Cluster Optimization
Prepared by:
Samsung
Course Name: SCFT Procedure
Course Objective
This module will enable participants
to understand how to conduct
Cluster Optimization Drive
Who should attend
RF / DT engineers, Riggers
Morning Session (10:30am to 1:30pm)
Lunchbreak
Afternoon Session (2:30pm to 6pm)
Day 1
‱XCAL Demonstration
‱ Hands on exercises
Good to know
Keep your mobile phone in the silent mode during the session
Need to sign attendance sheet at the start and end of each day
At the end of each training post test will be conducted
Stick to break timings
Your valuable feedback will be taken at the end to enhance training experience
For logistics support contact the co-ordinator
Agenda
Introduction
 Cluster Optimization Test Entrance Criteria
 High level process
 Drive Route Selection
Test Procedure
 Types of tests
 Checklist for cluster optimization
Cluster System Acceptance Test
 RF Design Validation
 Handover Test
 Retainability Test
 Accessibility Test
 VoLTE Quality
Introduction to Cluster Optimization
Cluster Optimization Test Entrance Criteria
Cluster Definition
 Minimum of 20 to 30 eNB’s
 Contiguous coverage
 Can cross TA boundaries
Test entrance criteria
 At least 80% of the eNB’s in the
test cluster shall have passed
SCFT and shall have compliance
with EMF norms
 SCFT and EMF compliance
report for each eNB for the test
cluster has to be verified
 Any changes to the eNB physical
configuration required for EMF
compliance shall be updated in
the cluster database
(((
(((
(((
(((
(((
(((
(((
((( (((
(((
Cluster Optimization High-level Process
Drive 1
‱ First cluster drive
after 80 % of the
sites pass SCFT &
EMF
Optimization
‱ Post-analysis
changes to
network
Drive 2
‱ Second Drive
Test result will be
compared with
the first Drive
Test for worst
areas by
measuring entire
signal
environment
after change in
System
Parameters and
adjustments of
Antenna
Drive Route Selection
UE should be served by all sectors of every eNB in the cluster
Include highways, major and minor roads in the cluster
Route should represent potential subscriber usage locations
Should not leave the designed coverage area for the cluster
First and second drive routes should remain identical
Conditions (e.g. UE position) should be identical between drives
Do not cross 40 kmph
SCFT + Cluster Drive Case
Suppose an eNB comes on-air after the rest of the cluster
For that site, SCFT & Cluster optimization drive test should be done till first tier
neighbors for the site
Drive Route for late on-air site
B B
1. Drive route for Cluster when Site B is not on Air 2. Drive route for Sub Cluster after Site B is on Air
Test Procedure
Tests to be conducted
FTP Downlink Long Call
FTP Uplink Long Call
VoLTE Long Call
VoLTE Short Call4 UE’s : 1 Master, 3 Slaves
FTP Downlink Long Call
Ensure that OCNS is enabled for all eNBs in the
cluster with 76% downlink load
Ensure that the UE is successfully attached to
the LTE network
Select the appropriate UE and download the
FTP DL Scenario from FMS
Start the Autocall test. FTP download uses a
single file with the highest possible
compression and file size of 8GB. (Attach to
detach - 60 min & 10 Sec Idle time)
Ensure that the log files are being captured
Start traversing around the pre-defined drive
route at 30-40 Kmph, continuing the
FTP download and reinitiating in case of call
drop
At the end of the drive route stop the logging
and ensure that the log files are uploaded
FTP Uplink Long Call
Ensure that OCNS is enabled for all eNBs in the
cluster with 76% downlink load
Ensure that the UE is successfully attached to
the LTE network
Select the appropriate UE and download the
FTP UL Scenario from FMS
Start the Autocall test. FTP UL uses a single file
of highest possible compression and file size of
1GB. ( Attach to detach - 60 min & 10 Sec Idle
time)
Ensure that the log files are being captured
Start traversing around the pre-defined drive
route at 30-40 Kmph, continuing the
FTP upload and reinitiating in case of call drop
At the end of the drive route stop the logging
and ensure that the log files are uploaded
VoLTE Long Call
Ensure that OCNS is enabled for all eNBs in the
cluster with 76% downlink load
Ensure that the UE is successfully attached to
the LTE network and successfully registered for
VoLTE service
Select the appropriate UE and download the
VoLTE Long call Scenario from FMS
Start the Autocall test. Ensure that the log files
are being captured
Start traversing around the pre-defined drive
route at 30-40 Kmph, continuing the long call
and reinitiating in case of call drop
At the end of the drive route stop the logging
and ensure that the log files are uploaded
VoLTE Short Call
Ensure that OCNS is enabled for all eNBs in
the cluster with 76% downlink load
Ensure that the UE is successfully attached
to the LTE network and successfully
registered for VoLTE service
Select the appropriate UE and download
the VoLTE Short call Scenario from FMS
Start the Autocall test. Ensure that the log
files are being captured
Start traversing around the pre-defined
drive route at 30-40 Kmph, continuing the
short calls
At the end of the drive route stop the
logging and ensure that the log files are
uploaded
Checklist for Cluster Optimization
Items Parameter Action
Test Call FTP Test Call Upload & Download Before starting drive test make a test call
Ping Google server Ping from command prompt Before starting drive test try ping test
OCNS Loading Loading effect 76% in the downlink Before starting drive test
Site Coverage
Analysis of RSRP,SINR plot, PCI plot Optimization suggestions will be given after
post processing of 1st drive test
Sector Overshooting
1. Analysis based on each sector
coverage area and handover till
adjacent cluster boundary 2.SCFT
report should be considered for
reference
Optimization suggestions should be given
and which will be implemented after 1st
drive test in Cluster optimization
Coverage overlapping
Analysis based on each sector
coverage area using PCI plot of
serving cell
Optimization suggestions should be given to
reduce coverage overlapping and which will
be implemented in after 1st drive test in
Cluster optimization
Accessibility
Attach success rate, RACH success
rate, Tracking area update success
rate
KPI analysis w.r.t benchmark and
optimization after 1st drive test
Quality check
Analysis for weak DL & UL
throughput areas. Analysis based on
interference, overlapping, Handoff
issues, SINR, hardware issues etc
Optimization suggestion should be given to
improve weak throughput areas
Mobility/Retainability
Handoff, call drop Specific issues for Handoff, call drops should
be analyzed and optimized accordingly
Worst Area
Analysis for the worst area for
Throughput, SINR, Low coverage etc
Optimization suggestion should be given to
improve worst areas
Cluster System Acceptance Tests
Cluster System Acceptance Tests
RF Design Validation
Handover
Retainability
Accessibility
VoLTE Quality
Index KPI Type of Call Target Value No. of UE's
1
RSRP Coverage per
Morphology
Downlink data long >95% 1
2
No. of Overlapping Server
within 5dB, < 3 Servers
Downlink data long > 90% 1
3
No. of Overlapping Server
within 5dB, < 2 Servers
Downlink data long > 60% 1
4 DL Throughput > 2Mbps Downlink data long > 95% 1
5 Average DL Throughput Downlink data long > 14.5M 1
6 UL Throughput > 256kbps Uplink data long > 95% 1
7
Average UL Throughput
(Mbps)
Uplink data long > 2.5M 1
[JR1]Samsung modified table as per test case agreement between RJIL & Samsung
RF Design Validation Tests
Following test cases shall be conducted & will be mandatory for pass/fail criteria
RSRP by Morphology
Parameter Morphology Criteria
RSRP
Dense Urban
> -107dBm for 95% of
samples
Medium Urban
> -110dBm for 95% of
samples
SubUrban
> -113dBm for 95% of
samples
Rural
> -116dBm for 95% of
samples
Handover Test
Index KPI Type of Call Target Value No. of UE's
11 Handover Success Rate
Downlink data
long + Uplink data
long + VoLTE long
> 98% 3
12
Handover Interruption
Time
< 50ms + UE Switching
Time
Downlink data
long + Uplink data
long + VoLTE long
> 95% 3
Following test cases shall be conducted & will be mandatory for pass/fail criteria
Retainability Test
Index KPI Type of Call Target Value No. of UE's
13 Call Drop Rate*
Downlink data
long + Uplink data
long + VoLTE long
TBD 3
Following test cases shall be conducted & will be mandatory for pass/fail criteria
c
Accessibility Test
Index KPI Type of Call Target Value No. of UE's
14 RACH Success Rate VoLTE Short* TBD 1
15 Attach Success Rate VoLTE Short* TBD 1
16 Detach Success Rate VoLTE Short* TBD 1
17
VoLTE Attach Time < 3.5
sec
VoLTE Short* TBD 1
Following test cases shall be conducted & will be mandatory for pass/fail criteria
VoLTE Quality Test
Index KPI Type of Call Target Value No. of UE's
19
RTP Packet Loss and
Discard Rate
VoLTE Long* TBD 1
20
e2e one way delay <
100ms
VoLTE Long* TBD 1
21
Packet Delay Variation
(Jitter) < 40ms
VoLTE Long* TBD 1
Following test cases shall be conducted & will be mandatory for pass/fail criteria
Cluster optimization procedure v1

Weitere Àhnliche Inhalte

Was ist angesagt?

08. DRIVE TEST Analysis
08. DRIVE TEST Analysis08. DRIVE TEST Analysis
08. DRIVE TEST Analysis
Amit vishwakarma
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysis
a8us
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1
Md.Akm Sahansha
 
1.training lte ran kpi &amp; counters rjil
1.training lte ran kpi &amp; counters rjil1.training lte ran kpi &amp; counters rjil
1.training lte ran kpi &amp; counters rjil
Satish Jadav
 
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
anteneh amsalu
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HO
paulo_campolina
 

Was ist angesagt? (20)

Lte basic parameters
Lte basic parametersLte basic parameters
Lte basic parameters
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
 
08. DRIVE TEST Analysis
08. DRIVE TEST Analysis08. DRIVE TEST Analysis
08. DRIVE TEST Analysis
 
02_LTE_KPI architecture.pdf
02_LTE_KPI architecture.pdf02_LTE_KPI architecture.pdf
02_LTE_KPI architecture.pdf
 
Rf planning for lte using atoll v1
Rf planning for lte using atoll v1Rf planning for lte using atoll v1
Rf planning for lte using atoll v1
 
4g interview-question
4g interview-question4g interview-question
4g interview-question
 
RF Planning and Optimization in GSM and UMTS Networks
RF Planning and Optimization in GSM and UMTS NetworksRF Planning and Optimization in GSM and UMTS Networks
RF Planning and Optimization in GSM and UMTS Networks
 
LTE KPI
LTE KPILTE KPI
LTE KPI
 
LTE Planning
LTE PlanningLTE Planning
LTE Planning
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Wcdma kpi-analysis
Wcdma kpi-analysisWcdma kpi-analysis
Wcdma kpi-analysis
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1
 
Lte signaling
Lte signalingLte signaling
Lte signaling
 
Drive test using tems investation 16.1
Drive test using tems investation 16.1Drive test using tems investation 16.1
Drive test using tems investation 16.1
 
1.training lte ran kpi &amp; counters rjil
1.training lte ran kpi &amp; counters rjil1.training lte ran kpi &amp; counters rjil
1.training lte ran kpi &amp; counters rjil
 
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
toaz.info-zte-fdd-lte-radio-network-optimization-guideline-v14-1-pr_2dc3a4737...
 
UMTS/3G RAN Capacity Management Guideline Part-02 (Sectorization))
UMTS/3G RAN Capacity Management Guideline Part-02 (Sectorization))UMTS/3G RAN Capacity Management Guideline Part-02 (Sectorization))
UMTS/3G RAN Capacity Management Guideline Part-02 (Sectorization))
 
WCDMA RF optimization
WCDMA RF optimizationWCDMA RF optimization
WCDMA RF optimization
 
huawei-lte-kpi-ref
huawei-lte-kpi-refhuawei-lte-kpi-ref
huawei-lte-kpi-ref
 
LTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HOLTE Review - Load Balancing and Interfreq HO
LTE Review - Load Balancing and Interfreq HO
 

Andere mochten auch

SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
mahesh savita
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
Anto Radde
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
Vijay Anand
 
Day 1 LTE Technology Overview
Day 1 LTE Technology OverviewDay 1 LTE Technology Overview
Day 1 LTE Technology Overview
mahesh savita
 
Notes for scft
Notes for scftNotes for scft
Notes for scft
Sunil Verma
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
Vugar Ali
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
bhashker sharma
 
Interference mitigation by dynamic self power control in femtocell
Interference mitigation by dynamic self power control in femtocellInterference mitigation by dynamic self power control in femtocell
Interference mitigation by dynamic self power control in femtocell
Yara Ali
 
aserra_phdthesis_ppt
aserra_phdthesis_pptaserra_phdthesis_ppt
aserra_phdthesis_ppt
aserrapages
 

Andere mochten auch (20)

SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
Rf optimisation
Rf optimisationRf optimisation
Rf optimisation
 
Interview question for 2g,3g,4g
Interview question for 2g,3g,4gInterview question for 2g,3g,4g
Interview question for 2g,3g,4g
 
Day 1 LTE Technology Overview
Day 1 LTE Technology OverviewDay 1 LTE Technology Overview
Day 1 LTE Technology Overview
 
Notes for scft
Notes for scftNotes for scft
Notes for scft
 
Lte optimization
Lte optimizationLte optimization
Lte optimization
 
Chap 5. lsm overview and practice
Chap 5. lsm overview and practiceChap 5. lsm overview and practice
Chap 5. lsm overview and practice
 
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-enE nodeb commissioning guide(v100r005c00 04)(pdf)-en
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
 
Radio Measurements in LTE
Radio Measurements in LTERadio Measurements in LTE
Radio Measurements in LTE
 
RF Planning & Optimization
RF Planning & OptimizationRF Planning & Optimization
RF Planning & Optimization
 
Tti bundling in fdd and tdd
Tti bundling in fdd and tddTti bundling in fdd and tdd
Tti bundling in fdd and tdd
 
Bhashker_sharma_CV
Bhashker_sharma_CVBhashker_sharma_CV
Bhashker_sharma_CV
 
Interference mitigation by dynamic self power control in femtocell
Interference mitigation by dynamic self power control in femtocellInterference mitigation by dynamic self power control in femtocell
Interference mitigation by dynamic self power control in femtocell
 
Cluster DT sample report
Cluster DT sample reportCluster DT sample report
Cluster DT sample report
 
aserra_phdthesis_ppt
aserra_phdthesis_pptaserra_phdthesis_ppt
aserra_phdthesis_ppt
 
Palapa ring
Palapa ringPalapa ring
Palapa ring
 
Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901Chap 3. e nb hardware description stc_ed01_0901
Chap 3. e nb hardware description stc_ed01_0901
 
SCFT report
SCFT reportSCFT report
SCFT report
 
Handover 3g
Handover 3gHandover 3g
Handover 3g
 

Ähnlich wie Cluster optimization procedure v1

Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011
Muhammad Noor Ifansyah
 
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
Malik Md Nurani
 
Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1
elipetso
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
usman ghani
 
syed mohsin ali Resume.
syed mohsin ali Resume.syed mohsin ali Resume.
syed mohsin ali Resume.
Syed Mohsin Ali
 
AQM performance for VOIP
AQM performance for VOIPAQM performance for VOIP
AQM performance for VOIP
Makkawy khair
 

Ähnlich wie Cluster optimization procedure v1 (20)

FIELD TESTING of 2G 3G Devices.ppt
FIELD TESTING  of 2G 3G Devices.pptFIELD TESTING  of 2G 3G Devices.ppt
FIELD TESTING of 2G 3G Devices.ppt
 
Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011Qualcomm lte-performance-challenges-09-01-2011
Qualcomm lte-performance-challenges-09-01-2011
 
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0W(level3) wcdma rno rf optimization-20041217-a-1[1].0
W(level3) wcdma rno rf optimization-20041217-a-1[1].0
 
wcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-librewcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-libre
 
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
wcdma-drive-test-analysis-ppt-libre-150315071837-conversion-gate01
 
Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014
 
Michael Monaghan - Evolution of New Feature Verification in 3G Networks
Michael Monaghan - Evolution of New Feature Verification in 3G NetworksMichael Monaghan - Evolution of New Feature Verification in 3G Networks
Michael Monaghan - Evolution of New Feature Verification in 3G Networks
 
2 g test procedures
2 g test procedures2 g test procedures
2 g test procedures
 
AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014
 
393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptx393575910-318163030-E2E-VOLTE-pptx.pptx
393575910-318163030-E2E-VOLTE-pptx.pptx
 
2 g dt and mapinfo
2 g dt and mapinfo2 g dt and mapinfo
2 g dt and mapinfo
 
ATE Testers Overview
ATE Testers OverviewATE Testers Overview
ATE Testers Overview
 
VoLTE Service Monitoring - VoLTE Voice Call
VoLTE Service Monitoring - VoLTE Voice CallVoLTE Service Monitoring - VoLTE Voice Call
VoLTE Service Monitoring - VoLTE Voice Call
 
SWIFT: Tango's Infrastructure For Real-Time Video Call Service
SWIFT: Tango's Infrastructure For Real-Time Video Call ServiceSWIFT: Tango's Infrastructure For Real-Time Video Call Service
SWIFT: Tango's Infrastructure For Real-Time Video Call Service
 
Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1Specification and key points for gprs&edge cqt&dt v1.1
Specification and key points for gprs&edge cqt&dt v1.1
 
Automotive Ethernet: Physical Layer Compliance Testing Webinar Slides
Automotive Ethernet: Physical Layer Compliance Testing Webinar SlidesAutomotive Ethernet: Physical Layer Compliance Testing Webinar Slides
Automotive Ethernet: Physical Layer Compliance Testing Webinar Slides
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
 
syed mohsin ali Resume.
syed mohsin ali Resume.syed mohsin ali Resume.
syed mohsin ali Resume.
 
LTE-Qualcomm EMERSON EDUARDO RODRIGUES
LTE-Qualcomm EMERSON EDUARDO RODRIGUESLTE-Qualcomm EMERSON EDUARDO RODRIGUES
LTE-Qualcomm EMERSON EDUARDO RODRIGUES
 
AQM performance for VOIP
AQM performance for VOIPAQM performance for VOIP
AQM performance for VOIP
 

Mehr von Terra Sacrifice (17)

Smallcellsforumforjason 150318164026-conversion-gate01
Smallcellsforumforjason 150318164026-conversion-gate01Smallcellsforumforjason 150318164026-conversion-gate01
Smallcellsforumforjason 150318164026-conversion-gate01
 
Hwlte rf-optimization-guide-140704020836-phpapp02
Hwlte rf-optimization-guide-140704020836-phpapp02Hwlte rf-optimization-guide-140704020836-phpapp02
Hwlte rf-optimization-guide-140704020836-phpapp02
 
Introduction to-telecommunication-rf
Introduction to-telecommunication-rfIntroduction to-telecommunication-rf
Introduction to-telecommunication-rf
 
Drivetest training znix team
Drivetest training znix teamDrivetest training znix team
Drivetest training znix team
 
Sdcch drop rate
Sdcch drop rateSdcch drop rate
Sdcch drop rate
 
Wcdmaphysicallayer 111120031701-phpapp02
Wcdmaphysicallayer 111120031701-phpapp02Wcdmaphysicallayer 111120031701-phpapp02
Wcdmaphysicallayer 111120031701-phpapp02
 
2gcaseanalsyishandover training
2gcaseanalsyishandover training2gcaseanalsyishandover training
2gcaseanalsyishandover training
 
Basic gsm ok
Basic gsm okBasic gsm ok
Basic gsm ok
 
Rf bts configurations v1
Rf bts configurations v1Rf bts configurations v1
Rf bts configurations v1
 
Ericsson optimization opti
Ericsson optimization optiEricsson optimization opti
Ericsson optimization opti
 
Case analysis call drop
Case analysis call dropCase analysis call drop
Case analysis call drop
 
Wcdma channels
Wcdma channelsWcdma channels
Wcdma channels
 
Huawei umts o&m planning and configuration
Huawei umts o&m planning and configurationHuawei umts o&m planning and configuration
Huawei umts o&m planning and configuration
 
49529487 abis-interface
49529487 abis-interface49529487 abis-interface
49529487 abis-interface
 
Basic gsm ok
Basic gsm okBasic gsm ok
Basic gsm ok
 
Rf bts configurations v1
Rf bts configurations v1Rf bts configurations v1
Rf bts configurations v1
 
Rf radio parameters
Rf radio parametersRf radio parameters
Rf radio parameters
 

KĂŒrzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

KĂŒrzlich hochgeladen (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 

Cluster optimization procedure v1

  • 2. Course Name: SCFT Procedure Course Objective This module will enable participants to understand how to conduct Cluster Optimization Drive Who should attend RF / DT engineers, Riggers Morning Session (10:30am to 1:30pm) Lunchbreak Afternoon Session (2:30pm to 6pm) Day 1 ‱XCAL Demonstration ‱ Hands on exercises
  • 3. Good to know Keep your mobile phone in the silent mode during the session Need to sign attendance sheet at the start and end of each day At the end of each training post test will be conducted Stick to break timings Your valuable feedback will be taken at the end to enhance training experience For logistics support contact the co-ordinator
  • 4. Agenda Introduction  Cluster Optimization Test Entrance Criteria  High level process  Drive Route Selection Test Procedure  Types of tests  Checklist for cluster optimization Cluster System Acceptance Test  RF Design Validation  Handover Test  Retainability Test  Accessibility Test  VoLTE Quality
  • 5. Introduction to Cluster Optimization
  • 6. Cluster Optimization Test Entrance Criteria Cluster Definition  Minimum of 20 to 30 eNB’s  Contiguous coverage  Can cross TA boundaries Test entrance criteria  At least 80% of the eNB’s in the test cluster shall have passed SCFT and shall have compliance with EMF norms  SCFT and EMF compliance report for each eNB for the test cluster has to be verified  Any changes to the eNB physical configuration required for EMF compliance shall be updated in the cluster database ((( ((( ((( ((( ((( ((( ((( ((( ((( (((
  • 7. Cluster Optimization High-level Process Drive 1 ‱ First cluster drive after 80 % of the sites pass SCFT & EMF Optimization ‱ Post-analysis changes to network Drive 2 ‱ Second Drive Test result will be compared with the first Drive Test for worst areas by measuring entire signal environment after change in System Parameters and adjustments of Antenna
  • 8. Drive Route Selection UE should be served by all sectors of every eNB in the cluster Include highways, major and minor roads in the cluster Route should represent potential subscriber usage locations Should not leave the designed coverage area for the cluster First and second drive routes should remain identical Conditions (e.g. UE position) should be identical between drives Do not cross 40 kmph
  • 9. SCFT + Cluster Drive Case Suppose an eNB comes on-air after the rest of the cluster For that site, SCFT & Cluster optimization drive test should be done till first tier neighbors for the site
  • 10. Drive Route for late on-air site B B 1. Drive route for Cluster when Site B is not on Air 2. Drive route for Sub Cluster after Site B is on Air
  • 12. Tests to be conducted FTP Downlink Long Call FTP Uplink Long Call VoLTE Long Call VoLTE Short Call4 UE’s : 1 Master, 3 Slaves
  • 13. FTP Downlink Long Call Ensure that OCNS is enabled for all eNBs in the cluster with 76% downlink load Ensure that the UE is successfully attached to the LTE network Select the appropriate UE and download the FTP DL Scenario from FMS Start the Autocall test. FTP download uses a single file with the highest possible compression and file size of 8GB. (Attach to detach - 60 min & 10 Sec Idle time) Ensure that the log files are being captured Start traversing around the pre-defined drive route at 30-40 Kmph, continuing the FTP download and reinitiating in case of call drop At the end of the drive route stop the logging and ensure that the log files are uploaded
  • 14. FTP Uplink Long Call Ensure that OCNS is enabled for all eNBs in the cluster with 76% downlink load Ensure that the UE is successfully attached to the LTE network Select the appropriate UE and download the FTP UL Scenario from FMS Start the Autocall test. FTP UL uses a single file of highest possible compression and file size of 1GB. ( Attach to detach - 60 min & 10 Sec Idle time) Ensure that the log files are being captured Start traversing around the pre-defined drive route at 30-40 Kmph, continuing the FTP upload and reinitiating in case of call drop At the end of the drive route stop the logging and ensure that the log files are uploaded
  • 15. VoLTE Long Call Ensure that OCNS is enabled for all eNBs in the cluster with 76% downlink load Ensure that the UE is successfully attached to the LTE network and successfully registered for VoLTE service Select the appropriate UE and download the VoLTE Long call Scenario from FMS Start the Autocall test. Ensure that the log files are being captured Start traversing around the pre-defined drive route at 30-40 Kmph, continuing the long call and reinitiating in case of call drop At the end of the drive route stop the logging and ensure that the log files are uploaded
  • 16. VoLTE Short Call Ensure that OCNS is enabled for all eNBs in the cluster with 76% downlink load Ensure that the UE is successfully attached to the LTE network and successfully registered for VoLTE service Select the appropriate UE and download the VoLTE Short call Scenario from FMS Start the Autocall test. Ensure that the log files are being captured Start traversing around the pre-defined drive route at 30-40 Kmph, continuing the short calls At the end of the drive route stop the logging and ensure that the log files are uploaded
  • 17. Checklist for Cluster Optimization Items Parameter Action Test Call FTP Test Call Upload & Download Before starting drive test make a test call Ping Google server Ping from command prompt Before starting drive test try ping test OCNS Loading Loading effect 76% in the downlink Before starting drive test Site Coverage Analysis of RSRP,SINR plot, PCI plot Optimization suggestions will be given after post processing of 1st drive test Sector Overshooting 1. Analysis based on each sector coverage area and handover till adjacent cluster boundary 2.SCFT report should be considered for reference Optimization suggestions should be given and which will be implemented after 1st drive test in Cluster optimization Coverage overlapping Analysis based on each sector coverage area using PCI plot of serving cell Optimization suggestions should be given to reduce coverage overlapping and which will be implemented in after 1st drive test in Cluster optimization Accessibility Attach success rate, RACH success rate, Tracking area update success rate KPI analysis w.r.t benchmark and optimization after 1st drive test Quality check Analysis for weak DL & UL throughput areas. Analysis based on interference, overlapping, Handoff issues, SINR, hardware issues etc Optimization suggestion should be given to improve weak throughput areas Mobility/Retainability Handoff, call drop Specific issues for Handoff, call drops should be analyzed and optimized accordingly Worst Area Analysis for the worst area for Throughput, SINR, Low coverage etc Optimization suggestion should be given to improve worst areas
  • 19. Cluster System Acceptance Tests RF Design Validation Handover Retainability Accessibility VoLTE Quality
  • 20. Index KPI Type of Call Target Value No. of UE's 1 RSRP Coverage per Morphology Downlink data long >95% 1 2 No. of Overlapping Server within 5dB, < 3 Servers Downlink data long > 90% 1 3 No. of Overlapping Server within 5dB, < 2 Servers Downlink data long > 60% 1 4 DL Throughput > 2Mbps Downlink data long > 95% 1 5 Average DL Throughput Downlink data long > 14.5M 1 6 UL Throughput > 256kbps Uplink data long > 95% 1 7 Average UL Throughput (Mbps) Uplink data long > 2.5M 1 [JR1]Samsung modified table as per test case agreement between RJIL & Samsung RF Design Validation Tests Following test cases shall be conducted & will be mandatory for pass/fail criteria
  • 21. RSRP by Morphology Parameter Morphology Criteria RSRP Dense Urban > -107dBm for 95% of samples Medium Urban > -110dBm for 95% of samples SubUrban > -113dBm for 95% of samples Rural > -116dBm for 95% of samples
  • 22. Handover Test Index KPI Type of Call Target Value No. of UE's 11 Handover Success Rate Downlink data long + Uplink data long + VoLTE long > 98% 3 12 Handover Interruption Time < 50ms + UE Switching Time Downlink data long + Uplink data long + VoLTE long > 95% 3 Following test cases shall be conducted & will be mandatory for pass/fail criteria
  • 23. Retainability Test Index KPI Type of Call Target Value No. of UE's 13 Call Drop Rate* Downlink data long + Uplink data long + VoLTE long TBD 3 Following test cases shall be conducted & will be mandatory for pass/fail criteria c
  • 24. Accessibility Test Index KPI Type of Call Target Value No. of UE's 14 RACH Success Rate VoLTE Short* TBD 1 15 Attach Success Rate VoLTE Short* TBD 1 16 Detach Success Rate VoLTE Short* TBD 1 17 VoLTE Attach Time < 3.5 sec VoLTE Short* TBD 1 Following test cases shall be conducted & will be mandatory for pass/fail criteria
  • 25. VoLTE Quality Test Index KPI Type of Call Target Value No. of UE's 19 RTP Packet Loss and Discard Rate VoLTE Long* TBD 1 20 e2e one way delay < 100ms VoLTE Long* TBD 1 21 Packet Delay Variation (Jitter) < 40ms VoLTE Long* TBD 1 Following test cases shall be conducted & will be mandatory for pass/fail criteria