0.4 2020/07/TSL ISSUED FOR EXECUTION
KM
KD
L
TSL
0.5
0.6
0.7
1.0
2020/08/27 UPDATED EXECUTION INDEX
2020/08/27 ISSUED FOR CLIENT REVIEW (EXECUTION)
2020/09/04 ISSUED FOR CLIENT REVIEW (EXECUTION) - REMOVED ICE TT'S
2020/11/16 ISSUED FOR CONSTRUCTION (EXECUTION)
C
J
BB
TSL
C
JKdL
TSL
C
J
SD
TSL
C
J
SD
DRAWING No. REV DATE REVISIONSREFERENCE DRAWINGS
SLENG
BYCHK
BUSINESS UNIT
PROJECT WVS SCF1 TOTAL REBUILD 2020
CLIENT
PROJECT PHASE
ORDER NO
:
:
:
:
: EXECUTION
WATERVAL SMELTER
ACD 613 08 000079
AREACOMP SEC DISP DRG. No. ID CODE REV
6 1 3 0 0 0 0 0 7 9 HE 1.0
ANGLO AMERICAN PLATINUM LTD VOTE No: CB19008
EXECUTION
PROJECT PHASE
8A C D
SHEET NO
01
COOLING
INSTRUMENT INDEX
OPERATIONS UNIT
COMOS DOCUMENT
UPDATES IN COMOS DATABASE ONLY
SAFETY
PROTECTION
SERVICES
PROCESS
OPERATIONS
MANAGER
SHE
MANAGER
ENGINEERING
MANAGER
SCALE
CONTRACTOR / CONSULTANT
ENGINEERING
COORD
LEAD PROC
ENGINEER
MINING
ENGINEER
MECH
ENGINEER
ELECT
ENGINEER
STRUCT / CIVIL
ENGINEER
PROJECT
MANAGER
PROJECT
MANAGER
E AND I
ENGINEER
DISCIPLINE
DESIGNER
CHECKED
DESIGN
COORD
DRAWN
AREA
ENGINEER
PROJECTS & ENGINEERING
KM
CJ
KdL
TSL
20100306
COPYRIGHT HELD BY ANGLO AMERICAN PLATINUM
"Copyright subsists in this work. Any unauthorised reproduction in any manner or form,
publication, making an adaption of the work, any of the acts above, are acts of copyright
infringement and make the DOER liable for civil law copyright infringement and may make the
DOER liable to criminal prosecution."
C&I
ENGINEER
PR. ENG / PR TECH
PLANT
SEC. MANAGER
REG NUMBER
MET. SUP.
SIGNATURE
SEC. MET. NAME
NTS
2020/11/20
2020/11/20
2020/11/23
Page 1 of 148
613 COOLING - INSTRUMENT INDEX
3E GROUP
XB 1555
CONSULTANTS DRAWING No: 3E5856-613501-06-00508-05067-51
SMELTER
WVS SCF1 TOTAL REBUILD 2020
FURNACE
ACD 613 08 000079 Page 2 of 148
I/O Type Count
I/O List
AI 940
AO 2
DI 19
DO 271
ACD 613 08 000079 Page 3 of 148
Tag NumberLoop No.
Type Description
I/O
Input
Output
Comm.
Protocol
Service Status
Location
Sub Area
System
Original Equip. No.
Original Equip. Description
Original P&ID No.
New P&ID No. Scope
Supplied By
Installed By
RemarksRev
613-FE-002A613-F-002A
Flow Element - Magflow
-
-
-
-
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-002A613-F-002A
Flow Indicator
-
-
-
Software
TK-106 Inlet Flow From Cooler DU-002 NewNew
SCADA
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
PCS7
PCS7
-1.0
613-FIT-002A613-F-002A
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-002B613-F-002B
Flow Element - Magflow
-
-
-
-
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-002B613-F-002B
Flow Indicator
-
-
-
Software
TK-106 Inlet Flow From Cooler DU-002 NewNew
SCADA
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
PCS7
PCS7
-1.0
613-FIT-002B613-F-002B
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-002C613-F-002C
Flow Element - Magflow
-
-
-
-
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-002C613-F-002C
Flow Indicator
-
-
-
Software
TK-106 Inlet Flow From Cooler DU-002 NewNew
SCADA
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
PCS7
PCS7
-1.0
613-FIT-002C613-F-002C
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-106 Inlet Flow From Cooler DU-002 New
Field
Cooling Water
Cooling
613-TK-106
Tundish 106
-
ACD 613 05 000690 09 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-049613-F-049
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler EK-001-12 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-049613-F-049
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler EK-001-12 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
PCS7
PCS7
-1.0
613-FIT-049613-F-049
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-108 Inlet Flow From Cooler EK-001-12 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-051613-F-051
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler EK-001-16 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-051613-F-051
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler EK-001-16 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
PCS7
PCS7
-1.0
613-FIT-051613-F-051
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-108 Inlet Flow From Cooler EK-001-16 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-053613-F-053
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler HS-001-01 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-053613-F-053
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler HS-001-01 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
PCS7
PCS7
-1.0
613-FIT-053613-F-053
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-108 Inlet Flow From Cooler HS-001-01 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-055613-F-055
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler HS-001-02 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
-*
613-FI-055613-F-055
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler HS-001-02 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
PCS7
PCS7
-1.0
613-FIT-055613-F-055
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-108 Inlet Flow From Cooler HS-001-02 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 02 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-057613-F-057
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler HS-001-03 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 03 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-057613-F-057
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler HS-001-03 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 03 New
PCS7
PCS7
-1.0
613-FIT-057613-F-057
Flow Indicating Transmitter
AI
-
-
Profibus PA
TK-108 Inlet Flow From Cooler HS-001-03 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 03 New
AAP Free Issue
E&I Contractor
Wired to CFU. HOLD: I/O Assignment by PCS7.1.0
613-FE-059613-F-059
Flow Element - Magflow
-
-
-
-
TK-108 Inlet Flow From Cooler HS-001-04 New
Field
Cooling Water
Cooling
613-TK-108
Tundish 108
-
ACD 613 05 000692 03 New
AAP Free Issue
E&I Contractor
-1.0
613-FI-059613-F-059
Flow Indicator
-
-
-
Software
TK-108 Inlet Flow From Cooler HS-001-04 NewNew
SCADA
Cooling Water
Cooling
613-TK-108
Tundish 108
ACD 613 15 004 03 PY
ACD 613 05 000692 03 New
PCS7
PCS7
-1.0

Weitere ähnliche Inhalte

Ähnlich wie COMOS Instrument Index

23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
BMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdfBMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdfSnowWolf InGalaxy
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfSuparlan7
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Emily Tan
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfAmitKunduDVC
 
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDFVP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDFssuser30385d
 
Spice park Update of OCT2015
Spice park Update of OCT2015Spice park Update of OCT2015
Spice park Update of OCT2015Tsuyoshi Horigome
 
SPICE PARK Update of SEP2015
SPICE PARK  Update of SEP2015SPICE PARK  Update of SEP2015
SPICE PARK Update of SEP2015Tsuyoshi Horigome
 
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVO
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVOPANO ELECTRICO JUMBO FRONTONERO DD311 NUEVO
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVOJulioMoleroCastillo
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiulianoBozzo98
 

Ähnlich wie COMOS Instrument Index (20)

23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
CV Page.pdf
CV Page.pdfCV Page.pdf
CV Page.pdf
 
BMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdfBMS_Siemen_solution_for_the_building.pdf
BMS_Siemen_solution_for_the_building.pdf
 
START UP by Rekind
START UP by RekindSTART UP by Rekind
START UP by Rekind
 
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdfMANUFACTURE DRAWING 220V DC SYSTEM.pdf
MANUFACTURE DRAWING 220V DC SYSTEM.pdf
 
Pid area 291
Pid area 291Pid area 291
Pid area 291
 
aaa.pptx
aaa.pptxaaa.pptx
aaa.pptx
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Bdc recording
Bdc recordingBdc recording
Bdc recording
 
10004239951
1000423995110004239951
10004239951
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDFVP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
VP-2025JV8J10121-216-B06-001_05_A CODE 1.PDF
 
Spice park Update of OCT2015
Spice park Update of OCT2015Spice park Update of OCT2015
Spice park Update of OCT2015
 
Sch 28303 b
Sch 28303 bSch 28303 b
Sch 28303 b
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
 
SPICE PARK Update of SEP2015
SPICE PARK  Update of SEP2015SPICE PARK  Update of SEP2015
SPICE PARK Update of SEP2015
 
Ch 03-30 mpw060
Ch 03-30 mpw060Ch 03-30 mpw060
Ch 03-30 mpw060
 
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVO
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVOPANO ELECTRICO JUMBO FRONTONERO DD311 NUEVO
PANO ELECTRICO JUMBO FRONTONERO DD311 NUEVO
 
Giuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendioGiuliano bozzo moncada 2.3.5. incendio
Giuliano bozzo moncada 2.3.5. incendio
 

Kürzlich hochgeladen

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Kürzlich hochgeladen (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

COMOS Instrument Index

  • 1. 0.4 2020/07/TSL ISSUED FOR EXECUTION KM KD L TSL 0.5 0.6 0.7 1.0 2020/08/27 UPDATED EXECUTION INDEX 2020/08/27 ISSUED FOR CLIENT REVIEW (EXECUTION) 2020/09/04 ISSUED FOR CLIENT REVIEW (EXECUTION) - REMOVED ICE TT'S 2020/11/16 ISSUED FOR CONSTRUCTION (EXECUTION) C J BB TSL C JKdL TSL C J SD TSL C J SD DRAWING No. REV DATE REVISIONSREFERENCE DRAWINGS SLENG BYCHK BUSINESS UNIT PROJECT WVS SCF1 TOTAL REBUILD 2020 CLIENT PROJECT PHASE ORDER NO : : : : : EXECUTION WATERVAL SMELTER ACD 613 08 000079 AREACOMP SEC DISP DRG. No. ID CODE REV 6 1 3 0 0 0 0 0 7 9 HE 1.0 ANGLO AMERICAN PLATINUM LTD VOTE No: CB19008 EXECUTION PROJECT PHASE 8A C D SHEET NO 01 COOLING INSTRUMENT INDEX OPERATIONS UNIT COMOS DOCUMENT UPDATES IN COMOS DATABASE ONLY SAFETY PROTECTION SERVICES PROCESS OPERATIONS MANAGER SHE MANAGER ENGINEERING MANAGER SCALE CONTRACTOR / CONSULTANT ENGINEERING COORD LEAD PROC ENGINEER MINING ENGINEER MECH ENGINEER ELECT ENGINEER STRUCT / CIVIL ENGINEER PROJECT MANAGER PROJECT MANAGER E AND I ENGINEER DISCIPLINE DESIGNER CHECKED DESIGN COORD DRAWN AREA ENGINEER PROJECTS & ENGINEERING KM CJ KdL TSL 20100306 COPYRIGHT HELD BY ANGLO AMERICAN PLATINUM "Copyright subsists in this work. Any unauthorised reproduction in any manner or form, publication, making an adaption of the work, any of the acts above, are acts of copyright infringement and make the DOER liable for civil law copyright infringement and may make the DOER liable to criminal prosecution." C&I ENGINEER PR. ENG / PR TECH PLANT SEC. MANAGER REG NUMBER MET. SUP. SIGNATURE SEC. MET. NAME NTS 2020/11/20 2020/11/20 2020/11/23 Page 1 of 148 613 COOLING - INSTRUMENT INDEX 3E GROUP XB 1555 CONSULTANTS DRAWING No: 3E5856-613501-06-00508-05067-51 SMELTER WVS SCF1 TOTAL REBUILD 2020 FURNACE
  • 2. ACD 613 08 000079 Page 2 of 148 I/O Type Count I/O List AI 940 AO 2 DI 19 DO 271
  • 3. ACD 613 08 000079 Page 3 of 148 Tag NumberLoop No. Type Description I/O Input Output Comm. Protocol Service Status Location Sub Area System Original Equip. No. Original Equip. Description Original P&ID No. New P&ID No. Scope Supplied By Installed By RemarksRev 613-FE-002A613-F-002A Flow Element - Magflow - - - - TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor -1.0 613-FI-002A613-F-002A Flow Indicator - - - Software TK-106 Inlet Flow From Cooler DU-002 NewNew SCADA Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New PCS7 PCS7 -1.0 613-FIT-002A613-F-002A Flow Indicating Transmitter AI - - Profibus PA TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-002B613-F-002B Flow Element - Magflow - - - - TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor -1.0 613-FI-002B613-F-002B Flow Indicator - - - Software TK-106 Inlet Flow From Cooler DU-002 NewNew SCADA Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New PCS7 PCS7 -1.0 613-FIT-002B613-F-002B Flow Indicating Transmitter AI - - Profibus PA TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-002C613-F-002C Flow Element - Magflow - - - - TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor -1.0 613-FI-002C613-F-002C Flow Indicator - - - Software TK-106 Inlet Flow From Cooler DU-002 NewNew SCADA Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New PCS7 PCS7 -1.0 613-FIT-002C613-F-002C Flow Indicating Transmitter AI - - Profibus PA TK-106 Inlet Flow From Cooler DU-002 New Field Cooling Water Cooling 613-TK-106 Tundish 106 - ACD 613 05 000690 09 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-049613-F-049 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler EK-001-12 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 02 New AAP Free Issue E&I Contractor -1.0 613-FI-049613-F-049 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler EK-001-12 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New PCS7 PCS7 -1.0 613-FIT-049613-F-049 Flow Indicating Transmitter AI - - Profibus PA TK-108 Inlet Flow From Cooler EK-001-12 New Field Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-051613-F-051 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler EK-001-16 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 02 New AAP Free Issue E&I Contractor -1.0 613-FI-051613-F-051 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler EK-001-16 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New PCS7 PCS7 -1.0 613-FIT-051613-F-051 Flow Indicating Transmitter AI - - Profibus PA TK-108 Inlet Flow From Cooler EK-001-16 New Field Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-053613-F-053 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler HS-001-01 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 02 New AAP Free Issue E&I Contractor -1.0 613-FI-053613-F-053 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler HS-001-01 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New PCS7 PCS7 -1.0 613-FIT-053613-F-053 Flow Indicating Transmitter AI - - Profibus PA TK-108 Inlet Flow From Cooler HS-001-01 New Field Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-055613-F-055 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler HS-001-02 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 02 New AAP Free Issue E&I Contractor -* 613-FI-055613-F-055 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler HS-001-02 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New PCS7 PCS7 -1.0 613-FIT-055613-F-055 Flow Indicating Transmitter AI - - Profibus PA TK-108 Inlet Flow From Cooler HS-001-02 New Field Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 02 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-057613-F-057 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler HS-001-03 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 03 New AAP Free Issue E&I Contractor -1.0 613-FI-057613-F-057 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler HS-001-03 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 03 New PCS7 PCS7 -1.0 613-FIT-057613-F-057 Flow Indicating Transmitter AI - - Profibus PA TK-108 Inlet Flow From Cooler HS-001-03 New Field Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 03 New AAP Free Issue E&I Contractor Wired to CFU. HOLD: I/O Assignment by PCS7.1.0 613-FE-059613-F-059 Flow Element - Magflow - - - - TK-108 Inlet Flow From Cooler HS-001-04 New Field Cooling Water Cooling 613-TK-108 Tundish 108 - ACD 613 05 000692 03 New AAP Free Issue E&I Contractor -1.0 613-FI-059613-F-059 Flow Indicator - - - Software TK-108 Inlet Flow From Cooler HS-001-04 NewNew SCADA Cooling Water Cooling 613-TK-108 Tundish 108 ACD 613 15 004 03 PY ACD 613 05 000692 03 New PCS7 PCS7 -1.0