OG 321 DRILLING 1
LECTURE SIX
DRILLING COST AND DRILLING RATE
DRILLING COST ANALYSIS
Drilling cost predictions are made so that sound economic
decision can be made
The drilling engineer recommends
• drilling procedures that will safely drilled and complete the
well at the minimum cost possible
• routine rig operations such as
Drilling fluid treatment
Pump operation
Bit selection
Any problem encountered in drilling operation
3
The Drilling Cost Equation
Cf = drilling cost, $/ft
Cb= cost of bit, $/bit
Cr = fixed operating cost of rig, $/hr
tb = total rotating time, hrs
tc = total non-rotating time, hrs
tt = total trip time (round trip), hrs
D

ft
D
t
t
t
C
C
C
t
c
b
r
b
f
$
)
(





= footage drilled
with bit, ft/bit
Also known as cost per foot equation
4
Example
A recommended bit program is being prepared for a
new well using bit performance records from nearby
wells.
Drilling performance records for three bits are shown
for a thick limestone formation at 9,000 ft.
Determine which bit gives the lowest drilling cost if the
operating cost of the rig is $400/hr, the trip time is 7
hours, and connection time is 1 minute per connection.
5
Assume that each of the bits was operated at near
the minimum cost per foot attainable for that bit.
Mean
Bit Rotating Connection Penetration
Cost Time Time Rate
Bit ($) (hours) (hours) (ft/hr)
A 800 14.8 0.1 13.8
B 4,900 57.7 0.4 12.6
C 4,500 95.8 0.5 10.2
Example cont’d
Which bit would you select?
6
Solution:
The cost per foot drilled for each bit type can
be computed using drilling cost equation for
Bit A, the cost per foot is
/ft.
81
.
46
$
)
8
.
14
(
8
.
13
)
7
1
.
0
8
.
14
(
400
800





f
C
ft
D
t
t
t
C
C
C
t
c
b
r
b
f
$
)
(





7
Solution:
Similarly, for Bit B,
/ft.
56
.
42
$
)
7
.
57
(
6
.
12
)
7
4
.
0
7
.
57
(
400
900
,
4





f
C
ft
D
t
t
t
C
C
C
t
c
b
r
b
f
$
)
(





8
Solution, cont’d
Finally, for Bit C,
/ft.
89
.
46
$
)
8
.
95
(
2
.
10
)
7
5
.
0
8
.
95
(
400
500
,
4





f
C
ft
D
t
t
t
C
C
C
t
c
b
r
b
f
$
)
(





9
Solution, cont’d
Bit A: $46.81 /ft
Bit B: $42.56 /ft
Bit C: $46.89 /ft
The lowest drilling cost was obtained using Bit
B.
Regardless of highest bit cost …it has
intermediate bit life and ROP...
10
Drilling Costs
• Tend to increase exponentially with depth.
Thus, when curve-fitting drilling cost data, it is
often convenient to assume a relationship
between total well cost, C, and depth, D, given
by
C = aebD
• Constants a and b depend primarily on the
well location.
11
Drilling Costs, cont’d
Shown on the next page is a least-squares
curve fit of the south Louisiana completed well
data given in Table 1.7 (ADE book)
Depth range of 7,500 ft to 21,000 ft.
For these data,
a = 1 X 105 dollars
b = 2 X 10-4 ft -1.
C = aebD
12
Fig. 1-65. Least-square curve fit of 1978 completed well costs for wells below
7,500 ft in the south Louisiana area.
13
Penetration Rate
When major variations are not present in the
subsurface lithology, the penetration rate
usually decreases exponentially with depth.
Under these conditions, the penetration rate
can be related to depth, D, by
where K and a2 are constants.
D
a
Ke
dt
dD 2
303
.
2


14
Drilling Time
The drilling time, td , required to drill to a given
depth can be obtained by separating variables
and integrating. Separating variables gives
dD
e
dt
K D
a
303
.
2
D
0
t
0
2
d



Integrating and solving for td yields
)
1
(
303
.
2
1 2
303
.
2
2

 D
a
d e
K
a
t
15
Drilling Time cont’d
Plotting depth vs. drilling time from past drilling
operations:
• Allows more accurate prediction of time and cost for
drilling a new well
• Is used in evaluating new drilling procedures
(designed to reduce drilling time to a given depth).
16
EXAMPLE - Cost per ft
t R D Total Cost Cf
hr fph ft $ $/ft
5 90 475 36,950 77.80
10 80 900 47,800 53.10
20 60 1,600 69,200 43.30
25 50 1,875 79,750 42.50
30 40 2,100 90,200 43.00
35 30 2,275 100,550 44.20
40 20 2,400 110,800 46.20
These cost data are plotted below.
17
Cost per ft for one entire bit run
Minimum Cost
80
70
60
50
40
18
Economic Procedure in previous Table
 Can pull bit after about 25 hr. ($42.50/ft)
- the precise pulling time is not critical
Note that the cost in dollars per foot
was $43.00 after 30 hr.
 Primarily applicable to tooth-type bits
where wear rate is predictable.
19
Economic Procedure in above Table
 Also used with tungsten carbide insert
bits when inserts are broken or
pulled out of the matrix.
 Unfortunately, wear rate with insert
bits is unpredictable.
 Economically, the insert bit should be
pulled when the cost in $/ft begins to
increase.
20
Economic Procedure in Table
– Bits pulled for economic reasons make it
hard to obtain wear information.
– Operator might pull bit after 120 hr of use
but part of bit might get left in hole.
Recovery is very difficult. Avoid!
– 75% of rock bits are pulled green or
before the bit is worn out.
21
An increase in
TORQUE may
indicate that a bit
should be pulled.
Experience often
dictates when to
pull bit (footage or
hours).
22
Factors that affect Penetration Rate
 Type of Drill bit
 Bit weight
 Rotary speed
 Bottom-hole cleaning
 Mud properties
 Rock hardness
 Formation pore pressure
Variables:
Fixed Factors:
23
Bit Selection is based on
 Past bit records
 Geologic predictions of lithology
 Drilling costs in $/bit...
 Drilling cost in $/ft
24
Bit Weight and Rotary Speed
• Increasing bit weight and rotary speed
boosts drilling rate
• These increases accelerate bit wear
• Field tests show that drilling rate
increases more or less in direct
proportion to bit weight
25
Consider 10” hole
(don’t overdo!!)
Bit Weight x 1,000 lb/in
40,000 lbf
26
Rotary Speed, RPM
Don’t overdo!
Casing wear,
bit life ...
27
EFFECT OF BACK PRESSURE
Keep P_bit = const.= 550 psi
28
Hydrostatic Pressure, 1,000’s of psi
EFFECT OF BACK PRESSURE
0 - 5,000 psi
29
Drilling Time, days
Drilled with gas
Drilled with mud
EFFECT OF DRILLING FLUID
mud vs. gas
30
Rotating Time, hours
EFFECT OF DRILLING FLUID
water vs. air
31
Old style water course bits
32
EFFECT OF SOLIDS IN THE MUD

Weitere ähnliche Inhalte

Was ist angesagt?

Drilling Mud Laboratory
Drilling Mud LaboratoryDrilling Mud Laboratory
Drilling Mud LaboratoryJames Craig
 
Petroleum well completion overview
Petroleum well completion overviewPetroleum well completion overview
Petroleum well completion overviewAndi Anriansyah
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)Mubarik Rao
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well ControlM.T.H Group
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids MudM.T.H Group
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing DesignJames Craig
 
Introduction to Well Testing.pdf
Introduction to Well Testing.pdfIntroduction to Well Testing.pdf
Introduction to Well Testing.pdfssuser2fc67e
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and explorationElsayed Amer
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineeringbehnamproeng
 
drilling operation
drilling operationdrilling operation
drilling operationkamran Ayoub
 
Directional drilling
Directional drillingDirectional drilling
Directional drillingamrhaggag
 
Production Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceProduction Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceMahmood Ghazi
 
1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theory1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theoryElsayed Amer
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operationsElsayed Amer
 

Was ist angesagt? (20)

Drilling Mud Laboratory
Drilling Mud LaboratoryDrilling Mud Laboratory
Drilling Mud Laboratory
 
Petroleum well completion overview
Petroleum well completion overviewPetroleum well completion overview
Petroleum well completion overview
 
Dst (Drill Stem Test)
Dst (Drill Stem Test)Dst (Drill Stem Test)
Dst (Drill Stem Test)
 
Basic Well Control
Basic Well ControlBasic Well Control
Basic Well Control
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
Drilling Engineering - Casing Design
Drilling Engineering - Casing DesignDrilling Engineering - Casing Design
Drilling Engineering - Casing Design
 
Drill stem testing
Drill stem testingDrill stem testing
Drill stem testing
 
tight reservoir
tight reservoir tight reservoir
tight reservoir
 
Introduction to Well Testing.pdf
Introduction to Well Testing.pdfIntroduction to Well Testing.pdf
Introduction to Well Testing.pdf
 
4- Geophysics and exploration
4- Geophysics and exploration4- Geophysics and exploration
4- Geophysics and exploration
 
reservoir engineering
reservoir engineeringreservoir engineering
reservoir engineering
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
drilling operation
drilling operationdrilling operation
drilling operation
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
 
Production Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis PerformanceProduction Optimization: Horizontal Well Analysis Performance
Production Optimization: Horizontal Well Analysis Performance
 
Well Stimulation
Well StimulationWell Stimulation
Well Stimulation
 
Nodal analysis
Nodal analysisNodal analysis
Nodal analysis
 
1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theory1- history of petroleum engineering and organic theory
1- history of petroleum engineering and organic theory
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 

Ähnlich wie Drill.pptx

ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.pptSoulmananIndia
 
Prefeseability study of petroleum field
Prefeseability study of petroleum fieldPrefeseability study of petroleum field
Prefeseability study of petroleum fieldSafwen Sakhraoui
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxstilliegeorgiana
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical linerHridoy Saha
 
Skimming Vision System Project (4) 6th Feb 2015
Skimming Vision System Project (4) 6th Feb 2015Skimming Vision System Project (4) 6th Feb 2015
Skimming Vision System Project (4) 6th Feb 2015John Dunne
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTMUHAMMAD NOMAN KHAN
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments DesignPratik Patel
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latestVedachalam Mani
 
Field Development Project of E11 drilling dept.ppt
Field Development Project of E11 drilling dept.pptField Development Project of E11 drilling dept.ppt
Field Development Project of E11 drilling dept.pptMUHAMMAD NOMAN KHAN
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportkiransuresh7
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & costMECandPMV
 
thermal project # 2
thermal project # 2thermal project # 2
thermal project # 2James Li
 
Lecture7_2021_v2.pdf
Lecture7_2021_v2.pdfLecture7_2021_v2.pdf
Lecture7_2021_v2.pdfssuserc9da59
 
Mudlogging-Operations -Full presentation.ppt
Mudlogging-Operations -Full presentation.pptMudlogging-Operations -Full presentation.ppt
Mudlogging-Operations -Full presentation.pptssuser10407d
 
Ch10 math
Ch10 mathCh10 math
Ch10 mathklivsie
 
Y2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfY2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfTheHoang19
 

Ähnlich wie Drill.pptx (20)

ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
Prefeseability study of petroleum field
Prefeseability study of petroleum fieldPrefeseability study of petroleum field
Prefeseability study of petroleum field
 
PNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docxPNGE 310Class 21Overbalanced Drilling• Mos.docx
PNGE 310Class 21Overbalanced Drilling• Mos.docx
 
Cylindrical liner
Cylindrical linerCylindrical liner
Cylindrical liner
 
Wells & Pumps Project Report
Wells & Pumps Project ReportWells & Pumps Project Report
Wells & Pumps Project Report
 
5 economics
5   economics5   economics
5 economics
 
Skimming Vision System Project (4) 6th Feb 2015
Skimming Vision System Project (4) 6th Feb 2015Skimming Vision System Project (4) 6th Feb 2015
Skimming Vision System Project (4) 6th Feb 2015
 
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPTFIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
FIELD DEVELOPMENT REPORT PROJECT OF DRILLING DEPT
 
Diesel Production: Equipments Design
Diesel Production: Equipments DesignDiesel Production: Equipments Design
Diesel Production: Equipments Design
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
 
Field Development Project of E11 drilling dept.ppt
Field Development Project of E11 drilling dept.pptField Development Project of E11 drilling dept.ppt
Field Development Project of E11 drilling dept.ppt
 
Basic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining projectBasic E&Mcalculations for a coal mining project
Basic E&Mcalculations for a coal mining project
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & cost
 
thermal project # 2
thermal project # 2thermal project # 2
thermal project # 2
 
Lecture7_2021_v2.pdf
Lecture7_2021_v2.pdfLecture7_2021_v2.pdf
Lecture7_2021_v2.pdf
 
Mudlogging-Operations -Full presentation.ppt
Mudlogging-Operations -Full presentation.pptMudlogging-Operations -Full presentation.ppt
Mudlogging-Operations -Full presentation.ppt
 
Ch10 math
Ch10 mathCh10 math
Ch10 math
 
Y2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdfY2023 - Standoff Impovement V1.2.pdf
Y2023 - Standoff Impovement V1.2.pdf
 

Kürzlich hochgeladen

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Kürzlich hochgeladen (20)

Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Drill.pptx

  • 1. OG 321 DRILLING 1 LECTURE SIX DRILLING COST AND DRILLING RATE
  • 2. DRILLING COST ANALYSIS Drilling cost predictions are made so that sound economic decision can be made The drilling engineer recommends • drilling procedures that will safely drilled and complete the well at the minimum cost possible • routine rig operations such as Drilling fluid treatment Pump operation Bit selection Any problem encountered in drilling operation
  • 3. 3 The Drilling Cost Equation Cf = drilling cost, $/ft Cb= cost of bit, $/bit Cr = fixed operating cost of rig, $/hr tb = total rotating time, hrs tc = total non-rotating time, hrs tt = total trip time (round trip), hrs D  ft D t t t C C C t c b r b f $ ) (      = footage drilled with bit, ft/bit Also known as cost per foot equation
  • 4. 4 Example A recommended bit program is being prepared for a new well using bit performance records from nearby wells. Drilling performance records for three bits are shown for a thick limestone formation at 9,000 ft. Determine which bit gives the lowest drilling cost if the operating cost of the rig is $400/hr, the trip time is 7 hours, and connection time is 1 minute per connection.
  • 5. 5 Assume that each of the bits was operated at near the minimum cost per foot attainable for that bit. Mean Bit Rotating Connection Penetration Cost Time Time Rate Bit ($) (hours) (hours) (ft/hr) A 800 14.8 0.1 13.8 B 4,900 57.7 0.4 12.6 C 4,500 95.8 0.5 10.2 Example cont’d Which bit would you select?
  • 6. 6 Solution: The cost per foot drilled for each bit type can be computed using drilling cost equation for Bit A, the cost per foot is /ft. 81 . 46 $ ) 8 . 14 ( 8 . 13 ) 7 1 . 0 8 . 14 ( 400 800      f C ft D t t t C C C t c b r b f $ ) (     
  • 7. 7 Solution: Similarly, for Bit B, /ft. 56 . 42 $ ) 7 . 57 ( 6 . 12 ) 7 4 . 0 7 . 57 ( 400 900 , 4      f C ft D t t t C C C t c b r b f $ ) (     
  • 8. 8 Solution, cont’d Finally, for Bit C, /ft. 89 . 46 $ ) 8 . 95 ( 2 . 10 ) 7 5 . 0 8 . 95 ( 400 500 , 4      f C ft D t t t C C C t c b r b f $ ) (     
  • 9. 9 Solution, cont’d Bit A: $46.81 /ft Bit B: $42.56 /ft Bit C: $46.89 /ft The lowest drilling cost was obtained using Bit B. Regardless of highest bit cost …it has intermediate bit life and ROP...
  • 10. 10 Drilling Costs • Tend to increase exponentially with depth. Thus, when curve-fitting drilling cost data, it is often convenient to assume a relationship between total well cost, C, and depth, D, given by C = aebD • Constants a and b depend primarily on the well location.
  • 11. 11 Drilling Costs, cont’d Shown on the next page is a least-squares curve fit of the south Louisiana completed well data given in Table 1.7 (ADE book) Depth range of 7,500 ft to 21,000 ft. For these data, a = 1 X 105 dollars b = 2 X 10-4 ft -1. C = aebD
  • 12. 12 Fig. 1-65. Least-square curve fit of 1978 completed well costs for wells below 7,500 ft in the south Louisiana area.
  • 13. 13 Penetration Rate When major variations are not present in the subsurface lithology, the penetration rate usually decreases exponentially with depth. Under these conditions, the penetration rate can be related to depth, D, by where K and a2 are constants. D a Ke dt dD 2 303 . 2  
  • 14. 14 Drilling Time The drilling time, td , required to drill to a given depth can be obtained by separating variables and integrating. Separating variables gives dD e dt K D a 303 . 2 D 0 t 0 2 d    Integrating and solving for td yields ) 1 ( 303 . 2 1 2 303 . 2 2   D a d e K a t
  • 15. 15 Drilling Time cont’d Plotting depth vs. drilling time from past drilling operations: • Allows more accurate prediction of time and cost for drilling a new well • Is used in evaluating new drilling procedures (designed to reduce drilling time to a given depth).
  • 16. 16 EXAMPLE - Cost per ft t R D Total Cost Cf hr fph ft $ $/ft 5 90 475 36,950 77.80 10 80 900 47,800 53.10 20 60 1,600 69,200 43.30 25 50 1,875 79,750 42.50 30 40 2,100 90,200 43.00 35 30 2,275 100,550 44.20 40 20 2,400 110,800 46.20 These cost data are plotted below.
  • 17. 17 Cost per ft for one entire bit run Minimum Cost 80 70 60 50 40
  • 18. 18 Economic Procedure in previous Table  Can pull bit after about 25 hr. ($42.50/ft) - the precise pulling time is not critical Note that the cost in dollars per foot was $43.00 after 30 hr.  Primarily applicable to tooth-type bits where wear rate is predictable.
  • 19. 19 Economic Procedure in above Table  Also used with tungsten carbide insert bits when inserts are broken or pulled out of the matrix.  Unfortunately, wear rate with insert bits is unpredictable.  Economically, the insert bit should be pulled when the cost in $/ft begins to increase.
  • 20. 20 Economic Procedure in Table – Bits pulled for economic reasons make it hard to obtain wear information. – Operator might pull bit after 120 hr of use but part of bit might get left in hole. Recovery is very difficult. Avoid! – 75% of rock bits are pulled green or before the bit is worn out.
  • 21. 21 An increase in TORQUE may indicate that a bit should be pulled. Experience often dictates when to pull bit (footage or hours).
  • 22. 22 Factors that affect Penetration Rate  Type of Drill bit  Bit weight  Rotary speed  Bottom-hole cleaning  Mud properties  Rock hardness  Formation pore pressure Variables: Fixed Factors:
  • 23. 23 Bit Selection is based on  Past bit records  Geologic predictions of lithology  Drilling costs in $/bit...  Drilling cost in $/ft
  • 24. 24 Bit Weight and Rotary Speed • Increasing bit weight and rotary speed boosts drilling rate • These increases accelerate bit wear • Field tests show that drilling rate increases more or less in direct proportion to bit weight
  • 25. 25 Consider 10” hole (don’t overdo!!) Bit Weight x 1,000 lb/in 40,000 lbf
  • 26. 26 Rotary Speed, RPM Don’t overdo! Casing wear, bit life ...
  • 27. 27 EFFECT OF BACK PRESSURE Keep P_bit = const.= 550 psi
  • 28. 28 Hydrostatic Pressure, 1,000’s of psi EFFECT OF BACK PRESSURE 0 - 5,000 psi
  • 29. 29 Drilling Time, days Drilled with gas Drilled with mud EFFECT OF DRILLING FLUID mud vs. gas
  • 30. 30 Rotating Time, hours EFFECT OF DRILLING FLUID water vs. air
  • 31. 31 Old style water course bits
  • 32. 32 EFFECT OF SOLIDS IN THE MUD