-08 1-09 1-10 16-10     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   RAJKOT IRRIGATION PROJECT CIRCLE , RAJKOT 1 UND-II 12.15 18.25 13.90 17.75 17.75 18.25 18.25 18.25 2 VARTU-II 33.85 39.95 33.12 39.65 39.95 39.95 39.95 39.95 3 FULZAR(K.B) 89.75 95.85 89.75 94.85 94.85 95.35 95.85 95.85 4 DEMI-III 19.50 25.60 -- 23.60 24.30 25.00 25.60 25.60 5 SURVO 93.75 99.85 96.00 99.00 99.50 99.85 99.85 99.85 6 DONDI 100.67 103.70 0.00 102.80 102.80 102.80 102.80 102.80 7 KARNUKI 161.45 164.50 159.00 162.00 162.50 163.00 163.50 163.50 8 BANTWA KHARO 13.20 16.25 13.60 15.25 15.75 16.25 16.25 16.25
  • 38. SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO. OF R.L.   Reservoir             SCHEME     level as 1-07-09 1-08-09 1-09-09 1-10-09 16-10-09     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   RAJKOT IRRIGATION CIRCLE , RAJKOT 1 MOTISAR 141.00 143.00 139.50 143.00 143.00 143.00 143.00 143.00 2 BHADAR - I 106.09 107.92 103.08 107.30 107.60 107.92 107.92 107.92 3 MOJ 71.02 72.54 64.40 72.54 72.54 72.54 72.54 72.54 4 VENU-II 48.91 55.00 47.40 54.00 54.50 55.00 55.00 55.00 5 BANGAWADI 41.05 42.65 36.32 42.65 42.65 42.65 42.65 42.65 6 NYARI-II 82.40 88.50 85.00 88.50 88.50 88.50 88.50 88.50 7 GHODADHROI 92.20 98.30 Nil 97.70 98.00 98.00 98.30 98.30 8 CHHAPARWADI-II 90.15 98.38 Nil 98.00 98.38 98.38 98.38 98.38 9 KARMAL 162.90 169.00 Nil 168.70 169.00 169.00 169.00 169.00 10 NIMBHANI 131.45 134.50 Nil 134.20 134.50 134.50 134.50 134.50
  • 39. SR NAME CREST F.R.L. Likely Proposed Rule levels for monsoon-2009 as on NO. OF R.L.   Reservoir             SCHEME     level as 1-07-09 1-08-09 1-09-09 1-10-09 16-10-09     (m) (m) on 31-5-09 (m) (m) (m) (m) (m) 1 2 3 4 11 12 13 14 15 16   BHAVNAGAR IRRIGATION CIRCLE , BHAVNAGAR 1 SHETRUNJI 54.63 55.55 46.67 55.25 55.25 55.55 55.55 55.55 2 HAMIRPARA 81.70 87.80 -- 87.00 87.50 87.50 87.80 87.80 3 LAKHANKA 38.12 44.22 -- 44.22 44.22 44.22 44.22 44.22 4 KHODIYAR 196.58 202.68 193.50 201.00 202.25 202.50 202.68 202.68 5 SUKHBHADAR 103.10 109.20 102.50 107.20 107.70 109.20 109.20 109.20 6 KHAMBHADA 46.69 50.35 48.30 49.00 49.75 50.35 50.35 50.35 7 RANGHOLA 60.98 62.50 -- 62.50 62.50 62.50 62.50 62.50 8 MALAN 102.74 104.25 -- 104.25 104.25 104.25 104.25 104.25 9 MALPARA 72.00 78.10 -- 76.50 77.25 77.80 78.10 78.10
  • 40.
  • 41. Computational procedure DATA RL-Cap-Area Chart
  • 42. Computational procedure DATA- DEMANDS Sr Period Demand Evap Depth   From To irri WS m 1   1-Oct 0 0 0 2 21-Sep 30-Sep 112.00 0 0.029 3 11-Sep 30-Sep 255.10 0 0.058 4 1-Sep 30-Sep 372.52 0 0.088 5 21-Aug 30-Sep 541.88 0 0.114 6 11-Aug 30-Sep 698.28 0 0.141 7 1-Aug 30-Sep 844.95 0 0.167 8 21-Jul 30-Sep 887.63 0 0.198 9 11-Jul 30-Sep 919.45 0 0.229 10 1-Jul 30-Sep 968.30 0 0.260
  • 43. Computational procedure DATA- 10-DAILY INFLOW SERIES
  • 44. Computational procedure DATA- 10-DAILY INFLOW SERIES ARRANGED IN DESCENDING ORDER
  • 45. COMPUTATION OF RULE LEVELS FRL = 105.157 m (345 FT) Surplus = (Inflow – Total Demand)
  • 46. UKAI RES. PROJ.(1973-2006, CARR ( By RWT.exe ) -------------------------------- RESERVOIR WORKING TABLE ------------------------- ****************************** ** ALL FIGURES ARE IN MKS ** PAGE 1 ****************************** F.R.L. .................... 105.150 L.W.L. .................... 82.300 CAPACITY AT F.R.L. ...... 7497.000 CAPACITY AT L.W.L. ...... 882.000 DESIGN CARRYOVER ......... .000 WATER SUPPLY RESERVATION.. .000 IRRIGABLE AREA.............. 10000.00 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN   IRRI. REQ. 123.3 472.4 372.5 260.3 326.9 349.1 404.6 444.1 413.2 436.7 470.0 314.5 ****** TOTAL REQ. 123.3 472.4 372.5 260.3 326.9 349.1 404.6 444.1 413.2 436.7 470.0 314.5 ****** EVAP. DEP. .101 .101 .152 .203 .152 .127 .127 .127 .203 .229 .254 .203 1.98 --------------------------------------------------------------------------------------------------------- OPEN. CORS. IN ABSTRACT RES. EVEP TOT. CORS SPI % YEAR MON TOTAL ---------- AREA AL BAL LL TH BAL. RL FLOW IRRI W/S (AV) LOSS ABST RL. DEF ---------------------------------------------------------------------------------------------------------- 2001 JUL 882.0 82.3 1153.0 2035.0 123.3 .0 166.0 16.8 140.1 1894.9 89.2 .0 .0 AUG 1894.9 89.2 2386.0 4280.9 472.4 .0 255.9 25.8 498.3 3782.6 95.9 .0 .0 SEP 3782.6 95.9 943.0 4725.6 372.5 .0 334.3 50.8 423.3 4302.3 97.3 .0 .0 OCT 4302.3 97.3 508.0 4810.3 260.3 .0 352.1 71.5 331.7 4478.5 97.8 .0 .0 NOV 4478.5 97.8 333.0 4811.5 326.9 .0 355.8 54.1 381.0 4430.6 97.7 .0 .0 DEC 4430.6 97.7 281.0 4711.6 349.1 .0 351.3 44.6 393.7 4317.9 97.3 .0 .0 JAN 4317.9 97.3 265.0 4582.9 404.6 .0 343.9 43.7 448.3 4134.6 96.8 .0 .0 FEB 4134.6 96.8 191.0 4325.6 444.1 .0 331.6 42.1 486.2 3839.4 96.0 .0 .0 MAR 3839.4 96.0 222.0 4061.4 413.2 .0 315.9 64.1 477.3 3584.1 95.3 .0 .0 APR 3584.1 95.3 224.0 3808.1 436.7 .0 298.3 68.3 505.0 3303.1 94.4 .0 .0 MAY 3303.1 94.4 266.0 3569.1 470.0 .0 281.4 71.5 541.4 3027.7 93.5 .0 .0 JUN 3027.7 93.5 374.0 3401.7 314.5 .0 273.5 55.5 370.1 3031.6 93.5 .0 .0     NO. OF FAIL YEARS = 0 %AGE RELIABILITY =100.0
  • 47. UKAI RES. PROJ.(1973-2006, CARR -------------------------------- RESERVOIR WORKING TABLE ------------------------- ****************************** ** ALL FIGURES ARE IN MKS ** PAGE 1 ****************************** F.R.L. .................... 105.150 L.W.L. .................... 82.300 CAPACITY AT F.R.L. ...... 7497.000 CAPACITY AT L.W.L. ...... 882.000 DESIGN CARRYOVER ......... 1699.000 WATER SUPPLY RESERVATION.. .000 IRRIGABLE AREA.............. 10000.00 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN   IRRI. REQ. 123.3 472.4 372.5 260.3 326.9 349.1 404.6 444.1 413.2 436.7 470.0 314.5 ******   TOTAL REQ. 123.3 472.4 372.5 260.3 326.9 349.1 404.6 444.1 413.2 436.7 470.0 314.5 ******   EVAP. DEP. .101 .101 .152 .203 .152 .127 .127 .127 .203 .229 .254 .203 1.98 --------------------------------------------------------------------------------------------------------- OPEN. CORS. IN ABSTRACT RES. EVEP TOT. CORS SPI % YEAR MON TOTAL---------- AREA AL BAL LL TH BAL. RL FLOW IRRI W/S (AV) LOSS ABST RL. DEF --------------------------------------------------------------------------------------------------------- 2001 JUL 2581.0 92.0 1153.0 3734.0 123.3 .0 275.2 27.8 151.1 3582.9 95.2 .0 .0 AUG 3582.9 95.2 2386.0 5968.9 472.4 .0 357.0 36.1 508.5 5460.4 100.3 .0 .0 SEP 5460.4 100.3 943.0 6403.4 372.5 .0 429.9 65.3 437.9 5965.5 101.5 .0 .0 OCT 5965.5 101.5 508.0 6473.5 260.3 .0 451.3 91.6 351.9 6121.6 101.9 .0 .0 NOV 6121.6 101.9 333.0 6454.6 326.9 .0 454.3 69.1 395.9 6058.7 101.8 .0 .0 DEC 6058.7 101.8 281.0 6339.7 349.1 .0 448.3 56.9 406.0 5933.7 101.5 .0 .0 JAN 5933.7 101.5 265.0 6198.7 404.6 .0 437.8 55.6 460.2 5738.5 101.0 .0 .0 FEB 5738.5 101.0 191.0 5929.5 444.1 .0 421.5 53.5 497.6 5431.9 100.2 .0 .0 MAR 5431.9 100.2 222.0 5653.9 413.2 .0 404.3 82.1 495.3 5158.6 99.6 .0 .0 APR 5158.6 99.6 224.0 5382.6 436.7 .0 387.1 88.6 525.3 4857.3 98.8 .0 .0 MAY 4857.3 98.8 266.0 5123.3 470.0 .0 370.2 94.0 564.0 4559.3 98.0 .0 .0 JUN 4559.3 98.0 374.0 4933.3 314.5 .0 361.4 73.4 387.9 4545.4 98.0 .0 .0 --------------------------------------------------------------------------------------------------------- NO. OF FAIL YEARS = 0 %AGE RELIABILITY =100.0
  • 48. UKAI RESERVOIR PROJECT 10-daily Rule Levels with capacity of 1992-93 sedimentation survey F.R.L. 105.157 m Sr Period Inflow Demand Evap Total Surplus Res. Res. Rule Level   From To       Depth Losses Demand   Cap R.L.           irri WS m           m 1   01-Oct 0.00 0.00 0.00 0.000 0.0000 0.00 0.00 7497.00 105.16 105.00 2 21-Sep 30-Sep 30.10 112.00 0.00 0.029 16.4305 128.43 0.00 7497.00 105.16 105.00 3 11-Sep 30-Sep 154.68 255.10 0.00 0.058 32.8611 287.96 0.00 7497.00 105.16 105.00 4 01-ep 30-Sep 296.79 372.52 0.00 0.088 49.8582 422.38 0.00 7497.00 105.16 105.00 5 21-Aug 30-Sep 1072.80 541.88 0.00 0.114 59.9273 601.81 470.99 7026.01 104.06 104.00 6 11-Aug 30-Sep 2402.32 698.28 0.00 0.141 61.9216 760.20 1642.12 5854.88 101.27 101.00 7 01-ug 30-Sep 2720.95 844.95 0.00 0.167 71.5751 916.53 1804.42 5692.58 100.88 101.00 8 21-Jul 30-Sep 3646.63 887.63 0.00 0.198 74.4870 962.12 2684.51 4812.49 98.67 99.00 9 11-Jul 30-Sep 4231.68 919.45 0.00 0.229 79.2032 998.65 3233.03 4263.97 97.20 97.00 10 01-Jul 30-Sep 4399.68 968.30 0.00 0.260 88.4701 1056.77 3342.91 4154.09 96.90 97.00
  • 49. UKAI RESERVOIR PROJECT 10-daily Rule Levels (75% dependability with capacity of 2003 sedimentation survey F.R.L. 105.157 m Sr Period   Inflow Demand Evap Evap Total Surplus Cap Res. RL Rule   From To       depth losses demand       level         irri WS m             1   1-Oct 0.00 0.00 0.00 0.000 0.0000 0.00 0.00 7414.29 105.16 105.00 2 21-Sep 30-Sep 134.33 112.00 0.00 0.029 17.7535 129.75 4.58 7409.71 105.15 105.00 3 11-Sep 30-Sep 345.12 255.10 0.00 0.058 35.3237 290.42 54.70 7359.59 105.06 105.00 4 1-Sep 30-Sep 735.78 372.52 0.00 0.088 52.1710 424.69 311.09 7103.20 104.62 105.00 5 21-Aug 30-Sep 1622.43 541.88 0.00 0.114 62.5135 604.39 1018.04 6396.25 103.39 103.00 6 11-Aug 30-Sep 3074.63 698.28 0.00 0.141 65.9070 764.19 2310.44 5103.85 100.84 101.00 7 1-Aug 30-Sep 4227.87 844.95 0.00 0.167 67.5210 912.47 3315.40 4098.89 98.53 99.00 8 21-Jul 30-Sep 4859.18 887.63 0.00 0.198 72.9897 960.62 3898.56 3515.73 97.02 97.00 9 11-Jul 30-Sep 5431.59 919.45 0.00 0.229 77.3732 996.82 4434.77 2979.52 95.51 96.00 10 1-Jul 30-Sep 5488.46 968.30 0.00 0.260 87.8869 1056.19 4432.27 2982.02 95.52 96.00
  • 50. RULE CURVES BASED ON 1992-93 & 2003 RESERVOIR CAPACITY
  • 51.
  • 52.
  • 53.
  • 54.
  • 55. MWL/OUTFLOW ATTAINED FOR VARIOUS FLOODS ROUTED AT DIFF. ELEVATIONS MULTIPLYING FACTOR RESERVOIR LEVEL IN M 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 122.00 123.06 124.00 124.95 125.83 126.69 127.48 128.29 129.10 4750. 5941. 7238. 8521. 9870. 11170. 12532. 13914. 122.50 123.27 124.14 125.04 125.89 126.73 127.51 128.31 129.11 5006. 6121. 7359. 8608. 9927. 11214. 12565. 13940. 123.00 123.49 124.29 125.14 125.96 126.78 127.54 128.33 129.13 5289. 6320. 7506. 8726. 10004. 11271. 12612. 13975. 123.50 123.73 124.46 125.26 126.06 126.84 127.59 128.37 129.16 5583. 6559. 7682. 8879. 10107. 11351. 12676. 14026. 124.00 124.06 124.70 125.42 126.20 126.93 127.66 128.43 129.21 6016. 6884. 7920. 9087. 10259. 11472. 12773. 14101. 124.50 124.50 124.95 125.60 126.34 127.04 127.75 128.50 129.26 6610. 7229. 8186. 9315. 10436. 11624. 12896. 14199.
  • 56. MWL/OUTFLOW ATTAINED FOR VARIOUS FLOODS ROUTED AT DIFF. ELEVATIONS MULTIPLYING FACTOR RESERVOIR LEVEL IN M 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 125.00 125.00 125.20 125.81 126.50 127.17 127.86 128.59 129.34 7306. 7593. 8497. 9568. 10648. 11812. 13052. 14325. 125.50 125.50 125.55 126.07 126.69 127.33 128.01 128.71 129.44 8031. 8107. 8890. 9866. 10916. 12055. 13260. 14501. 126.00 126.00 126.00 126.34 126.90 127.50 128.16 128.85 129.56 8784. 8784. 9311. 10203. 11203. 12319. 13495. 14703. 126.50 126.50 126.50 126.64 127.12 127.69 128.33 129.00 129.70 9563. 9563. 9781. 10566. 11521. 12606. 13755. 14936. 127.00 127.00 127.00 127.02 127.40 127.95 128.54 129.19 129.87 10368. 10368. 10396 11033. 11950. 12968. 14080. 15233. 127.41 127.41 127.41 127.41 127.65 128.16 128.74 129.36 130.02 11046. 11046. 11046. 11449. 12315. 13297. 14357. 15483.
  • 57.
  • 58.
  • 59.  
  • 60.
  • 61. Computer Programming For Gate Operation ( PGCP.EXE ) Data File : PGDAT Line 1 : Name of Scheme Line 2 : Hd CRL FRL Avg Bed RL No.of Gate Wg Hg 0 Line 3 : X-ordinate of Gate Seat Radius of Gate Xt Yt 1 0 Example : PGDAT SURVO WATER RESOURCES PROJECT 20 307 575 327 588 303 17 16 30 20 0 5.712 24 28.661 6.0367 1 0 Output File : File 1 PGCPO File 2 PGOUT Note : Conversion Factor from meter to ft. is only 3.28 Correct. Because 3.28 is used for programming.
  • 62. SURVO WATER RESOURCES PROJECT ( Partial Gate Opening ) RES. DISC. AT VARIOUS GATE OPENINGS IN M. IN CUMECS ELEV. IN M. .15 .30 .60 .90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 3.30 3.60 3.90 4.20 4.50 4.80 5.10 5.40 5.70 6.00 -------------------------------------------------------------------------------------------------------------------------------------------------- 93.75 0 93.80 0 0 94.00 0 0 0 94.20 46 87 0 0 94.40 53 101 0 0 0 94.60 59 114 210 0 0 0 94.80 64 125 235 0 0 0 0 95.00 69 135 258 364 0 0 0 0 95.20 73 145 278 398 0 0 0 0 0 95.40 78 154 297 429 546 0 0 0 0 0 95.60 82 162 316 458 588 0 0 0 0 0 0 95.80 86 170 333 485 626 755 0 0 0 0 0 0 96.00 90 178 349 511 663 803 0 0 0 0 0 0 0 96.20 93 185 365 536 698 849 988 0 0 0 0 0 0 0 96.40 97 192 380 559 730 892 1043 0 0 0 0 0 0 0 0 96.60 100 199 394 582 762 934 1095 1246 0 0 0 0 0 0 0 0 96.80 103 206 408 604 793 974 1145 1307 0 0 0 0 0 0 0 0 0 97.00 106 212 421 625 822 1011 1193 1365 1527 0 0 0 0 0 0 0 0 0 97.20 109 219 434 645 850 1048 1239 1421 1593 0 0 0 0 0 0 0 0 0 0 97.40 112 225 447 665 877 1084 1283 1475 1658 1831 0 0 0 0 0 0 0 0 0 0 97.60 115 230 459 684 903 1118 1326 1527 1719 1903 0 0 0 0 0 0 0 0 0 0 0 97.80 118 236 471 702 929 1151 1368 1577 1779 1973 0 0 0 0 0 0 0 0 0 0 0 98.00 121 242 483 721 954 1184 1408 1626 1837 2041 2238 0 0 0 0 0 0 0 0 0 0 98.20 123 247 494 738 979 1215 1447 1673 1893 2106 2313 0 0 0 0 0 0 0 0 0 0 98.40 126 253 505 756 1002 1246 1485 1719 1947 2169 2386 2596 0 0 0 0 0 0 0 0 0 98.60 129 258 516 772 1026 1276 1523 1764 2000 2231 2457 2677 0 0 0 0 0 0 0 0 0 98.80 131 263 527 789 1048 1305 1559 1808 2052 2290 2525 2755 2979 0 0 0 0 0 0 0 0 99.00 134 268 537 805 1071 1334 1594 1850 2102 2349 2592 2832 3065 0 0 0 0 0 0 0 0 99.20 136 273 547 821 1092 1362 1629 1892 2151 2406 2658 2906 3149 3385 0 0 0 0 0 0 0 99.40 139 278 557 836 1114 1390 1663 1933 2199 2461 2721 2978 3230 3476 0 0 0 0 0 0 0 99.60 141 283 567 852 1135 1417 1696 1973 2246 2516 2784 3049 3309 3565 3815 0 0 0 0 0 0 99.80 143 287 577 867 1155 1443 1729 2012 2292 2569 2845 3118 3387 3652 3912 0 0 0 0 0 0 99.85 144 289 579 871 1160 1450 1737 2022 2304 2583 2860 3135 3406 3673 3936 4195 0 0 0 0 0 100.00 0 292 586 881 1176 1469 1761 2050 2337 2621 2904 3185 3463 3736 4005 4271 0 0 0 0 0 100.20 0 0 596 896 1195 1495 1792 2088 2381 2673 2963 3252 3537 3819 4098 4373 0 0 0 0 0 100.40 0 0 0 910 1215 1520 1823 2125 2425 2723 3020 3316 3610 3900 4187 4472 4753 0 0 0 0 100.60 0 0 0 0 1234 1545 1854 2162 2468 2772 3076 3380 3681 3979 4275 4569 4859 0 0 0 0 100.80 0 0 0 0 0 1569 1884 2197 2510 2820 3132 3442 3751 4057 4361 4664 4964 5262 0 0 0 101.00 0 0 0 0 0 1593 1913 2233 2551 2868 3186 3504 3820 4133 4446 4757 5066 5374 0 0 0 101.20 0 0 0 0 0 0 1942 2267 2591 2915 3239 3564 3887 4208 4528 4848 5166 5483 5798 0 0 101.40 0 0 0 0 0 0 0 0 2632 2961 3292 3623 3953 4282 4610 4938 5264 5591 5915 0 0 101.60 0 0 0 0 0 0 0 0 0 3006 3343 3681 4018 4354 4690 5026 5360 5696 6029 6360 0 101.80 0 0 0 0 0 0 0 0 0 0 3394 3738 4082 4426 4769 5112 5455 5799 6141 6482 0 102.00 0 0 0 0 0 0 0 0 0 0 0 3795 4146 4496 4846 5197 5548 5900 6252 6602 6951 102.20 0 0 0 0 0 0 0 0 0 0 0 0 0 4565 4922 5281 5639 6000 6360 6719 7077 102.40 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4997 5363 5729 6098 6467 6834 7202 102.60 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5818 6195 6572 6948 7325 102.80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7060 7445 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Table : 1
  • 63. SURVO WATER RESOURCES PROJECT ( Free Discharge ) SPILLWAY RATING TABLE FOR 16 NO.OF RADIAL GATES OF SIZE 30. X 20. -------------------------------------------------------------------------------------------------------------------------------   RES. DISCHARGE IN CUMECS ELEV. IN m. .00 .05 .10 .15 .20 .25 .30 .35 .40 .45 .50 .55 .60 .65 .70 .75 .80 .85 .90 .95 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ 93.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 12 19 25 94.00 32 38 50 62 74 87 99 111 126 142 159 175 191 207 225 245 265 284 304 323 95.00 344 367 389 412 434 457 481 506 532 557 582 608 634 662 690 718 746 774 803 833 96.00 864 895 925 956 987 1020 1053 1086 1119 1152 1185 1221 1256 1291 1327 1362 1398 1436 1474 1511 97.00 1549 1587 1625 1665 1705 1745 1785 1826 1866 1908 1950 1992 2034 2076 2118 2162 2207 2251 2295 2340 98.00 2384 2430 2476 2522 2568 2614 2660 2708 2756 2804 2852 2900 2949 2998 3048 3098 3149 3199 3249 3300 99.00 3353 3405 3458 3510 3562 3615 3669 3723 3777 3831 3886 3940 3996 4052 4108 4164 4220 4277 4334 4391 100.00 4449 4506 4563 4620 4680 4739 4798 4857 4916 4975 5036 5097 5158 5219 5280 5341 5404 5467 5530 5593 101.00 5655 5718 5782 5845 5909 5973 6037 6100 6165 6231 6296 6361 6427 6492 6559 6626 6693 6760 6827 6894 102.00 6962 7031 7100 7169 7237 7306 7375 7445 7515 7585 7655 7725 7795 7867 7938 8010 8081 8153 8224 8297 103.00 8369 8442 8514 8586 8659 8733 8807 8881 8955 9029 9103 9177 9252 9327 9402 9476 9551 9627 9703 9780 104.00 9856 9932 10008 10085 10163 10241 10318 10396 10474 10552 10631 10710 10789 10869 10948 11027 11108 11188 11269 11349 105.00 11430 11511 11593 11675 11757 11839 11921 12003 12086 12170 12253 12336 12419 12503 12586 12669 12753 12836 12919 13003 106.00 13086 13169 13253 13336 13419 13503 13586 13669 13752 13836 13919 14002 14086 14169 14252 14336 14419 14502 14586 14669 ------------------------------------------------------------------------------------------------------------------------------------ ----------------------------------------------------------------------------------------------------- Table : 1(a)
  • 64. Plate - 1 Note : 1.Spillway is equipped with 7 No.of Vertical Lift Gate of Size 9.14 m X 3.05 m.( 30’ X 10’ ) 2. All Gates are assumed to be opened uniformly. 3. Gate opening Represents vertical distance of lower edge of gate above gate seat in cms. 4. As the FRL & MWL of Kaniyad W.R.Project are same ( 02.25m.) Free & Partial discharge curves up to RL 102.25m.have been drawn. 5. Partial Curve indicates discharge through all Gates. 6. Transition Zone in corporate here is subject to modification on model Run.
  • 65. (A)Operation guidelines for reservoir condition below FRL When flood starts impounding reservoir, the following guide lines may be observed. 1) Note the rule level fixed for the current period. 2) Note the PWL and its corresponding discharging capacity at current elevation from free discharge curve in Plate-1. 3) If the PWL is below rule level , fill the reservoir up to scheduled rule level. Example: Current rule level = 46.00m Current reservoir level = 43.00m Operation: Fill the reservoir up to RL 46.00m
  • 66. 4) Thereafter, release outflow corresponding to inflow rate by gate operation either partially or under free discharge from the graph as shown in Plate-1 or Table no.1 Example: Radial gates 22 No. Size 14.93m x 10.67m FRL = 53.10m Current rule level = 46.00m Current reservoir level = 46.0m Q free at RL 46.00m = 3965 m 3 /s Operation: Generally there will be two cases (a) Inflow rate is less than free discharging capacity. ( Q = 2790 m 3 /s ) (b) Inflow rate is more than free discharging capacity.( Q = 6000 m 3 /s ) So for each case, it would be necessary to maintain current rule level by controlling the discharge in the following way. a)Example: For inflow rate = 2790 m 3 /s (Less than free discharging capacity 3965 m 3 /s), reduce outflow equal to inflow by opening all gates partially with gate opening =180cm b) Example: For inflow rate = 6000 m 3 /s (more than free discharging capacity 3965 m3/s), allow free discharge of 6000 m 3 /s by opening all gates above water profile( above RL 46.00m). So that the level will build up resulting in to increased free outflow.
  • 67. 5) Repeat this procedure for making outflow equal to inflow approximately until reservoir elevation stops raising and information is received from u/s wireless system that the recession of flood has been started. 6) Operate gates at 1 hr. to 2 hr. intervals , following Plate-1 and decrease outflow gradually when the flood starts receding and rate of rise in water level decreased or fall in water level has been observed. During the process of fall in water level of reservoir, take care that the water level does not fall below scheduled rule level, by suitable gate operation , keeping the outflow restricted within maximum safe carrying capacity of river channel d/s of dam. 7) Close all the gates gradually when water level in the reservoir is again back to the scheduled rule curve level. 8) Know Inflow from forecast station in u/s of dam or u/s projects. 9) To know inflow from rise/fall of water level in reservoir when there is no existence of forecast station in u/s of dam for information of inflow rate incoming when inflow rate can be decided earlier observed rate of rise or fall in the reservoir water levels by using Plate-2
  • 68. How Plate-2 can be used is shown in the below illustrated example .
  • 69. Example : Survo.dat SURVO WATER RESOURCES PROJECT 16 93.75 99.85 93.75 94.0 94.5 95.0 95.5 96.0 96.5 97.0 97.5 98.0 98.5 99.0 99.5 100.0 100.5 101.0 0.87 1.01 1.48 1.95 2.56 3.16 4.11 5.05 6.20 7.35 8.93 10.50 12.50 14.61 17.18 19.75 For Rate of Change of Storage per Hour in Equivalent Discharge Computer Programme : RMK.EXE Line 1 : Name of Scheme Line 2 : No.of RL-Cap Ordinates CRL FRL Line 3 : RL Ordinates. Line 4 : Capacity Ordinates.
  • 70. Survo.out ( RMK.EXE ) Table no.3 SURVO WATER RESOURCES PROJECT Table Showing Rate of Change of Storage per Hour in Equivalent Discharge Reservoir   EQ. DISCHARGE ( Cumec ) AT VARIOUS RISE/FALL( m / hr)     Level                     m 0.30 0.60 0.90 1.20 1.50 1.80 2.10 2.40 2.70 3.00 1 2 3 4 5 6 7 8 9 10 11 93.75 49.31 111.81 174.31 236.81 309.03 383.06 456.39 544.31 646.81 748.61 94.50 78.33 155.28 229.45 303.06 376.39 478.89 581.11 682.78 796.11 915.28 95.00 90.00 179.72 268.89 366.94 469.44 571.11 678.61 797.78 916.94 1036.11 95.50 100.83 207.50 325.83 443.61 561.11 680.28 799.44 918.61 1061.67 1216.67 96.00 129.17 258.33 387.50 520.55 655.56 790.56 932.22 1087.22 1241.67 1395.83 96.50 157.50 311.11 456.95 603.33 750.00 920.84 1091.39 1261.39 1444.72 1634.72 97.00 174.17 348.61 523.61 703.05 884.72 1066.39 1256.11 1461.95 1673.89 1888.89 97.50 191.67 389.44 599.45 809.44 1019.45 1236.11 1456.11 1682.78 1927.22 2180.56 98.00 227.50 454.72 681.39 920.28 1165.28 1420.28 1678.33 1942.50 2207.22 2472.22 98.50 262.50 525.00 787.50 1056.11 1327.78 1620.28 1913.06 2206.39 2480.28 2744.45 99.00 297.50 598.33 905.84 1215.00 1525.00 1835.00 2139.17 2431.67 2724.72 3018.06 99.50 342.50 685.83 1030.84 1376.39 1722.22 2032.23 2342.22 2652.23 2950.55 3243.06 99.85 370.84 753.19 1128.06 1473.05 1818.47 2164.31 2480.28 2790.28 3100.28 3401.53
  • 71.  
  • 72. USE OF PLATE ; 2 ( Table Showing Rate of Change of Storage per Hour in Equivalent Discharge) CASE-I a)Observations:---- Reservoir level at 10:00hr 46.00m Reservoir level at 10:30hr 46.15m So, rise in water level = (46.15 – 46.00)/ 0.50 hr = 0.30m / hr (30cm/hr.) Outflow released between 10:00 to 10:30hr –Nil Earlier observed rate of rise in the reservoir 2)Actions:- i) Read change in storage. Flow rate from Plate-2 or Table no.3 corresponding to current elevation of 46.00m and rise/fall rate of 0.30m/hr @ 10:00hr is 240 m3/s. ii) Now inflow rate on average can be found out by using the following storage equation I – O = ∆ S ∆ S +ve for Rise Where, I = Average Inflow rate I = ∆ S + O --ve for Fall O= Average Outflow rate = 240 + Nil = 240 m 3 /s Therefore, average Inflow rate during 10:00hr to 10:30 hr =240 m 3 /s. Therefore from Plate-1 or Table no.2 release 240m 3 /s with 15cm by partial opening of all gates if conservation of storage is not required.
  • 73. CASE-II Observations: Reservoir level @ 12:00hr 47.00m Reservoir level @ 12:30hr 47.60m Therefore, rate of rise is (47.60 – 47.00) / 0.5hr = 1.20m/hr (120cm/hr.) Outflow released between 12:00 to 12:30 hr =500 m 3 /s From Plate-2 or Table no.3, flow rate corresponding to RL 47.00m and rise/fall rate of 1.20m/hr is read as 1150 m 3 /s. So, by equation I = ∆S + O (Where O is the average outflow rate) = 1150+500 = 1650m 3 /s Therefore average inflow rate between 12:00 to 12:30 hr = 1650m 3 /s 8.1.0 Release outflow as shown in Plate-1 corresponding to inflow rate worked out. To release Q = 1650m 3/ s , open all gates, if conservation of storage is not required. 8.2.0 When water level starts to decrease after peak inflow, then flood is on recession and therefore decrease outflow gradual say at an interval of 1hr to 2hr and allow water level to decrease up to rule level prescribed, but not below the Rule curve level. 8.3.0 Close all the gates where inflow rate under observation become equal to base flow rate and ensure that no successive flood is incoming in to reservoir.
  • 74.