SlideShare ist ein Scribd-Unternehmen logo
1 von 8
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 1 -
Guidelines and Project Management Handbook for Greek NGOs
Dipl.Eng. – MBA Triantafyllos Katsarelis1
(Scientific Associate, School of Civil Engineering, Centre for Construction
Innovation, National Technical University of Athens, Greece, IPMA Level C certified)
Dipl.Eng. Nikolaos Depountis
(Quality Advisor, Member of the BoD PM-Greece, Athens, Greece)
Iliana Adamopoulou
(undergr. Student, National Technical University of Athens, Greece, IPMA Level D
certified)
Abstract
“APOPLOUS” was the outcome of a project assigned by the Coordination Committee
of the Campaign of 800 Greek NGOs, with the purpose of constructing a set of
“Values, Organization, Conduct and Practice” for Greek NGOs. The main objective of
the present study was to construct a comprehensive, easy-to-use tool for Greek
NGOs, an add-on to “APOPLOUS”. An additional objective was to facilitate Greek
NGOs to be certified under the ELOT 1429 & 1431-3 Standards for the “Certification
of Project Management Competency of Organizations”, thus ensuring their
candidature for European Union co-financed Projects. The authors based their study
on the latest International Competence Baseline version in use of the International
Project Management Association and specifically on the Austrian and the Greek
National Baselines. The Guidelines and the standardised handbook were used in a
pilot phase by a selected sample of NGOs and their feedback is included in the
presented version.
Keywords
Standards, E.U. co-financed projects, APOPLOUS, Greek NGOs, Project handbook
1 Introduction
Three years ago the Coordination Committee of the Campaign of 800 Greek NGOs
assigned to the Scientific Committee the project of constructing a set of “Values,
Organization, Conduct and Practice” to be adopted and used by Greek NGOs. The
outcome of this project was “APOPLOUS”. This “Set of Values” is now being
established as a “Code of Conduct”, adopted by a large number of Greek NGOs. The
present study is the second add-on to “APOPLOUS”, providing a tool for Greek
NGOs for their continuous improvement under the very spirit of this Code of Values,
Organization, Conduct and Practice.
Meanwhile the Greek Organization for Standardization – ELOT developed and issued
the 1429 & 1431-3 Standards, which are maturity organization standards, for the
field of European Union co-financed Projects in Greece, which could also affect
NGOs’ candidature for such Projects. The additional objective of this study was to
facilitate Greek NGOs to be certified under these Standards.
1
Corresponding author. Mailing address: Bentouri 22B, Holargos 15561, Athens, Greece.
E-mail address: baikats@hotmail.com
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 2 -
“APOPLOUS - Code of Values, Organization, Conduct and Practice” for Greek NGOs
and the ELOT 1429 Standard are briefly described. The “Project Management
Guidelines and Handbook” proposed by the authors are presented.
2 APOPLOUS: History and background
“APOPLOUS - Code of Values, Organization, Conduct and Practice” for Greek NGOs
(Katsarelis, Depountis et al. (2008)) was the outcome of a project assigned to the
Scientific Committee of the Campaign of 800 Greek NGOs by the Coordination
Committee. The final text was approved, went through the public enquiry procedure
and currently undergoes the procedure of formal acceptance by the interested
Greek NGOs, thus moving forward from a “Set of Principles” to a “Code of
Conduct”.
“APOPLOUS” is structured in six equally weighted “values”. In the “APOPLOUS
Code” a brief description of each value is provided. These Principles do not negate
the institutional articles of each organization, nor do they replace the additional
terms of function or their applied practices. In contrast they are additional to the
above, while enhancing them. Through the adoption of these Principles all
organizations are encouraged to use more sophisticated and standardized
instruments to ameliorate their performance, such as evaluation indicators,
mechanisms of internal control, prototypes and standards.
The first add-on was “Comprehensive Guidelines for the application of the principles
of APOPLOUS” and contained more detailed documentation and some examples of
application in order to clarify the concept.
Fig. 1: APOPLOUS
The authors have proposed the following graph, which depicts the continuum of
standardization for NGOs. This proposal was based on the approach for Corporate
Responsibility Codes (Leipziger (2003)).
FOCUS
on
EFFECTIVENESS
RESPONSIBLE
ORGANIZATION
& PRACTICE
CONTINUOUS
IMPROVEMENT
& INNOVATION
PARTNERSHIP
DEVELOPMENT
& NETWORKING
VISION &
MISSION
INDEPENDENCE
TRANSPARENCY
& REPORTING
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 3 -
Fig. 2: The continuum for standardization for NGOs
The authors have expressed their commitment and vision to help upgrade the
Code. With the presentation of the two add-ons – Guidelines this Code of conduct is
moving forward towards becoming a Standard.
3 The ELOT 1429 standard: Background and field of application
The ELOT 1429 Standard for the “Certification of Project Management Competency
of Organizations”, along with the linked Standard ELOT 1430 – series, addresses
the field of European Union co-financed Projects in Greece. NGOs must fulfill the
general requirements of ELOT 1429 and specifically ELOT 1431 - 3 Standards.
Disregarding the field of application of these Standards, the authors strongly
believe that Greek NGOs should adopt, implement and follow in all their projects
any comprehensive set of “Project Management Guidelines” under the requirements
of APOPLOUS. This set of “Guidelines” must follow specifically the values of
“Responsible Organization and Practice”, Focus on Effectiveness” and “Continuous
Improvement and Innovation”. The set of “Guidelines” proposed by the authors in
this paper is a step towards this goal.
4 Project management guidelines and handbook for Greek NGOs
4.1 Methodology
The scope of the study was to construct a comprehensive document, which would
be easy to use by the Greek NGOs who base their activity on volunteer work and
lack of trained full-time personnel. They actually are “Project Oriented”
Organizations usually supported by a “week permanent” Organization.
The authors based their study on the Project Management approach proposed by
the International Project Management Association – IPMA and specifically on the
latest International Competence Baseline – ICB 3 version in use and more
specifically on the Austrian National Baseline of PMA and the final draft of the Greek
National Baseline of PM Greece. Additional bibliography was used on project
management for NGOs.
The Guidelines and the Handbook were reviewed for consistency, clarity and
usability during the pilot phase by a selected sample of Greek NGOs: “European
Expression”, “Cell of Alternative Youth Activities”, “ARCHELON – The Sea Turtle
Protection Society of Greece”, “2nd
Holargos System of Sea Scouts” and “Gymnastic
Athletic Club of Holargos”. These NGOs are committed to adapt the Handbook to
their specific operational needs and use it in a future project, with the help and
guidance of the authors. More NGOs, members of the “Campaign of 800 Greek
NGOs” will take part in this implementation phase.
Values Principles
Codes
of
Conduct
Standards Models
Norms
&
Guidelines
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 4 -
4.2 Guidelines’ construction
The “Guidelines and Project Management Handbook” is a bilingual tool (in greek
and in english), as many Greek NGOs have volunteers not fluent in the greek
language, or collaborate with NGOs from other countries in common bilateral
issues, or even undertake projects abroad. The tool consists of two parts: the
Project Management Handbook and the Guidelines for the implementation of the
Project Management methods introduced in the Handbook.
The Project Management Handbook contains easy-to-use templates for all the sub-
processes of a project (start, controlling, coordination and closedown, together with
the continuous marketing task). It also addresses the issue of risk management, in
a project risk register and with further risk analysis and alternative scenarios, which
need to be monitored constantly during the project, and could be very useful in
case the crisis management sub-process needs to be launched. A special and rather
innovative contribution, associated with the risk management but also with the
closedown sub-process, is the “Non-completed project stop” template, which
inevitably has to replace the normal “Project closedown report”, in case a project
ends abruptly before its completion. The templates can be filled using low cost
software or even freeware, therefore the tool represents an affordable solution for
even small NGOs.
Distribution list Project list of dates
Project assignment Project communication
structures
Project objectives Project risk register
Pre-project and post-
project phase analysis
Risk analysis –
Alternative scenarios
Project objects of
consideration
“Professional” liability
insurance contract
Project rules Relationship to other
projects
Project cost plan Connection to the
Organisation’s strategy
Project resource plan To-do list
Project organisation
chart
Approval of work
packages
Work breakdown
structure
Minutes of meeting
Project interested
parties
Project status report
Project work package
specifications
Project score card
Project responsibility
matrix
Project close down
report
Project milestone plan To-do list: Remaining
work – Post-project
phase
Project bar chart Non-completed project
stop
Table 1: Project Handbook contents
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 5 -
The Guidelines, apart from helping with the implementation of the proposed Project
Management methods, contain basic Project Management glossary and databases
(e.g. risk management register and potential interested parties register).
Examples of the Handbook templates and the Guidelines are shown below.
The Project Interested Parties Analysis and Graph
 The project Interested Parties analysis considers the relationship of the project
to its relevant Interested Parties (Stakeholders). These are the parties that have
an effect on, or are affected by the project and its results.
 This project Interested Parties graph is structured as: Project internal area:
Project organization (Project Owner or team + Project Manager + Project
Team), and Project external area: All relevant Interested Parties.
 The distance from the Project figure depicts the importance of the Interested
Party within an arbitrary scale: Critical – Important – Other.
 The correspondent mark depicts the assessed relationship “attitude” of the
Interested Party within an arbitrary scale: Negative – Neutral – Positive.
 The Analysis and corresponding Chart enables the Project Team to design the
actions to be planned in order to improve the relationships with each Interested
Party, using an “Importance/ Attitude” matrix.
Figure X: Typical Project Interested Parties Analysis graph
Fig. 3: Guidelines extract: Interested Parties Analysis
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 6 -
<Ονομασία Έργου>
<Project name>
<Κωδικός Έργου>
<Project No.>
ΑΝΑΛΥΣΗ ΚΙΝΔΥΝΩΝ
ΕΝΑΛΛΑΚΤΙΚΑ ΣΕΝΑΡΙΑ
RISK ANALYSIS
ALTERNATIVE SCENARIOS
<Λογότυπο ΜΚΟ>
<NGO’s logo>
Κίνδυνος Risk
Κόστος κινδύνου Risk cost Κόστος πρόληψης κινδύνου Cost for preventing risk
Προληπτικές ενέργειες Preventative actions
Ενέργειες ενδεχόμενης εμφάνισης Contingency actions
Εναλλακτικό σενάριο 1 Alternative scenario 1
Υπεύθυνος Responsible
Κόστος Cost Χρονική καθυστέρηση Delay
Αποτελέσματα Results


Εναλλακτικό σενάριο 2 Alternative scenario 2
Υπεύθυνος Responsible
Κόστος Cost Χρονική καθυστέρηση Delay
Αποτελέσματα Results


Fig. 4: “Risk analysis – Alternative scenarios” template
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 7 -
<Ονομασία Έργου>
<Project name>
<Κωδικός Έργου>
<Project No.>
ΑΝΑΚΕΦΑΛΑΙΩΤΙΚΟ ΔΕΛΤΙΟ
ΚΑΤΑΣΤΑΣΗΣ ΤΟΥ ΕΡΓΟΥ
PROJECT SCORE CARD
<Λογότυπο ΜΚΟ>
<NGO’s logo>
Στόχοι και πλαίσιο του Έργου
Project objectives and context
<Ημερ.1>
<Date 1>
<Ημερ.2>
<Date 2>
<Ημερ.3>
<Date 3>
<Ημερ.4>
<Date 4>
Στόχοι Project objectives 1
Αντικείμενα θεώρησης Project objects of consideration 2
Στρατηγικές Οργανισμού Organisation strategies 3
Άλλα έργα Other projects 4
Σχεδιασμός, έλεγχος
Planning, controlling
<Ημερ.1>
<Date 1>
<Ημερ.2>
<Date 2>
<Ημερ.3>
<Date 3>
<Ημερ.4>
<Date 4>
Πρόοδος Project progress
Χρονοδιάγραμμα Project schedule
Κόστη Project costs
Πόροι Project resources
Οργάνωση του Έργου
Project organisation
<Ημερ.1>
<Date 1>
<Ημερ.2>
<Date 2>
<Ημερ.3>
<Date 3>
<Ημερ.4>
<Date 4>
Ρόλοι Project roles
Επικοινωνία Project communication
Κουλτούρα Project culture
Ομαδική εργασία Project teamwork
Σχέσεις περιβαλλόντων του έργου
Project environment relationships
<Ημερ.1>
<Date 1>
<Ημερ.2>
<Date 2>
<Ημερ.3>
<Date 3>
<Ημερ.4>
<Date 4>
…
…
…
…
Γενική κατάσταση
Overall
<Ημερ.1>
<Date 1>
<Ημερ.2>
<Date 2>
<Ημερ.3>
<Date 3>
<Ημερ.4>
<Date 4>
<Ονομασία Έργου> <Project name> 3
Πολύ καλή 1 Very good
Καλή 2 Good
Μέση 3 Ok
Κακή 4 Bad
Πολύ κακή 5 Very bad
Fig. 5: “Project Score Card” template
PM-05 - Advancing Project Management for the 21st
Century
“Concepts, Tools & Techniques for Managing Successful Projects”
29-31 May 2010, Heraklion, Crete, Greece.
- 8 -
5 Conclusions
A comprehensive “Guidelines and Project Management Handbook” tool, which would
be easy to use by the Greek NGOs who base their activity on volunteer work and
lack of trained full-time personnel, is proposed by the authors. The authors
targeted mostly the medium and small NGOs with the above characteristics, but the
proposed tool can also be used by the larger NGOs with more experience. These
“Guidelines” may support Greek NGOs to be certified under the ELOT 1429 and
1430-3 Standards and ensure their candidature for European Union co-financed
Projects. But, most of all, these ‘Guidelines” are a tool for their continuous
improvement – kaizen, into their “journey towards excellence”, under the very
spirit of “APOPLOUS - Code of Values, Organization, Conduct and Practice”.
6 References
European Commission – EuropeAid Cooperation Office (2004), “Aid Delivery
Methods – Project Cycle Management Guidelines”.
Depountis, N. and Katsarelis, T. (2008), “APOPLOUS – Code of Values,
Organization, Conduct and Practice for Greek NGOs”.
Depountis, N. and Katsarelis, T. (2008), “Standards and Certification of NGOs”,
Proceedings of the 3rd
National Conference on Standardization, Standards and
Quality”, Thessaloniki.
Depountis, N. and Katsarelis, T. (2009), “Project Management Guidelines for Greek
NGOs”, Proceedings of the 6th
Conference “Standardization, Prototypes and
Quality: A means of Balkan Countries Collaboration”, Thessaloniki.
Gareis, R. (2005), “Happy Projects”, MANZ Verlag, Vienna.
Gaskin, K. (2006), “Risk Toolkit: How to take care of risk in volunteering – A guide
for organisations”, The Institute for Volunteering Research & Volunteering
England.
Gower (2000), “Handbook of Project Management”.
Harrington, H. and McNellis, T. (2006), “Project Management Excellence”, Patton
Press.
International Project Management Association – IPMA:
http://www.ipma.ch/Pages/default.aspx
Leipziger, D. (2003), “The Corporate Responsibility Code Book”, Greenleaf
Publishing Limited, Sheffield.
PMI (2004), “A Guide to the Project Management Body of Knowledge – PMOBK”.
Project Management Association Austria – PMA: http://www.p-m-a.at/content.php
Project Management Association Greece – PM Greece: http://pmgreece.gr/

Weitere ähnliche Inhalte

Ähnlich wie Pm 05 apoplous paper

How to measure innovation in eLearning. The i-AFIEL methodology
How to measure innovation in eLearning. The i-AFIEL methodologyHow to measure innovation in eLearning. The i-AFIEL methodology
How to measure innovation in eLearning. The i-AFIEL methodologyeLearning Papers
 
Ict project management in theory and practice
Ict project management in theory and practiceIct project management in theory and practice
Ict project management in theory and practiceKennedy Kiprono
 
A Review Of Program And Project Evaluation Models
A Review Of Program And Project Evaluation ModelsA Review Of Program And Project Evaluation Models
A Review Of Program And Project Evaluation ModelsNat Rice
 
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIA
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIAPUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIA
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIAEmils Pulmanis
 
Winning ITNs with RRI - Relevant sources and further reading
Winning ITNs with RRI - Relevant sources and further readingWinning ITNs with RRI - Relevant sources and further reading
Winning ITNs with RRI - Relevant sources and further readingJobenco
 
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...European Network of Living Labs (ENoLL)
 
UCISA Major Projects Governance Assessment Toolkit
UCISA Major Projects Governance Assessment ToolkitUCISA Major Projects Governance Assessment Toolkit
UCISA Major Projects Governance Assessment ToolkitMark Ritchie
 
Bridging the ‘missing middle’: a design based approach to scaling
Bridging the ‘missing middle’: a design based approach to scalingBridging the ‘missing middle’: a design based approach to scaling
Bridging the ‘missing middle’: a design based approach to scalingdebbieholley1
 
Ia4 si caps concertation presentation
Ia4 si caps concertation presentationIa4 si caps concertation presentation
Ia4 si caps concertation presentationCAPS2020
 
Knowledge sharing in a distributed community of practice: a case study of ePr...
Knowledge sharing in a distributed community of practice: a case study of ePr...Knowledge sharing in a distributed community of practice: a case study of ePr...
Knowledge sharing in a distributed community of practice: a case study of ePr...ePractice.eu
 
Coaching material about strategic use of ICT and Communication Tools.pdf
Coaching material about strategic use of ICT and Communication Tools.pdfCoaching material about strategic use of ICT and Communication Tools.pdf
Coaching material about strategic use of ICT and Communication Tools.pdfBrodoto
 
Best practices in eGovernment: on a knife-edge between success and failure
Best practices in eGovernment: on a knife-edge between success and failureBest practices in eGovernment: on a knife-edge between success and failure
Best practices in eGovernment: on a knife-edge between success and failureTrond Arne Undheim
 
Best practices in eGovernment: - on a knife-edge between success and failure
Best practices in eGovernment: - on a knife-edge between success and failureBest practices in eGovernment: - on a knife-edge between success and failure
Best practices in eGovernment: - on a knife-edge between success and failureePractice.eu
 
The case of Labein Tecnalia technology institute as learning organization
The case of Labein Tecnalia technology institute as learning organizationThe case of Labein Tecnalia technology institute as learning organization
The case of Labein Tecnalia technology institute as learning organizationJavier Ruiz
 
Change2020 RIS3 workbook for learning-driven regional development
Change2020 RIS3 workbook for learning-driven regional developmentChange2020 RIS3 workbook for learning-driven regional development
Change2020 RIS3 workbook for learning-driven regional developmentBusiness Arena Oy
 
Paper presented @ IST Africa 2010
Paper presented @ IST Africa 2010Paper presented @ IST Africa 2010
Paper presented @ IST Africa 2010Tiziana Lombardo
 
Meshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 KopieMeshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 KopieMarcel van Marrewijk
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsDr Lendy Spires
 

Ähnlich wie Pm 05 apoplous paper (20)

How to measure innovation in eLearning. The i-AFIEL methodology
How to measure innovation in eLearning. The i-AFIEL methodologyHow to measure innovation in eLearning. The i-AFIEL methodology
How to measure innovation in eLearning. The i-AFIEL methodology
 
Ict project management in theory and practice
Ict project management in theory and practiceIct project management in theory and practice
Ict project management in theory and practice
 
A Review Of Program And Project Evaluation Models
A Review Of Program And Project Evaluation ModelsA Review Of Program And Project Evaluation Models
A Review Of Program And Project Evaluation Models
 
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIA
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIAPUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIA
PUBLIC SECTOR PROJECT MANAGEMENT EFFICIENCY PROBLEMS, CASE OF LATVIA
 
Winning ITNs with RRI - Relevant sources and further reading
Winning ITNs with RRI - Relevant sources and further readingWinning ITNs with RRI - Relevant sources and further reading
Winning ITNs with RRI - Relevant sources and further reading
 
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...
Strategic Innovation Ecosystems and Enabling Actions for Addressing Societal ...
 
UCISA Major Projects Governance Assessment Toolkit
UCISA Major Projects Governance Assessment ToolkitUCISA Major Projects Governance Assessment Toolkit
UCISA Major Projects Governance Assessment Toolkit
 
Bridging the ‘missing middle’: a design based approach to scaling
Bridging the ‘missing middle’: a design based approach to scalingBridging the ‘missing middle’: a design based approach to scaling
Bridging the ‘missing middle’: a design based approach to scaling
 
Ia4 si caps concertation presentation
Ia4 si caps concertation presentationIa4 si caps concertation presentation
Ia4 si caps concertation presentation
 
Knowledge sharing in a distributed community of practice: a case study of ePr...
Knowledge sharing in a distributed community of practice: a case study of ePr...Knowledge sharing in a distributed community of practice: a case study of ePr...
Knowledge sharing in a distributed community of practice: a case study of ePr...
 
Coaching material about strategic use of ICT and Communication Tools.pdf
Coaching material about strategic use of ICT and Communication Tools.pdfCoaching material about strategic use of ICT and Communication Tools.pdf
Coaching material about strategic use of ICT and Communication Tools.pdf
 
Best practices in eGovernment: on a knife-edge between success and failure
Best practices in eGovernment: on a knife-edge between success and failureBest practices in eGovernment: on a knife-edge between success and failure
Best practices in eGovernment: on a knife-edge between success and failure
 
Best practices in eGovernment: - on a knife-edge between success and failure
Best practices in eGovernment: - on a knife-edge between success and failureBest practices in eGovernment: - on a knife-edge between success and failure
Best practices in eGovernment: - on a knife-edge between success and failure
 
The case of Labein Tecnalia technology institute as learning organization
The case of Labein Tecnalia technology institute as learning organizationThe case of Labein Tecnalia technology institute as learning organization
The case of Labein Tecnalia technology institute as learning organization
 
Change2020 RIS3 workbook for learning-driven regional development
Change2020 RIS3 workbook for learning-driven regional developmentChange2020 RIS3 workbook for learning-driven regional development
Change2020 RIS3 workbook for learning-driven regional development
 
Paper presented @ IST Africa 2010
Paper presented @ IST Africa 2010Paper presented @ IST Africa 2010
Paper presented @ IST Africa 2010
 
Meshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 KopieMeshworking For Sustainability 090320 Kopie
Meshworking For Sustainability 090320 Kopie
 
Socializing and disseminating the academic and intellectual creation: experie...
Socializing and disseminating the academic and intellectual creation: experie...Socializing and disseminating the academic and intellectual creation: experie...
Socializing and disseminating the academic and intellectual creation: experie...
 
Akcapinar arkun dct_poster
Akcapinar arkun dct_posterAkcapinar arkun dct_poster
Akcapinar arkun dct_poster
 
New thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gapsNew thinking on technical assistance to solve knowledge and capacity gaps
New thinking on technical assistance to solve knowledge and capacity gaps
 

Mehr von Triantafyllos Katsarelis

Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...
Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...
Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...Triantafyllos Katsarelis
 
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Triantafyllos Katsarelis
 
University of Athens - Advanced project management sample presentation_gr
University of Athens - Advanced project management sample presentation_grUniversity of Athens - Advanced project management sample presentation_gr
University of Athens - Advanced project management sample presentation_grTriantafyllos Katsarelis
 
University of Athens - Advanced project management sample presentation_en
University of Athens - Advanced project management sample presentation_enUniversity of Athens - Advanced project management sample presentation_en
University of Athens - Advanced project management sample presentation_enTriantafyllos Katsarelis
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textTriantafyllos Katsarelis
 
University of Athens - Advanced project management_curriculum
University of Athens - Advanced project management_curriculumUniversity of Athens - Advanced project management_curriculum
University of Athens - Advanced project management_curriculumTriantafyllos Katsarelis
 
Environmental Management Systems, Social Responsibility and Sustainability (i...
Environmental Management Systems, Social Responsibility and Sustainability (i...Environmental Management Systems, Social Responsibility and Sustainability (i...
Environmental Management Systems, Social Responsibility and Sustainability (i...Triantafyllos Katsarelis
 
Advanced Project Management - Professional Education_programme presentation
Advanced Project Management - Professional Education_programme presentationAdvanced Project Management - Professional Education_programme presentation
Advanced Project Management - Professional Education_programme presentationTriantafyllos Katsarelis
 
Advanced Project Management - Professional Education
Advanced Project Management - Professional EducationAdvanced Project Management - Professional Education
Advanced Project Management - Professional EducationTriantafyllos Katsarelis
 
Social Corporate Responsibility and Sustainability
Social Corporate Responsibility and SustainabilitySocial Corporate Responsibility and Sustainability
Social Corporate Responsibility and SustainabilityTriantafyllos Katsarelis
 
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟTriantafyllos Katsarelis
 
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...Triantafyllos Katsarelis
 
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...Triantafyllos Katsarelis
 
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...Triantafyllos Katsarelis
 
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012Triantafyllos Katsarelis
 
Invited lecture at hma - Eede 1 gpm_prs_short
Invited lecture at hma - Eede 1 gpm_prs_shortInvited lecture at hma - Eede 1 gpm_prs_short
Invited lecture at hma - Eede 1 gpm_prs_shortTriantafyllos Katsarelis
 
Ταξίδι στον θαυμαστό κόσμο των Προτύπων
Ταξίδι στον θαυμαστό κόσμο των Προτύπων Ταξίδι στον θαυμαστό κόσμο των Προτύπων
Ταξίδι στον θαυμαστό κόσμο των Προτύπων Triantafyllos Katsarelis
 

Mehr von Triantafyllos Katsarelis (20)

Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...
Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...
Πρότυπα στηρίζουν Πρότυπα: ISO 31000:2009, ISO 26000:2010, Ευρωπαϊκό Μοντέλο ...
 
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
Infusing the PRiSM™ Sustainability Framework into the IPMA Project Excellence...
 
University of Athens - Advanced project management sample presentation_gr
University of Athens - Advanced project management sample presentation_grUniversity of Athens - Advanced project management sample presentation_gr
University of Athens - Advanced project management sample presentation_gr
 
University of Athens - Advanced project management sample presentation_en
University of Athens - Advanced project management sample presentation_enUniversity of Athens - Advanced project management sample presentation_en
University of Athens - Advanced project management sample presentation_en
 
University of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample textUniversity of Athens - Advanced project management_sample text
University of Athens - Advanced project management_sample text
 
University of Athens - Advanced project management_curriculum
University of Athens - Advanced project management_curriculumUniversity of Athens - Advanced project management_curriculum
University of Athens - Advanced project management_curriculum
 
Environmental Management Systems, Social Responsibility and Sustainability (i...
Environmental Management Systems, Social Responsibility and Sustainability (i...Environmental Management Systems, Social Responsibility and Sustainability (i...
Environmental Management Systems, Social Responsibility and Sustainability (i...
 
Advanced Project Management - Professional Education_programme presentation
Advanced Project Management - Professional Education_programme presentationAdvanced Project Management - Professional Education_programme presentation
Advanced Project Management - Professional Education_programme presentation
 
Advanced Project Management - Professional Education
Advanced Project Management - Professional EducationAdvanced Project Management - Professional Education
Advanced Project Management - Professional Education
 
SED magazine 6/2014
SED magazine 6/2014SED magazine 6/2014
SED magazine 6/2014
 
Social Corporate Responsibility and Sustainability
Social Corporate Responsibility and SustainabilitySocial Corporate Responsibility and Sustainability
Social Corporate Responsibility and Sustainability
 
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ
8 ΑΡΧΕΣ + 8 ΠΡΟΤΑΣΕΙΣ για ΑΡΙΣΤΟ ΔΗΜΟ
 
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...
Evolving Project Management: The PRiSM™ Framework – Projects Integrating Sust...
 
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
 
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
ΕΞΕΛΙΣΣΟΝΤΑΣ ΤΗ ΔΙΟΙΚΗΣΗ ΕΡΓΩΝ: ΤΟ ΜΟΝΤΕΛΟ PRiSM™ – PROJECTS INTEGRATING SUST...
 
Sed letter 05-14
Sed letter 05-14Sed letter 05-14
Sed letter 05-14
 
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012
Διοίκηση Έργων - Σύγχρονες τάσεις - ISO 21500:2012
 
Invited lecture at hma - Eede 1 gpm_prs_short
Invited lecture at hma - Eede 1 gpm_prs_shortInvited lecture at hma - Eede 1 gpm_prs_short
Invited lecture at hma - Eede 1 gpm_prs_short
 
ISO 31000 & ISO 26000
ISO 31000 & ISO 26000ISO 31000 & ISO 26000
ISO 31000 & ISO 26000
 
Ταξίδι στον θαυμαστό κόσμο των Προτύπων
Ταξίδι στον θαυμαστό κόσμο των Προτύπων Ταξίδι στον θαυμαστό κόσμο των Προτύπων
Ταξίδι στον θαυμαστό κόσμο των Προτύπων
 

Kürzlich hochgeladen

KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 

Kürzlich hochgeladen (20)

KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 

Pm 05 apoplous paper

  • 1. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 1 - Guidelines and Project Management Handbook for Greek NGOs Dipl.Eng. – MBA Triantafyllos Katsarelis1 (Scientific Associate, School of Civil Engineering, Centre for Construction Innovation, National Technical University of Athens, Greece, IPMA Level C certified) Dipl.Eng. Nikolaos Depountis (Quality Advisor, Member of the BoD PM-Greece, Athens, Greece) Iliana Adamopoulou (undergr. Student, National Technical University of Athens, Greece, IPMA Level D certified) Abstract “APOPLOUS” was the outcome of a project assigned by the Coordination Committee of the Campaign of 800 Greek NGOs, with the purpose of constructing a set of “Values, Organization, Conduct and Practice” for Greek NGOs. The main objective of the present study was to construct a comprehensive, easy-to-use tool for Greek NGOs, an add-on to “APOPLOUS”. An additional objective was to facilitate Greek NGOs to be certified under the ELOT 1429 & 1431-3 Standards for the “Certification of Project Management Competency of Organizations”, thus ensuring their candidature for European Union co-financed Projects. The authors based their study on the latest International Competence Baseline version in use of the International Project Management Association and specifically on the Austrian and the Greek National Baselines. The Guidelines and the standardised handbook were used in a pilot phase by a selected sample of NGOs and their feedback is included in the presented version. Keywords Standards, E.U. co-financed projects, APOPLOUS, Greek NGOs, Project handbook 1 Introduction Three years ago the Coordination Committee of the Campaign of 800 Greek NGOs assigned to the Scientific Committee the project of constructing a set of “Values, Organization, Conduct and Practice” to be adopted and used by Greek NGOs. The outcome of this project was “APOPLOUS”. This “Set of Values” is now being established as a “Code of Conduct”, adopted by a large number of Greek NGOs. The present study is the second add-on to “APOPLOUS”, providing a tool for Greek NGOs for their continuous improvement under the very spirit of this Code of Values, Organization, Conduct and Practice. Meanwhile the Greek Organization for Standardization – ELOT developed and issued the 1429 & 1431-3 Standards, which are maturity organization standards, for the field of European Union co-financed Projects in Greece, which could also affect NGOs’ candidature for such Projects. The additional objective of this study was to facilitate Greek NGOs to be certified under these Standards. 1 Corresponding author. Mailing address: Bentouri 22B, Holargos 15561, Athens, Greece. E-mail address: baikats@hotmail.com
  • 2. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 2 - “APOPLOUS - Code of Values, Organization, Conduct and Practice” for Greek NGOs and the ELOT 1429 Standard are briefly described. The “Project Management Guidelines and Handbook” proposed by the authors are presented. 2 APOPLOUS: History and background “APOPLOUS - Code of Values, Organization, Conduct and Practice” for Greek NGOs (Katsarelis, Depountis et al. (2008)) was the outcome of a project assigned to the Scientific Committee of the Campaign of 800 Greek NGOs by the Coordination Committee. The final text was approved, went through the public enquiry procedure and currently undergoes the procedure of formal acceptance by the interested Greek NGOs, thus moving forward from a “Set of Principles” to a “Code of Conduct”. “APOPLOUS” is structured in six equally weighted “values”. In the “APOPLOUS Code” a brief description of each value is provided. These Principles do not negate the institutional articles of each organization, nor do they replace the additional terms of function or their applied practices. In contrast they are additional to the above, while enhancing them. Through the adoption of these Principles all organizations are encouraged to use more sophisticated and standardized instruments to ameliorate their performance, such as evaluation indicators, mechanisms of internal control, prototypes and standards. The first add-on was “Comprehensive Guidelines for the application of the principles of APOPLOUS” and contained more detailed documentation and some examples of application in order to clarify the concept. Fig. 1: APOPLOUS The authors have proposed the following graph, which depicts the continuum of standardization for NGOs. This proposal was based on the approach for Corporate Responsibility Codes (Leipziger (2003)). FOCUS on EFFECTIVENESS RESPONSIBLE ORGANIZATION & PRACTICE CONTINUOUS IMPROVEMENT & INNOVATION PARTNERSHIP DEVELOPMENT & NETWORKING VISION & MISSION INDEPENDENCE TRANSPARENCY & REPORTING
  • 3. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 3 - Fig. 2: The continuum for standardization for NGOs The authors have expressed their commitment and vision to help upgrade the Code. With the presentation of the two add-ons – Guidelines this Code of conduct is moving forward towards becoming a Standard. 3 The ELOT 1429 standard: Background and field of application The ELOT 1429 Standard for the “Certification of Project Management Competency of Organizations”, along with the linked Standard ELOT 1430 – series, addresses the field of European Union co-financed Projects in Greece. NGOs must fulfill the general requirements of ELOT 1429 and specifically ELOT 1431 - 3 Standards. Disregarding the field of application of these Standards, the authors strongly believe that Greek NGOs should adopt, implement and follow in all their projects any comprehensive set of “Project Management Guidelines” under the requirements of APOPLOUS. This set of “Guidelines” must follow specifically the values of “Responsible Organization and Practice”, Focus on Effectiveness” and “Continuous Improvement and Innovation”. The set of “Guidelines” proposed by the authors in this paper is a step towards this goal. 4 Project management guidelines and handbook for Greek NGOs 4.1 Methodology The scope of the study was to construct a comprehensive document, which would be easy to use by the Greek NGOs who base their activity on volunteer work and lack of trained full-time personnel. They actually are “Project Oriented” Organizations usually supported by a “week permanent” Organization. The authors based their study on the Project Management approach proposed by the International Project Management Association – IPMA and specifically on the latest International Competence Baseline – ICB 3 version in use and more specifically on the Austrian National Baseline of PMA and the final draft of the Greek National Baseline of PM Greece. Additional bibliography was used on project management for NGOs. The Guidelines and the Handbook were reviewed for consistency, clarity and usability during the pilot phase by a selected sample of Greek NGOs: “European Expression”, “Cell of Alternative Youth Activities”, “ARCHELON – The Sea Turtle Protection Society of Greece”, “2nd Holargos System of Sea Scouts” and “Gymnastic Athletic Club of Holargos”. These NGOs are committed to adapt the Handbook to their specific operational needs and use it in a future project, with the help and guidance of the authors. More NGOs, members of the “Campaign of 800 Greek NGOs” will take part in this implementation phase. Values Principles Codes of Conduct Standards Models Norms & Guidelines
  • 4. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 4 - 4.2 Guidelines’ construction The “Guidelines and Project Management Handbook” is a bilingual tool (in greek and in english), as many Greek NGOs have volunteers not fluent in the greek language, or collaborate with NGOs from other countries in common bilateral issues, or even undertake projects abroad. The tool consists of two parts: the Project Management Handbook and the Guidelines for the implementation of the Project Management methods introduced in the Handbook. The Project Management Handbook contains easy-to-use templates for all the sub- processes of a project (start, controlling, coordination and closedown, together with the continuous marketing task). It also addresses the issue of risk management, in a project risk register and with further risk analysis and alternative scenarios, which need to be monitored constantly during the project, and could be very useful in case the crisis management sub-process needs to be launched. A special and rather innovative contribution, associated with the risk management but also with the closedown sub-process, is the “Non-completed project stop” template, which inevitably has to replace the normal “Project closedown report”, in case a project ends abruptly before its completion. The templates can be filled using low cost software or even freeware, therefore the tool represents an affordable solution for even small NGOs. Distribution list Project list of dates Project assignment Project communication structures Project objectives Project risk register Pre-project and post- project phase analysis Risk analysis – Alternative scenarios Project objects of consideration “Professional” liability insurance contract Project rules Relationship to other projects Project cost plan Connection to the Organisation’s strategy Project resource plan To-do list Project organisation chart Approval of work packages Work breakdown structure Minutes of meeting Project interested parties Project status report Project work package specifications Project score card Project responsibility matrix Project close down report Project milestone plan To-do list: Remaining work – Post-project phase Project bar chart Non-completed project stop Table 1: Project Handbook contents
  • 5. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 5 - The Guidelines, apart from helping with the implementation of the proposed Project Management methods, contain basic Project Management glossary and databases (e.g. risk management register and potential interested parties register). Examples of the Handbook templates and the Guidelines are shown below. The Project Interested Parties Analysis and Graph  The project Interested Parties analysis considers the relationship of the project to its relevant Interested Parties (Stakeholders). These are the parties that have an effect on, or are affected by the project and its results.  This project Interested Parties graph is structured as: Project internal area: Project organization (Project Owner or team + Project Manager + Project Team), and Project external area: All relevant Interested Parties.  The distance from the Project figure depicts the importance of the Interested Party within an arbitrary scale: Critical – Important – Other.  The correspondent mark depicts the assessed relationship “attitude” of the Interested Party within an arbitrary scale: Negative – Neutral – Positive.  The Analysis and corresponding Chart enables the Project Team to design the actions to be planned in order to improve the relationships with each Interested Party, using an “Importance/ Attitude” matrix. Figure X: Typical Project Interested Parties Analysis graph Fig. 3: Guidelines extract: Interested Parties Analysis
  • 6. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 6 - <Ονομασία Έργου> <Project name> <Κωδικός Έργου> <Project No.> ΑΝΑΛΥΣΗ ΚΙΝΔΥΝΩΝ ΕΝΑΛΛΑΚΤΙΚΑ ΣΕΝΑΡΙΑ RISK ANALYSIS ALTERNATIVE SCENARIOS <Λογότυπο ΜΚΟ> <NGO’s logo> Κίνδυνος Risk Κόστος κινδύνου Risk cost Κόστος πρόληψης κινδύνου Cost for preventing risk Προληπτικές ενέργειες Preventative actions Ενέργειες ενδεχόμενης εμφάνισης Contingency actions Εναλλακτικό σενάριο 1 Alternative scenario 1 Υπεύθυνος Responsible Κόστος Cost Χρονική καθυστέρηση Delay Αποτελέσματα Results   Εναλλακτικό σενάριο 2 Alternative scenario 2 Υπεύθυνος Responsible Κόστος Cost Χρονική καθυστέρηση Delay Αποτελέσματα Results   Fig. 4: “Risk analysis – Alternative scenarios” template
  • 7. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 7 - <Ονομασία Έργου> <Project name> <Κωδικός Έργου> <Project No.> ΑΝΑΚΕΦΑΛΑΙΩΤΙΚΟ ΔΕΛΤΙΟ ΚΑΤΑΣΤΑΣΗΣ ΤΟΥ ΕΡΓΟΥ PROJECT SCORE CARD <Λογότυπο ΜΚΟ> <NGO’s logo> Στόχοι και πλαίσιο του Έργου Project objectives and context <Ημερ.1> <Date 1> <Ημερ.2> <Date 2> <Ημερ.3> <Date 3> <Ημερ.4> <Date 4> Στόχοι Project objectives 1 Αντικείμενα θεώρησης Project objects of consideration 2 Στρατηγικές Οργανισμού Organisation strategies 3 Άλλα έργα Other projects 4 Σχεδιασμός, έλεγχος Planning, controlling <Ημερ.1> <Date 1> <Ημερ.2> <Date 2> <Ημερ.3> <Date 3> <Ημερ.4> <Date 4> Πρόοδος Project progress Χρονοδιάγραμμα Project schedule Κόστη Project costs Πόροι Project resources Οργάνωση του Έργου Project organisation <Ημερ.1> <Date 1> <Ημερ.2> <Date 2> <Ημερ.3> <Date 3> <Ημερ.4> <Date 4> Ρόλοι Project roles Επικοινωνία Project communication Κουλτούρα Project culture Ομαδική εργασία Project teamwork Σχέσεις περιβαλλόντων του έργου Project environment relationships <Ημερ.1> <Date 1> <Ημερ.2> <Date 2> <Ημερ.3> <Date 3> <Ημερ.4> <Date 4> … … … … Γενική κατάσταση Overall <Ημερ.1> <Date 1> <Ημερ.2> <Date 2> <Ημερ.3> <Date 3> <Ημερ.4> <Date 4> <Ονομασία Έργου> <Project name> 3 Πολύ καλή 1 Very good Καλή 2 Good Μέση 3 Ok Κακή 4 Bad Πολύ κακή 5 Very bad Fig. 5: “Project Score Card” template
  • 8. PM-05 - Advancing Project Management for the 21st Century “Concepts, Tools & Techniques for Managing Successful Projects” 29-31 May 2010, Heraklion, Crete, Greece. - 8 - 5 Conclusions A comprehensive “Guidelines and Project Management Handbook” tool, which would be easy to use by the Greek NGOs who base their activity on volunteer work and lack of trained full-time personnel, is proposed by the authors. The authors targeted mostly the medium and small NGOs with the above characteristics, but the proposed tool can also be used by the larger NGOs with more experience. These “Guidelines” may support Greek NGOs to be certified under the ELOT 1429 and 1430-3 Standards and ensure their candidature for European Union co-financed Projects. But, most of all, these ‘Guidelines” are a tool for their continuous improvement – kaizen, into their “journey towards excellence”, under the very spirit of “APOPLOUS - Code of Values, Organization, Conduct and Practice”. 6 References European Commission – EuropeAid Cooperation Office (2004), “Aid Delivery Methods – Project Cycle Management Guidelines”. Depountis, N. and Katsarelis, T. (2008), “APOPLOUS – Code of Values, Organization, Conduct and Practice for Greek NGOs”. Depountis, N. and Katsarelis, T. (2008), “Standards and Certification of NGOs”, Proceedings of the 3rd National Conference on Standardization, Standards and Quality”, Thessaloniki. Depountis, N. and Katsarelis, T. (2009), “Project Management Guidelines for Greek NGOs”, Proceedings of the 6th Conference “Standardization, Prototypes and Quality: A means of Balkan Countries Collaboration”, Thessaloniki. Gareis, R. (2005), “Happy Projects”, MANZ Verlag, Vienna. Gaskin, K. (2006), “Risk Toolkit: How to take care of risk in volunteering – A guide for organisations”, The Institute for Volunteering Research & Volunteering England. Gower (2000), “Handbook of Project Management”. Harrington, H. and McNellis, T. (2006), “Project Management Excellence”, Patton Press. International Project Management Association – IPMA: http://www.ipma.ch/Pages/default.aspx Leipziger, D. (2003), “The Corporate Responsibility Code Book”, Greenleaf Publishing Limited, Sheffield. PMI (2004), “A Guide to the Project Management Body of Knowledge – PMOBK”. Project Management Association Austria – PMA: http://www.p-m-a.at/content.php Project Management Association Greece – PM Greece: http://pmgreece.gr/