1. WAR ON THE
PEOPLE
Camp Re-Route
destroyed,
27Jun 2012, at
entrance to
Debe-Mon Desir
highway
1. The PP Government was refused a loan for this project by the 4. The people in the communities between Debe and Mon Desir were
Inter American Development Bank (IADB). The Government NOT consulted before the decision to build this segment
was told to repair, widen, and add to the existing roads
5. The cost of this segment would be over $ 5 billion. This would incur a
2. Key Government Ministers were totally against the Debe to Mon debt which our children would have to pay for decades Destructive Debe to Mon Desir Highway
Desir segment when they were in Opposition Destroying 300 homes, 13 communities, 20 streets, temple, church,
3. The EMA granted a Certificate of Environmental Clearance to
Highway Re-Route Trinidad Highway Re-Route
mosque, 13 businesses, 65 oil wells, oil and gas pipelines, the
the Government without having seen a hydrological report highwayreroutemovement@gmail.com 461-1822 / 385-1185 / 771-5181 Oropouche lagoon, fertile agricultural lands, our heritage and
Published by the Highway Re-Route Movement system of tenure...and will cause permanent flooding
2. THE GOVERNMENT’S PROPOSAL THE RE-ROUTE PROPOSAL Why has no cost-
AGGREGATE AND
benefit analysis been TRANSPORT ALONE FOR
There are THREE (3) highway 1. Remove Debe to Mon Desir done for this project?? 9.1 MILE EMBANKMENT
sections in the Government’s 2. Add a new highway section IS OVER
proposal: between Debe and Mosquito $ 1 BILLION
Creek, La Romaine end Because hiding costs
(1) San Fernando to Pt Fortin
3. Repair, widen and add to the hide corruption!!!
(2) Golconda to Debe
numerous existing bypass COMPENSATION AND
(3) Debe to Mon Desir and connector roads in the
RELOCATION FOR
The Highway Re-route Movement Debe, Penal, Siparia and Why has NIDCO CEO HUNDREDS OF HOMES,
Fyzabad districts
FULLY SUPPORTS: Carson Charles FARMS, BUSINESSES IS OVER
Feed them into the new high- claimed that this $1.5 BILLION
San Fernando to Pt Fortin
way sections:
Golconda to Debe
segment is costing $2.1
San Fernando to Pt Fortin
billion?
The Movement does NOT
Golconda to Debe
SUPPORT the: DESIGN AND BUILD
Debe to Mosquito Creek CONTRACT FOR 9 BRIDGES,
Debe to Mon Desir The real cost for this
so that Debe, Penal, Siparia and FOUR INTERCHANGES, 9.1
section, which crosses the segment is not $2.1
Fyzabad are within minutes of MILE EMBANKMENT IS OVER
Oropouche Lagoon
the highway system billion. $2 BILLION
BENEFITS OF THE RE-ROUTE PROPOSAL FOR TRINIDAD & TOBAGO The real cost is over
$ 4 billion will be saved; $ 1.5 billion instead of $ 5.5. billion Road connectivity for South West peninsula will be improved $5 billion. HIDDEN COSTS: COST OF
Savings could be used, for example, to build Pt Fortin hospital LOAN, CAPPING OF 65 OIL
13 businesses and more than 1500 jobs will be preserved
and develop infrastructure for agricultural development in the WELLS, RE-ROUTING
Places of religious worship (temple, church, mosque) will be OIL/GAS LINES, LEGAL, AD-
Oropouche lagoon communities And that is for
saved MINISTRATIVE, SURVEYING
Permanent flooding in the Oropouche lagoon districts will be Debe to Mon Desir
65 oil wells will be preserved SINCE 2005, LOSS OF FERTILE
prevented alone!!! SOIL, COST OVERRUNS,
Oil and gas transmission lines will not have to be re-routed
300 homes will be saved FLOODING IMPACTS, OVER
Burden on the taxpayer will be reduced by spreading the costs $1 BILLION
13 communities will be saved Source: Government’s Environmental
for repair, widening and adding of roads over a longer period of Impact Assessment and statements
179 agricultural plots of fertile land will be saved time from Government Ministers