Osaka – Office Modification at Miyazaki Ginko Building
In line with Elsevier’s operation objectives and its required head counts for the forthcoming years, slight design
modification to existing office was carried out, and concurrently with the drive for implementation of
workplace of the future upon project completion.
The office modification project involved the re-configuration of existing 1.2K sqft office space with additional new
static work desks and meeting boxes. It was successfully completed within short timeline of 1 weekend on 12
January 2015.
The new office space can accommodate up to 24 staff, and it is a hybrid solution between flexi and static desks
with added breakout spaces that facilitate better collaboration and operational efficiency within the same office.
The entire transition process was managed by the GRECS team, remotely via Tokyo and Singapore, with assistance
from the RETS team, and with full support and co-ordination of the project leads from Elsevier.

Weitere ähnliche Inhalte

Andere mochten auch (7)

Grant Proposal
Grant ProposalGrant Proposal
Grant Proposal
 
Desa pemohon domain desa.id
Desa pemohon domain desa.idDesa pemohon domain desa.id
Desa pemohon domain desa.id
 
Jez Whitaker CV - Sales and Marketing - BK
Jez Whitaker CV - Sales and Marketing - BKJez Whitaker CV - Sales and Marketing - BK
Jez Whitaker CV - Sales and Marketing - BK
 
(696558749) Farashath_Resume_28-11-2015
(696558749) Farashath_Resume_28-11-2015(696558749) Farashath_Resume_28-11-2015
(696558749) Farashath_Resume_28-11-2015
 
K
KK
K
 
Aegis annual report 2013 14 (1)
Aegis annual report 2013 14 (1)Aegis annual report 2013 14 (1)
Aegis annual report 2013 14 (1)
 
power of personnel
power of personnelpower of personnel
power of personnel
 

Ähnlich wie Project Show Case-Osaka Miyazaki Ginko Building

Project Show Case - Tokyo Higashi Azabu
Project Show Case - Tokyo Higashi AzabuProject Show Case - Tokyo Higashi Azabu
Project Show Case - Tokyo Higashi Azabu
Thomas Yong
 
Project Show Case-Beijing Gateway Plaza
Project Show Case-Beijing Gateway PlazaProject Show Case-Beijing Gateway Plaza
Project Show Case-Beijing Gateway Plaza
Thomas Yong
 
MHS Case Study 2014 v3
MHS Case Study 2014 v3MHS Case Study 2014 v3
MHS Case Study 2014 v3
Chris Webber
 
Danone Baby Nutrition (English)
Danone Baby Nutrition (English)Danone Baby Nutrition (English)
Danone Baby Nutrition (English)
Marcap Engenharia
 
Lendlease Case Study
Lendlease Case StudyLendlease Case Study
Lendlease Case Study
Ian MacHenry
 

Ähnlich wie Project Show Case-Osaka Miyazaki Ginko Building (13)

Project Show Case - Tokyo Higashi Azabu
Project Show Case - Tokyo Higashi AzabuProject Show Case - Tokyo Higashi Azabu
Project Show Case - Tokyo Higashi Azabu
 
Project Show Case-Beijing Gateway Plaza
Project Show Case-Beijing Gateway PlazaProject Show Case-Beijing Gateway Plaza
Project Show Case-Beijing Gateway Plaza
 
MHS Case Study 2014 v3
MHS Case Study 2014 v3MHS Case Study 2014 v3
MHS Case Study 2014 v3
 
Danone Baby Nutrition (English)
Danone Baby Nutrition (English)Danone Baby Nutrition (English)
Danone Baby Nutrition (English)
 
BROCHURE_INTERIORS_PDF
BROCHURE_INTERIORS_PDFBROCHURE_INTERIORS_PDF
BROCHURE_INTERIORS_PDF
 
CONTEMPORARY OFFICE INTERIOR DESIGN
CONTEMPORARY OFFICE INTERIOR DESIGNCONTEMPORARY OFFICE INTERIOR DESIGN
CONTEMPORARY OFFICE INTERIOR DESIGN
 
Engineers Australia
Engineers Australia Engineers Australia
Engineers Australia
 
A.T.E. Pune LEED Gold Certified Office - An Overview
A.T.E. Pune LEED Gold Certified Office - An OverviewA.T.E. Pune LEED Gold Certified Office - An Overview
A.T.E. Pune LEED Gold Certified Office - An Overview
 
Flexility case study - Oxford Health
Flexility case study - Oxford HealthFlexility case study - Oxford Health
Flexility case study - Oxford Health
 
MODERN OFFICE SPACE DESIGN
MODERN OFFICE SPACE DESIGNMODERN OFFICE SPACE DESIGN
MODERN OFFICE SPACE DESIGN
 
Workplace 2.0
Workplace 2.0Workplace 2.0
Workplace 2.0
 
AIPL PROFILE - 2023 (2).pdf
AIPL PROFILE - 2023 (2).pdfAIPL PROFILE - 2023 (2).pdf
AIPL PROFILE - 2023 (2).pdf
 
Lendlease Case Study
Lendlease Case StudyLendlease Case Study
Lendlease Case Study
 

Mehr von Thomas Yong

Education & Institutional Project
Education & Institutional ProjectEducation & Institutional Project
Education & Institutional Project
Thomas Yong
 
Residential & Clean Room Facilities Project
Residential & Clean Room Facilities ProjectResidential & Clean Room Facilities Project
Residential & Clean Room Facilities Project
Thomas Yong
 
Residential Project-condo
Residential Project-condoResidential Project-condo
Residential Project-condo
Thomas Yong
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)
Thomas Yong
 

Mehr von Thomas Yong (7)

8 on Claymore
8 on Claymore8 on Claymore
8 on Claymore
 
Education & Institutional Project
Education & Institutional ProjectEducation & Institutional Project
Education & Institutional Project
 
Residential & Clean Room Facilities Project
Residential & Clean Room Facilities ProjectResidential & Clean Room Facilities Project
Residential & Clean Room Facilities Project
 
JTC
JTCJTC
JTC
 
KLAT
KLATKLAT
KLAT
 
Residential Project-condo
Residential Project-condoResidential Project-condo
Residential Project-condo
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)
 

Project Show Case-Osaka Miyazaki Ginko Building

  • 1. Osaka – Office Modification at Miyazaki Ginko Building In line with Elsevier’s operation objectives and its required head counts for the forthcoming years, slight design modification to existing office was carried out, and concurrently with the drive for implementation of workplace of the future upon project completion. The office modification project involved the re-configuration of existing 1.2K sqft office space with additional new static work desks and meeting boxes. It was successfully completed within short timeline of 1 weekend on 12 January 2015. The new office space can accommodate up to 24 staff, and it is a hybrid solution between flexi and static desks with added breakout spaces that facilitate better collaboration and operational efficiency within the same office. The entire transition process was managed by the GRECS team, remotely via Tokyo and Singapore, with assistance from the RETS team, and with full support and co-ordination of the project leads from Elsevier.