07/04/2014 Leadership Loading 1
Leadership Loading
07/04/2014 Leadership Loading
• The whole work leader has ‘Twelve tasks of whole leadership’ (see
‘Whole Work Leadership’ slides)
• We firstly adjust the emerging design of a whole work team for human
scale for its team members (see ‘Human Scale’ slides),
• We then need to check that the whole work leader’s role is also on a
human scale. We do this by checking the ‘Leadership Loading’.
2
Background to
Leadership Loading
07/04/2014 Leadership Loading 3
The Leader
Is A Member
Of Two Teams & Mediates Between
Two Organisational Levels
Higher level
whole work
team.
Lower level
whole work
team.
07/04/2014 Leadership Loading
Given proposed whole work structure
• The proposed design of the lower level whole work team (working
team level)
• The proposed design of the higher level whole work team
(management team level)
Given the inherent complexity
• Technical Complexity
• Social complexity
• Rate of Change
4
The Key Question
In these circumstances what size of whole
work team can the leader readily cope with?
07/04/2014 Leadership Loading 5
Low Medium High
Score = 2 Score = 6 Score = 10
• Process complexity A whole work unit with a
simple, linear primary
process with one 'significant
event'
A whole work unit primary
process with one or two
significant events', a limited
number of channels and simple
feedback loops
A whole work unit with multiple
'significant events', an inter-
related, multi-channel primary
process with multiple feeedback
loops.
• Range of equipment used A small range of stable and
familiar equipment used
A range of moderately complex
equipment used in fairly
standard ways.
A wide variety of technically
complex equipment used in
different patterns
• Complexity of control
system
A simple paperwork or IT
system is used to control a
small variety of data
A paper work and/or tailored IT
system controls a set of local and
business level information flows.
A complex and specialist IT
system, supported by paperwork
systems, is used to control a wide
variety of inter-related local and
business level information flows.
• Regulatory complexity There is only a basic set of
legal regulatory
requirements.
There are standard external
regulatory and legal
requirements.
There are a complex set of external
regualtory and legal controls.
• Variety of job roles All team members have same
job role
Team has 2 or 3 different team
job roles
Team members have a wide
variety of different job role and
functions
• Geographical spread All work together in one
physical area
Spread over 2 or 3 areas or
locations
Spread over many areas and
locations or work as a virtual team
• Working hours alignment All work the same hours. The
leader attends occasional
planned business meetings
Some team members have
slightly different working hours.
The leader attends regular
planned business meetings.
The leader and the team members
work an variety of working hours
or shift arrangements. The leader
frequently attend irregular and
planned business metings.
• Stability of objectives and
plan
3 or less simple key
objectives set for up to a year
3 to 7 key objectves set that are
occasionally revised
A complex set of inter-related
objectives which frequently
change
• Stability of process and
structure
A stable primary process and
organisation structure
Moderate continuous
improvements to the primary
process and occasional step
changes to the process and
organisation structure
Frequent step changes to the
primary process and major
changes to the organisational
structure
• Stability of team membership Moderate to low labour
turnover within a year and
infrequent new team
members
Moderate labour turnover with
occasional leavers
Particularly high labour turnover
and frequent changes in team
membership
Totals /100 0 0
Leadership Loading Table
Higher Team
Leadership
Loading
Rate of Change
Social Complexity
Technical Complexity
Leadership Loading Table
Lower Team
Leadership
Loading
07/04/2014 Leadership Loading 6
Lower Whole Work
Team Size +/- 20%
Lower Whole Work
Team Leadership
Loading
20 -39 40-59 60-79 80-100
20 -39 20 18 16 14
40-59 16 14 12 10
60 - 79 12 10 8 6
Higher Whole WorkTeam Leadership Loading
Team Size Capacity
07/04/2014 Leadership Loading
2. Note the totals for each and
look up the ‘comfortable’ lower
whole work team size on the
‘Team Size Capacity’ table.
7
1. Fill in the leadership
loading table for both the
leader’s lower and higher
whole work teams.
Low Medium High
Score = 2 Score = 6 Score = 10
• Process complexity A whole work unit with a
simple, linear primary
process with one 'significant
event'
A whole work unit primary
process with one or two
significant events', a limited
number of channels and simple
feedback loops
A whole work unit with multiple
'significant events', an inter-
related, multi-channel primary
process with multiple feeedback
loops.
• Range of equipment used A small range of stable and
familiar equipment used
A range of moderately complex
equipment used in fairly
standard ways.
A wide variety of technically
complex equipment used in
different patterns
• Complexity of control
system
A simple paperwork or IT
system is used to control a
small variety of data
A paper work and/or tailored IT
system controls a set of local and
business level information flows.
A complex and specialist IT
system, supported by paperwork
systems, is used to control a wide
variety of inter-related local and
business level information flows.
• Regulatory complexity There is only a basic set of
legal regulatory
requirements.
There are standard external
regulatory and legal
requirements.
There are a complex set of external
regualtory and legal controls.
• Variety of job roles All team members have same
job role
Team has 2 or 3 different team
job roles
Team members have a wide
variety of different job role and
functions
• Geographical spread All work together in one
physical area
Spread over 2 or 3 areas or
locations
Spread over many areas and
locations or work as a virtual team
• Working hours alignment All work the same hours. The
leader attends occasional
planned business meetings
Some team members have
slightly different working hours.
The leader attends regular
planned business meetings.
The leader and the team members
work an variety of working hours
or shift arrangements. The leader
frequently attend irregular and
planned business metings.
• Stability of objectives and
plan
3 or less simple key
objectives set for up to a year
3 to 7 key objectves set that are
occasionally revised
A complex set of inter-related
objectives which frequently
change
• Stability of process and
structure
A stable primary process and
organisation structure
Moderate continuous
improvements to the primary
process and occasional step
changes to the process and
organisation structure
Frequent step changes to the
primary process and major
changes to the organisational
structure
• Stability of team membership Moderate to low labour
turnover within a year and
infrequent new team
members
Moderate labour turnover with
occasional leavers
Particularly high labour turnover
and frequent changes in team
membership
Totals /100 0 0
Leadership Loading Table
Higher Team
Leadership
Loading
Rate of Change
Social Complexity
Technical Complexity
Leadership Loading Table
Lower Team
Leadership
Loading
Lower Whole Work
Team Size +/- 20%
Lower Whole Work
Team Leadership
Loading
20 -39 40-59 60-79 80-100
20 -39 20 18 16 14
40-59 16 14 12 10
60 - 79 12 10 8 6
Higher Whole WorkTeam Leadership Loading
Team Size Capacity
07/04/2014 Leadership Loading 8
Skill /
Will Adjustments
OK Team size + 20%
Team size – 20% OK
High will
Low will
Low skill High skill

Weitere ähnliche Inhalte

Was ist angesagt?

Fayols General theory of management
Fayols General theory of management Fayols General theory of management
Fayols General theory of management Ezhildev
 
Pharmaceutical industrial management
Pharmaceutical industrial managementPharmaceutical industrial management
Pharmaceutical industrial managementirshad0786
 
Planning And Controlling
Planning And ControllingPlanning And Controlling
Planning And Controllingguestead93f3
 
Pharmacy administration and management
Pharmacy administration and managementPharmacy administration and management
Pharmacy administration and managementJesse Contillo
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurementAndrew Lengkong
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen EventsStephen Depoe
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentTimothy Wooi
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsAshraf Hameed
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectivenessgrubinm
 
Kaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance ImprovementKaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance ImprovementPhilip Lowe
 

Was ist angesagt? (20)

Fayols General theory of management
Fayols General theory of management Fayols General theory of management
Fayols General theory of management
 
Kaizen Workshop
Kaizen WorkshopKaizen Workshop
Kaizen Workshop
 
Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 
Pharmaceutical industrial management
Pharmaceutical industrial managementPharmaceutical industrial management
Pharmaceutical industrial management
 
KAIZEN
KAIZENKAIZEN
KAIZEN
 
Planning And Controlling
Planning And ControllingPlanning And Controlling
Planning And Controlling
 
JOB OPPORTUNITY
JOB OPPORTUNITYJOB OPPORTUNITY
JOB OPPORTUNITY
 
Pharmacy administration and management
Pharmacy administration and managementPharmacy administration and management
Pharmacy administration and management
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurement
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
Time study
Time studyTime study
Time study
 
Overview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course ContentOverview of 3 day Lean & Kaizen Course Content
Overview of 3 day Lean & Kaizen Course Content
 
Management Skills
Management SkillsManagement Skills
Management Skills
 
Kaizen
KaizenKaizen
Kaizen
 
Ch11
Ch11Ch11
Ch11
 
Kanban kaizen
Kanban kaizenKanban kaizen
Kanban kaizen
 
Kaizen, A Continuous Improvements
Kaizen, A Continuous ImprovementsKaizen, A Continuous Improvements
Kaizen, A Continuous Improvements
 
Work Measurement and Operational Effectiveness
Work Measurement and Operational EffectivenessWork Measurement and Operational Effectiveness
Work Measurement and Operational Effectiveness
 
Key Performance Indicators (KPIs)
Key Performance Indicators (KPIs)Key Performance Indicators (KPIs)
Key Performance Indicators (KPIs)
 
Kaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance ImprovementKaizen events -what are they? Driving Performance Improvement
Kaizen events -what are they? Driving Performance Improvement
 

Ähnlich wie Pp slide set 8 leadership loading

Pp slide set 5 whole work teams and human scale
Pp slide set 5   whole work teams and human scalePp slide set 5   whole work teams and human scale
Pp slide set 5 whole work teams and human scaleTricordant
 
Leader_Standard_Work_sample.ppt lean management
Leader_Standard_Work_sample.ppt lean managementLeader_Standard_Work_sample.ppt lean management
Leader_Standard_Work_sample.ppt lean managementssuser72b8e8
 
Management511 team f_presentation[1]
Management511 team f_presentation[1]Management511 team f_presentation[1]
Management511 team f_presentation[1]Mike Seuffert
 
10 Keys to Lean Daily Management
10 Keys to Lean Daily Management10 Keys to Lean Daily Management
10 Keys to Lean Daily ManagementTom Fabrizio
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Agile Mumbai 2019 Conference | Meet the incredibles Executive Leadership eng...
Agile Mumbai 2019 Conference |  Meet the incredibles Executive Leadership eng...Agile Mumbai 2019 Conference |  Meet the incredibles Executive Leadership eng...
Agile Mumbai 2019 Conference | Meet the incredibles Executive Leadership eng...AgileNetwork
 
5 organizing (part 1)
5   organizing (part 1)5   organizing (part 1)
5 organizing (part 1)Baby'z Girlz
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.pptAbinet17
 
The Kanban Retrospective
The Kanban RetrospectiveThe Kanban Retrospective
The Kanban RetrospectiveColleen Johnson
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"admford
 
How to create an effective lean daily work management system
How to create an effective lean daily work management system How to create an effective lean daily work management system
How to create an effective lean daily work management system globalsevensteps
 
Module 3 Operations Management Process Layout
Module 3 Operations Management  Process LayoutModule 3 Operations Management  Process Layout
Module 3 Operations Management Process LayoutAnushreeSingh49
 

Ähnlich wie Pp slide set 8 leadership loading (20)

Pp slide set 5 whole work teams and human scale
Pp slide set 5   whole work teams and human scalePp slide set 5   whole work teams and human scale
Pp slide set 5 whole work teams and human scale
 
Leader_Standard_Work_sample.ppt lean management
Leader_Standard_Work_sample.ppt lean managementLeader_Standard_Work_sample.ppt lean management
Leader_Standard_Work_sample.ppt lean management
 
Job Analysis.pptx
Job Analysis.pptxJob Analysis.pptx
Job Analysis.pptx
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Management511 team f_presentation[1]
Management511 team f_presentation[1]Management511 team f_presentation[1]
Management511 team f_presentation[1]
 
10 Keys to Lean Daily Management
10 Keys to Lean Daily Management10 Keys to Lean Daily Management
10 Keys to Lean Daily Management
 
Performance Apraisal
Performance ApraisalPerformance Apraisal
Performance Apraisal
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Agile Mumbai 2019 Conference | Meet the incredibles Executive Leadership eng...
Agile Mumbai 2019 Conference |  Meet the incredibles Executive Leadership eng...Agile Mumbai 2019 Conference |  Meet the incredibles Executive Leadership eng...
Agile Mumbai 2019 Conference | Meet the incredibles Executive Leadership eng...
 
Lean Management System Assessment
Lean Management System AssessmentLean Management System Assessment
Lean Management System Assessment
 
People Presentation
People PresentationPeople Presentation
People Presentation
 
3 job analyisis
3  job analyisis3  job analyisis
3 job analyisis
 
5 organizing (part 1)
5   organizing (part 1)5   organizing (part 1)
5 organizing (part 1)
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.ppt
 
The Kanban Retrospective
The Kanban RetrospectiveThe Kanban Retrospective
The Kanban Retrospective
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
 
How to create an effective lean daily work management system
How to create an effective lean daily work management system How to create an effective lean daily work management system
How to create an effective lean daily work management system
 
Module 3 Operations Management Process Layout
Module 3 Operations Management  Process LayoutModule 3 Operations Management  Process Layout
Module 3 Operations Management Process Layout
 
CDorris WHSE PR
CDorris WHSE PRCDorris WHSE PR
CDorris WHSE PR
 
Job analyisis
Job analyisisJob analyisis
Job analyisis
 

Mehr von Tricordant

Pp slide set 14 older people's health and care pathway
Pp slide set 14   older people's health and care pathwayPp slide set 14   older people's health and care pathway
Pp slide set 14 older people's health and care pathwayTricordant
 
Pp slide set 13 workforce planning
Pp slide set 13   workforce planningPp slide set 13   workforce planning
Pp slide set 13 workforce planningTricordant
 
Pp slide set 12 useful lean ideas
Pp slide set 12   useful lean ideasPp slide set 12   useful lean ideas
Pp slide set 12 useful lean ideasTricordant
 
Pp slide set 11 whole system ri es
Pp slide set 11   whole system ri esPp slide set 11   whole system ri es
Pp slide set 11 whole system ri esTricordant
 
Pp slide set 10 tricordant change management
Pp slide set 10   tricordant change managementPp slide set 10   tricordant change management
Pp slide set 10 tricordant change managementTricordant
 
Pp slide set 9 classifiation of teams
Pp slide set 9   classifiation of teamsPp slide set 9   classifiation of teams
Pp slide set 9 classifiation of teamsTricordant
 
Pp slide set 7 integrated leadership
Pp slide set 7   integrated leadershipPp slide set 7   integrated leadership
Pp slide set 7 integrated leadershipTricordant
 
Pp slide set 6 whole work cycles and requisite levels
Pp slide set 6   whole work cycles and requisite levelsPp slide set 6   whole work cycles and requisite levels
Pp slide set 6 whole work cycles and requisite levelsTricordant
 
Pp slide set 4 tricord scoring
Pp slide set 4   tricord scoringPp slide set 4   tricord scoring
Pp slide set 4 tricord scoringTricordant
 
Pp slide set 3 whole work units
Pp slide set 3   whole work unitsPp slide set 3   whole work units
Pp slide set 3 whole work unitsTricordant
 
Pp slide set 2 healthy work for whole people
Pp slide set 2   healthy work for whole peoplePp slide set 2   healthy work for whole people
Pp slide set 2 healthy work for whole peopleTricordant
 
Pp slide set 1 whole systems perspectice & tricord
Pp slide set 1   whole systems perspectice & tricordPp slide set 1   whole systems perspectice & tricord
Pp slide set 1 whole systems perspectice & tricordTricordant
 

Mehr von Tricordant (12)

Pp slide set 14 older people's health and care pathway
Pp slide set 14   older people's health and care pathwayPp slide set 14   older people's health and care pathway
Pp slide set 14 older people's health and care pathway
 
Pp slide set 13 workforce planning
Pp slide set 13   workforce planningPp slide set 13   workforce planning
Pp slide set 13 workforce planning
 
Pp slide set 12 useful lean ideas
Pp slide set 12   useful lean ideasPp slide set 12   useful lean ideas
Pp slide set 12 useful lean ideas
 
Pp slide set 11 whole system ri es
Pp slide set 11   whole system ri esPp slide set 11   whole system ri es
Pp slide set 11 whole system ri es
 
Pp slide set 10 tricordant change management
Pp slide set 10   tricordant change managementPp slide set 10   tricordant change management
Pp slide set 10 tricordant change management
 
Pp slide set 9 classifiation of teams
Pp slide set 9   classifiation of teamsPp slide set 9   classifiation of teams
Pp slide set 9 classifiation of teams
 
Pp slide set 7 integrated leadership
Pp slide set 7   integrated leadershipPp slide set 7   integrated leadership
Pp slide set 7 integrated leadership
 
Pp slide set 6 whole work cycles and requisite levels
Pp slide set 6   whole work cycles and requisite levelsPp slide set 6   whole work cycles and requisite levels
Pp slide set 6 whole work cycles and requisite levels
 
Pp slide set 4 tricord scoring
Pp slide set 4   tricord scoringPp slide set 4   tricord scoring
Pp slide set 4 tricord scoring
 
Pp slide set 3 whole work units
Pp slide set 3   whole work unitsPp slide set 3   whole work units
Pp slide set 3 whole work units
 
Pp slide set 2 healthy work for whole people
Pp slide set 2   healthy work for whole peoplePp slide set 2   healthy work for whole people
Pp slide set 2 healthy work for whole people
 
Pp slide set 1 whole systems perspectice & tricord
Pp slide set 1   whole systems perspectice & tricordPp slide set 1   whole systems perspectice & tricord
Pp slide set 1 whole systems perspectice & tricord
 

Kürzlich hochgeladen

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Kürzlich hochgeladen (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Pp slide set 8 leadership loading

  • 1. 07/04/2014 Leadership Loading 1 Leadership Loading
  • 2. 07/04/2014 Leadership Loading • The whole work leader has ‘Twelve tasks of whole leadership’ (see ‘Whole Work Leadership’ slides) • We firstly adjust the emerging design of a whole work team for human scale for its team members (see ‘Human Scale’ slides), • We then need to check that the whole work leader’s role is also on a human scale. We do this by checking the ‘Leadership Loading’. 2 Background to Leadership Loading
  • 3. 07/04/2014 Leadership Loading 3 The Leader Is A Member Of Two Teams & Mediates Between Two Organisational Levels Higher level whole work team. Lower level whole work team.
  • 4. 07/04/2014 Leadership Loading Given proposed whole work structure • The proposed design of the lower level whole work team (working team level) • The proposed design of the higher level whole work team (management team level) Given the inherent complexity • Technical Complexity • Social complexity • Rate of Change 4 The Key Question In these circumstances what size of whole work team can the leader readily cope with?
  • 5. 07/04/2014 Leadership Loading 5 Low Medium High Score = 2 Score = 6 Score = 10 • Process complexity A whole work unit with a simple, linear primary process with one 'significant event' A whole work unit primary process with one or two significant events', a limited number of channels and simple feedback loops A whole work unit with multiple 'significant events', an inter- related, multi-channel primary process with multiple feeedback loops. • Range of equipment used A small range of stable and familiar equipment used A range of moderately complex equipment used in fairly standard ways. A wide variety of technically complex equipment used in different patterns • Complexity of control system A simple paperwork or IT system is used to control a small variety of data A paper work and/or tailored IT system controls a set of local and business level information flows. A complex and specialist IT system, supported by paperwork systems, is used to control a wide variety of inter-related local and business level information flows. • Regulatory complexity There is only a basic set of legal regulatory requirements. There are standard external regulatory and legal requirements. There are a complex set of external regualtory and legal controls. • Variety of job roles All team members have same job role Team has 2 or 3 different team job roles Team members have a wide variety of different job role and functions • Geographical spread All work together in one physical area Spread over 2 or 3 areas or locations Spread over many areas and locations or work as a virtual team • Working hours alignment All work the same hours. The leader attends occasional planned business meetings Some team members have slightly different working hours. The leader attends regular planned business meetings. The leader and the team members work an variety of working hours or shift arrangements. The leader frequently attend irregular and planned business metings. • Stability of objectives and plan 3 or less simple key objectives set for up to a year 3 to 7 key objectves set that are occasionally revised A complex set of inter-related objectives which frequently change • Stability of process and structure A stable primary process and organisation structure Moderate continuous improvements to the primary process and occasional step changes to the process and organisation structure Frequent step changes to the primary process and major changes to the organisational structure • Stability of team membership Moderate to low labour turnover within a year and infrequent new team members Moderate labour turnover with occasional leavers Particularly high labour turnover and frequent changes in team membership Totals /100 0 0 Leadership Loading Table Higher Team Leadership Loading Rate of Change Social Complexity Technical Complexity Leadership Loading Table Lower Team Leadership Loading
  • 6. 07/04/2014 Leadership Loading 6 Lower Whole Work Team Size +/- 20% Lower Whole Work Team Leadership Loading 20 -39 40-59 60-79 80-100 20 -39 20 18 16 14 40-59 16 14 12 10 60 - 79 12 10 8 6 Higher Whole WorkTeam Leadership Loading Team Size Capacity
  • 7. 07/04/2014 Leadership Loading 2. Note the totals for each and look up the ‘comfortable’ lower whole work team size on the ‘Team Size Capacity’ table. 7 1. Fill in the leadership loading table for both the leader’s lower and higher whole work teams. Low Medium High Score = 2 Score = 6 Score = 10 • Process complexity A whole work unit with a simple, linear primary process with one 'significant event' A whole work unit primary process with one or two significant events', a limited number of channels and simple feedback loops A whole work unit with multiple 'significant events', an inter- related, multi-channel primary process with multiple feeedback loops. • Range of equipment used A small range of stable and familiar equipment used A range of moderately complex equipment used in fairly standard ways. A wide variety of technically complex equipment used in different patterns • Complexity of control system A simple paperwork or IT system is used to control a small variety of data A paper work and/or tailored IT system controls a set of local and business level information flows. A complex and specialist IT system, supported by paperwork systems, is used to control a wide variety of inter-related local and business level information flows. • Regulatory complexity There is only a basic set of legal regulatory requirements. There are standard external regulatory and legal requirements. There are a complex set of external regualtory and legal controls. • Variety of job roles All team members have same job role Team has 2 or 3 different team job roles Team members have a wide variety of different job role and functions • Geographical spread All work together in one physical area Spread over 2 or 3 areas or locations Spread over many areas and locations or work as a virtual team • Working hours alignment All work the same hours. The leader attends occasional planned business meetings Some team members have slightly different working hours. The leader attends regular planned business meetings. The leader and the team members work an variety of working hours or shift arrangements. The leader frequently attend irregular and planned business metings. • Stability of objectives and plan 3 or less simple key objectives set for up to a year 3 to 7 key objectves set that are occasionally revised A complex set of inter-related objectives which frequently change • Stability of process and structure A stable primary process and organisation structure Moderate continuous improvements to the primary process and occasional step changes to the process and organisation structure Frequent step changes to the primary process and major changes to the organisational structure • Stability of team membership Moderate to low labour turnover within a year and infrequent new team members Moderate labour turnover with occasional leavers Particularly high labour turnover and frequent changes in team membership Totals /100 0 0 Leadership Loading Table Higher Team Leadership Loading Rate of Change Social Complexity Technical Complexity Leadership Loading Table Lower Team Leadership Loading Lower Whole Work Team Size +/- 20% Lower Whole Work Team Leadership Loading 20 -39 40-59 60-79 80-100 20 -39 20 18 16 14 40-59 16 14 12 10 60 - 79 12 10 8 6 Higher Whole WorkTeam Leadership Loading Team Size Capacity
  • 8. 07/04/2014 Leadership Loading 8 Skill / Will Adjustments OK Team size + 20% Team size – 20% OK High will Low will Low skill High skill