1. WORK EXPERIENCE
2010 ~ 2012 Chang Chun Group, Miaoli
Chemical Process Engineer
=====================================================================================
◉ Improvement of Process and Quality Control
● Established statistic data base and built up quality monitor system via VBA program
◦ QC 7 tools
◦ SPC
=====================================================================================
◉ Improvement of Process and Quality Control
● Established statistic data base and built up quality monitor system via VBA program
◦ QC 7 tools
◦ SPC
● Process Capability Estimation via :
◦ Application of Transportation Phenomenon
◦ Pump Design ◦ Storage tank Design;
◦ Dryer Design ◦ Decanter Design
● Programming Automated Process Control System ( DCS YOKOGAWA )
◦ Optimize process procedure and to meet recipe requirement via program modification
◦ Establish user interface for operation
◦ Trouble shooting and debug
● Process Improvement
◦ Process capability evaluation - With built data base monitor system.
◦ Production throughput improvement -
- Bottleneck elimination - Throughput Capability Estimation
- Instant evaluation - Hidden factory finding
- Cycle time reduction - Recipe fine-tune and verification
● Standard Operation Procedure build-up
◦ SOP of Production ◦ SOP of Inspection
◦ SOP of Safety
=====================================================================================
◉ Cost Reduction
◦ Optimize utility of resource :
- Chilling water / Steam utilization optimization
- Recipe optimization and verification
◦ Optimization of equipment lifetime
◦ Rise up working efficiency with proper equipment design
2. - Design Change - New equipment and process introduction
◦ Maintenance efficiency and safety improvement
- Maintenance tool introduction - Procedure and principle definition
=====================================================================================
◉ Voice of Customer (VOC) and Improvement
◦ Assist to come out solution from customer point of view
- Trouble of production / scale up - Aging issue (storage / material decay)
◦ Quality improvement
- Critical quality improve
◉ Process Capability Estimation via :
◦ Application of Transportation Phenomenon
◦ Pump Design ◦ Storage tank Design;
◦ Dryer Design ◦ Decanter Design
● Programming Automated Process Control System ( DCS YOKOGAWA )
◦ Optimize process procedure and to meet recipe requirement via program modification
◦ Establish user interface for operation
◦ Trouble shooting and debug
● Process Improvement
◦ Process capability evaluation - With built data base monitor system.
◦ Production throughput improvement -
- Bottleneck elimination - Throughput Capability Estimation
- Instant evaluation - Hidden factory finding
- Cycle time reduction - Recipe fine-tune and verification
● Standard Operation Procedure build-up
◦ SOP of Production ◦ SOP of Inspection
◦ SOP of Safety
=====================================================================================
◉ Cost Reduction
◦ Optimize Utility of Resource :
- Chilling water / Steam utilization optimization
- Recipe optimization and verification
◦ Optimization of Equipment Lifetime
◦ Rise up working efficiency with proper equipment design
- Design Change - New equipment and process introduction
◦ Maintenance Efficiency and safety improvement
- Maintenance tool introduction - Procedure and principle definition
=====================================================================================
◉ Voice of Customer (VOC) and Improvement