2. Bus
Route
Delivery
Model
Bus Route delivery model works on FIXED route like a bus service. A new route is
only started when service finds minimum feasible orders to cater in a route.
3. Similar
Concepts
Across
Country
SPAR On Wheels
SPAR launched Mobile Fruits
and Vegetables delivery
service in Bangalore, which is
connected with its Online
platform.
Guwahati District
Government’s official Fruits
and Vegetables vendor for
door delivery.
Local Vendors in
Kolhapur started
delivery and sales of
fruits and vegetables
during lockdown.
4. Pune based Promethean Power’s referred van for F&V delivery.
Refrigeration improves shelf life of the produce and the produce stays better for
longer duration.
Referred
Van
5. Bus
Route
Example
-
Route
1:
Pune
Route 1: Total Distance Covered 50km area to area + 20km within the area = 70km
Areas Covered: Bavdhan, Kothrud, Range Hills (Shivaji Nagar), Aundh, Baner, Balewadi, Wakad
6. Route
1:
Projections
For the overheads in this example, an OPD (orders/day) of 30 is sufficient to maintain the route in
flow. This can be further made profitable by switching to Electric vehicle and further enhancing the
route. An OPD of 30 is not a small number to achieve keeping in mind that a family might order 2ce
a week, but once an OPD of 30 is achieved, every order after that is certain profit, as you have
recovered all your fixed expenses.
P&L at Max OPD of 100 P&L at an OPD of 30
MAX Daily Monthly Units AVERAGE Daily Monthly Units
Driver (1) 500 15,000 INR Driver (1) 500 15,000 INR
Helper (1) 400 12,000 INR Helper (1) 400 12,000 INR
Route Cycle Distance 70 2,100 Km Route Cycle Distance 70 2,100 Km
Fuel Cost (at petrol Rs 100/lit) 700 21,000 INR Fuel Cost (at petrol Rs 100/lit) 700 21,000 INR
Maintenance 167 5,000 INR Maintenance 167 5,000 INR
Running Cost 1,837 55,100 INR Running Cost 1,837 55,100 INR
Vehicle Order Capacity 100 3,000 nos Average Orders 30 900 nos
Average Order Ticket Size 300 300 INR Average Order Ticket Size 300 300 INR
Max Achievable Revenue 30,000 900,000 INR Max Achievable Revenue 9,000 270,000 INR
COGS 28,163 844,900 INR COGS 7,163 214,900 INR
Gross Margins 30.00% 30.00% - Gross Margins 30.00% 30.00% -
Gross Margins in INR 9,000 270,000 INR Gross Margins in INR 2,700 81,000 INR
Net Profit 7,163 214,900 INR Net Profit 863 25,900 INR
7. Delivery
Feasibility
Area
Area Last
Mile (km)
Number of
Orders
Travel Time
(mins)
Delivery
Time for area
orders (4
min/order) Total Time
Bavdhan 12.3 4 18 16 34
Kothrud 4.5 18 12 72 84
Range Hills 9 6 25 24 49
Aundh 6.5 15 14 60 74
Baner 4.4 15 13 60 73
Balewadi 4.9 14 13 56 69
Wakad 6.5 21 12 84 96
SUBTOTAL 48.1 93 107 372 479
in Hrs
2 hrs 47
mins
6 hrs 12
mins
7 hrs 59
mins
Mathematically it does look possible to deliver 93 orders in 8 hrs, but the
calculation is missing actual live parameters:
traffic + customer + weather conditions + human errors