1. PORTFOLIO OF WORK
TIEN BUI
1. P E R S O N A L
2014 - Present: Architect @ RMJM - Dubai - United Arab Emirates
2013 - Architect License @ Vietnam
2011 - 2013 Architect - Project Coordinator @ Steelman Partners
2009 - 2010
Architect @ Korn Architects
2008 - 2009 Design Architect @ Archetype Group
2007 - 2008 Junior Architect @ Korn Architects
2002 - 2007 B.Arch, Ho Chi Minh City University of Architecture
2. S E L E C T E D
PROJECTS
2.0 Saadiyat Cultural District - Residentials, Offices & Hotels (2014)
2.1 MGM Grand Ho Tram – 5 Star Integrated Hotel Resort
2.2 Happyland Hotel – 5 Star Hotel, Part of Happyland
Entertainment Project
2.3 Riverpark Residences - Phase 2 - H24 (2010)
2.4 Petro Power Tower - Design Competition (2008)
2.5 SJC Tower
Design Competition (2007)
2.6 Saigon Center - HCM City Urban Redevelopment (2007)
2.7 Crescent Residence - Retail & Serviced Apartment (2007)
2.8 Sunrise City - Phase 1 - Plot V - Highrise Residences (2009)
2.9 Cantavil Premier - Highrise Residences (2009)
3.0 Thanh Da Pearl - Highrise Residences (2008)
(2012)
(2011)
2. PORTFOLIO OF WORK
saadiyat cultural District
master Plan Model & RMJM Scope of Work
4
6
5
3
7
2
1
Cultural district is a unique offering and it is a privilege for RMJM to be associated
with. Project scope included three hotel 5, 6, and a 7-star, two office building and
6 residential buildings. RMJM are appointed to design and delivery concept and
schematic.
1. GUGGENHEIM AD
2. LOUVRE AD
3. PERFORMING ARTS
4. NATIONAL MUSEUM
5. SAADIYAT MALL
6. RMJM SCOPE - PLOT 2-3 & 4-5-6
7. RMJM SCOPE - PLOT H1 & 6-7-8 & H2
picture taken @ cityscape - wtc - dubai oct. 2013
3. Master Planning by Steelman
Partners in 2006 ~ 150 Ha
PHASE A
PHASE C-D-E
PHASE B
MAIN ENTRANCE
BUS DROP OFF
PARKING
RETENTION POND
LOADING DOCK
+ SERVICE
TECHNICAL
BUILDING B + 2F
VIP ENTRANCE
PHASE A-2 HOTEL 20F
UNDER CONSTRUCTION
CASINO 2F
SERVICED
APARTMENT BLDG
HOTEL 20F
PROJECT PHASE-A1 AS-BUILT:
LOWRISE 2F + HIGHRISE 20F
LAKE OF DREAM
BEACH GARDEN
DUNES Bar+Grill &
SWIMMING POOL
OBSERVATION DECK
4. BALL ROOM &
CONFERENCE
GROUND LEVEL
BOH KITCHEN
MAIN LOBBY
RESTAURANT
KIDS CORNER
LIBRARY LOUNGE &
24HR CAFETERIA
ESCAPE STAIR
PASSEGER LIFT &
SERVICE LIFT CORE
HOTEL FRONT
OFFICE
RESTAURANT
RESTAURANT
CASINO
TYPICAL GUEST ROOM
VIP JUNKET
2BAY SUITE
SUITE FLOOR
VIP JUNKET
VIP LOBBY
3BAY SUITE
4BAY SUITE
5. CLAY TILE ROOF
ELEVATION 01
GFRC
PRESIDENT SUITE
ESCAPE ROUTE
METAL
BALUSTRADE
CURTAIN WALL
GFRC DECORATIVE
ELEVATION 01
GFRC DECORATIVE
SPA 2ND FLOOR
6. MAIN PORTE
COCHERE
BIRD-EYES VIEW PERSPECTIVE
BALLROOM +
CONFERENCE
PHASE-A2
MAIN ENTRANCE
PHASE-A1 HOTEL +CASINO
BUS+CASINO
DROP OFF
VIP ENTRANCE
SUBMITTAL
FLOW CHART
PRESIDENT SUITE
PHASE-A1 HOTEL TOWER
SUITE - 3 LEVEL
STANDARD
GUESTROOM
7. Aug 2012
Site Office Jan 2012
Site walk Feb 2012
Lead Site Architects
Tony & Alfredo
Finishing Hotel
Corridor Jun 2102
Long Lai - Project Architect
Adam Lawton - Manager
Ethan Nelson - President
Steelman Defect
Checking Team
Nicole Dalton - ID Manager
Nguyen Vu
Rebecca & Mayumi
FF&E Coordinator
Finishing Casino Ceiling
B.O.H - MGM - Operation - Laundry
Site Walk July 2012 VIP Junket
Finishing Chinese
Restaurant - LR
Chau Tran & TIEN BUI
Steelman Partners HoTram Team
8. LR CASINO
MAIN ENTRANCE
HR HOTEL
MGM SCULPTURE
VIEW FROM HOTEL TO POOL AREA
PHASE A2-PILING
POOL BAR
POOL TO HOTEL
PRESIDENT
DUNES - Bar+Grill
DUNES BAR
SWIMMING POOL
LAKE OF DREAM DECORATIVE POOL
CONFERENCE TO POOL
10. HAPPYLAND
THEME PARK
HAPPYLAND HOTEL
VIP ENTRANCE
VIP JUNKETS
SERVICE
ENTRANCE
CASINO
POOL GARDEN
HCM city to Trungluong
Expressway
Vamcodong River
GRAND ATRIUM
KIDS AREA
THEME PARK
HAPPYLAND HOTEL
CASINO
ENTRANCE
RESTAURANTS
MAIN ENTRANCE
FUTURE
DEVELOPMENT
11. VIEW 4
TOWER A 19F
TYPICAL FLOOR
TOWER B 18F
VIEW 1 & 2
VIEW 3
SUITE FLOOR
PRESIDENT SUITE
BUSINESS CLLUB
12. TOWER A - GFA
TOWER A
ROOM TYPE
3 BAY SUITE
GFA - SD STAGE