TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
February 8th, 2013
FRANCO BERTONE
Telecom Italia - Telecom Argentina
Full-Year 2012 Preliminary Results and 2013-15
Plan Outline
1
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Safe Harbour
These presentations contain statements that constitute forward-looking statements within the meaning of
the Private Securities Litigation Reform Act of 1995. These statements appear in a number of places in
this presentation and include statements regarding the intent, belief or current expectations of the
customer base, estimates regarding future growth in the different business lines and the global business,
market share, financial results and other aspects of the activities and situation relating to the Company
and the Group.
Such forward looking statements are not guarantees of future performance and involve risks and
uncertainties, and actual results may differ materially from those projected or implied in the forward
looking statements as a result of various factors. . As a result thereof, Telecom Italia S.p.A. makes no
representation, whether express or implied, as to the conformity of the actual results with those projected
in the forward looking statement.
Forward-looking information is based on certain key assumptions which we believe to be reasonable as of
the date hereof, but forward looking information by its nature involves risks and uncertainties, which are
outside our control, and could significantly affect expected results.
Analysts are cautioned not to place undue reliance on those forward looking statements, which speak
only as of the date of this presentation. Telecom Italia S.p.A. undertakes no obligation to release publicly
the results of any revisions to these forward looking statements which may be made to reflect events and
circumstances after the date of this presentation, including, without limitation, changes in Telecom Italia
S.p.A. business or acquisition strategy or planned capital expenditures or to reflect the occurrence of
unanticipated events. Analysts and investors are encouraged to consult the Company's Annual Report on
Form 20-F as well as periodic filings made on Form 6-K, which are on file with the United States Securities
and Exchange Commission.
2
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Agenda
BU Argentina 2012 Preliminary Results (IFRS)
Telecom Argentina Plan
Take-aways on main Telecom Argentina Trends
3
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
2012 Main Preliminary Results
2,8042,324
896
980
0
FY11 FY12
3,784
3,220
4Q
9M 759
825
276
296
FY11 FY12
1,121
1,035
4Q
9M
EBITDARevenues
Key Highlights CAPEX and NFP
CAPEX NFP (cash)
417
563556 557
Reported € mln Reported € mln
Reported € mln
FY11 FY12 FY11 FY12
 Strong revenues and EBITDA growth in line with targets
despite of slowing economy
 Fixed-Mobile network integration proven key to success
 Capex freed due to cancelled spectrum auction,
reassigned to additional access network deployment
 Strong cash flow generation and solid financial position
with no debt instruments in foreign currency
FY12
Adjusted*
825
311
1,136
* Net of Exceptional Items
+564M€
+17.5%
+9.4%
+20.7%
+86M€
+8.3%
+7.2%
+8.7%
+101M€
+9.8%
+12.7%
+8.7%
organic +18.5%
organic +19.6%
organic +21.8%
organic +11.7%
4
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Mobile Business
2012 HighlightsMobile Customers & Revenue Share
KPI’s Service Revenues & VAS(1)(3)
 Consistent net port-ins leadership in MNP first year
 Postpaid contracts 58% of total net adds and 83% of
port-ins
 Growing share of smart/3G handsets (>90% of 4Q12
sellouts)
 12% YoY ARPU growth despite prices adjustment
limited to postpaid in 4Q12 only
 Upgrade to 3G handset for improved spectrum usage
efficiency and data service
 VAS growth affected by frequency spectrum shortage
 Consolidation of Personal Black premium brand
101
222
102
299
99
322
41
44
51
2009 2010 2011
MOU SMS ARPU (AR$)
(1) Argentinean Operation (2) Estimated data (3) Net of intercompany
58
99
309
2012
+33%
+46%
+55%
+21%
+24%
+30%
2.3 3.4
5.3
4.5
5.1
5.76.8
8.5
11.0
2009 2010 2011
VAS Revenues (bAR$)Non-VAS Revenues (bAR$)
+10%
+13%
+13%
VAS includes: SMS, MMS, SMS revenue sharing, Contents, Mobile internet & others
Figures are in Argentina GAAP, with no material difference in terms of growth under IFRS for
2009, 2010 2011 and 2012.
7.0
6.3
13.3
2012
14.5
16.3
18.2 18.9 19.0
29.9% 31.1%
33.5% 34.5%
2009 2010 2011 3Q12 4Q12
Mln. Rev.Sh.(2)
5
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Wireline Business
2012 HighlightsBB Access & ARPU
BB Churn BB/Fixed Lines
 Deploying FTTC to improve Bandwidth and effectively
compete with CATV
 Upselling of bandwidth upgrades and video streaming
 Increasing ICT orders backlog
 Voice and wireline/mobile broadband product bundling
 Flat pricing to mitigate impact of regulated tariffs
 Broadband ARPU growth 18% YoY in 2012
2012
39%
2011
37%
2009
30%
2010
34%
2009 2010 2011 2012
1.8% 1.4% 1.2% 1.4%
1.21 1.38 1.55 1.63
67
76
87
102
BB Access Lines Mln
BB ARPU (AR$)
2009 2010 2011 2012
6
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Telecom Argentina Full Year Results vs. Guidance
FY12 Results
22.1 Bln
+19.6% vs. FY11
6.6 Bln
+9.6% vs. FY11 reported
+11.1% vs. FY11 adjusted (*)
(*) excluding non-recurring costs
3.3 Bln
+2% Vs. FY11
15% of Revenues
delays in clearing customs for
equipment imports affected target
Guidance FY12
2011 2012
Positive
double digit
yoy trend
2011 2012
Positive
double digit
yoy trend
Capex as %
of Revenues
17%
2011 2012
18%
Revenues
Ebitda
Capex
Telecom Argentina Group, excluding Nortel/Sofora, excluding PPA, AR$
3.2
4.0
7
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Agenda
BU Argentina 2012 Preliminary Results (IFRS)
Telecom Argentina Plan
Take-aways on main Telecom Argentina Trends
8
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Mobile
ICT
Wireline Broadband
Wireline Voice
Business Environment
Competitive & Regulatory FrameworkMacroeconomic Context
2010 2011
9.2% 8.9%
GDPGrowth
(constantprices)
Weak 2012 economic growth impacted business growth
 Exports declined due to a severe drought affecting
the harvest and to lower Brazilian demand
 Increased regulation on the FX market impacted
economic growth
 Reduction in public sectors (energy, transportation)
reduced disposable income
Economy expected to recover in 2013
Source: INDEC and Company estimates
 1.7/2.1 GHz band auction process expected to start
 RAN sharing being considered for LTE
 Competition shifting to revenue share
 MNP winners; strong postpaid performance
 Mobile data leaders
 Sustained value generation
 FTTC network upgrade
 Developing ICT market for governments, private
enterprises and SMEs
2012e
1.8%
2013 f
#1 >34% #2 >32%
Market ShareRevenue Share
#2 ~34%
#2 ~48%
Company Competitive position
Revenue and Market Share among Top 3 Players for Mobile and BB Wirelines; among Top 2 Players
for Voice Wirelines.
Among main Players
9
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Mobile Business: Main Goals and Action Plan
ARPU
(AR$ per month)
Mobile Lines
(Million)
Action Plan
Goals Outlook (1)
18.2
19.0
51
58
2011 2012 2015
2011 2012 2015
Improve Customer Experience
Focus on quality of service
Multichannel approach and self caring
Social networking to get closer to the customer
Bundle of products and upselling
Cagr ’12 -’15
~+4%
Consolidate Revenue Share Leadership
Promote Mobile Internet across the customer base
Consolidate Leadership in Youth Segment
Outlook (1)
Cagr ’12 -’15
~+12%
(1) Argentinean Operations only
10
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Wireline Business: Main Goals and Action Plan
ARPU
(AR$ per month)
Fixed BB Lines
(Million)
Action Plan
Goals
1.55
1.63
87
102
2011 2012 2015
2011 2012 2015
Increase BB penetration of the existing customer base
Continue the FTTC deployment
Improve core network capacity and quality of service
Integrate connectivity with Hosting and Cloud Computing
Develop video streaming and content delivery
(1) Argentinean Operations only
Cagr ’12 -’15
~4%
Consolidate leadership in ICT market
Improve service provision
Improve network delivery
Outlook (1)
Cagr ’12 -’15
~+15%
Outlook (1)
11
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
CAPEX Plan
Key DriversCapex (AR$, in billion)
 Upgrade Mobile Access Network capacity and service
delivery
 low visual impact radiobase sites
 2G to 3G spectrum refarming
 6-Sectors cell sites
 extend own network reach to reduce roaming
 Deploy Content Delivery Network
 Full-speed FTTC deployment
 Improve Core Network capacity and fault tolerance
 Upgrade Data Centre hosting and cloud computing
capabilities
Capex as %
of Revenues
15%
2012 2013
17%
3.3
4.7
2015
12
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Agenda
BU Argentina 2012 Preliminary Results (IFRS)
Telecom Argentina Plan
Take-aways on main Telecom Argentina Trends
13
TELECOM ITALIA CONFERENCE CALL
Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
FRANCO BERTONE
Take-aways on main Telecom Argentina Trends
 Improve Customer Experience
 Promote Mobile Data
 Increase Broadband Wireline Penetration
 Improve Quality of Service and Customer Experience to
control Operation Costs
 Leverage on Mobile Leadership to control
Acquisition/Retention Costs
 Streamline overhead expenses
 Focus on delivered Network Service Quality
 Extend Reach and Capacity of Mobile Access
 Deploy FTTC
2012 2013
Positive
double digit
yoy trend
2012 2013
Positive
double digit
yoy trend
2012 2015
Revenues
Ebitda
Capex
Capex/Revenues
growing trend

Weitere ähnliche Inhalte

Was ist angesagt?

FY 2015 Preliminary Results & 2016-2018 Plan Update
FY 2015 Preliminary Results & 2016-2018 Plan UpdateFY 2015 Preliminary Results & 2016-2018 Plan Update
FY 2015 Preliminary Results & 2016-2018 Plan UpdateGruppo TIM
 
3Q 2015 Financial Results
3Q 2015 Financial Results 3Q 2015 Financial Results
3Q 2015 Financial Results Gruppo TIM
 
9M 2014 Results
9M 2014 Results9M 2014 Results
9M 2014 ResultsGruppo TIM
 
Telecom Italia Group FY 2013 Results - Marco Patuano
Telecom Italia Group FY 2013 Results - Marco PatuanoTelecom Italia Group FY 2013 Results - Marco Patuano
Telecom Italia Group FY 2013 Results - Marco PatuanoGruppo TIM
 
TIM 2Q'16 Results
TIM 2Q'16 ResultsTIM 2Q'16 Results
TIM 2Q'16 ResultsGruppo TIM
 
Half-Year Financial Report at June 30, 2015
Half-Year Financial Report at June 30, 2015Half-Year Financial Report at June 30, 2015
Half-Year Financial Report at June 30, 2015Gruppo TIM
 
dbAccess TMT Conference
dbAccess TMT ConferencedbAccess TMT Conference
dbAccess TMT ConferenceGruppo TIM
 
Telecom Italia 1H 2013 Results - Operations - Marco Patuano
Telecom Italia 1H 2013 Results - Operations - Marco PatuanoTelecom Italia 1H 2013 Results - Operations - Marco Patuano
Telecom Italia 1H 2013 Results - Operations - Marco PatuanoGruppo TIM
 
Company Presentation, June 2015
Company Presentation, June 2015Company Presentation, June 2015
Company Presentation, June 2015Gruppo TIM
 
Interim Management Report
Interim Management Report Interim Management Report
Interim Management Report Gruppo TIM
 
Annual report 2015
Annual report 2015Annual report 2015
Annual report 2015Gruppo TIM
 
Telecom Italia 1H 2013 Results - Franco Bernabè
Telecom Italia 1H 2013 Results - Franco BernabèTelecom Italia 1H 2013 Results - Franco Bernabè
Telecom Italia 1H 2013 Results - Franco BernabèGruppo TIM
 
Telecom Italia Group 1H 2014 Results
Telecom Italia Group 1H 2014 ResultsTelecom Italia Group 1H 2014 Results
Telecom Italia Group 1H 2014 ResultsGruppo TIM
 
Telecom Italia 1H 2013 Results - Piergiorgio Peluso
Telecom Italia 1H 2013 Results - Piergiorgio PelusoTelecom Italia 1H 2013 Results - Piergiorgio Peluso
Telecom Italia 1H 2013 Results - Piergiorgio PelusoGruppo TIM
 
Interim Report at September 30, 2015
Interim Report at September 30, 2015Interim Report at September 30, 2015
Interim Report at September 30, 2015Gruppo TIM
 
Report on Corporate Governance 2015
Report on Corporate Governance 2015Report on Corporate Governance 2015
Report on Corporate Governance 2015Gruppo TIM
 
Nokia q3 2018_slides
Nokia q3 2018_slidesNokia q3 2018_slides
Nokia q3 2018_slidesAqeel Ahmad
 
TIM Brasil 2013-2015 Plan Outline - Franco Bernabè
TIM Brasil 2013-2015 Plan Outline - Franco BernabèTIM Brasil 2013-2015 Plan Outline - Franco Bernabè
TIM Brasil 2013-2015 Plan Outline - Franco BernabèGruppo TIM
 
Telecom Italia 3Q 2010 Results - Domestic Market
Telecom Italia 3Q 2010 Results - Domestic MarketTelecom Italia 3Q 2010 Results - Domestic Market
Telecom Italia 3Q 2010 Results - Domestic MarketGruppo TIM
 

Was ist angesagt? (19)

FY 2015 Preliminary Results & 2016-2018 Plan Update
FY 2015 Preliminary Results & 2016-2018 Plan UpdateFY 2015 Preliminary Results & 2016-2018 Plan Update
FY 2015 Preliminary Results & 2016-2018 Plan Update
 
3Q 2015 Financial Results
3Q 2015 Financial Results 3Q 2015 Financial Results
3Q 2015 Financial Results
 
9M 2014 Results
9M 2014 Results9M 2014 Results
9M 2014 Results
 
Telecom Italia Group FY 2013 Results - Marco Patuano
Telecom Italia Group FY 2013 Results - Marco PatuanoTelecom Italia Group FY 2013 Results - Marco Patuano
Telecom Italia Group FY 2013 Results - Marco Patuano
 
TIM 2Q'16 Results
TIM 2Q'16 ResultsTIM 2Q'16 Results
TIM 2Q'16 Results
 
Half-Year Financial Report at June 30, 2015
Half-Year Financial Report at June 30, 2015Half-Year Financial Report at June 30, 2015
Half-Year Financial Report at June 30, 2015
 
dbAccess TMT Conference
dbAccess TMT ConferencedbAccess TMT Conference
dbAccess TMT Conference
 
Telecom Italia 1H 2013 Results - Operations - Marco Patuano
Telecom Italia 1H 2013 Results - Operations - Marco PatuanoTelecom Italia 1H 2013 Results - Operations - Marco Patuano
Telecom Italia 1H 2013 Results - Operations - Marco Patuano
 
Company Presentation, June 2015
Company Presentation, June 2015Company Presentation, June 2015
Company Presentation, June 2015
 
Interim Management Report
Interim Management Report Interim Management Report
Interim Management Report
 
Annual report 2015
Annual report 2015Annual report 2015
Annual report 2015
 
Telecom Italia 1H 2013 Results - Franco Bernabè
Telecom Italia 1H 2013 Results - Franco BernabèTelecom Italia 1H 2013 Results - Franco Bernabè
Telecom Italia 1H 2013 Results - Franco Bernabè
 
Telecom Italia Group 1H 2014 Results
Telecom Italia Group 1H 2014 ResultsTelecom Italia Group 1H 2014 Results
Telecom Italia Group 1H 2014 Results
 
Telecom Italia 1H 2013 Results - Piergiorgio Peluso
Telecom Italia 1H 2013 Results - Piergiorgio PelusoTelecom Italia 1H 2013 Results - Piergiorgio Peluso
Telecom Italia 1H 2013 Results - Piergiorgio Peluso
 
Interim Report at September 30, 2015
Interim Report at September 30, 2015Interim Report at September 30, 2015
Interim Report at September 30, 2015
 
Report on Corporate Governance 2015
Report on Corporate Governance 2015Report on Corporate Governance 2015
Report on Corporate Governance 2015
 
Nokia q3 2018_slides
Nokia q3 2018_slidesNokia q3 2018_slides
Nokia q3 2018_slides
 
TIM Brasil 2013-2015 Plan Outline - Franco Bernabè
TIM Brasil 2013-2015 Plan Outline - Franco BernabèTIM Brasil 2013-2015 Plan Outline - Franco Bernabè
TIM Brasil 2013-2015 Plan Outline - Franco Bernabè
 
Telecom Italia 3Q 2010 Results - Domestic Market
Telecom Italia 3Q 2010 Results - Domestic MarketTelecom Italia 3Q 2010 Results - Domestic Market
Telecom Italia 3Q 2010 Results - Domestic Market
 

Ähnlich wie Telecom Argentina Full-Year 2012 Preliminary Results and 2013-2015 Plan Outline - Franco Bertone

Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio Peluso
Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio PelusoTelecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio Peluso
Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio PelusoGruppo TIM
 
Telecom Italia 3Q 2012 Results – Operations – Marco Patuano
Telecom Italia 3Q 2012 Results – Operations – Marco PatuanoTelecom Italia 3Q 2012 Results – Operations – Marco Patuano
Telecom Italia 3Q 2012 Results – Operations – Marco PatuanoGruppo TIM
 
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio Peluso
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio PelusoTelecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio Peluso
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio PelusoGruppo TIM
 
Comunicado Telecom Italia
Comunicado Telecom ItaliaComunicado Telecom Italia
Comunicado Telecom Italiaradiobrisas
 
Telecom Italia 3Q 2010 Results
Telecom Italia 3Q 2010 ResultsTelecom Italia 3Q 2010 Results
Telecom Italia 3Q 2010 ResultsGruppo TIM
 
Deutsche Telekom Q1/13 Results
Deutsche Telekom Q1/13 ResultsDeutsche Telekom Q1/13 Results
Deutsche Telekom Q1/13 ResultsDeutsche Telekom
 
Deutsche Telekom CMD 2015 - Europe
Deutsche Telekom CMD 2015 - EuropeDeutsche Telekom CMD 2015 - Europe
Deutsche Telekom CMD 2015 - EuropeDeutsche Telekom
 
1Q 2015 Financial Results
1Q 2015 Financial Results1Q 2015 Financial Results
1Q 2015 Financial ResultsGruppo TIM
 
PT\'s 4Q10 earnings presentation
PT\'s 4Q10 earnings presentationPT\'s 4Q10 earnings presentation
PT\'s 4Q10 earnings presentationNuno Vieira
 
Deutsche Telekom Q4/13 Results
Deutsche Telekom Q4/13 ResultsDeutsche Telekom Q4/13 Results
Deutsche Telekom Q4/13 ResultsDeutsche Telekom
 
Deutsche Telekom Q2/13 Results
Deutsche Telekom Q2/13 ResultsDeutsche Telekom Q2/13 Results
Deutsche Telekom Q2/13 ResultsDeutsche Telekom
 
Deutsche Telekom Q3/13 Results
Deutsche Telekom Q3/13 ResultsDeutsche Telekom Q3/13 Results
Deutsche Telekom Q3/13 ResultsDeutsche Telekom
 
Tim part industrial plan 2014-16
Tim part   industrial plan 2014-16Tim part   industrial plan 2014-16
Tim part industrial plan 2014-16TIM RI
 
TIM 1Q16 Results
TIM 1Q16 ResultsTIM 1Q16 Results
TIM 1Q16 ResultsGruppo TIM
 
3Q and 9M Results Presentation- November 08th 2013
3Q and 9M Results Presentation- November 08th 20133Q and 9M Results Presentation- November 08th 2013
3Q and 9M Results Presentation- November 08th 2013Leonardo
 
TIM Group Q3 '21 Results - Leading the Country's digitalization
TIM Group Q3 '21 Results - Leading the Country's digitalizationTIM Group Q3 '21 Results - Leading the Country's digitalization
TIM Group Q3 '21 Results - Leading the Country's digitalizationGruppo TIM
 
Deutsche Bank 23rd Annual Leveraged Finance Conference
Deutsche Bank 23rd Annual Leveraged Finance ConferenceDeutsche Bank 23rd Annual Leveraged Finance Conference
Deutsche Bank 23rd Annual Leveraged Finance ConferenceLevel3_Communications
 
Telecom Italia - Interim Report at March 31, 2015
Telecom Italia - Interim Report at March 31, 2015Telecom Italia - Interim Report at March 31, 2015
Telecom Italia - Interim Report at March 31, 2015Gruppo TIM
 
Full Year 2020 results and 2021-23 plan
Full Year 2020 results and 2021-23 planFull Year 2020 results and 2021-23 plan
Full Year 2020 results and 2021-23 planGruppo TIM
 
Tele2 Q4 2010 report
Tele2 Q4 2010 report Tele2 Q4 2010 report
Tele2 Q4 2010 report Tele2
 

Ähnlich wie Telecom Argentina Full-Year 2012 Preliminary Results and 2013-2015 Plan Outline - Franco Bertone (20)

Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio Peluso
Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio PelusoTelecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio Peluso
Telecom Italia 1Q 2013 Results - Franco Bernabè, Piergiorgio Peluso
 
Telecom Italia 3Q 2012 Results – Operations – Marco Patuano
Telecom Italia 3Q 2012 Results – Operations – Marco PatuanoTelecom Italia 3Q 2012 Results – Operations – Marco Patuano
Telecom Italia 3Q 2012 Results – Operations – Marco Patuano
 
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio Peluso
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio PelusoTelecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio Peluso
Telecom Italia 3Q 2012 Results – Franco Bernabè and Piergiorgio Peluso
 
Comunicado Telecom Italia
Comunicado Telecom ItaliaComunicado Telecom Italia
Comunicado Telecom Italia
 
Telecom Italia 3Q 2010 Results
Telecom Italia 3Q 2010 ResultsTelecom Italia 3Q 2010 Results
Telecom Italia 3Q 2010 Results
 
Deutsche Telekom Q1/13 Results
Deutsche Telekom Q1/13 ResultsDeutsche Telekom Q1/13 Results
Deutsche Telekom Q1/13 Results
 
Deutsche Telekom CMD 2015 - Europe
Deutsche Telekom CMD 2015 - EuropeDeutsche Telekom CMD 2015 - Europe
Deutsche Telekom CMD 2015 - Europe
 
1Q 2015 Financial Results
1Q 2015 Financial Results1Q 2015 Financial Results
1Q 2015 Financial Results
 
PT\'s 4Q10 earnings presentation
PT\'s 4Q10 earnings presentationPT\'s 4Q10 earnings presentation
PT\'s 4Q10 earnings presentation
 
Deutsche Telekom Q4/13 Results
Deutsche Telekom Q4/13 ResultsDeutsche Telekom Q4/13 Results
Deutsche Telekom Q4/13 Results
 
Deutsche Telekom Q2/13 Results
Deutsche Telekom Q2/13 ResultsDeutsche Telekom Q2/13 Results
Deutsche Telekom Q2/13 Results
 
Deutsche Telekom Q3/13 Results
Deutsche Telekom Q3/13 ResultsDeutsche Telekom Q3/13 Results
Deutsche Telekom Q3/13 Results
 
Tim part industrial plan 2014-16
Tim part   industrial plan 2014-16Tim part   industrial plan 2014-16
Tim part industrial plan 2014-16
 
TIM 1Q16 Results
TIM 1Q16 ResultsTIM 1Q16 Results
TIM 1Q16 Results
 
3Q and 9M Results Presentation- November 08th 2013
3Q and 9M Results Presentation- November 08th 20133Q and 9M Results Presentation- November 08th 2013
3Q and 9M Results Presentation- November 08th 2013
 
TIM Group Q3 '21 Results - Leading the Country's digitalization
TIM Group Q3 '21 Results - Leading the Country's digitalizationTIM Group Q3 '21 Results - Leading the Country's digitalization
TIM Group Q3 '21 Results - Leading the Country's digitalization
 
Deutsche Bank 23rd Annual Leveraged Finance Conference
Deutsche Bank 23rd Annual Leveraged Finance ConferenceDeutsche Bank 23rd Annual Leveraged Finance Conference
Deutsche Bank 23rd Annual Leveraged Finance Conference
 
Telecom Italia - Interim Report at March 31, 2015
Telecom Italia - Interim Report at March 31, 2015Telecom Italia - Interim Report at March 31, 2015
Telecom Italia - Interim Report at March 31, 2015
 
Full Year 2020 results and 2021-23 plan
Full Year 2020 results and 2021-23 planFull Year 2020 results and 2021-23 plan
Full Year 2020 results and 2021-23 plan
 
Tele2 Q4 2010 report
Tele2 Q4 2010 report Tele2 Q4 2010 report
Tele2 Q4 2010 report
 

Mehr von Gruppo TIM

Free to Run – TIM Capital Market Day 2024
Free to Run – TIM Capital Market Day 2024Free to Run – TIM Capital Market Day 2024
Free to Run – TIM Capital Market Day 2024Gruppo TIM
 
TIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfTIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfGruppo TIM
 
TIM Q3 ’23 – Delivering and Delayering
TIM Q3 ’23 – Delivering and DelayeringTIM Q3 ’23 – Delivering and Delayering
TIM Q3 ’23 – Delivering and DelayeringGruppo TIM
 
TIM-Q2-2023-Results.pdf
TIM-Q2-2023-Results.pdfTIM-Q2-2023-Results.pdf
TIM-Q2-2023-Results.pdfGruppo TIM
 
TIM Q2 2023 RESULTS
TIM Q2 2023 RESULTSTIM Q2 2023 RESULTS
TIM Q2 2023 RESULTSGruppo TIM
 
TIM-Q1-2023-Results.pdf
TIM-Q1-2023-Results.pdfTIM-Q1-2023-Results.pdf
TIM-Q1-2023-Results.pdfGruppo TIM
 
FY 2022 Preliminary Results and 2023-‘25 Plan
FY 2022 Preliminary Results and 2023-‘25 PlanFY 2022 Preliminary Results and 2023-‘25 Plan
FY 2022 Preliminary Results and 2023-‘25 PlanGruppo TIM
 
TIM GROUP - Q3 '22 results.pdf
TIM GROUP - Q3 '22 results.pdfTIM GROUP - Q3 '22 results.pdf
TIM GROUP - Q3 '22 results.pdfGruppo TIM
 
TIM Group - Q2-2022 Results
TIM Group - Q2-2022 ResultsTIM Group - Q2-2022 Results
TIM Group - Q2-2022 ResultsGruppo TIM
 
TIM Capital Market Day, 7 July 2022
TIM Capital Market Day, 7 July 2022TIM Capital Market Day, 7 July 2022
TIM Capital Market Day, 7 July 2022Gruppo TIM
 
FY-2021-Results-2022-24-Plan.pdf
FY-2021-Results-2022-24-Plan.pdfFY-2021-Results-2022-24-Plan.pdf
FY-2021-Results-2022-24-Plan.pdfGruppo TIM
 
Q1 '22 Results.pdf
Q1 '22 Results.pdfQ1 '22 Results.pdf
Q1 '22 Results.pdfGruppo TIM
 
TIM Q2 '21 results
TIM Q2 '21 resultsTIM Q2 '21 results
TIM Q2 '21 resultsGruppo TIM
 
Q1 '21 results
Q1 '21 resultsQ1 '21 results
Q1 '21 resultsGruppo TIM
 
TIM Group - Sustainability Financing Framework
TIM Group - Sustainability Financing FrameworkTIM Group - Sustainability Financing Framework
TIM Group - Sustainability Financing FrameworkGruppo TIM
 
TIM Group Q3 2020 Results
TIM Group Q3 2020 Results TIM Group Q3 2020 Results
TIM Group Q3 2020 Results Gruppo TIM
 
FiberCop and TIM CPD equity lol
FiberCop and TIM CPD equity lolFiberCop and TIM CPD equity lol
FiberCop and TIM CPD equity lolGruppo TIM
 
Tim Q2-2020-Financial Results
Tim Q2-2020-Financial ResultsTim Q2-2020-Financial Results
Tim Q2-2020-Financial ResultsGruppo TIM
 
TIM Q1'20 financial results
TIM Q1'20 financial resultsTIM Q1'20 financial results
TIM Q1'20 financial resultsGruppo TIM
 
TIM - Capital Market Day 2020
TIM - Capital Market Day 2020TIM - Capital Market Day 2020
TIM - Capital Market Day 2020Gruppo TIM
 

Mehr von Gruppo TIM (20)

Free to Run – TIM Capital Market Day 2024
Free to Run – TIM Capital Market Day 2024Free to Run – TIM Capital Market Day 2024
Free to Run – TIM Capital Market Day 2024
 
TIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdfTIM GROUP FY '23 Preliminary Results.pdf
TIM GROUP FY '23 Preliminary Results.pdf
 
TIM Q3 ’23 – Delivering and Delayering
TIM Q3 ’23 – Delivering and DelayeringTIM Q3 ’23 – Delivering and Delayering
TIM Q3 ’23 – Delivering and Delayering
 
TIM-Q2-2023-Results.pdf
TIM-Q2-2023-Results.pdfTIM-Q2-2023-Results.pdf
TIM-Q2-2023-Results.pdf
 
TIM Q2 2023 RESULTS
TIM Q2 2023 RESULTSTIM Q2 2023 RESULTS
TIM Q2 2023 RESULTS
 
TIM-Q1-2023-Results.pdf
TIM-Q1-2023-Results.pdfTIM-Q1-2023-Results.pdf
TIM-Q1-2023-Results.pdf
 
FY 2022 Preliminary Results and 2023-‘25 Plan
FY 2022 Preliminary Results and 2023-‘25 PlanFY 2022 Preliminary Results and 2023-‘25 Plan
FY 2022 Preliminary Results and 2023-‘25 Plan
 
TIM GROUP - Q3 '22 results.pdf
TIM GROUP - Q3 '22 results.pdfTIM GROUP - Q3 '22 results.pdf
TIM GROUP - Q3 '22 results.pdf
 
TIM Group - Q2-2022 Results
TIM Group - Q2-2022 ResultsTIM Group - Q2-2022 Results
TIM Group - Q2-2022 Results
 
TIM Capital Market Day, 7 July 2022
TIM Capital Market Day, 7 July 2022TIM Capital Market Day, 7 July 2022
TIM Capital Market Day, 7 July 2022
 
FY-2021-Results-2022-24-Plan.pdf
FY-2021-Results-2022-24-Plan.pdfFY-2021-Results-2022-24-Plan.pdf
FY-2021-Results-2022-24-Plan.pdf
 
Q1 '22 Results.pdf
Q1 '22 Results.pdfQ1 '22 Results.pdf
Q1 '22 Results.pdf
 
TIM Q2 '21 results
TIM Q2 '21 resultsTIM Q2 '21 results
TIM Q2 '21 results
 
Q1 '21 results
Q1 '21 resultsQ1 '21 results
Q1 '21 results
 
TIM Group - Sustainability Financing Framework
TIM Group - Sustainability Financing FrameworkTIM Group - Sustainability Financing Framework
TIM Group - Sustainability Financing Framework
 
TIM Group Q3 2020 Results
TIM Group Q3 2020 Results TIM Group Q3 2020 Results
TIM Group Q3 2020 Results
 
FiberCop and TIM CPD equity lol
FiberCop and TIM CPD equity lolFiberCop and TIM CPD equity lol
FiberCop and TIM CPD equity lol
 
Tim Q2-2020-Financial Results
Tim Q2-2020-Financial ResultsTim Q2-2020-Financial Results
Tim Q2-2020-Financial Results
 
TIM Q1'20 financial results
TIM Q1'20 financial resultsTIM Q1'20 financial results
TIM Q1'20 financial results
 
TIM - Capital Market Day 2020
TIM - Capital Market Day 2020TIM - Capital Market Day 2020
TIM - Capital Market Day 2020
 

Kürzlich hochgeladen

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 

Kürzlich hochgeladen (20)

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 

Telecom Argentina Full-Year 2012 Preliminary Results and 2013-2015 Plan Outline - Franco Bertone

  • 1. TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline February 8th, 2013 FRANCO BERTONE Telecom Italia - Telecom Argentina Full-Year 2012 Preliminary Results and 2013-15 Plan Outline
  • 2. 1 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Safe Harbour These presentations contain statements that constitute forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. These statements appear in a number of places in this presentation and include statements regarding the intent, belief or current expectations of the customer base, estimates regarding future growth in the different business lines and the global business, market share, financial results and other aspects of the activities and situation relating to the Company and the Group. Such forward looking statements are not guarantees of future performance and involve risks and uncertainties, and actual results may differ materially from those projected or implied in the forward looking statements as a result of various factors. . As a result thereof, Telecom Italia S.p.A. makes no representation, whether express or implied, as to the conformity of the actual results with those projected in the forward looking statement. Forward-looking information is based on certain key assumptions which we believe to be reasonable as of the date hereof, but forward looking information by its nature involves risks and uncertainties, which are outside our control, and could significantly affect expected results. Analysts are cautioned not to place undue reliance on those forward looking statements, which speak only as of the date of this presentation. Telecom Italia S.p.A. undertakes no obligation to release publicly the results of any revisions to these forward looking statements which may be made to reflect events and circumstances after the date of this presentation, including, without limitation, changes in Telecom Italia S.p.A. business or acquisition strategy or planned capital expenditures or to reflect the occurrence of unanticipated events. Analysts and investors are encouraged to consult the Company's Annual Report on Form 20-F as well as periodic filings made on Form 6-K, which are on file with the United States Securities and Exchange Commission.
  • 3. 2 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Agenda BU Argentina 2012 Preliminary Results (IFRS) Telecom Argentina Plan Take-aways on main Telecom Argentina Trends
  • 4. 3 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE 2012 Main Preliminary Results 2,8042,324 896 980 0 FY11 FY12 3,784 3,220 4Q 9M 759 825 276 296 FY11 FY12 1,121 1,035 4Q 9M EBITDARevenues Key Highlights CAPEX and NFP CAPEX NFP (cash) 417 563556 557 Reported € mln Reported € mln Reported € mln FY11 FY12 FY11 FY12  Strong revenues and EBITDA growth in line with targets despite of slowing economy  Fixed-Mobile network integration proven key to success  Capex freed due to cancelled spectrum auction, reassigned to additional access network deployment  Strong cash flow generation and solid financial position with no debt instruments in foreign currency FY12 Adjusted* 825 311 1,136 * Net of Exceptional Items +564M€ +17.5% +9.4% +20.7% +86M€ +8.3% +7.2% +8.7% +101M€ +9.8% +12.7% +8.7% organic +18.5% organic +19.6% organic +21.8% organic +11.7%
  • 5. 4 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Mobile Business 2012 HighlightsMobile Customers & Revenue Share KPI’s Service Revenues & VAS(1)(3)  Consistent net port-ins leadership in MNP first year  Postpaid contracts 58% of total net adds and 83% of port-ins  Growing share of smart/3G handsets (>90% of 4Q12 sellouts)  12% YoY ARPU growth despite prices adjustment limited to postpaid in 4Q12 only  Upgrade to 3G handset for improved spectrum usage efficiency and data service  VAS growth affected by frequency spectrum shortage  Consolidation of Personal Black premium brand 101 222 102 299 99 322 41 44 51 2009 2010 2011 MOU SMS ARPU (AR$) (1) Argentinean Operation (2) Estimated data (3) Net of intercompany 58 99 309 2012 +33% +46% +55% +21% +24% +30% 2.3 3.4 5.3 4.5 5.1 5.76.8 8.5 11.0 2009 2010 2011 VAS Revenues (bAR$)Non-VAS Revenues (bAR$) +10% +13% +13% VAS includes: SMS, MMS, SMS revenue sharing, Contents, Mobile internet & others Figures are in Argentina GAAP, with no material difference in terms of growth under IFRS for 2009, 2010 2011 and 2012. 7.0 6.3 13.3 2012 14.5 16.3 18.2 18.9 19.0 29.9% 31.1% 33.5% 34.5% 2009 2010 2011 3Q12 4Q12 Mln. Rev.Sh.(2)
  • 6. 5 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Wireline Business 2012 HighlightsBB Access & ARPU BB Churn BB/Fixed Lines  Deploying FTTC to improve Bandwidth and effectively compete with CATV  Upselling of bandwidth upgrades and video streaming  Increasing ICT orders backlog  Voice and wireline/mobile broadband product bundling  Flat pricing to mitigate impact of regulated tariffs  Broadband ARPU growth 18% YoY in 2012 2012 39% 2011 37% 2009 30% 2010 34% 2009 2010 2011 2012 1.8% 1.4% 1.2% 1.4% 1.21 1.38 1.55 1.63 67 76 87 102 BB Access Lines Mln BB ARPU (AR$) 2009 2010 2011 2012
  • 7. 6 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Telecom Argentina Full Year Results vs. Guidance FY12 Results 22.1 Bln +19.6% vs. FY11 6.6 Bln +9.6% vs. FY11 reported +11.1% vs. FY11 adjusted (*) (*) excluding non-recurring costs 3.3 Bln +2% Vs. FY11 15% of Revenues delays in clearing customs for equipment imports affected target Guidance FY12 2011 2012 Positive double digit yoy trend 2011 2012 Positive double digit yoy trend Capex as % of Revenues 17% 2011 2012 18% Revenues Ebitda Capex Telecom Argentina Group, excluding Nortel/Sofora, excluding PPA, AR$ 3.2 4.0
  • 8. 7 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Agenda BU Argentina 2012 Preliminary Results (IFRS) Telecom Argentina Plan Take-aways on main Telecom Argentina Trends
  • 9. 8 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Mobile ICT Wireline Broadband Wireline Voice Business Environment Competitive & Regulatory FrameworkMacroeconomic Context 2010 2011 9.2% 8.9% GDPGrowth (constantprices) Weak 2012 economic growth impacted business growth  Exports declined due to a severe drought affecting the harvest and to lower Brazilian demand  Increased regulation on the FX market impacted economic growth  Reduction in public sectors (energy, transportation) reduced disposable income Economy expected to recover in 2013 Source: INDEC and Company estimates  1.7/2.1 GHz band auction process expected to start  RAN sharing being considered for LTE  Competition shifting to revenue share  MNP winners; strong postpaid performance  Mobile data leaders  Sustained value generation  FTTC network upgrade  Developing ICT market for governments, private enterprises and SMEs 2012e 1.8% 2013 f #1 >34% #2 >32% Market ShareRevenue Share #2 ~34% #2 ~48% Company Competitive position Revenue and Market Share among Top 3 Players for Mobile and BB Wirelines; among Top 2 Players for Voice Wirelines. Among main Players
  • 10. 9 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Mobile Business: Main Goals and Action Plan ARPU (AR$ per month) Mobile Lines (Million) Action Plan Goals Outlook (1) 18.2 19.0 51 58 2011 2012 2015 2011 2012 2015 Improve Customer Experience Focus on quality of service Multichannel approach and self caring Social networking to get closer to the customer Bundle of products and upselling Cagr ’12 -’15 ~+4% Consolidate Revenue Share Leadership Promote Mobile Internet across the customer base Consolidate Leadership in Youth Segment Outlook (1) Cagr ’12 -’15 ~+12% (1) Argentinean Operations only
  • 11. 10 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Wireline Business: Main Goals and Action Plan ARPU (AR$ per month) Fixed BB Lines (Million) Action Plan Goals 1.55 1.63 87 102 2011 2012 2015 2011 2012 2015 Increase BB penetration of the existing customer base Continue the FTTC deployment Improve core network capacity and quality of service Integrate connectivity with Hosting and Cloud Computing Develop video streaming and content delivery (1) Argentinean Operations only Cagr ’12 -’15 ~4% Consolidate leadership in ICT market Improve service provision Improve network delivery Outlook (1) Cagr ’12 -’15 ~+15% Outlook (1)
  • 12. 11 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE CAPEX Plan Key DriversCapex (AR$, in billion)  Upgrade Mobile Access Network capacity and service delivery  low visual impact radiobase sites  2G to 3G spectrum refarming  6-Sectors cell sites  extend own network reach to reduce roaming  Deploy Content Delivery Network  Full-speed FTTC deployment  Improve Core Network capacity and fault tolerance  Upgrade Data Centre hosting and cloud computing capabilities Capex as % of Revenues 15% 2012 2013 17% 3.3 4.7 2015
  • 13. 12 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Agenda BU Argentina 2012 Preliminary Results (IFRS) Telecom Argentina Plan Take-aways on main Telecom Argentina Trends
  • 14. 13 TELECOM ITALIA CONFERENCE CALL Full-Year 2012 Preliminary Results and 2013-15 Plan Outline FRANCO BERTONE Take-aways on main Telecom Argentina Trends  Improve Customer Experience  Promote Mobile Data  Increase Broadband Wireline Penetration  Improve Quality of Service and Customer Experience to control Operation Costs  Leverage on Mobile Leadership to control Acquisition/Retention Costs  Streamline overhead expenses  Focus on delivered Network Service Quality  Extend Reach and Capacity of Mobile Access  Deploy FTTC 2012 2013 Positive double digit yoy trend 2012 2013 Positive double digit yoy trend 2012 2015 Revenues Ebitda Capex Capex/Revenues growing trend