This presentation addresses the various drivers for environmental PM, as well as best practices for implementing an inspection-based PM program and calendar. Find out who the regulators are and how to ensure compliance with these cost-saving techniques.
3. ïŒ All lines will be muted â please communicate via
the questions tab in your webinar panel.
ïŒ There will be a Q&A session at the end of the
presentation â submit your question(s) anytime
throughout the webinar.
ïŒ Stick around for an exclusive offer at the end of
the webinar.
Webinar Overview
4. Meet Your Presenter
Brian Blenkhorn
Field Service Coordinator
Triumvirate Environmental, Inc.
âą Has worked at Triumvirate for 6 years
âą Previous roles included:
Environmental Chemist, Preventative
Maintenance Specialist
âą Has HEM and Industrial Wastewater
Operators License
5. Our Key Message
Help identify areas of
maintaining a PM program
to enhance regulatory
compliance.
6. Who Is Responsible for
Environmental PMs?
Facilities
Managers
EH&S
Managers
Property
Managers
8. You Might Be
Thinking...
How do I keep up with regulatory
compliance through a PM schedule?
âą So many agencies to comply with
What other PMs should I be tracking within
my facility?
âą Am I missing a regulatory PM?
Am I required to cover the PM on all parts of
my facility?
âą Are we required to check the safety
equipment in the space we are leasing?
28. SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
Set up Fire
Extinguisher Annual
Inspection (to be
completed before
2/28
Complete MAA
Inspections
4 5 6 7 8 9 10
Complete Catch Basin
Inspections for
NPDES
Inspect USTs on
campus
Annual cleaning of
Waste Water pH
Tanks
Perform Eye Wash
and Safety Shower
weekly flush
Set up Annual Fume
Hood and BSC
Inspections to be
completed before
2/28
Complete MAA
Inspections
11 12 13 14 15 16 17
Run Emergency
Response Drill
Inspect ASTs on
campus
Perform Eye Wash
and Safety Shower
weekly flush
Inspect all Spill Kits
Annual cleaning of all
Limestone Chip
Tanks
Complete MAA
Inspections
18 19 20 21 22 23 24
Inspect and Clean
Grease Traps
Chemistry Lab
Inspections
Inspect all Hydraulic
Elevators
Perform Eye Wash
and Safety Shower
weekly flush
Complete Exit Sign
and Exit Lighting 30
second monthly
inspection
Complete MAA
Inspections
Annual Pigeon Guano
Cleaning of Roof area
around Chiller Plant
25 26 27 28 29 30 31
Inspect oil water
separators
Biology and Physics
Lab Inspections
Complete Monthly
waste water
discharge sampling
Perform full monthly
inspection of eye
wash and safety
showers
Update Contingency
Plan for 2015
Complete MAA
Inspections
Begin TIER II Report
Storm Water Sampling at new Dorm construction site to happen in January. Must have
addequate rain event.
NOTES:
29. What is
Help incorporate necessary PMs
into your facilities daily routine
Interactive assessment of facilities
to help identify areas needing an
Environmental PM
Assess the risk of an Environmental
Emergency and provide tips on
preventing emergencies
Provide a write up of observations
with recommendations and links
to the regulations
31. Thank You For
Attending!
Request a Free On-Site Assessment!
http://info.triumvirate.com/facilitycare-webinar-offer
Contact Brian Blenkhorn:
bblenkhorn@triumvirate.com
Call Us!
1-888-834-9697
www.triumvirate.com