SlideShare ist ein Scribd-Unternehmen logo
1 von 7
Resume
Mr.Traisit Yutthavisut
DATE OF BIRTH - 11 April 1978
PLACE OF BIRTH - Chanthaburi City , Thailand
ADDRESS - Suchavalai Village 92/65 M.5 Sukrapibang 1
Soi. Nakornin Road Nontaburi
City 11000
Hight 170 Cm.
Weight 69 Kg.
Tel.Contract 02- 447- 8414
Mobile 091-426-9445
EDUCATION - MBA Master's Degree Master
Of Business Development
Major Industrial and Human
Resources ,King Mongkut ’s
University Of Technology North
Bangkok
- Bachelor Engineering, Major in
Electrical Power Engineering,
Mahanakorn University of Technology.
- Diploma, Major in Electronics
Chantaburi Technical College.
QUALIFICATION
- License Control Engineering
Electrical Power Engineer License (
ภภภ.43456 )
- Basic PLC Mitsubishi Of Japan By
Automation Expert
1 of 7
- Safety in the Workplace Supervisor (
ภภ.ภภภภภภภภภภภภภภภ )
- Project Management
Professional · PMP · Project
Management Professional (credential)
Training
- CCNA Training
Program Computer Windows, Internet ,MS-Office Word
Excel Power Point , Auto cad 2004 –
2010 ,MS - Visio, Microsoft
Project ,Primavera Management Program
TRAINING/SEMINAR
- Anti Malware ,Hacker &Cracker
King Mongkut’s Institute of
Technology,Ladkrabang.
- Basic Scada System Mahanakorn
University of Technology.
- Primavera Project management Program
- Mea CCTV IP Network System and
Millstone Soft ware Control Of Axis
Sweden in Digital Com company
- Surge Protection
- SCADA System for Bangkok
Metropolitan Administrator
MOTOROLA RTU and
Radio System Of Israel
- UPS
- Emergency Phone
- Water Level
- Computer Server
- Total Network BMA
- video surveillance
systems (CCTV) to monitor and report on
traffic
Of Iteris USA.
- First Aid and Health
2 of 7
- Supervisor Safety Course by NPC Safety and
Environmental Service Co., Ltd
- Understanding OTDR by Mahanakorn
University of Technology
- PLC Omron
- PLC Mitsubishi Of Japan By
Automation Expert
- Access Controlled Security System by
BWT Siam
- Fiber Optic Communication
System for CATV by Scientific
Atlanta Company Limited of
China.
- PLC Blow Molding Machine SYSTEM
- Safety in the Workplace Supervisor (
จจ.จจจจจจจจจจจจจจจ )
JOB EXPERIENCE
- Drawing & Implement Project Network
Phase 3-5
Department of Traffic and Transport
Bangkok Year 2004 - 2005
- Drawing & Implement Engineer Project
Chaopraya Phase 2 Royal Irrigation
Department 2005
- Project Engineer Project Installation
Emergency Phone110 point Of Expressway
Authority Of Thailand Year 2004 – 2005
(16 million baht).
- Project Engineer Project MA Department
Of Drainage and Sewerage Bangkok Of
Thunburi Year 2005 (5 million baht).
- Project Engineer Project Installation
Gauge Flood Road Water Level 20 Point
With GPRS Department Of Drainage and
Sewerage Bangkok Years 2006 – 2007 (15
million baht).
3 of 7
- Project Engineer Management Gauge
Water Level Canal master 6 Canal 23 Point
With GPRS Department Of Drainage and
Sewerage Bangkok Years 2006 – 2007 (15
million baht).
- Project Engineer Management Project
MA Computer And Equipment Department
Of Drainage and Sewerage Bangkok
Installation Year 2006 (10 million baht).
- Project Engineer Management Project
MA Computer And Equipment Department
Of Drainage and Sewerage Bangkok
Installation 55 Station Year 2007 (14
million baht).
- Project Manager Project Installation Water
Level Station East Bangkok 10 Station Of
Department Of Drainage and Sewerage
Bangkok
Years 2007 – 2008 (23 million baht).
- Project Manager Project Installation Server
Computer 6 Set Office the Council Of
State Years 2007 - 2008 (15M)
- Project Manager Project Web Enterprise
Portal Site System Of Development Office
the Council Of State Years 2008 – 2009
(34 million baht).
- Assistance Project management
Project Bangkok Mass
Transit System (BTS) (80M)
Silom Line Extension to S7, S8
Project Years 2008 - 2009
(TETRA Radio Communication)
Bangkok Mass Transit system (BTS)
Re-Signaling project (Vehicle)
Installation & Testing for
Bombardier Transportation Signal
(Thailand) Ltd.
Bangkok Mass Transit System Radio
Upgrade Project 23 Stations (TETRA
Digital Trunk Radio).
4 of 7
- Project Manager Project Installation
Gauge Flood Road Water Level 50 Point
With GPRS Department Of Drainage and
Sewerage Bangkok Year 2009 (9 million
baht).
- Project Manager Project Installation
Water Level Station West Bangkok 6
Station Department Of Drainage and
Sewerage Bangkok Year 2009 (10
million baht).
Project Manager Project Install Gauge
Water Level transmission main canals in
15 points With GPRS Of Department Of
Drainage and Sewerage Bangkok Year
2009 (13M million baht).
- Project Manager Project Improve the
network of district offices of 50 districts
16 District Office of Division computer
system Office of Strategic and evaluation
Bangkok Years 2008 – 2009 (50 million
baht).
- Project Manager Project Relocation of
fiber optic cable, CCTV and network
communications Bangkok Underground in
the Rama 6 Road Of Department of
Traffic and Transport Bangkok Year 2010
(8 million baht).
- Project Manager Project to install video
surveillance
systems (CCTV) to monitor and report on
traffic conditions. Department of
Traffic and Transport Bangkok Year
2010. (128 million baht).
- Project Manager Project to install video
surveillance
systems (CCTV) and accessories. The Depar
tment of
Traffic and Transportation. Department of
Town and Country Planning And Municipal
agencies.. Of Department of
Traffic and Transport Bangkok 2010. (8
million baht).
5 of 7
- Project Manager Project to install video
surveillance systems (CCTV) at the point
of changing travel
community. And the risk of Department of
Traffic and Transport Bangkok 2011 –
2012 (330 million baht).
- Project Manager Project Install CCTV IP
Camera with 6 stations, MEA 2012. (18
million baht).
- Project manager Project
system on schedule. Council of State in
2012. (0.9 million baht).
- Project Manager Project Building bus
shelters Bangkok 200 Stations Of
Department Traffic and Transport
Bangkok 2013-2014 (40 million baht).
- Project management BRT passenger
station Of Department
Traffic and Transport Bangkok ( 2000
million baht).
- Project management outsourcing test run
Saen Saeb canal boat Of Department
Traffic and Transport Bangkok (90 million
baht).
- Project management outsourcing test run
Pasri chalean canal boat Of Department
Traffic and Transport Bangkok (40
million baht).
- Project Manager Project Purchasing with
Implement computer equipment Cargo
storage, backup, network, network. Of
Bureau of the Budget (1.4 million baht).
- Project Manager Purchasing with
Implement computer equipment that cost
less than one million baht per unit 2 record
(326 units), Of Bureau the budget (13
million baht).
- Project Manager Purchasing with
Implement Access Switch 213 Set Of
Electricity Generating Authority Of Thailand
(EGAT) (20 million baht)
- Project Manager Purchasing with
Implement Wireless Networking Homes
6 of 7
for staff at the mahmoh Lampang Of
Electricity Generating Authority Of Thailand
(EGAT) (18 million baht)
PROFESSIONAL EXPERIENCE
2016 – Present - Section Manager
Project Management Department
Thai transmission Industry Limited
2014 – 2016 - Supervisor Project Manager 2
Project Management Department
Thai transmission Industry Limited
2010 – 2014 - Assistant Manager ( Project Manager
)
Project Management Department
AMR Asia Company Limited
2007 – 2010 - Section Chief (Project Manager )
Project Management Department
AMR Asia Company Limited
2005 – 2007 - Implement Engineer
Implement Department Scada
Division
AMR Asia Company Limited
2004 – 2005 - Drawing Design Engineer
Implement Department
AMR Asia Company Limited
2001-2003 - PLC Engineer
Electrical Department
Unity MTTS Company Limited
7 of 7

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...
Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...
Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...Sok-Tharath CHREUNG
 
Maghreb telecom services
Maghreb telecom services Maghreb telecom services
Maghreb telecom services mtservices
 
How technology road mapping facilitate organizational large scale change
How technology road mapping facilitate organizational large scale change How technology road mapping facilitate organizational large scale change
How technology road mapping facilitate organizational large scale change Majid Babaie, MBA, PMP
 
Presentation of Railway Department, Cambodia, 2012
Presentation of Railway Department, Cambodia, 2012Presentation of Railway Department, Cambodia, 2012
Presentation of Railway Department, Cambodia, 2012Sok-Tharath CHREUNG
 
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC @ CSUSB
 

Was ist angesagt? (11)

Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...
Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...
Presentation for Railways Rehabilitation Project in Cambodia for Technical Wo...
 
Bagheri Dec 2016
Bagheri Dec 2016Bagheri Dec 2016
Bagheri Dec 2016
 
Maghreb telecom services
Maghreb telecom services Maghreb telecom services
Maghreb telecom services
 
How technology road mapping facilitate organizational large scale change
How technology road mapping facilitate organizational large scale change How technology road mapping facilitate organizational large scale change
How technology road mapping facilitate organizational large scale change
 
Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)
 
Presentation of Railway Department, Cambodia, 2012
Presentation of Railway Department, Cambodia, 2012Presentation of Railway Department, Cambodia, 2012
Presentation of Railway Department, Cambodia, 2012
 
CV(M.Javed )
CV(M.Javed )CV(M.Javed )
CV(M.Javed )
 
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
LTC, Annual Forum, The Direction of Technology in Transportation, 05/13/2011,...
 
Resume Mohd Faisal
Resume Mohd Faisal Resume Mohd Faisal
Resume Mohd Faisal
 
Culver Test Track
Culver Test TrackCulver Test Track
Culver Test Track
 
Innovation in gcc-railway
Innovation in gcc-railwayInnovation in gcc-railway
Innovation in gcc-railway
 

Andere mochten auch

Mariana, kimi y sara en vista
Mariana, kimi y sara en vistaMariana, kimi y sara en vista
Mariana, kimi y sara en vistaMariana Ortega
 
Morfofisiologia (ANATOMIA) CELULA Y TEJIDO
Morfofisiologia (ANATOMIA) CELULA Y TEJIDOMorfofisiologia (ANATOMIA) CELULA Y TEJIDO
Morfofisiologia (ANATOMIA) CELULA Y TEJIDOSALEM LEON
 
Navin kumar pathak 1
Navin kumar pathak 1Navin kumar pathak 1
Navin kumar pathak 1navin pathak
 
Mileeeeevaleeeeee12123123ftgthjh
Mileeeeevaleeeeee12123123ftgthjhMileeeeevaleeeeee12123123ftgthjh
Mileeeeevaleeeeee12123123ftgthjhPaola Castro
 
Taller práctico 10 claves jorge rojano
Taller práctico 10 claves jorge rojanoTaller práctico 10 claves jorge rojano
Taller práctico 10 claves jorge rojanoIrina Peñaranda
 
Comprehensive reform of manufacturing sector penal system of Ukraine
Comprehensive reform of manufacturing sector penal system of UkraineComprehensive reform of manufacturing sector penal system of Ukraine
Comprehensive reform of manufacturing sector penal system of UkraineБорис Гунько
 
CBBC - Exporting to the Chinese ‘Silver Consumer’
CBBC - Exporting to the Chinese ‘Silver Consumer’ CBBC - Exporting to the Chinese ‘Silver Consumer’
CBBC - Exporting to the Chinese ‘Silver Consumer’ ENGAGE_Events
 
Taller practico 10 claves para la implemantación de tendencias y enfoque
Taller practico 10 claves para la implemantación de tendencias y enfoqueTaller practico 10 claves para la implemantación de tendencias y enfoque
Taller practico 10 claves para la implemantación de tendencias y enfoqueJuan Ricardo Arjona Palomar
 
zvernennia_chesno_tyagnybok
zvernennia_chesno_tyagnybokzvernennia_chesno_tyagnybok
zvernennia_chesno_tyagnybokCHESNO
 
Five Digital Marketing Steps to Dominate Online Like A Superhero
Five Digital Marketing Steps to Dominate Online Like A SuperheroFive Digital Marketing Steps to Dominate Online Like A Superhero
Five Digital Marketing Steps to Dominate Online Like A SuperheroJay Feitlinger
 
Intro to Product Management and Business Model Canvas (BMC)
Intro to Product Management and Business Model Canvas (BMC)Intro to Product Management and Business Model Canvas (BMC)
Intro to Product Management and Business Model Canvas (BMC)Mulyadi Oey
 
COMPANY PROFILE EL.MO.
COMPANY PROFILE EL.MO.COMPANY PROFILE EL.MO.
COMPANY PROFILE EL.MO.EL.MO. SPA
 
Direkt nach berlin!Direkt nach Deutschland!
Direkt nach berlin!Direkt nach Deutschland!Direkt nach berlin!Direkt nach Deutschland!
Direkt nach berlin!Direkt nach Deutschland!mxgiosi
 

Andere mochten auch (20)

Mariana, kimi y sara en vista
Mariana, kimi y sara en vistaMariana, kimi y sara en vista
Mariana, kimi y sara en vista
 
Morfofisiologia (ANATOMIA) CELULA Y TEJIDO
Morfofisiologia (ANATOMIA) CELULA Y TEJIDOMorfofisiologia (ANATOMIA) CELULA Y TEJIDO
Morfofisiologia (ANATOMIA) CELULA Y TEJIDO
 
Continuity editing
Continuity editing Continuity editing
Continuity editing
 
Navin kumar pathak 1
Navin kumar pathak 1Navin kumar pathak 1
Navin kumar pathak 1
 
Mileeeeevaleeeeee12123123ftgthjh
Mileeeeevaleeeeee12123123ftgthjhMileeeeevaleeeeee12123123ftgthjh
Mileeeeevaleeeeee12123123ftgthjh
 
Día mundial sin tabaco david
Día mundial sin tabaco davidDía mundial sin tabaco david
Día mundial sin tabaco david
 
Taller práctico 10 claves jorge rojano
Taller práctico 10 claves jorge rojanoTaller práctico 10 claves jorge rojano
Taller práctico 10 claves jorge rojano
 
Domingo14
Domingo14Domingo14
Domingo14
 
Comprehensive reform of manufacturing sector penal system of Ukraine
Comprehensive reform of manufacturing sector penal system of UkraineComprehensive reform of manufacturing sector penal system of Ukraine
Comprehensive reform of manufacturing sector penal system of Ukraine
 
Diseño empresarial
Diseño empresarialDiseño empresarial
Diseño empresarial
 
CBBC - Exporting to the Chinese ‘Silver Consumer’
CBBC - Exporting to the Chinese ‘Silver Consumer’ CBBC - Exporting to the Chinese ‘Silver Consumer’
CBBC - Exporting to the Chinese ‘Silver Consumer’
 
Taller practico 10 claves para la implemantación de tendencias y enfoque
Taller practico 10 claves para la implemantación de tendencias y enfoqueTaller practico 10 claves para la implemantación de tendencias y enfoque
Taller practico 10 claves para la implemantación de tendencias y enfoque
 
zvernennia_chesno_tyagnybok
zvernennia_chesno_tyagnybokzvernennia_chesno_tyagnybok
zvernennia_chesno_tyagnybok
 
kiosks (1) (1)
kiosks (1) (1)kiosks (1) (1)
kiosks (1) (1)
 
Diseño empresarial
Diseño empresarialDiseño empresarial
Diseño empresarial
 
laporan pkl joshua
laporan pkl joshualaporan pkl joshua
laporan pkl joshua
 
Five Digital Marketing Steps to Dominate Online Like A Superhero
Five Digital Marketing Steps to Dominate Online Like A SuperheroFive Digital Marketing Steps to Dominate Online Like A Superhero
Five Digital Marketing Steps to Dominate Online Like A Superhero
 
Intro to Product Management and Business Model Canvas (BMC)
Intro to Product Management and Business Model Canvas (BMC)Intro to Product Management and Business Model Canvas (BMC)
Intro to Product Management and Business Model Canvas (BMC)
 
COMPANY PROFILE EL.MO.
COMPANY PROFILE EL.MO.COMPANY PROFILE EL.MO.
COMPANY PROFILE EL.MO.
 
Direkt nach berlin!Direkt nach Deutschland!
Direkt nach berlin!Direkt nach Deutschland!Direkt nach berlin!Direkt nach Deutschland!
Direkt nach berlin!Direkt nach Deutschland!
 

Ähnlich wie CV ไตรสิทธิ์ (Eng)

Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015Sayan Ml
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Ibrahim Al-Hudhaif
 
Curriculum Vitae Omkar
Curriculum Vitae OmkarCurriculum Vitae Omkar
Curriculum Vitae OmkarOmkar Raikar
 
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )AnandMohan271812
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...The Business Council of Mongolia
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiswatantra tripathi
 
SANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSantosh Naik
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copyibrahim ramadan
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 

Ähnlich wie CV ไตรสิทธิ์ (Eng) (20)

Sayan-CV 2015
Sayan-CV 2015Sayan-CV 2015
Sayan-CV 2015
 
CV udayan
CV  udayan CV  udayan
CV udayan
 
Rabi Kumar Purohita
Rabi Kumar PurohitaRabi Kumar Purohita
Rabi Kumar Purohita
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Curriculum Vitae Omkar
Curriculum Vitae OmkarCurriculum Vitae Omkar
Curriculum Vitae Omkar
 
CV_MPS_Elango_Vadiveloo
CV_MPS_Elango_VadivelooCV_MPS_Elango_Vadiveloo
CV_MPS_Elango_Vadiveloo
 
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
Noida Metro Rail Corporation Summer Tanning/Internship(Anand Mohan )
 
Wichai B_CV_2016
Wichai B_CV_2016Wichai B_CV_2016
Wichai B_CV_2016
 
Orkun_Bozkurt_CV.PDF
Orkun_Bozkurt_CV.PDFOrkun_Bozkurt_CV.PDF
Orkun_Bozkurt_CV.PDF
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
28.01.2013, The UB-Metro toward a world competitive city - Ulaanbaatar, Dr. K...
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
SANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RSTSANTOSH_NAIK_C.V.RST
SANTOSH_NAIK_C.V.RST
 
Resume_Darpan Majumder1
Resume_Darpan Majumder1Resume_Darpan Majumder1
Resume_Darpan Majumder1
 
Muhammad Faisal
Muhammad FaisalMuhammad Faisal
Muhammad Faisal
 
My resume updated
My resume updatedMy resume updated
My resume updated
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copy
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
CV_SANJAY SOHIL
CV_SANJAY SOHILCV_SANJAY SOHIL
CV_SANJAY SOHIL
 

CV ไตรสิทธิ์ (Eng)

  • 1. Resume Mr.Traisit Yutthavisut DATE OF BIRTH - 11 April 1978 PLACE OF BIRTH - Chanthaburi City , Thailand ADDRESS - Suchavalai Village 92/65 M.5 Sukrapibang 1 Soi. Nakornin Road Nontaburi City 11000 Hight 170 Cm. Weight 69 Kg. Tel.Contract 02- 447- 8414 Mobile 091-426-9445 EDUCATION - MBA Master's Degree Master Of Business Development Major Industrial and Human Resources ,King Mongkut ’s University Of Technology North Bangkok - Bachelor Engineering, Major in Electrical Power Engineering, Mahanakorn University of Technology. - Diploma, Major in Electronics Chantaburi Technical College. QUALIFICATION - License Control Engineering Electrical Power Engineer License ( ภภภ.43456 ) - Basic PLC Mitsubishi Of Japan By Automation Expert 1 of 7
  • 2. - Safety in the Workplace Supervisor ( ภภ.ภภภภภภภภภภภภภภภ ) - Project Management Professional · PMP · Project Management Professional (credential) Training - CCNA Training Program Computer Windows, Internet ,MS-Office Word Excel Power Point , Auto cad 2004 – 2010 ,MS - Visio, Microsoft Project ,Primavera Management Program TRAINING/SEMINAR - Anti Malware ,Hacker &Cracker King Mongkut’s Institute of Technology,Ladkrabang. - Basic Scada System Mahanakorn University of Technology. - Primavera Project management Program - Mea CCTV IP Network System and Millstone Soft ware Control Of Axis Sweden in Digital Com company - Surge Protection - SCADA System for Bangkok Metropolitan Administrator MOTOROLA RTU and Radio System Of Israel - UPS - Emergency Phone - Water Level - Computer Server - Total Network BMA - video surveillance systems (CCTV) to monitor and report on traffic Of Iteris USA. - First Aid and Health 2 of 7
  • 3. - Supervisor Safety Course by NPC Safety and Environmental Service Co., Ltd - Understanding OTDR by Mahanakorn University of Technology - PLC Omron - PLC Mitsubishi Of Japan By Automation Expert - Access Controlled Security System by BWT Siam - Fiber Optic Communication System for CATV by Scientific Atlanta Company Limited of China. - PLC Blow Molding Machine SYSTEM - Safety in the Workplace Supervisor ( จจ.จจจจจจจจจจจจจจจ ) JOB EXPERIENCE - Drawing & Implement Project Network Phase 3-5 Department of Traffic and Transport Bangkok Year 2004 - 2005 - Drawing & Implement Engineer Project Chaopraya Phase 2 Royal Irrigation Department 2005 - Project Engineer Project Installation Emergency Phone110 point Of Expressway Authority Of Thailand Year 2004 – 2005 (16 million baht). - Project Engineer Project MA Department Of Drainage and Sewerage Bangkok Of Thunburi Year 2005 (5 million baht). - Project Engineer Project Installation Gauge Flood Road Water Level 20 Point With GPRS Department Of Drainage and Sewerage Bangkok Years 2006 – 2007 (15 million baht). 3 of 7
  • 4. - Project Engineer Management Gauge Water Level Canal master 6 Canal 23 Point With GPRS Department Of Drainage and Sewerage Bangkok Years 2006 – 2007 (15 million baht). - Project Engineer Management Project MA Computer And Equipment Department Of Drainage and Sewerage Bangkok Installation Year 2006 (10 million baht). - Project Engineer Management Project MA Computer And Equipment Department Of Drainage and Sewerage Bangkok Installation 55 Station Year 2007 (14 million baht). - Project Manager Project Installation Water Level Station East Bangkok 10 Station Of Department Of Drainage and Sewerage Bangkok Years 2007 – 2008 (23 million baht). - Project Manager Project Installation Server Computer 6 Set Office the Council Of State Years 2007 - 2008 (15M) - Project Manager Project Web Enterprise Portal Site System Of Development Office the Council Of State Years 2008 – 2009 (34 million baht). - Assistance Project management Project Bangkok Mass Transit System (BTS) (80M) Silom Line Extension to S7, S8 Project Years 2008 - 2009 (TETRA Radio Communication) Bangkok Mass Transit system (BTS) Re-Signaling project (Vehicle) Installation & Testing for Bombardier Transportation Signal (Thailand) Ltd. Bangkok Mass Transit System Radio Upgrade Project 23 Stations (TETRA Digital Trunk Radio). 4 of 7
  • 5. - Project Manager Project Installation Gauge Flood Road Water Level 50 Point With GPRS Department Of Drainage and Sewerage Bangkok Year 2009 (9 million baht). - Project Manager Project Installation Water Level Station West Bangkok 6 Station Department Of Drainage and Sewerage Bangkok Year 2009 (10 million baht). Project Manager Project Install Gauge Water Level transmission main canals in 15 points With GPRS Of Department Of Drainage and Sewerage Bangkok Year 2009 (13M million baht). - Project Manager Project Improve the network of district offices of 50 districts 16 District Office of Division computer system Office of Strategic and evaluation Bangkok Years 2008 – 2009 (50 million baht). - Project Manager Project Relocation of fiber optic cable, CCTV and network communications Bangkok Underground in the Rama 6 Road Of Department of Traffic and Transport Bangkok Year 2010 (8 million baht). - Project Manager Project to install video surveillance systems (CCTV) to monitor and report on traffic conditions. Department of Traffic and Transport Bangkok Year 2010. (128 million baht). - Project Manager Project to install video surveillance systems (CCTV) and accessories. The Depar tment of Traffic and Transportation. Department of Town and Country Planning And Municipal agencies.. Of Department of Traffic and Transport Bangkok 2010. (8 million baht). 5 of 7
  • 6. - Project Manager Project to install video surveillance systems (CCTV) at the point of changing travel community. And the risk of Department of Traffic and Transport Bangkok 2011 – 2012 (330 million baht). - Project Manager Project Install CCTV IP Camera with 6 stations, MEA 2012. (18 million baht). - Project manager Project system on schedule. Council of State in 2012. (0.9 million baht). - Project Manager Project Building bus shelters Bangkok 200 Stations Of Department Traffic and Transport Bangkok 2013-2014 (40 million baht). - Project management BRT passenger station Of Department Traffic and Transport Bangkok ( 2000 million baht). - Project management outsourcing test run Saen Saeb canal boat Of Department Traffic and Transport Bangkok (90 million baht). - Project management outsourcing test run Pasri chalean canal boat Of Department Traffic and Transport Bangkok (40 million baht). - Project Manager Project Purchasing with Implement computer equipment Cargo storage, backup, network, network. Of Bureau of the Budget (1.4 million baht). - Project Manager Purchasing with Implement computer equipment that cost less than one million baht per unit 2 record (326 units), Of Bureau the budget (13 million baht). - Project Manager Purchasing with Implement Access Switch 213 Set Of Electricity Generating Authority Of Thailand (EGAT) (20 million baht) - Project Manager Purchasing with Implement Wireless Networking Homes 6 of 7
  • 7. for staff at the mahmoh Lampang Of Electricity Generating Authority Of Thailand (EGAT) (18 million baht) PROFESSIONAL EXPERIENCE 2016 – Present - Section Manager Project Management Department Thai transmission Industry Limited 2014 – 2016 - Supervisor Project Manager 2 Project Management Department Thai transmission Industry Limited 2010 – 2014 - Assistant Manager ( Project Manager ) Project Management Department AMR Asia Company Limited 2007 – 2010 - Section Chief (Project Manager ) Project Management Department AMR Asia Company Limited 2005 – 2007 - Implement Engineer Implement Department Scada Division AMR Asia Company Limited 2004 – 2005 - Drawing Design Engineer Implement Department AMR Asia Company Limited 2001-2003 - PLC Engineer Electrical Department Unity MTTS Company Limited 7 of 7