Presentation to
                                         City Council
                                       November 26, 2012
CarolloMetallicTemplateWithLogo.pptx
Wastewater Facility Master Plan Update
                                       provides a comprehensive 20 year plan
                                       for the collection system and treatment
                                       facility to:

                                       •   Accommodate growth
                                       •   Maintain assets
                                       •   Meet regulatory requirements
                                       •   Improve treatment facility:
                                           – Appearance
                                           – Odor control
CarolloMetallicTemplateWithLogo.pptx




                                           – Beneficial use of resources


                                                                                 2
Growth projected through 2030:




                                                                           1.3% projected
                                                                              thru 2030

                                                          1.9% projected
                                                             thru 2026

                                            1.6% recent
CarolloMetallicTemplateWithLogo.pptx




                                            growth rate




                                                                                            3
Service area includes UGB and areas
                                       planned for future service:

                                                         UGB
                                                          New service areas

                                                        Existing service areas

                                                          City limits
CarolloMetallicTemplateWithLogo.pptx




                                                                                 4
Summary of projected flows

                                                     Flow Parameter (mgd)       Current   2022   2030
                                       Base Wastewater Flow (BWF)                 2.0     3.0    3.5
                                       Average Annual Flow (AAF)                  2.3     3.5    4.0
                                       Average Dry Weather Flow (ADWF)            2.0     3.1    3.6
                                       Average Wet Weather Flow (AWWF)            2.6     3.9    4.5
                                       Maximum Month Dry Weather Flow (MMDWF)     2.5     3.7    4.3
                                       Maximum Month Wet Weather Flow (MMWWF)     3.4     5.0    5.7
                                       Peak Daily Average Flow (PDAF)             6.1     8.5    9.3
                                       Peak Instantaneous Flow (PIF)              7.7     10.8   11.9
CarolloMetallicTemplateWithLogo.pptx




                                                                                                        5
Comprehensive H2O SWMM Model
                                       provides sound planning tool:
CarolloMetallicTemplateWithLogo.pptx




                                                                       6
GIS integration allows modeling when
                                       zoning changes occur


                                                            Current land use
                                                            zoning overlay
CarolloMetallicTemplateWithLogo.pptx




                                                                               7
Model used for comprehensive collection
                                       system analysis that included:
                                       • Calibrating the model through:
                                           – Flow monitoring
                                           – Correlating with existing flow data
                                       •   Identifying the design storm
                                       •   Analyzing inflow and infiltration rates
                                       •   Analyzing lift station capacities
                                       •   Identifying deficiencies
                                       •   Identifying capital improvements
CarolloMetallicTemplateWithLogo.pptx




                                                                                     8
Nine collection system improvements
                                          identified:

                                                               2015
                                                               2nd Street

                                                                            2016
                                                                            8th Street Lift Station
                                                                            Replacement


                                                                             2017
                                                                             Cliff Lift Station
                                                                             Replacement
                                       2017 & 2018
                                       6th Street - North
CarolloMetallicTemplateWithLogo.pptx




                                          2014
                                          6th Street - South



                                                                                                      9
Nine collection system improvements
                                       identified:

                                                          10 CIP projects saving
                                                          about $2.3 million
                                                          eliminated through
                                                          new modeling work
CarolloMetallicTemplateWithLogo.pptx




                                                                                   10
Collection system CIP:
                                                        CIP Project                   $        Fiscal Year
                                        6th Street – South                         290,000        2014
                                        2nd Street                                 650,000        2015
                                        8th St Lift Station Replacement            340,000        2016
                                        Cliff Lift Station Replacement             340,000        2017
                                        6th Street – North                         610,000     2017 & 2018
                                        Laughlin Street                            240,000        2021
                                        8” Sewer to serve Septic Area              250,000        2022
                                        Chenowith Loop Rd / Irvine St / 10th St    850,000     2022 & 2023
                                        Snipes Street                              120,000        2023
                                        Union Street / 2nd Street                  180,000        2027
CarolloMetallicTemplateWithLogo.pptx




                                        Near 1st Street                            390,000     2028 & 2029
                                                     Total Collection System CIP   4,260,000


                                                                                                             11
Treatment facility evaluation included:
                                       • Capacity &       • Regulatory
                                         condition          scenarios for
                                         assessments        effluent discharge
                                                            and biosolids
                                       • Aesthetic          reuse
                                         improvements
                                       • Odor control
                                         upgrades
                                       • Benefits of
                                         Cogeneration
CarolloMetallicTemplateWithLogo.pptx




                                                                                 12
Program #1 addresses
                                       capacity, redundancy, and odor
                                       issues and improves plant
                                       appearance




                                       Program #1 - $4,880,000
                                       ● Influent Pump Station
                                       ● Headworks
CarolloMetallicTemplateWithLogo.pptx




                                       ● Digester 2 conversion
                                       ● Aesthetic upgrades

                                                                        13
Program #2 addresses capacity and
                                       redundancy issues




                                                                             Biosolids
                                       Program #2 - $3,381,000               Storage
                                       ● Biosolids storage tank                Tank
                                       ● Additional secondary clarifier
CarolloMetallicTemplateWithLogo.pptx




                                       ● Additional gravity belt thickener


                                                                                         14
Program #3 addresses
                                       capacity, redundancy, asset and site
                                       management, and future regulatory
                                       requirements




                                       Program #3 - $4,760,000
CarolloMetallicTemplateWithLogo.pptx




                                       ● New Administration, Laboratory,
                                       and Control Building
                                       ● Secondary process upgrades
                                                                              15
Treatment Facility CIP:
                                                       CIP Project                      $        Fiscal Years
                                        Program #1                                   4,880,000   2014 - 2016
                                         Influent Pump Station                       1,660,000
                                         Headworks                                   2,320,000

                                         Digester 2 Conversion                        690,000
                                         Aesthetic Improvements                       210,000
                                        Program #2                                   3,381,000   2017 - 2019
                                         Biosolids Storage Tank                       920,000
                                         Secondary Clarifier                         1,791,000
                                         Gravity Belt Thickener                       670,000
                                        Program #3                                   4,760,000   2020 - 2022
CarolloMetallicTemplateWithLogo.pptx




                                         New Administration, Lab, and Control Bldg   1,200,000
                                         Secondary Process Improvements              3,560,000


                                                                                                                16
Treatment facilities strategically located
                                       on existing site:
CarolloMetallicTemplateWithLogo.pptx




                                                                                    17
Aesthetic improvements consistent with
                                       downtown development plans
CarolloMetallicTemplateWithLogo.pptx




                                                                                18
Two concepts presented:

                                       Concept 1
                                       provides higher
                                       level of
                                       landscaping and
                                       upgraded fence
                                       along East 1st
                                       Street



                                       Concept 2
                                       provides
                                       moderate level of
                                       landscaping and
                                       fence along East
CarolloMetallicTemplateWithLogo.pptx




                                       1st Street that
                                       matches park
                                       fence

                                                                 19
CarolloMetallicTemplateWithLogo.pptx




                                       Both concepts improve appearance:




 20

Weitere ähnliche Inhalte

Ähnlich wie 112612 carollo council presentation final

On Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing SoftwareOn Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing Software
Power System Operation
 
On Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing SoftwareOn Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing Software
Power System Operation
 
An Update on XBRL (Ms Sia Su Chun, Singapore)
An Update on XBRL (Ms Sia Su Chun, Singapore)An Update on XBRL (Ms Sia Su Chun, Singapore)
An Update on XBRL (Ms Sia Su Chun, Singapore)
Corporate Registers Forum
 
Iaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributedIaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd Iaetsd
 
Content-aware resource allocation model for IPTV delivery networks
Content-aware resource allocation model for IPTV delivery networksContent-aware resource allocation model for IPTV delivery networks
Content-aware resource allocation model for IPTV delivery networks
IJECEIAES
 
161021 Water & Telecoms dmcb
161021 Water & Telecoms dmcb161021 Water & Telecoms dmcb
161021 Water & Telecoms dmcb
Airov8
 

Ähnlich wie 112612 carollo council presentation final (20)

Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
Oilfield Modeling and Optimization of a Mature Field using Integrated Product...Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
Oilfield Modeling and Optimization of a Mature Field using Integrated Product...
 
The Status of CCS 2011 Report - Victor Der - Global CCS Institute – Nov 2011 ...
The Status of CCS 2011 Report - Victor Der - Global CCS Institute – Nov 2011 ...The Status of CCS 2011 Report - Victor Der - Global CCS Institute – Nov 2011 ...
The Status of CCS 2011 Report - Victor Der - Global CCS Institute – Nov 2011 ...
 
Keeping an Operational Eye on Wind and Solar
Keeping an Operational Eye on Wind and SolarKeeping an Operational Eye on Wind and Solar
Keeping an Operational Eye on Wind and Solar
 
High Performance Green Infrastructure, New Directions in Real-Time Control
High Performance Green Infrastructure, New Directions in Real-Time ControlHigh Performance Green Infrastructure, New Directions in Real-Time Control
High Performance Green Infrastructure, New Directions in Real-Time Control
 
Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...Introduction to the draft greenhouse gas emissions(director's report) regulat...
Introduction to the draft greenhouse gas emissions(director's report) regulat...
 
A Novel Scheduling Mechanism for Hybrid Cloud Systems
A Novel Scheduling Mechanism for Hybrid Cloud SystemsA Novel Scheduling Mechanism for Hybrid Cloud Systems
A Novel Scheduling Mechanism for Hybrid Cloud Systems
 
On Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing SoftwareOn Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing Software
 
On Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing SoftwareOn Improving Efficiency of Electricity Market Clearing Software
On Improving Efficiency of Electricity Market Clearing Software
 
Solving advanced research problems with real time open data from satellites a...
Solving advanced research problems with real time open data from satellites a...Solving advanced research problems with real time open data from satellites a...
Solving advanced research problems with real time open data from satellites a...
 
IRJET- LORA based Solid Waste Management
IRJET- LORA based Solid Waste ManagementIRJET- LORA based Solid Waste Management
IRJET- LORA based Solid Waste Management
 
Benchmarking - with Formula.PDF
Benchmarking - with Formula.PDFBenchmarking - with Formula.PDF
Benchmarking - with Formula.PDF
 
A0340105
A0340105A0340105
A0340105
 
An Update on XBRL (Ms Sia Su Chun, Singapore)
An Update on XBRL (Ms Sia Su Chun, Singapore)An Update on XBRL (Ms Sia Su Chun, Singapore)
An Update on XBRL (Ms Sia Su Chun, Singapore)
 
Iaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributedIaetsd pinpointing performance deviations of subsystems in distributed
Iaetsd pinpointing performance deviations of subsystems in distributed
 
Content-aware resource allocation model for IPTV delivery networks
Content-aware resource allocation model for IPTV delivery networksContent-aware resource allocation model for IPTV delivery networks
Content-aware resource allocation model for IPTV delivery networks
 
Covid Hazardous Waste Management System
Covid Hazardous Waste Management SystemCovid Hazardous Waste Management System
Covid Hazardous Waste Management System
 
e-government and open government - how open measurements can help, Mikael Sn...
e-government and open government  - how open measurements can help, Mikael Sn...e-government and open government  - how open measurements can help, Mikael Sn...
e-government and open government - how open measurements can help, Mikael Sn...
 
Observability
ObservabilityObservability
Observability
 
SBPAT for RAA (2013-09-17)
SBPAT for RAA (2013-09-17)SBPAT for RAA (2013-09-17)
SBPAT for RAA (2013-09-17)
 
161021 Water & Telecoms dmcb
161021 Water & Telecoms dmcb161021 Water & Telecoms dmcb
161021 Water & Telecoms dmcb
 

112612 carollo council presentation final

  • 1. Presentation to City Council November 26, 2012 CarolloMetallicTemplateWithLogo.pptx
  • 2. Wastewater Facility Master Plan Update provides a comprehensive 20 year plan for the collection system and treatment facility to: • Accommodate growth • Maintain assets • Meet regulatory requirements • Improve treatment facility: – Appearance – Odor control CarolloMetallicTemplateWithLogo.pptx – Beneficial use of resources 2
  • 3. Growth projected through 2030: 1.3% projected thru 2030 1.9% projected thru 2026 1.6% recent CarolloMetallicTemplateWithLogo.pptx growth rate 3
  • 4. Service area includes UGB and areas planned for future service: UGB New service areas Existing service areas City limits CarolloMetallicTemplateWithLogo.pptx 4
  • 5. Summary of projected flows Flow Parameter (mgd) Current 2022 2030 Base Wastewater Flow (BWF) 2.0 3.0 3.5 Average Annual Flow (AAF) 2.3 3.5 4.0 Average Dry Weather Flow (ADWF) 2.0 3.1 3.6 Average Wet Weather Flow (AWWF) 2.6 3.9 4.5 Maximum Month Dry Weather Flow (MMDWF) 2.5 3.7 4.3 Maximum Month Wet Weather Flow (MMWWF) 3.4 5.0 5.7 Peak Daily Average Flow (PDAF) 6.1 8.5 9.3 Peak Instantaneous Flow (PIF) 7.7 10.8 11.9 CarolloMetallicTemplateWithLogo.pptx 5
  • 6. Comprehensive H2O SWMM Model provides sound planning tool: CarolloMetallicTemplateWithLogo.pptx 6
  • 7. GIS integration allows modeling when zoning changes occur Current land use zoning overlay CarolloMetallicTemplateWithLogo.pptx 7
  • 8. Model used for comprehensive collection system analysis that included: • Calibrating the model through: – Flow monitoring – Correlating with existing flow data • Identifying the design storm • Analyzing inflow and infiltration rates • Analyzing lift station capacities • Identifying deficiencies • Identifying capital improvements CarolloMetallicTemplateWithLogo.pptx 8
  • 9. Nine collection system improvements identified: 2015 2nd Street 2016 8th Street Lift Station Replacement 2017 Cliff Lift Station Replacement 2017 & 2018 6th Street - North CarolloMetallicTemplateWithLogo.pptx 2014 6th Street - South 9
  • 10. Nine collection system improvements identified: 10 CIP projects saving about $2.3 million eliminated through new modeling work CarolloMetallicTemplateWithLogo.pptx 10
  • 11. Collection system CIP: CIP Project $ Fiscal Year 6th Street – South 290,000 2014 2nd Street 650,000 2015 8th St Lift Station Replacement 340,000 2016 Cliff Lift Station Replacement 340,000 2017 6th Street – North 610,000 2017 & 2018 Laughlin Street 240,000 2021 8” Sewer to serve Septic Area 250,000 2022 Chenowith Loop Rd / Irvine St / 10th St 850,000 2022 & 2023 Snipes Street 120,000 2023 Union Street / 2nd Street 180,000 2027 CarolloMetallicTemplateWithLogo.pptx Near 1st Street 390,000 2028 & 2029 Total Collection System CIP 4,260,000 11
  • 12. Treatment facility evaluation included: • Capacity & • Regulatory condition scenarios for assessments effluent discharge and biosolids • Aesthetic reuse improvements • Odor control upgrades • Benefits of Cogeneration CarolloMetallicTemplateWithLogo.pptx 12
  • 13. Program #1 addresses capacity, redundancy, and odor issues and improves plant appearance Program #1 - $4,880,000 ● Influent Pump Station ● Headworks CarolloMetallicTemplateWithLogo.pptx ● Digester 2 conversion ● Aesthetic upgrades 13
  • 14. Program #2 addresses capacity and redundancy issues Biosolids Program #2 - $3,381,000 Storage ● Biosolids storage tank Tank ● Additional secondary clarifier CarolloMetallicTemplateWithLogo.pptx ● Additional gravity belt thickener 14
  • 15. Program #3 addresses capacity, redundancy, asset and site management, and future regulatory requirements Program #3 - $4,760,000 CarolloMetallicTemplateWithLogo.pptx ● New Administration, Laboratory, and Control Building ● Secondary process upgrades 15
  • 16. Treatment Facility CIP: CIP Project $ Fiscal Years Program #1 4,880,000 2014 - 2016 Influent Pump Station 1,660,000 Headworks 2,320,000 Digester 2 Conversion 690,000 Aesthetic Improvements 210,000 Program #2 3,381,000 2017 - 2019 Biosolids Storage Tank 920,000 Secondary Clarifier 1,791,000 Gravity Belt Thickener 670,000 Program #3 4,760,000 2020 - 2022 CarolloMetallicTemplateWithLogo.pptx New Administration, Lab, and Control Bldg 1,200,000 Secondary Process Improvements 3,560,000 16
  • 17. Treatment facilities strategically located on existing site: CarolloMetallicTemplateWithLogo.pptx 17
  • 18. Aesthetic improvements consistent with downtown development plans CarolloMetallicTemplateWithLogo.pptx 18
  • 19. Two concepts presented: Concept 1 provides higher level of landscaping and upgraded fence along East 1st Street Concept 2 provides moderate level of landscaping and fence along East CarolloMetallicTemplateWithLogo.pptx 1st Street that matches park fence 19
  • 20. CarolloMetallicTemplateWithLogo.pptx Both concepts improve appearance: 20